MONTHYEARML21299A3292021-11-0909 November 2021 Relaxation of 2005 Confirmatory Order Modifying License L-19-243, Supplement to Application for Order Consenting to Transfer of Licenses and Conforming License Amendments (EPID-L-2019-LLM-0000)2019-10-17017 October 2019 Supplement to Application for Order Consenting to Transfer of Licenses and Conforming License Amendments (EPID-L-2019-LLM-0000) L-18-246, EA-16-022 Davis-Besse Nuclear Power Station, Notification of Completion of Actions for Confirmatory Order2018-12-26026 December 2018 EA-16-022 Davis-Besse Nuclear Power Station, Notification of Completion of Actions for Confirmatory Order ML16250A3132016-09-0707 September 2016 EA-16-022 Davis Besse FRN Notice NRC-2016-0191, EA-16-022 Davis Besse FRN Notice2016-09-0707 September 2016 EA-16-022 Davis Besse FRN Notice IR 05000346/20160082016-09-0101 September 2016 Confirmatory Order Related to NRC Reports 05000346/2016008; Investigation Report No. 3-2015-009 ML14181B2842014-06-30030 June 2014 Confirmatory Order Modifying License (EA-14-094) L-08-357, Submittal of 2008 Confirmatory Order Independent Assessment Report of Engineering Programs Effectiveness2008-11-21021 November 2008 Submittal of 2008 Confirmatory Order Independent Assessment Report of Engineering Programs Effectiveness L-08-219, Submittal of 2008 Confirmatory Order Independent Assessment Report of Operations Performance2008-07-17017 July 2008 Submittal of 2008 Confirmatory Order Independent Assessment Report of Operations Performance ML0722702572007-08-15015 August 2007 Federal Register Notice Confirmatory Order - Anthony Alexander, FENOC ML0602003602006-01-19019 January 2006 EA-01-082, EA-04-172-Confirmatory Order ML0436304762004-12-22022 December 2004 CY2004 Independent Operations Assessment, Revision 1 ML0428604742004-10-0808 October 2004 Submittal of Independent Assessment Report of Operations Performance for the Davis-Besse Nuclear Power Station ML0406411712004-03-0808 March 2004 EA-03-214, CAL No. 3-02-001, Approval to Restart the Davis-Besse Nuclear Power Station Closure of Confirmatory Action Letter, and Issuance of Confirmatory Order ML0333605992004-03-0808 March 2004 EA-03-214, Firstenergy Nuclear Operating Company, Confirmatory Order Modifying License (Effective Immediately) 2021-11-09
[Table view] Category:Letter type:L
MONTHYEARL-23-260, Corrections to the 2022 Combined Annual Radiological Environmental Operating Report and Radioactive Effluent Release Report for the Davis-Besse Nuclear Power Station2023-12-0707 December 2023 Corrections to the 2022 Combined Annual Radiological Environmental Operating Report and Radioactive Effluent Release Report for the Davis-Besse Nuclear Power Station L-23-243, Independent Spent Fuel Storage Installation - Request for Exemption from Enhanced Weapons, Firearms Background Checks, and Security Event Notifications Implementation2023-12-0606 December 2023 Independent Spent Fuel Storage Installation - Request for Exemption from Enhanced Weapons, Firearms Background Checks, and Security Event Notifications Implementation L-23-215, Changes to Emergency Plan2023-10-19019 October 2023 Changes to Emergency Plan L-23-205, Supplement to Application for Order Consenting to Transfer of Licenses and Conforming License Amendments2023-09-12012 September 2023 Supplement to Application for Order Consenting to Transfer of Licenses and Conforming License Amendments L-23-172, Quality Assurance Program Manual2023-08-31031 August 2023 Quality Assurance Program Manual L-23-188, Energy Harbor Nuclear Corp., Supplement to Application for Order Consenting to Transfer of Licenses and Conforming License Amendments2023-08-0707 August 2023 Energy Harbor Nuclear Corp., Supplement to Application for Order Consenting to Transfer of Licenses and Conforming License Amendments L-23-175, Submittal of Fifth Ten Year Inservice Testing Program2023-08-0101 August 2023 Submittal of Fifth Ten Year Inservice Testing Program L-23-034, 2022 Annual 10 CFR 50.46 Report of Changes to or Errors in Emergency Core Cooling System Evaluation Models2023-06-13013 June 2023 2022 Annual 10 CFR 50.46 Report of Changes to or Errors in Emergency Core Cooling System Evaluation Models L-23-135, Response to Regulatory Issue Summary 2023-01, Preparation and Scheduling of Operator Licensing Examinations2023-05-31031 May 2023 Response to Regulatory Issue Summary 2023-01, Preparation and Scheduling of Operator Licensing Examinations L-23-065, Annual Financial Report2023-05-22022 May 2023 Annual Financial Report L-23-131, Readiness