Letter Sequence Withholding Request Acceptance |
---|
EPID:L-2018-LLA-0112, License Amendment Request for Use of the Tranflow Code for Determining the Pressure Drops Across the Steam Generator Secondary Side Internal Components (Approved, Closed) |
|
MONTHYEARW3F1-2018-0014, License Amendment Request for Use of the Tranflow Code for Determining the Pressure Drops Across the Steam Generator Secondary Side Internal Components2018-04-12012 April 2018 License Amendment Request for Use of the Tranflow Code for Determining the Pressure Drops Across the Steam Generator Secondary Side Internal Components Project stage: Request ML18145A2652018-06-0101 June 2018 Supplemental Information Needed for Acceptance of Request for Licensing Action Use of Tranflow Code for Determining Pressure Drops Across Steam Generator Secondary Side Components Project stage: Acceptance Review W3F1-2018-0031, Supplemental Information Supporting the License Amendment Request Regarding Use of the Tranflow Code for Determining the Pressure Drops Across the Steam Generator Secondary Side Internal Components2018-06-13013 June 2018 Supplemental Information Supporting the License Amendment Request Regarding Use of the Tranflow Code for Determining the Pressure Drops Across the Steam Generator Secondary Side Internal Components Project stage: Supplement ML18178A2932018-06-28028 June 2018 Acceptance of Requested Licensing Action Use of Tranflow Code for Determining Pressure Drops Across Steam Generator Secondary Side Internal Components Project stage: Acceptance Review ML18212A1672018-08-15015 August 2018 Request for Withholding Information from Public Disclosure - 2/26/18, Affidavit Executed by James Gresham, Westinghouse Related to Tranflow License Amendment Request Project stage: Withholding Request Acceptance ML18212A1602018-08-15015 August 2018 Request for Withholding Information from Public Disclosure - 6/13/18 Affidavit Executed by Paul A. Russ, Westinghouse Related to Tranflow License Amendment Request Project stage: Withholding Request Acceptance ML18299A0862018-11-0707 November 2018 Draft Request for Additional Information License Amendment Request Regarding the Revision of UFSAR Section 3.9 Project stage: Draft RAI ML18323A4212018-11-26026 November 2018 Summary of Teleconference with Entergy Operations, Inc. License Amendment Request for Use of Tranflow Code for Determining Pressure Drops Across the Steam Generator Secondary Side Internal Components Project stage: Meeting ML18320A0902018-11-26026 November 2018 Request for Additional Information Regarding License Amendment Request for Use of the Transflow Code for Determining Pressure Drops Across the Steam Generator Secondary Side Internal Components Project stage: RAI W3F1-2019-0002, (Waterford 3) - Response to U. S. Nuclear Regulatory Commission Request for Additional Information Regarding License Amendment Request Regarding Use of the Tranflow Code for Determining the Pressure Drops Across2019-01-19019 January 2019 (Waterford 3) - Response to U. S. Nuclear Regulatory Commission Request for Additional Information Regarding License Amendment Request Regarding Use of the Tranflow Code for Determining the Pressure Drops Across Project stage: Request ML19046A1552019-02-19019 February 2019 Request for Withholding Information from Public Disclosure, 1/8/19 Affidavit Executed by Korey L. Hosack, Westinghouse Electric Company Related to Tranflow License Amendment Request Project stage: Withholding Request Acceptance ML19151A6102019-06-0404 June 2019 Non-Proprietary Second Round RAI Regarding License Amendment Request for Use of the Tranflow Code for Determining Pressure Drops Across the Steam Generator Secondary Side Internal Components Project stage: RAI W3F1-2019-0040, Response to U. S. Nuclear Regulatory Commission Second Round Request for Additional Information Regarding License Amendment Request for Use of the Tranflow Code for Determining Pressure Drops Across the Steam Generator Secondary Side2019-07-11011 July 2019 Response to U. S. Nuclear Regulatory Commission Second Round Request for