MONTHYEARIR 05000255/20210062022-03-0202 March 2022 Annual Assessment Letter for Palisades Nuclear Plant, Unit 1, (Report 05000255/2021006) ML21327A2962021-11-23023 November 2021 Information Request for NRC Triennial Evaluations of Changes, Tests, and Experiments (50.59) Baseline Inspection; Inspection Report 05000255/2022010 ML21278A4442021-10-0505 October 2021 Notification of NRC Fire Protection Team Inspection Request for Information Inspection Report 05000255/2021010 ML21274A4172021-10-0505 October 2021 Request for Information for an NRC Triennial Heat Exchanger/Sink Performance Inspection and Request for Information Inspection Report 05000255/2021004 IR 05000255/20210052021-09-0101 September 2021 Updated Inspection Plan for Palisades Nuclear Plant (Report 05000255/2021005) IR 05000255/20200062021-03-0404 March 2021 Annual Assessment Letter for Palisades Nuclear Plant (Report 05000255/2020006) IR 05000255/20200052020-09-0101 September 2020 Updated Inspection Plan for Palisades Nuclear Plant (Report 05000255/2020005) ML20205L6282020-07-23023 July 2020 Notification of NRC Baseline Inspection and Request for Information; Inspection Report 05000255/2020003 ML20133K0562020-05-14014 May 2020 Information Request to Support the NRC Annual Baseline Emergency Action Level and Emergency Plan Changes Inspection ML20127H8712020-05-0606 May 2020 Information Request to Support Upcoming Problem Identification and Resolution Inspection at Palisades Nuclear Plant IR 05000255/20190062020-03-0303 March 2020 Annual Assessment Letter Palisades Nuclear Plant (Report 05000255/2019006) IR 05000255/20190052019-08-28028 August 2019 Updated Inspection Plan for Palisades Nuclear Plant, Unit 1 (Report 05000255/2019005) ML19227A0652019-08-14014 August 2019 Inspection Plan for Palisades Nuclear Plant for Design Bases Assurance Inspection (Programs); Inspection Report 05000255/2019010 (DRS-N.FelizAdorno) IR 05000255/20180062019-03-0404 March 2019 Annual Assessment Letter for Palisades Nuclear Plant (Report 05000255/2018006) ML19056A1132019-02-25025 February 2019 Request for Information Design Bases Assurance Inspection (Program); NRC Inspection Report 05000255/2019010 (DRS-N. Feliz-Adorno) IR 05000255/20180052018-08-28028 August 2018 Updated Inspection Plan for Palisades (Report 05000255/2018005) IR 05000255/20170062018-03-0202 March 2018 Annual Assessment Letter for Palisades Nuclear Plant (Report 05000255/2017006) ML18047A7112018-02-16016 February 2018 Notification of an NRC Biennial Licensed Operator Requalification Program Inspection and Request for Information (DRS-R.Baker) ML17304A4822017-10-31031 October 2017 Information Request to Support Upcoming Problem Identification and Resolution Inspection at Palisades IR 05000255/20170052017-08-28028 August 2017 Updated Inspection Plan (Report 05000255/2017005) IR 05000255/20160062017-03-0101 March 2017 Annual Assessment Letter for Palisades Nuclear Plant (Report 05000255/2016006) IR 05000255/20160052016-08-31031 August 2016 Mid-Cycle Assessment Letter for Palisades Nuclear Plant (Report 05000255/2016005) ML16174A4132016-06-22022 June 2016 Information Request to Support Upcoming Temporary Instruction 191 Inspection at Palisades Nuclear Plant ML16125A5332016-05-0303 May 2016 Ltr. 05/03/16 Palisades Nuclear Plant - Information Request to Support the NRC Annual Baseline Emergency Action Level and Emergency Plan Changes Inspection (Mxg) IR 05000255/20150062016-03-0202 March 2016 Annual Assessment Letter for Palisades Nuclear Plant (Inspection Report 05000255/2015006) ML16057A1212016-02-25025 February 2016 Ltr. 02/25/16 Palisades Nuclear Plant - Information Request for and NRC Triennial Permanent Modifications and 10 CFR 50.59 (MOD/50.59) Baseline Inspection 05000255/2016007 ML16019A4602016-01-19019 January 2016 Information Request to Support Upcoming Problem Identification and Resolution Inspection at the Palisades Nuclear Plant IR 05000255/20150052015-09-0101 September 2015 Mid-Cycle Assessment Letter