Notification of Action Completion Associated with Confirmatory Order EA-17-077 - Item G.1
ML19109A108
Person / Time
Site: Millstone  Dominion icon.png
Issue date: 04/15/2019
From: Stoddard D
Dominion Energy Nuclear Connecticut
To:
Document Control Desk, Office of Nuclear Reactor Regulation, Division of Nuclear Materials Safety I
References
17-465H, EA-17-077
Download: ML19109A108 (2)


Text

Dominion Energy Nuclear Connecticut, Inc.

5000 Dominion Bpulevard, Glen Allen, VA 23060 Dominion DominioriEnergy.com Energy April 15, 2019 U.S. Nuclear Regulatory Commission* Serial No. 17-465H Regional Administrator, Region I NSSL/TFO R2 2100 Renaissance Blvd, Suite 100 Docket Nos. 50-336 King of Prussia, PA 19406-2713 50-423 License Nos. DPR-65 NPF-49 DOMINION ENERGY NUCLEAR CONNECTICUT, INC . .

MILLSTONE POWER STATION UNITS 2 AND 3 NOTIFICATION OF ACTION COMPLETION ASSOCIATED WITH CONFIRMATORY ORDER EA-17-077 - ITEM G.1 .

On November 21, 2017, the Nuclear Regulatory Commission (NRC) issued

Section V of the Confirmatory Order requires that by December 31, 2019, DENC shall discuss this issue, including the results of the evaluations conducted as required by the Order and resulting corrective actions, with the following.industry groups: a) the Nuclear Security Working Group; and b) the 2019 National Nuclear Security Conference.

  • In accordance with Item G.1, the discussion shall include reference to any identified organizational weaknesses that DENC determined contributed to the issue. Item G.1 specifies that within 30 days of completing each discussion, DENC shall inform the NRC, in writing, that the action is complete, and shall make the presentation materials available to the NRG for one year after the presentation for review during an inspection.

On March 19, 2019, DENC completed a presentation of Confirmatory Order EA-17-077 to the Nuclear Security Working Group. The presentation included a discussion of the issue, the results of the evaluations performed, including organizational weaknesses that contributed to the issue, and the resulting corrective actions taken. As specified in Item G.1, the presentation materials will be available to the NRC for one year after the presentation for review during an inspection.

If you have any questions concerning this matter, please contact Michael Whitlock at (804) 273:3123. '

Sincerely, Dan~IG.S~dda~ .

Senior Vice President and Chief Nuclear Officer Commitments* made in this letter: None

Serial No. 17-465H Docket Nos. 50-336/423 Page 2 of 2 cc: U.S. Nuclear Regulatory Commission Document Control Desk Washington, DC 20555-0001 Richard V. Guzman Senior Project Manager U.S. Nuclear Regulatory Commission One White Flint North, Mail Stop 08 C 2 11555 Rockville Pike Rockville, MD 20852-2738 NRC Senior Resident Inspector Millstone Power Station