Additional Information Regarding License Amendment Request for Use of the Tranflow Code for Determining Pressure Drops Across the Steam Generator Secondary Side Intern Project stage: Request ML19234A0172019-09-0909 September 2019 Request for Withholding Information from Public Disclosure, 7/3/19 Affidavit Executed by Camille T. Zozula, Westinghouse Electric Company, LLC, Tranflow License Amendment Request Project stage: Withholding Request Acceptance ML19275D4382019-10-24024 October 2019 Redacted - Issuance of Amendment No. 256 for Use of the Tranflow Code for Determining Pressure Drops Across the Steam Generator Secondary Side Internal Components Project stage: Approval 2018-08-15
[Table View] |
|
---|
Category:Letter
MONTHYEARIR 05000382/20230102024-01-31031 January 2024 Comprehensive Engineering Team Inspection Report 05000382/2023010 IR 05000382/20230032024-01-23023 January 2024 Acknowledgment of Reply to a Notice of Violation NRC Inspection Report 05000382/2023003 ML24012A1962024-01-12012 January 2024 Response to 2nd Round Request for Additional Information Concerning Relief Request Number EN-RR-22-001 Proposed Alternative to Use ASME Code Case N-752, Risk-Informed Categorization and ML23340A2292023-12-28028 December 2023 Withdrawal of an Amendment Request to Revise Technical Specification 3/4.3.2 to Remove Exemption from Testing Certain Relays at Power to Support Elimination of Potential Single Point Vulnerability (EPID L-2022-LLA-0169)-LTR ML23349A1672023-12-21021 December 2023 Request for Withholding Information from Public Disclosure ML23348A3572023-12-14014 December 2023 Application to Revise Technical Specifications to Use Online Monitoring Methodology Slides and Affidavit for Pre-Submittal Meeting ML23352A0292023-12-13013 December 2023 Entergy - 2024 Nuclear Energy Liability Evidence of Financial Protection ML23340A1592023-12-13013 December 2023 Entergy Operations, Inc. - Entergy Fleet Project Manager Assignment ML23333A1362023-11-29029 November 2023 Supplement to Request for Exemption from Enhanced Weapons, Firearms Background Checks, and Security Event Notifications Implementation ML23325A1442023-11-21021 November 2023 Request for Exemption from Enhanced Weapons, Firearms Background Checks, and Security Event Notifications Implementation ML23312A1832023-11-14014 November 2023 Integrated Inspection Report 05000382/2023003 and Notice of Violation ML23311A2082023-11-0909 November 2023 Reassignment of U.S. Nuclear Regulatory Commission Branch Chief in the Division of Operating Reactor Licensing for Plant Licensing Branch IV IR 05000382/20234012023-10-0404 October 2023 Cyber Security Inspection Report 05000382/2023401 (Cover Letter Only) IR 05000382/20230052023-08-21021 August 2023 Updated Inspection Plan for Waterford Steam Electric Station, Unit 3 - (Report 05000382/2023005) IR 05000382/20233012023-08-15015 August 2023 NRC Initial Operator Licensing Examination Approval 05000382/2023301 IR 05000382/20230022023-08-0808 August 2023 Integrated Inspection Report 05000382/2023002 IR 05000382/20234022023-08-0707 August 2023 NRC Security Inspection Report 05000382/2023402 (Full Report) IR 05000382/20230402023-07-12012 July 2023 Revised 95001 Supplemental Inspection Report 05000382/2023040, Exercise of Enforcement Discretion, and Follow-Up Assessment Letter ML23191A4562023-07-10010 July 2023 Notification of Comprehensive Engineering Team Inspection (050003822023010) and Request for Information ML23158A1042023-06-0808 June 2023 Information Request for the Cybersecurity Baseline Inspection, Notification to Perform Inspection 05000382/2023401 ML23145A2272023-06-0202 June 2023 95001 Supplemental Inspection Report 05000382/2023040, and Exercise of Enforcement Discretion ML23130A2732023-05-10010 May 2023 and Waterford 3 Steam Electric Station - Response to Regulatory Issue Summary 2023-01, Preparation and Scheduling of Operator Licensing Examinations ML23117A2172023-05-0101 May 2023 Safety Evaluation for Quality Assurance Program Manual Reduction in Commitment IR 05000382/20230012023-04-24024 April 2023 Integrated