for Resumption of NRC Supplemental Inspection2023-05-12012 May 2023 Readiness for Resumption of NRC Supplemental Inspection L-23-101, Combined Annual Radiological Environmental Operating Report and Radioactive Effluent Release Report for the Davis-Besse Nuclear Power Station - 20222023-05-12012 May 2023 Combined Annual Radiological Environmental Operating Report and Radioactive Effluent Release Report for the Davis-Besse Nuclear Power Station - 2022 L-23-092, Occupational Radiation Exposure Report for Year 20222023-04-27027 April 2023 Occupational Radiation Exposure Report for Year 2022 L-23-061, Submittal of the Decommissioning Funding Status Reports2023-03-31031 March 2023 Submittal of the Decommissioning Funding Status Reports L-23-037, and Perry Nuclear Power Plant - Independent Spent Fuel Storage Installation Changes, Tests, and Experiments2023-03-29029 March 2023 and Perry Nuclear Power Plant - Independent Spent Fuel Storage Installation Changes, Tests, and Experiments L-23-066, Annual Notification of Property Insurance Coverage2023-03-21021 March 2023 Annual Notification of Property Insurance Coverage L-23-059, Response to Apparent Violation in NRC Inspection Report 05000346/2022091; EA 23-0022023-03-0909 March 2023 Response to Apparent Violation in NRC Inspection Report 05000346/2022091; EA 23-002 L-22-212, CFR 50.55a Request RP-5 Regarding Inservice Pump Testing2023-03-0606 March 2023 CFR 50.55a Request RP-5 Regarding Inservice Pump Testing L-23-048, Response to Request for Additional Information Regarding Technical Specification 5.6.6 Steam Generator Tube Inspection 180-Day Report2023-03-0101 March 2023 Response to Request for Additional Information Regarding Technical Specification 5.6.6 Steam Generator Tube Inspection 180-Day Report L-23-057, Energy Harbor Nuclear Corp Retrospective Premium Guarantee2023-02-20020 February 2023 Energy Harbor Nuclear Corp Retrospective Premium Guarantee L-22-253, Submittal of Pressure and Temperature Limits Report, Revision 52023-01-10010 January 2023 Submittal of Pressure and Temperature Limits Report, Revision 5 L-22-284, Request for Notice of Enforcement Discretion for Technical Specification 3.7.9, Ultimate Heat Sink (UHS)2022-12-28028 December 2022 Request for Notice of Enforcement Discretion for Technical Specification 3.7.9, Ultimate Heat Sink (UHS) L-22-211, Technical Specification 5.6.6 Steam Generator Tube Inspection 180-Day Report2022-09-29029 September 2022 Technical Specification 5.6.6 Steam Generator Tube Inspection 180-Day Report L-22-216, Submittal of Pressure and Temperature Limits Report. Revision 42022-09-27027 September 2022 Submittal of Pressure and Temperature Limits Report. Revision 4 L-22-213, Occupational Radiation Exposure Report for Year 2021 - Correction2022-09-23023 September 2022 Occupational Radiation Exposure Report for Year 2021 - Correction L-22-129, Submittal of the Updated Final Safety Analysis Report, Revision 342022-09-20020 September 2022 Submittal of the Updated Final Safety Analysis Report, Revision 34 L-22-194, Submittal of Supplemental Information for the Reanalysis for Protection Against Low Temperature Reactor Coolant System Overpressure Events2022-09-19019 September 2022 Submittal of Supplemental Information for the Reanalysis for Protection Against Low Temperature Reactor Coolant System Overpressure Events L-22-203, Submittal of Evacuation Time Estimates2022-09-12012 September 2022 Submittal of Evacuation Time Estimates L-22-050, Summary of Changes to the Energy Harbor Nuclear Corp. Quality Assurance Program Manual2022-08-0909 August 2022 Summary of Changes to the Energy Harbor Nuclear Corp. Quality Assurance Program Manual L-22-152, Response to Request for Additional Information Regarding a License Amendment Request That Revises the Davis-Besse Nuclear Power Station Emergency Plan2022-07-0505 July 2022 Response to Request for Additional Information Regarding a License Amendment Request That Revises the Davis-Besse Nuclear Power Station Emergency Plan L-22-068, Cycle 22 and Refueling Outage 22 Inservice Inspection Summary Report2022-06-30030 June 2022 Cycle 22 and Refueling Outage 22 Inservice Inspection Summary Report L-22-037, 2021 Annual 10 CFR 50.46 Report of Changes to or Errors in Emergency Core Cooling System Evaluation Models2022-06-30030 June 2022 2021 Annual 10 CFR 50.46 Report of Changes to or Errors in Emergency Core Cooling System Evaluation Models L-22-149, Post Accident Monitoring Report2022-06-23023 June 2022 Post Accident Monitoring Report L-22-153, Readiness