for Palisades Nuclear Plant (Report 05000255/2015005) ML15240A3442015-08-28028 August 2015 Ltr. 08/28/15 Palisades Nuclear Plant - Notification of an NRC Triennial Heat Sink Performance Inspection and Request for Information Inspection Report 05000255/2015004 (Axd) ML15211A5242015-07-30030 July 2015 Notification of NRC Supplemental Inspection (95001) and Request for Information IR 05000255/20154032015-06-18018 June 2015 Information Request for Temporary Instruction 2201/004 Inspection, Notification to Perform Inspecting of Implementation of Interim Cyber Security Milestones 1-7, 05000255/2015403 ML15124A9272015-05-0101 May 2015 Ltr. 05/01/15 Palisades Nuclear Plant - Notification of NRC Inspection and Request for Information (Msh) IR 05000255/20140012015-03-0404 March 2015 Annual Assessment Letter for Palisades Nuclear Plant (Report 05000255/2014001) ML15013A4812015-01-12012 January 2015 15 Palisades Fire Protection Request for Information ML14245A2982014-09-0202 September 2014 Mid-Cycle Assessment Letter for Palisades Nuclear Plant ML14063A2762014-03-0404 March 2014 Annual Assessment Letter for Palisades Nuclear Plant (Report 05000255/3013001) IR 05000255/20301302014-03-0404 March 2014 Annual Assessment Letter for Palisades Nuclear Plant (Report 05000255/3013001) ML13337A6552013-12-0303 December 2013 Ltr 12/3/13 Palisades Fire Protection Request for Information ML13246A2482013-09-0303 September 2013 2013 Palisades Nuclear Plant 2013 Mid-Cycle Letter Combined IR 05000255/20120012013-03-0404 March 2013 Annual Assessment Letter for Palisades Nuclear Plant (IR 05000255-12-001) ML12248A3182012-09-0404 September 2012 Mid-Cycle Assessment Letter for Palisades Nuclear Plant IR 05000255/20110072012-03-0505 March 2012 Annual Assessment Letter for Palisades Nuclear Plant (Report 05000255/2011007) IR 05000255/20110062011-09-0101 September 2011 Mid-Cycle Letter for Palisades Nuclear Plant, 05000255-11-006 ML1106206252011-03-0404 March 2011 EOC Annual Assessment Letter and Inspection/Security Plan ML1024402002010-09-0101 September 2010 Mid-Cycle Performance Review and Inspection Plan - Palisades Nuclear Power Plant ML1006102742010-03-0303 March 2010 EOC Annual Assessment Letter, Inspection/Activity Plan ML0924403762009-09-0101 September 2009 Palisades - Mid-Cycle Performance Review and Inspection Plan IR 05000255/20090012009-03-0404 March 2009 Annual Assessment Letter - Palisades Nuclear Plant (5000255/2009001) ML0824602962008-09-0202 September 2008 Mid-Cycle Performance Review and Inspection Plan IR 05000255/20080012008-03-0303 March 2008 Palisades, EOC Annual Assessment Letter (Report 05000255/2008001) 2022-03-02
[Table view] Category:Letter
MONTHYEARML24022A1172024-01-23023 January 2024 Acceptance of Requested Licensing Action Amendment Request to Revise Renewed Facility Operating License and Permanently Defueled Technical Specifications to Support Resumption of Power Operations ML24012A2422024-01-16016 January 2024 Acceptance of Requested Licensing Action License Transfer Request ML23236A0042023-12-27027 December 2023 Issuance of Amendment 274 Re Changes to Perm Defueled Emergency Plan and Perm Defueled Emergency Action Level Scheme ML23355A1242023-12-26026 December 2023 Withdrawal of an Amendment Request Re License Amendment Request to Revise License Condition to Eliminate Cyber Security Plan Requirements ML23192A0772023-12-26026 December 2023 Letter Exemption from the Requirements of 10 CFR 140.11(a)(4) Concerning Offsite Primary and Secondary Liability Insurance ML23191A5222023-12-22022 December 2023 Exemption Letter from the Requirements of 10 CFR 50.54(W)(1) Concerning Onsite Property Damage Insurance (EPID - L-2022-LLE-0032) ML23263A9772023-12-22022 December 2023 Exemption from Certain Emergency Planning Requirements and Related Safety Evaluation ML23354A2602023-12-21021 December 2023 Reference Simulator Inspection Request for Information L-23-019, Proof of Financial Protection 10 CFR 140.152023-12-18018 December 2023 