2018 Biocide/Corrosion Treatment Plan Annual Report
ML19028A160
Person / Time
Site: Sequoyah  Tennessee Valley Authority icon.png
Issue date: 01/23/2018
From: Anthony Williams
Tennessee Valley Authority
To: Hall A
Office of Nuclear Reactor Regulation, State of TN, Dept of Environment & Conservation, Div of Water Pollution Control
References
Download: ML19028A160 (5)


Text

Tennessee Valley Authority, Post Office Box 2000, Soddy Daisy, Tennessee 37384-2000 January 23, 2018 State of Tennessee Department of Environment and Conservatio"n Division of Water Pollution Control Enforcement & Compliance Section William R. Snodgrass Tennessee Tower 312 Rosa L. Parks Avenue, 11th Floor Nashville, Tennessee 37243

Dear Ms. Angela Hall:

TENNESSEE VALLEY AUTHORITY (TVA) - SEQUOYAH NUCLEAR PLANT (SQN) - NPDES PERMIT NO. TN0026450-2018 BIOCIDE/CORROSION TREATMENT PLAN (8/CTP) ANNUAL REPORT Enclosed is a copy of the 2018 8/CTP Annual report for SQN. Biodetergent 73551and Flogard MS 6237 were not added during CY 2018. All treatments in 2018 were conducted in accordance with the approved 8/CTP.

If you have any questions or need additional information, please contact Millicent Garland at (423) 843~6714 or by e-mail at mrmoore@tva.gov of Sequoyah's Environmental staff.

I certify under penalty of law that this document and all attachments were prepared under my direction or supervision in accordance with a system designed to assure that qualified personnel properly gather and evaluate the information submitted. Based on my inquiry of the person or persons who manage the system, or those persons directly responsible for gathering the information, the information submitted is, to the best of my knowledge and belief, true, accurate, and complete. I am aware that there are significant penalties for submitting false information, including the possibility of fine and imprisonment for knowing violations.

  • Sincerely,

~ f ' - '"")-- \Jl\\:..__~

Anthony L. Williams Site Vice President Sequoyah Nuclear Plant Enclosures cc (Enclosures):

Mr. Vojin Janji6 Chattanooga Environmental Field Office State of Tennessee Division of Water Pollution Control Dept. of Environment and Conservation State Office Building, Suite 550 Division of Water Pollution Control 540 Mccallie Avenue 61h Floor, I!. & C Annex Chattanooga, Tennessee 37402-2013 401 Church Street Nashville, Tennessee 37243-1534 U.S. Nuclear Regulatory Commission ATIN: Document Control Desk Washington, D.C. 20555

TN0026450 SQN 2018 Biocide/Corrosion Treatment Plan Annual Report Spectrus BD 1500 Duration Quantity in Pounds in Hours Analytical Results (lbs/day) (hrs/day) mass balance calculations (mg/L)

  1. of Days in Month Maximum Average Limit Maximum Maximum AveraQe Limit Samples Service January 28.44 28.44 50 0.50 0.032 0.032 2.00 6 6 February 28.44 28.44 50 0;50 0.032 0.032 2.00 8 8 March 28.44 28.44 50 0.50. 0.035 0.035 2.00 8 8 April 28.44 24.49 50 0.50 0.047 0.045 2.00 12 12 May 28.44 18.96 50 0.50 0.035 0.031 2.00 15 15 June 28.44 27.49 50 0.50 0.037 0.033 2.00 10 10 July 28.44 28.44 50 0.50 0.031 0.031 2.00 9 9 August 28.44 28.44 50 0.50 0.031 0.031 2.00 12 12 September 28.44 24.49 50 0.50 0.031 0.031 2.00 12 12 October 28.44 22.75 50 0.50 0.031 0.031 2.00 10 10 November - - - - - - - - -

December - - - - - - - - -

Jan. - Dec. 102 102 Per the 8/CTP approval: "Whole Effluent toxicity testing (biomonitoring) of Outfall 101 and Outall 110 shall be undertaken once per year when non-oxidizing biocides are being used:"

Outfall 101: Toxicity was sampled October 8 - 12, 2018, during the Spectrus BD1500 treatment.

Test Results: Pimephales promelas: IC25 >100%

Ceriodaphnia dubia: IC25 > 100%

Outfall 11 O: There has been no discharge from Outfall 11 O January - December 2018.