Inspection Report 05000382/2023001, Independent Spent Fuel Storage Installation Report 07200075/2023001, and Exercise of Enforcement Discretion ML23111A2132023-04-21021 April 2023 Responses to RAI Concerning Relief Request Number EN-RR-22-001 Proposed Alternative to Use ASME Code Case N-752, Risk-Informed Categorization and Treatment for Repair/ Replacement Activities ML23110A1122023-04-20020 April 2023 Annual Report for Entergy Quality Assurance Program Manual Changes Under 10 CFR 50.54(a)(3), 10 CFR 71.106, and 10 CFR 72.140(d). Notification of Application of Approved Appendix B to 10 CFR 72 Subpart G ML23108A2542023-04-18018 April 2023 WCGS Information Request, Security IR 2023401 IR 05000382/20234032023-04-17017 April 2023 Security Baseline Inspection Report 05000382/2023403 ML23093A2122023-04-0303 April 2023 Annual Report on Westinghouse Electric Company LLC Combustion Engineering Emergency Core Cooling System Performance Evaluation Models for Calendar Year 2022 ML23089A0602023-03-30030 March 2023 Entergy Operations, Inc. - Fleet Project Manager Assignment ML23088A3922023-03-29029 March 2023 Nuclear Onsite Property Damage Insurance (10 CFR 50.54(w)(3)) ML23080A2882023-03-21021 March 2023 Decommissioning Funding Status Report Per 10 CFR 50.75(f)(1) Entergy Operations, Inc ML23059A2592023-03-0707 March 2023 Correction to Issuance to Amendment No. 270 Adoption of TSTF-505, Revision 2, Provide Risk-Informed Extended Completion Times - RITSTF Initiative 4b ML23065A2002023-03-0303 March 2023 EN 56252 Update - Flow Serve - Final Notification of Potential Part 21 on Peerless 56 Frame DC Motors ML23060A1092023-03-0101 March 2023 Proof of Financial Protection (10 CFR 140.15) IR 05000382/20220062023-03-0101 March 2023 Annual Assessment Letter for Waterford Steam Electric Station, Unit 3, (Report 05000382/2022006) ML22322A1092023-02-17017 February 2023 Issuance of Amendment No. 270 Adoption of TSTF-505, Revision 2, Provide Risk-Informed Extended Completion Times - RITSTF Initiative 4b IR 05000382/20230902023-02-0101 February 2023 Final Significance Determination of a White Finding, NOV, and Follow-Up Assessment Letter; NRC Inspection Report 05000382/2023090 ML23032A5062023-02-0101 February 2023 Technical Specification Index and Bases Update to the NRC for the Period November 11, 2021 Through July 25, 2022 ML23030A6642023-01-27027 January 2023 Flowserve, Part 21 Second Interim Notification Report Re Peerless 56 Frame DC Motors IR 05000382/20220042023-01-26026 January 2023 Integrated Inspection Report 05000382/2022004 and Independent Fuel Storage Installation Inspection Report 07200075/2022001 ML23024A0822023-01-20020 January 2023 Stephens Insurance, Entergy - 2023 Nuclear Energy Liability Evidence of Financial Protection ML23018A2202023-01-18018 January 2023 Quality Assurance Program Manual Reduction in Commitment IR 05000382/20220912023-01-12012 January 2023 Emergency Preparedness Inspection Report 05000382/2022091 and Preliminary White Finding and Apparent Violation IR 05000382/20220032023-01-0505 January 2023 Revised Integrated Inspection Report 05000382/2022003 ML22342B1402022-12-0202 December 2022 56252-EN 56252 - Flowserve - Limitorque - Interim Report Potential Part 21 on Peerless 56 Frame DC Motors ML22300A2082022-11-30030 November 2022 Issuance of Amendment No. 269 Adoption of 10 CFR 50.69, Risk-Informed Categorization and Treatment of Structures, Systems and Components for Nuclear Power Reactors ML22332A5292022-11-29029 November 2022 Notification of NRC Initial Operator Licensing Examination 05000382/2023301 IR 05000382/20220132022-11-28028 November 2022 Design Basis Assurance Inspection (Programs) Inspection Report 05000382/2022013 IR 05000382/20220022022-11-0101 November 2022 Revised Integrated Inspection Report 05000382/2022002 2024-01-31
[Table view] Category:Proprietary Information Review