Proof of Financial Protection 10 CFR 140.15 PNP 2023-030, License Amendment Request to Revise Renewed Facility Operating License and Permanently Defueled Technical Specifications to Support Resumption of Power Operations2023-12-14014 December 2023 License Amendment Request to Revise Renewed Facility Operating License and Permanently Defueled Technical Specifications to Support Resumption of Power Operations PNP 2023-035, Withdrawal of License Amendment Request - Revise License Condition to Eliminate Cyber Security Plan Requirements2023-12-12012 December 2023 Withdrawal of License Amendment Request - Revise License Condition to Eliminate Cyber Security Plan Requirements PNP 2023-028, Application for Order Consenting to Transfer of Control of License and Approving Conforming License Amendments2023-12-0606 December 2023 Application for Order Consenting to Transfer of Control of License and Approving Conforming License Amendments L-23-012, Master Decommissioning Trust Agreement Changes for Indian Point Nuclear Generating Units 1, 2 and 3, Pilgrim Nuclear Power Station, Palisades Nuclear Plant and the Non-Qualified Trust for Big Rock Point2023-11-13013 November 2023 Master Decommissioning Trust Agreement Changes for Indian Point Nuclear Generating Units 1, 2 and 3, Pilgrim Nuclear Power Station, Palisades Nuclear Plant and the Non-Qualified Trust for Big Rock Point ML23291A4402023-11-0303 November 2023 Acceptance of Requested Licensing Action Request for Exemption from 10 CFR 50.82(a)(2) to Support Reauthorization of Power Operations IR 05000255/20230032023-10-0404 October 2023 NRC Inspection Report No. 05000255/2023003(DRSS)-Holtec Decommissioning International, LLC, Palisades Nuclear Plant ML23275A0012023-10-0202 October 2023 Request for Withholding Information from Public Disclosure for Palisades Nuclear Plant PNP 2023-025, Request for Exemption from Certain Termination of License Requirements of 10 CFR 50.822023-09-28028 September 2023 Request for Exemption from Certain Termination of License Requirements of 10 CFR 50.82 PNP 2023-026, Pre-Submittal Meeting Presentation - Palisades Nuclear Plant License Transfer Application to Support Resumption of Power Operations2023-09-28028 September 2023 Pre-Submittal Meeting Presentation - Palisades Nuclear Plant License Transfer Application to Support Resumption of Power Operations PNP 2023-023, Special Report High Range Noble Gas Monitor Inoperable2023-08-0909 August 2023 Special Report High Range Noble Gas Monitor Inoperable ML23215A2302023-08-0303 August 2023 Notice of Organization Change - Chief Nuclear Officer IR 05000255/20230022023-07-19019 July 2023 NRC Inspection Report 05000255/2023002 DRSS-Holtec Decommissioning International, LLC, Palisades Nuclear Plant ML23087A0362023-05-0202 May 2023 PSDAR Review Letter ML23117A2172023-05-0101 May 2023 Safety Evaluation for Quality Assurance Program Manual Reduction in Commitment PNP 2023-018, 2022 Annual Non-Radiological Environmental Operating Report2023-04-25025 April 2023 2022 Annual Non-Radiological Environmental Operating Report L-23-004, HDI Annual Occupational Radiation Exposure Data Reports - 20222023-04-24024 April 2023 HDI Annual Occupational Radiation Exposure Data Reports - 2022 PNP 2023-007, and Big Rock Point, 2022 Annual Radioactive Effluent Release and Waste Disposal Reports2023-04-19019 April 2023 and Big Rock Point, 2022 Annual Radioactive Effluent Release and Waste Disposal Reports PNP 2023-008, 2022 Radiological Environmental Operating Report2023-04-18018 April 2023 2022 Radiological Environmental Operating Report L-23-003, Report on Status of Decommissioning Funding for Reactors and Independent Spent Fuel Storage Installations2023-03-31031 March 2023 Report on Status of Decommissioning Funding for Reactors and Independent Spent Fuel Storage Installations PNP 2023-002, 6 to Updated Final Safety Analysis Report2023-03-31031 March 2023 6 to Updated Final Safety Analysis Report ML23088A0382023-03-29029 March 2023 