TN0026450 SQN 2018 Biocide/Corrosion Treatment Plan Annual Report Spectrus CT1300 Duration Quantity in Pounds in Hours Analytical Results (lbs/day) (hrs/day) .mass balance calculations (mg/L)

  1. of Days in Month Maximum Average Limit Maximum Maximum Average Limit Samples Service January 855 0.05 February 855 0.05 March 855 0.05 April 855 0.05 May 855 0.05 June 855 0.05 July 855 0.05 August 855 0.05 September 855 0.05 October 300 240 855 15 0.033 0.033 0:05 8 8 November 297 238 855 15 0.033 0.033 0.05 2 2 December 855 0.05 Jan. - Dec. 10 10 Per the 8/CTP approval: 'Whole Effluent toxicity testing (biomonitoring) of Outfall 101 and Outall 110 shall be undertaken once per year when non-oxidizing biocides are being used."

Outfall 101: Toxicity was sampled October 8 - 12, 2018, during the Spectrus CT1300 treatment.

Test Results: Pimephales promelas: IC25 >100%

Ceriodaphnia dubia : IC25 > 100%

Outfall 11 O: There has been no discharge from Outfall 110 January - December 2018.

TN0026450 SQN 2018 Biocide/Corrosion Treatment Plan Annual Report Towerbrom 960 Duration Quantity in Pounds in Hours Analytical Results (lbs/day) (hrs/day) mass balance calculation (mg/L)

  1. of Month Maximum Average Limit Maximum Maximum Average Limit samples Days in Service (based on days in service)

January 125 69 1425 4.00 0.033 0.013 0.10 8 8 February 150 88 1425 4.00 0.026 0.014 0.10 13 13 March 150 136 1425 4.00 0.034 0.026 0.10 9 9 April 200 90 1425 8.00 0.028 0.020 0.10 24 24 May 200 128 1425 4.00 0.018 0.011 0.10 16 16 June 200 144 1425 6.00 0.035 0.015 0.10 25 24 July 200 170 1425 4.00 0.038 0.019 0.10 20 20 August 200 161 1425 4.00 0.026 0.016 0.10 28 28 September 200 133 1425 4.00 0.024 0.014 0.10 21 21 October 450 . 234 1425 23.98 0.028 0.016 0.10 20 20 November 150 97 -1425 9.98 0.017 0.010 0.10 18 18 December 150 122 1425 4.00 0.023 0.016 0.10 9 9 Jan. - Dec. 211 210 Per the B/CTP approval: "Whole Effluent toxicity testing (biomonitoring) of Outfall 101 and Outall 11 O shall be undertaken once per year when oxidizing biocides are being used."

Outfall 101: Toxicity was sampled May 14 -18, 2018.

Test Results: Pimephalesprome/as: IC25 >100%

Ceriodaphnia dubia: IC25 > 100%

Outfall 110: There has been no discharge from Outfall 110 January - December 2018.

TN0026450 SQN 2018 Biocide/Corrosion Treatment Plan Annual Report Flogard MS6236 Duration Quantity in Pounds in Hours Analytical Results (lbs/day) (hrs/day) mass balance calculations (mg/L)

  1. of Days in Month Maximum Avera e Limit Maximum. Maximum Avera e Limit sam les Service January 2275 0.2 February 2275. 0.2 March 418 273 2275 24.00 0.033 0.033 0.2 13 13 April 313.20 261.00 2275 18.00 0.043 0.039 0.2 14 14 May 313.20 243.60 2275 18.00 0.034 0.029 0.2 15 15 June 313 254 2275 18.00 0.033 0.030 0.2 14 14 July 313 271 2275 18.00 0.029 0.029 0.2 16 16 August 730.80 307.98 2275 24.00 0.029 0.029 0.2 20 20 September 522:00 346.17 2275 24.00 0.029 0.029 0.2 19 19 October 696.00 452.40 2275 24.00 0.029 0.029 0.2 15 15 November 313.20 243.60 2275 18.00 0.055 0.055 0.2 9 9 December 208.80 208.80 2275 12.00 0.055 0.032 0.2 12 12 Jan. - Dec. 147 147 Per the B/CTP approval: "Flogard MS6236 is injected into the RCW system continuously, except during periods of other chemical injection due to common injection lines. Flogard MS6236 is injected into the ERCW Train A & B system intermittently."