MONTHYEARML23349A1672023-12-21021 December 2023 Request for Withholding Information from Public Disclosure ML21195A0392021-09-0202 September 2021 Request for Withholding Proprietary Information from Public Disclosure for X-Energy, LLC Regulatory Engagement Plan Update for the XE-100 Reactor ML21090A0022021-04-12012 April 2021 Request for Withholding Information from Public Disclosure ML21095A1932021-04-0707 April 2021 Request for Withholding Information from Public Disclosure, ML21039A2682021-02-22022 February 2021 Summary of Category 1 Meetings with Entergy Operations, Inc. LAR to Install Digital Upgrade in Accordance with Digital I&C ISG No. 06, Rev. 2 for Waterford Steam Electric Station, Unit 3 ML20265A2872020-10-0101 October 2020 Request for Withholding Information from Public Disclosure Submittals for a Digital Upgrade ML20083J9212020-03-31031 March 2020 Request for Withholding Information from Public Disclosure ML19344D0362019-12-19019 December 2019 Request for Withholding Information from Public Disclosure Affidavit Dated December 4, 2019, Executed by Zachary S. Harper of Westinghouse Electric Company LLC Meeting Slides ML19269D2492019-10-0404 October 2019 Request for Withholding Information from Public Disclosure Related to 9/9/19 Affidavit Executed by K. Hosack, Westinghouse Electric Company, LLC ML19234A0172019-09-0909 September 2019 Request for Withholding Information from Public Disclosure, 7/3/19 Affidavit Executed by Camille T. Zozula, Westinghouse Electric Company, LLC, Tranflow License Amendment Request ML19046A1552019-02-19019 February 2019 Request for Withholding Information from Public Disclosure, 1/8/19 Affidavit Executed by Korey L. Hosack, Westinghouse Electric Company Related to Tranflow License Amendment Request ML18212A1602018-08-15015 August 2018 Request for Withholding Information from Public Disclosure - 6/13/18 Affidavit Executed by Paul A. Russ, Westinghouse Related to Tranflow License Amendment Request ML18212A1672018-08-15015 August 2018 Request for Withholding Information from Public Disclosure - 2/26/18, Affidavit Executed by James Gresham, Westinghouse Related to Tranflow License Amendment Request ML15272A0692015-10-0101 October 2015 Request for Withholding Information from Public Disclosure ML15153A2332015-06-15015 June 2015 Request for Withholding Information from Public Disclose - 5/20/15 Affidavit Executed by J. Gresham, Westinghouse, the 180-Day Steam Generator the 180-Day Steam Generator Report ML1108004372011-04-26026 April 2011 Request for Withholding Information from Public Disclosure, 3/16/11 Affidavit Executed by S. Gatcomb, Valcor Engineering Corporation ML1103504212011-02-18018 February 2011 Request for Withholding Information from Public Disclosure - Affidavit Executed by C. King, Electric Power Research Institute on 12/17/10; 04/05 MRP-109, Alloy 82/182 Pipe Butt Weld Safety Assessment for U.S. PWR Plant Designs ML0932003632009-11-25025 November 2009 Withholding Information from Public Disclosure, ME2401 ML0918905382009-07-23023 July 2009 Request for Withholding Proprietary Information from Public Disclosure ML0715701302007-06-14014 June 2007 Stream Electric Station, Unit 3 - Westinghouse Electric Company Request for Withholding Information from Public Disclosure ML0706606302007-03-13013 March 2007 Westinghouse Electric Company, LLC - Request for Withholding Information from Public Disclosure for Waterford Unit 3 ML0624401982006-10-12012 October 2006 Request for Withholding Information from Public Disclosure (CAW-06-2118) ML0523407462005-08-22022 August 2005 Westinghouse Electric Company, Request for Withholding Information from Public Disclosure for Waterford, Unit 3 ML0515205712005-05-27027 May 2005 Westinghouse - Request for Withholding Information from Public Disclosure ML0414702092004-05-26026 May 2004 Request for Withholding Information from Pubic Disclosure from Entergy Operations, Inc. by Letter Dated 4/30/04 ML0405506052004-02-20020 February 2004 Westinghouse Request Withholding from Public Disclosure, Waterford 3, Extended Power Uprate, Appendix 1 - Safety Evaluation Report Compliance, MC1355 2023-12-21
[Table view] |
Text
UNITED STATES NUCLEAR REGULATORY COMMISSION WASHINGTON, D.C. 20555-0001 February 19, 2019 Site Vice President Entergy Operations, Inc.