Stations 1, 2, & 3, Palisades Nuclear Plant, and Big Rock Point - Nuclear Onsite Property Damage Insurance PNP 2023-006, Report of Changes to Security Plan, Revision 202023-03-29029 March 2023 Report of Changes to Security Plan, Revision 20 PNP 2023-012, Presentation on Regulatory Path to Reauthorize Power Operations2023-03-16016 March 2023 Presentation on Regulatory Path to Reauthorize Power Operations ML23038A0982023-03-15015 March 2023 Request for Withholding Information from Public Disclosure ML23095A0642023-03-14014 March 2023 American Nuclear Insurers, Notice of Cancellation Rescinded PNP 2023-001, Regulatory Path to Reauthorize Power Operations2023-03-13013 March 2023 Regulatory Path to Reauthorize Power Operations PNP 2023-004, Report of Changes to Palisades Nuclear Plant Technical Specification Bases2023-03-0808 March 2023 Report of Changes to Palisades Nuclear Plant Technical Specification Bases PNP 2023-005, Response to Palisades Nuclear Plant - Request for Additional Information Related to the Post-Shutdown Decommissioning Activities Report2023-03-0101 March 2023 Response to Palisades Nuclear Plant - Request for Additional Information Related to the Post-Shutdown Decommissioning Activities Report ML22361A1022023-02-24024 February 2023 Reactor Decommissioning Branch Project Management Changes for Some Decommissioning Facilities and Establishment of Backup Project Manager for All Decommissioning Facilities ML23052A1092023-02-17017 February 2023 FEMA Letter to NRC, Proposed Commission Paper Language for Palisades Nuclear Plant Emergency Plan Decommissioning Exemption Request ML23032A3992023-02-0101 February 2023 Regulatory Path to Reauthorize Power Operations IR 05000255/20220032022-12-28028 December 2022 NRC Inspection Report No. 05000255/2022003(DRSS); 07200007/2022001 (Drss) Holtec Decommissioning International, LLC, Palisades Nuclear Plant L-22-042, Oyster, Pilgrim, Indian Point, Palisades and Big Rock Point - Proof of Financial Protection 10 CFR 140.152022-12-14014 December 2022 Oyster, Pilgrim, Indian Point, Palisades and Big Rock Point - Proof of Financial Protection 10 CFR 140.15 PNP 2022-037, Report of Changes to Security Plan, Revision 192022-12-14014 December 2022 Report of Changes to Security Plan, Revision 19 ML22321A2852022-11-17017 November 2022 LLC Master Decommissioning Trust Agreement for Palisades Nuclear Plant IR 05000255/20224012022-11-0909 November 2022 Decommissioning Palisades Nuclear Plant - Decommissioning Security Inspection Report 05000255/2022401 PNP 2022-036, Response to Request for Additional Information Regarding License Amendment Request for Proposed Permanently Defueled Emergency Plan and Permanently Defueled Emergency Action Level Scheme2022-11-0808 November 2022 Response to Request for Additional Information Regarding License Amendment Request for Proposed Permanently Defueled Emergency Plan and Permanently Defueled Emergency Action Level Scheme PNP 2022-035, International - Notification of Commitment Cancellations for Remaining Activities Related to Beyond-Design-Basis Seismic Hazard Reevaluations2022-11-0202 November 2022 International - Notification of Commitment Cancellations for Remaining Activities Related to Beyond-Design-Basis Seismic Hazard Reevaluations PNP 2022-024, Request for Exemption from 10 CFR 140.11(a)(4) Concerning Primary and Secondary Liability Insurance2022-10-26026 October 2022 Request for Exemption from 10 CFR 140.11(a)(4) Concerning Primary and Secondary Liability Insurance PNP 2022-026, Request for Exemption from 10 CFR 50.54(w)(1) Concerning Onsite Property Damage Insurance2022-10-26026 October 2022 Request for Exemption from 10 CFR 50.54(w)(1) Concerning Onsite Property Damage Insurance ML22292A2572022-10-25025 October 2022 Permanently Defueled Emergency Plan License Amendment RAI Letter 2024-01-23
[Table view] |
See also: IR 05000255/2019010
Text
February 25, 2019
Mr. Charles Arnone
Vice President, Operations
Entergy Nuclear Operations, Inc.