for NRC Supplemental Inspection Required for a White Finding2022-06-22022 June 2022 Readiness for NRC Supplemental Inspection Required for a White Finding L-22-098, Withdrawal of Proposed Inservice Inspection Alternative RR-A22022-06-22022 June 2022 Withdrawal of Proposed Inservice Inspection Alternative RR-A2 L-22-136, Steam Generator Tube Circumferential Crack Report - Spring 2022 Refueling Outage2022-06-0707 June 2022 Steam Generator Tube Circumferential Crack Report - Spring 2022 Refueling Outage L-22-102, Report of Facility Changes, Tests, and Experiments2022-05-16016 May 2022 Report of Facility Changes, Tests, and Experiments L-22-092, Combined Annual Radiological Environmental Operating Report and Radiological Effluent Release Report for the Davis-Besse Nuclear Power Station - 20212022-05-16016 May 2022 Combined Annual Radiological Environmental Operating Report and Radiological Effluent Release Report for the Davis-Besse Nuclear Power Station - 2021 L-22-124, Response to Request for Additional Information Regarding License Amendment Request to Revise the Design Basis for the Shield Building2022-05-12012 May 2022 Response to Request for Additional Information Regarding License Amendment Request to Revise the Design Basis for the Shield Building L-22-047, Unit No.1 - Core Operating Limits Report, Cycle 23, Revision O and Revision 12022-05-10010 May 2022 Unit No.1 - Core Operating Limits Report, Cycle 23, Revision O and Revision 1 L-22-127, Readiness for NRC Supplemental Inspection Required for a Greater than Green Finding2022-05-0606 May 2022 Readiness for NRC Supplemental Inspection Required for a Greater than Green Finding L-22-089, Occupational Radiation Exposure Report for Year 20212022-04-12012 April 2022 Occupational Radiation Exposure Report for Year 2021 L-22-056, Energy Harbor Nuclear Corp., Annual Notification of Property Insurance Coverage2022-03-22022 March 2022 Energy Harbor Nuclear Corp., Annual Notification of Property Insurance Coverage L-22-059, Response to Request for Additional Information on Proposed Inservice Test Alternative RP-32022-03-21021 March 2022 Response to Request for Additional Information on Proposed Inservice Test Alternative RP-3 L-22-074, Response to Regulatory Issue Summary 2022-01, Preparation and Scheduling of Operator Licensing Examinations2022-03-15015 March 2022 Response to Regulatory Issue Summary 2022-01, Preparation and Scheduling of Operator Licensing Examinations L-22-061, Ile Post Exam Letter L-22-0612022-02-24024 February 2022 Ile Post Exam Letter L-22-061 L-22-023, Retrospective Premium Guarantee2022-02-17017 February 2022 Retrospective Premium Guarantee L-21-266, Response to Request for Additional Information on Proposed Inservice Inspection Alternative RR-A22022-01-27027 January 2022 Response to Request for Additional Information on Proposed Inservice Inspection Alternative RR-A2 L-20-289, Emergency Plan Amendment Request2022-01-19019 January 2022 Emergency Plan Amendment Request L-21-290, Response to NRC Inspection Report 05000346/2021091, EA-21-1762021-12-21021 December 2021 Response to NRC Inspection Report 05000346/2021091, EA-21-176 2023-09-12
[Table view] |
Text
FENOC' -.. 5501 North State Route 2 Oak Harbor, Ohio 43449 FirstEnergy Nuclear Operating Company Mark 8. Bezilla 419-321-7676 Vice President, Nuclear December 26, 2018 L-18-246 Kenneth O'Brien Director, Division of Reactor Safety U.S. Nuclear Regulatory Commission Region Ill 2443 Warrenville Road, Suite 210 Lisle, Illinois 60532-4352
SUBJECT:
Davis-Besse Nuclear Power Station, Unit 1 Docket Number 50-346, License Number NPF-3 Notification of Completion of Actions for Confirmatory Order EA-16-022 On September 1, 2016, the NRC issued a Confirmatory Order to the FirstEnergy Nuclear Operating Company (FENOC) modifying the Davis-Besse Nuclear Power Station (DBNPS) license. This Confirmatory Order was the result of an agreement reached during an alternative dispute resolution (ADR) mediation session conducted on July 21, 2016. On March 1, 2017, FENOC provided written notification to the NRC of the completion of actions taken under Items 1, 2, 3, 6, 7, and 8 of Section V of the Confirmatory Order to fulfill Action 9 of the order, reference Letter L-17-060. Per Section V.10 of the Confirmatory Order, FENOC is also required to provide written notification of the completion of actions taken under Items 4 and 5 of Section V of the Confirmatory Order no later than December 31, 2018. These actions are complete as detailed in the attachment to this letter.