Waterford Steam Electric Station, Unit 3 17265 River Road Killona, LA 70057-3093
SUBJECT:
WATERFORD STEAM ELECTRIC STATION, UNIT 3- REQUEST FOR WITHHOLDING INFORMATION FROM PUBLIC DISCLOSURE (EPID L-2018-LLA-0112)
Dear Sir or Madam:
By letter dated January 19, 2019 (Agencywide Documents Access and Management System (ADAMS) Accession No. ML19019A025), Entergy Operations, Inc. (the licensee) submitted an affidavit dated January 8, 2019 (CAW-19-4851 ), executed by Korey L. Hosack, of Westinghouse Electric Company, LLC, requesting that the information contained in the following document be withheld from public disclosure pursuant to Title 10 of the Code of Federal Regulations (10 CFR), Part 2, Section 2.390:
LRT-SGMP-18-45 P-Attachment, Revision 0, "Responses to Request for Additional Information Regarding Waterford 3 Amendment Request for Revision of UFSAR [Updated Final Safety Analysis Report] Section 3.9 to Incorporate the TRANFLOW Computer Code (Proprietary)"
A nonproprietary copy of this document has been placed in the Nuclear Regulatory Commission's (NRC's) Public Document Room and added to the NRC Library in ADAMS at the above-referenced Accession No. ML19019A025.
The affidavit stated that the submitted information should be considered exempt from mandatory public disclosure for the following reasons:
(a) This information is part of that which will enable Westinghouse to describe the computer code, TRANFLOW, and to benchmark calculated pressure drops using TRANFLOW with other NRC approved computer code results.
(b) Further, this information has substantial commercial value as follows:
(i) Westinghouse plans to sell the use of similar information to its customers for the purpose of meeting NRC requirements for licensing documentation supporting the use of the computer code, TRANFLOW, during replacement steam generator design.
(ii) Westinghouse can sell support and defense industry guidelines and acceptance criteria for plant-specific applications.
(iii) The information requested to be withheld reveals the distinguishing aspects of a methodology which was developed by Westinghouse.
Public disclosure of this proprietary information is likely to cause substantial harm to the competitive position of Westinghouse because it would enhance the ability of competitors to provide similar technical evaluation justifications and licensing defense services for commercial power reactors without commensurate expenses. Also, public disclosure of the information would enable others to use the information to meet NRC requirements for licensing documentation without purchasing the right to use the information.
The development of the technology described in part by the information is the result of applying the results of many years of experience in an intensive Westinghouse effort and the expenditure of a considerable sum of money.
In order for competitors of Westinghouse to duplicate this information, similar technical programs would have to be performed and a significant manpower effort, having the requisite talent and experience, would have to be expended.
We have reviewed your application and the material in accordance with the requirements of 10 CFR 2.390 and, on the basis of the statements in the affidavit, have determined that the submitted information sought to be withheld contains proprietary commercial information and should be withheld from public disclosure.
Therefore, the version of the submitted information marked as proprietary will be withheld from public disclosure pursuant to 10 CFR 2.390(b )(5) and Section 103(b) of the Atomic Energy Act of 1954, as amended.
Withholding from public inspection shall not affect the right, if any, of persons properly and directly concerned to inspect the documents. If the need arises, we may send copies of this information to our consultants working in this area. We will, of course, ensure that the consultants have signed the appropriate agreements for handling proprietary information.
If the basis for withholding this information from public inspection should change in the future such that the information could then be made available for public inspection, you should promptly notify the NRC. You also should understand that the NRC may have cause to review this determination in the future, for example, if the scope of a Freedom of Information Act request includes your information. In all review situations, if the NRC makes a determination adverse to the above, you will be notified in advance of any public disclosure.
If you have any questions, please contact me at 301-415-1390 or via e-mail at April.Pulvirenti@nrc.gov.
Sincerely, April L. Pulvirenti, Project Manager Plant Licensing Branch IV Division of Operating Reactor Licensing Office of Nuclear Reactor Regulation Docket No. 50-382 cc: Korey L. Hosack Westinghouse Electric Company 1000 Westinghouse Drive Cranberry Township, PA 16066 Listserv
ML19046A155 OFFICE NRR/D0RULPL4/PM NRR/D0RULPL4/LA NRR/D0RULPL4/BC NRR/D0RULPL4/PM NAME APulvirenti PBlechman RPascarelli APulvirenti DATE 02/19/19 02/19/19 02/19/19 02/19/19