Palisades Nuclear Plant
27780 Blue Star Memorial Highway
Covert, MI 49043-9530
SUBJECT: PALISADES NUCLEAR PLANTREQUEST FOR INFORMATION DESIGN
BASES ASSURANCE INSPECTION (PROGRAM); NRC INSPECTION
REPORT 05000255/2019010
Dear Mr. Arnone:
On July 15, 2019, the U.S. Nuclear Regulatory Commission (NRC) will begin a Triennial
Baseline Design Bases Assurance Inspection (Program) at Palisades Nuclear Plant.
This inspection will be performed in accordance with NRC Baseline Inspection
Procedure 71111.21N, Attachment 1.
The Design Bases Assurance Inspection will focus on the implementation of the Electrical
Equipment Environmental Qualification (EQ) Program to verify you are maintaining the qualified
status of equipment during the life of the plant. The final selection of EQ components to be
reviewed during this baseline inspection will be identified during the inoffice preparation week
that occurs prior to the first onsite inspection week.
The inspection will include 2 weeks onsite. The inspection team will consist of three NRC
inspectors. The current inspection schedule is as follows:
- Team preparation week: July 8, 2019, through July12, 2019;
- Onsite inspection weeks: July 15, 2019, though July 19, 2019; and
July 29, 2019, through August 2, 2019.
Experience with previous baseline design inspections of similar depth and length has shown this
type of inspection is extremely resource intensive, both for the NRC inspectors and the licensee
staff. In order to minimize the inspection impact on the site and to ensure a productive
inspection for both parties, we have enclosed a request for information needed for the
inspection.
C. Arnone -2-
It is important that all of these documents are up-to-date and complete in order to minimize the
number of additional documents requested during the preparation and/or the onsite portions of
the inspection. Insofar as possible, this information should be provided electronically to the
lead inspector. The information request has been divided into four groups:
- The first group lists information necessary for our initial inspection scoping activities.
This information should be provided to the lead inspector no later than April 12, 2019.
The lead inspector will communicate the initial selected EQ components no later than
May 17, 2019.
- The second group of documents requested is those items needed to support our
in-office preparation activities. This set of documents should be provided to the lead
inspector at the Regional Office no later than June 5, 2019. During the in-office
preparation activities, the team may identify additional information needed to support
the inspection.
- The third group includes the additional information above. This information should be
available to the team onsite on July 15, 2019.
- The last group includes supporting information to be provided throughout the inspection.
Specifically, corrective action documents and questions developed during the inspection
are requested to be provided as the documents are generated.
In addition, the enclosure includes information and requests addressing inspection logistics.
The lead inspector for this inspection is Néstor J. Féliz-Adorno. We understand that our
licensing contact for this inspection is Barb Dotson of your organization. If there are any
questions about the inspection or the material requested in the enclosure, please contact
the lead inspector at 630-829-9739 or via e-mail at Nestor.Feliz-Adorno@nrc.gov.
This letter does not contain new or amended information collection requirements subject
to the Paperwork Reduction Act of 1995 (44 U.S.C. 3501 et seq.). Existing information
collection requirements were approved by the Office of Management and Budget, Control
Number 3150-0011. The NRC may not conduct or sponsor, and a person is not required
to respond to, a request for information or an information collection requirement unless the
requesting document displays a currently valid Office of Management and Budget Control
Number.
C. Arnone -3-
This letter, its enclosure, and your response (if any) will be made available for public inspection
and copying at http://www.nrc.gov/reading-rm/adams.html and at the NRC Public Document
Room in accordance with Title 10 of the Code of Federal Regulations, Part 2.390, Public
Inspections, Exemptions, Requests for Withholding.
