Summary of 5/16/2019 Public Meeting with Nuclear Energy Institute Regarding Probabilistic Risk Assessment Change Control Process
ML19141A130
Person / Time
Issue date: 05/30/2019
From: Geoffrey Miller
Special Projects and Process Branch
To: Michael Orenak
Special Projects and Process Branch
Miller G, 415-2481
References
Download: ML19141A130 (5)


Text

UNITED STATES NUCLEAR REGULATORY COMMISSION WASHINGTON, D.C. 20555-0001 Ma.y 3D, 2J19

+

MEMORANDUM TO: Michael D. Orenak, Acting Chief Special Projects and Process Branch Division of Operating Reactor Licensing Office of Nuclear Reactor Regulation FROM: G. Edward Miller, Project Manager J (_

Special Projects and Process Branch / ~' ' \

Division of Operating Reactor LicensinOv Office of Nuclear Reactor Regulation

SUBJECT:

SUMMARY

OF MAY 16, 2019, PUBLIC MEETING WITH NUCLEAR ENERGY INSTITUTE REGARDING PROBABILISTIC RISK ASSESSMENT CHANGE CONTROL PROCESS On May 16, 2019, the U.S. Nuclear Regulatory Commission (NRC) staff held a public meeting 1 with industry representatives including staff from the Nuclear Energy Institute (NEI). The purpose of the meeting was to discuss the process of acceptance of new methods for use in licensee probabilistic risk assessment (PRA) following approval of an amendment to implement, for example, a risk-informed completion time program. Specifically, the meeting discussed the necessary infrastructure (i.e., licensing and oversight) that needs to be established to develop a process to accept newly developed methods.

During the meeting, the NRC staff presented its assessment of discrete tasks that needed to be accomplished to establish the appropriate infrastructure. 2 The NRC staff slides provided a status, path forward, and challenges for short-term tasks and committed to publish those tasks.

NEI indicated that, in addition to seeking NRC staff acceptance of NEI 17-07, 3 "Performance of PRA Peer Reviews Using the ASME/ANS [American Society of Mechanical Engineers/American Nuclear Society] PRA Standard," they would also be submitting a document seeking NRC acceptance of clarifications and enhancements to some sections of the ASME/ANS PRA (ASME/ANS RA-Sa-009) standard to enable usage of a change control process for the risk-informed completion time program. The NRC staff discussed work on a memorandum that provides a summary of licensing and oversight strategies used in support of four risk-informed initiatives and publish it as a knowledge management tool. Additionally, the NRC staff discussed longer term efforts to adapt the Reactor Oversight Program to inspect key attributes of PRAs including newly developed methods in a performance-based risk-informed manner.

The NRC staff also presented its plan to update Regulatory Guide 1.200, "An Approach for Determining the Technical Adequacy of Probabilistic Risk Assessment Results for Risk-1 The original meeting notice is available in the Agencywide Documents Access and Management System (ADAMS) under Accession No. ML19095A004.

2 The NRC slides are available under ADAMS Accession No. ML19134A244.

3 NEI 17-07 is available under ADAMS Accession No. ML17341A548.

M. Orenak Informed Activities," and emphasized that its execution will significantly depend on the schedule of the planned update to the ASME/ANS PRA standard.

No regulatory decisions were made, and it was agreed that another interaction on this topic should be planned when sufficient progress had been made on the tasks to warrant another meeting. It was also acknowledged that a workshop was being planned in the future to discuss key assumptions and uncertainties in PRA models.

Following the discussion, an opportunity was afforded to any other participants who wished to ask questions or make comments. No comments were received.

Enclosure:

List of Attendees

rf-1(7f'

\ or z Sign In Sheet Public Meeting to Discuss Newly Developed PRA Methods DATE: May 16, 2019 Enclosure

,-~")

r ,4(--r<:" .

2of-Z_

Sign In Sheet Public Meeting to Discuss Newly Developed PRA Methods DATE: May 16, 2019 Name Organization


..JL-___________ ---- -.

Etve.RG\

ML19141A130 *via e-mail OFFICE NRR/DORL/LSPB/PM NRR/DORL/LSPB/LA NRR/DRA/APLA/BC NAME GEMiller JBurkhardt SRosenberg DATE 5/28/19 5/23/19 5/29/19 OFFICE NRR/DORL/LSPB/BC NRR/DORL/LSPB/PM NAME MOrenak GEMiller DATE 5/30/19 5/30/19