Sincerely,
/RA/
Néstor J. Féliz-Adorno, Senior Reactor Engineer
Engineering Branch 2
Division of Reactor Safety
Docket Nos. 50-255;72-007
License No. DPR-20
Enclosure:
Document Request for Design Bases
Assurance Inspection EQ Program
cc: Distribution via LISTSERV
C. Arnone -4-
Letter to Charles Arnone from Néstor J. Féliz-Adorno dated February 25, 2019.
SUBJECT: PALISADES NUCLEAR PLANTREQUEST FOR INFORMATION DESIGN
BASES ASSURANCE INSPECTION (PROGRAM); NRC INSPECTION
REPORT 05000255/2019010
DISTRIBUTION:
Michael McCoppin
RidsNrrPMPalisades Resource
RidsNrrDorlLpl3
RidsNrrDirsIrib Resource
Darrell Roberts
John Giessner
Jamnes Cameron
Allan Barker
DRPIII
DRSIII
ADAMS Accession Number: ML19056A113
OFFICE RIII
NAME NFéliz-Adorno:jw
DATE 02/25/19
OFFICIAL RECORD COPY
DOCUMENT REQUEST FOR DESIGN BASES ASSURANCE INSPECTION EQ PROGRAM
I. ADMINISTRATIVE INSPECTION INFORMATION
Inspection Report Number: 05000255/2019010
July 15, 2019, through July 19, 2019; and
Onsite Inspection Dates:
July 29, 2019, through August 2, 2019.
71111.21N, Design Bases Assurance Inspection (Program),
Attachment 1, Environmental Qualification under Title 10 of
Inspection Procedure:
the Code of Federal Regulations, Part 50.49, Programs,
Processes, and Procedures
Néstor J. Féliz-Adorno
Lead Inspector: 630-829-9739
Nestor.Feliz-Adorno@nrc.gov
John Bozga, Senior Reactor Engineer, RIII/DRS
Teammate Inspectors:
Michael Greenleaf, Reactor Engineer, RII/DRS
II. LOGISTICS
Email the following inspection logistics to the lead inspector by June 5, 2019, or sooner:
1. Inspection room name/number, directions from the main access facility, and
phone number;
2. Interview room name/number;
3. Response team contact information (names and phone numbers) and team roles
(e.g., management sponsor, lead, inspector counterpart);
4. Any site access/badging actions needed for each inspector;
5. Any dosimetry actions needed for each inspector;
6. Entrance meeting time (preferably after 11:00 a.m. Eastern Time) and location;
7. Confirmation that the team will have access to a licensee computer with a nearby
printer;
8. Confirmation that the team will have Wi-Fi access;
9. Cafeteria location and hours;
10. Engineering staff normal working hours; and
11. Any potential resource conflicts during the inspection (e.g., emergency drills and
all-staff meetings).
Enclosure
DOCUMENT REQUEST FOR DESIGN BASES ASSURANCE INSPECTION EQ PROGRAM
III. INFORMATION REQUEST
Contact the lead inspector as soon as possible if you have any questions regarding this
information request. Provide the information electronically in pdf files, Excel, or other
searchable formats, preferably on some portable electronic media (e.g., CD-ROM,
DVD). The files should contain descriptive names, and be indexed and hyperlinked to
facilitate ease of use. Information in lists should contain enough information to be
easily understood by someone who has knowledge of light water reactor technology.
1. Information Requested for Initial Inspection Scoping Activities
The following information is requested by April 12, 2019, or sooner, to facilitate
the initial sample selection.
1.1. Risk-ranking of top 250 components required to meet environmental
qualifications (EQ) from your site specific probabilistic safety analysis
sorted by Risk-Achievement Worth. Include values for Birnbaum
Importance, Risk-Reduction Worth, and Fussell-Veseley (as applicable).
Provide any basic event mapping used to develop the ranking of
components.
1.2. Probabilistic Safety Analysis listing of top ten risk significant systems.
1.3. U.S. Nuclear Regulatory Commission Safety Evaluation Reports
associated with EQ.
1.4. Updated Final Safety Analysis Report, Technical Specifications,
Technical Specifications Bases, and Technical Requirements Manual.
If any of these documents is not available electronically, contact the lead
inspector. Specifically identify which Updated Final Safety Analysis
Report sections address EQ (including seismic).
1.5. Identify the various EQ standards (including year, edition, or revision) that
the station is committed to.
1.6. Site (and corporate if applicable) procedures associated with the Title 10
of the Code of Federal Regulations, Part 50.49, EQ Program for electrical
components. Include procedures for procurement of qualified equipment,
maintenance of qualified equipment, modification to qualified equipment
(including Equivalency or Commercial Grade Dedication (CGD)
Programs), and material storage and shelf life controls.
1.7. Environmental Qualifications Design Basis Document, if applicable.
1.8. Any open licensing commitments related to EQ, if applicable.
1.9. Equipment Qualification Master List (EQML). Specific issues
to be identified include: safety classification (safety-related or
non safety-related), Regulatory Guide 1.97 instrumentation,
EQ qualification (e.g., DOR, NUREG-588, 50.49), original or replaced
after implementation of 50.49, plant location, and qualified life.
2
DOCUMENT REQUEST FOR DESIGN BASES ASSURANCE INSPECTION EQ PROGRAM
1.10. List of any installed equipment removed from the EQML and basis for
removal.
1.11. List of EQ solenoid valves that are normally continuously energized.
1.12. If EQ files were reviewed for Aging Management effects of license
renewal, identify which EQ files were modified/changed to incorporate
appropriate actions for the period of extended operation. Include any
EQ Aging Management Program documents.
1.13. List or drawings of plant areas that are subjected to EQ, identifying design
(limiting) temperature, high energy line break, radiation levels, etc. that
the associated equipment will have to be qualified to meet EQ. If the
reactor unit has obtained a power uprate (greater than 5 percent) provide
same information pre-update (earliest available if multiple uprates).
1.14. List of CGD evaluations performed, for which the dedicated parts have
been issued for installation (parts issued for the last 10 years) on EQ
applications in the plant. Include CGD evaluation number, name of part,
component ID or description of the component the part was issued to
repair, work order, and date issued or installed.
1.15. List of Corrective Action Documents related to the EQ Program or EQ of
specific components for the last 5 years.
1.16. Any self-assessment and/or audit of the EQ Program in the last 3 years.
1.17. Current management and engineering organizational chart.
1.18. Licensing point of contact information (name, phone number, and email).
2. Information Requested to Support Inspection Preparation Activities
The following information is requested by June 5, 2019, or sooner, to facilitate
the final inspection preparation. This information request is associated with the
selected components and should be separated by component (e.g., folder with
component name that includes EQ files, Qualification Test Reports, calculations,
corrective action documents, and maintenance history).
2.1. Component/subcomponent EQ summary report.
2.2. Qualification Maintenance Requirement Sheet or equivalent.
2.3. List of corrective action documents associated with each selected
component for the last 5 years.
2.4. Photos of any component in containment or high radiation areas,
if available.
2.5. EQ file, including associated Qualification Test Reports.
3
DOCUMENT REQUEST FOR DESIGN BASES ASSURANCE INSPECTION EQ PROGRAM
2.6. Vendor manual. If an electronic copy is not available, include a statement
explaining this and provide a hard copy during the onsite phase of the
inspection.
2.7. Preventive maintenance template.
2.8. Last two performed work order (WO) for each associated EQ preventive
maintenance.
2.9. List of corrective maintenance WOs for the last 10 years. Include WO
number, date performed, and brief one line description.
2.10. If repair work (e.g., a motor rewind) was performed under a purchase
order, provide the purchase order.
2.11. Thermal life calculation.
3. Additional Information to Be Provided Onsite
During the in-office preparation activities, the team may identify additional
information needed to support the inspection. The lead inspector will provide
a list of the additional information needed during the week of July 8, 2019.
4. Information Requested to Be Provided Throughout the Inspection
4.1. Any corrective action documents generated as a result of the teams
questions during this inspection as the documents are generated.
4.2. List of questions and/or document requests submitted by the team and
their status (e.g., open, closed) sorted by inspector. Provide daily by
2:30 p.m. to each inspector. It is recommended to provide the team
leader with a master list sorted by inspector and each inspector with
a list containing only the items originated by that inspector.
4