There are no new regulatory commitments contained in this letter. If there are any questions or if additional information is required, please contact Mr. Patrick J.
Mccloskey, Manager, Site Regulatory Compliance, at (419) 321-7274.
Sincerely,
~23~~
Mark B. Bezilla GMW
Attachment:
Completion of Actions for Confirmatory Order EA-16-022 RECEIVED DEC 2 7 2018
Davis-Besse Nuclear Power Station, Unit 1 L-18-246 Page 2 of 2 cc: NRC Document Control Desk DB-1 Senior Resident Inspector
Attachment L-18-246 Davis-Besse Nuclear Power Station (DBNPS)
Completion of Actions for Confirmatory Order EA-16-022 Page 1 of 3 The following actions as documented in the Section V of the Confirmatory Order issued September 1, 2016, with an effective date of 30 calendar days after issuance (October 1, 2016) to the FirstEnergy Nuclear Operating Company (FENOC) have been completed as shown below:
- 4. No later than December 31, 2017, FENOC will revise and administer fleetwide plant access training. The revised training shall address the provisions of 10 CFR 50.9 and incorporate facts and lessons learned from the event that gave rise to the Confirmatory Order.
Due to industry changes in the process for administering plant access training that occurred after the Confirmatory Order Actions were agreed upon, a separate training module was developed to address this Action. The training module reinforced the expectations to comply with 10 CFR 50.9, Completeness and Accuracy of Information and reviewed the lessons learned from the event involving a FENOC licensed Reactor Operator that was found not to be taking medications as required by his NRC license.
All personnel on a FENOC site as of December 1, 2017, completed this training.
During development of this notification of completion of actions letter (L-18-246) in December 2018, it was identified the training module regarding the expectations to comply with 10 CFR 50.9 was not established as a continuing action as intended, and therefore personnel badged after December 2017 did not receive the training.
Additionally, it was identified that some support groups such as Human Resources, Supply Chain, and Document Control with FENOC protected area badges were not assigned the training module in 2017. This issue was entered into the FENOC Corrective Action Program, the training module was made as a continuing training item, and the subject population of badged personnel have completed the training as of the date of this letter.
- 5. Upon completion of actions taken under items 1, 2, 3, and 4, but in no event later than two years from the effective date of the Confirmatory Order, FENOC shall complete an effectiveness review of those actions.
A review of the effectiveness of Confirmatory Order actions 1, 2, 3, and 4 was performed. A sampling of individuals applicable to each item was performed, with the intended focus to determine if individuals understood their requirement to report changes in status of medical conditions, and the requirements of 10 CFR 50.9 to be complete and accurate with information provided to the Nuclear Regulatory Commission. The four Confirmatory Order actions were as follows (refer to the Confirmatory Order for due dates of these actions):
Attachment L-18-246 Page 2 of 3
- 1. Davis-Besse operations management will complete discussions with each licensed operator regarding the facts and lessons learned from the event that gave rise to the Confirmatory Order.
- 2. FENOC will revise [Davis-Besse] operator requalification training materials to incorporate facts and lessons learned from the event that gave rise to the Confirmatory Order.
- 3. Appropriate FENOC management will communicate expectations and requirements for complete and accurate medical reporting to operations and security personnel subject to those requirements.
- 4. FENOC will revise and administer fleetwide plant access training. The revised training shall address the provisions of 10 CFR 50.9 and incorporate facts and lessons learned from the event that gave rise to the Confirmatory Order.
For the effectiveness of actions 1 and 2, a sampling of Davis-Besse licensed and non-licensed operators was selected from the five operating crews as well as off-shift staff.
All operators interviewed were aware of the issue from over two years ago that gave rise to the Confirmatory Order and knew of their requirement to report changes in medical status. They also knew of the requirements of 10 CFR 50.9 to provide complete and accurate information to the Nuclear Regulatory Commission.
For the effectiveness of action 3, a sampling of licensed and non-licensed operators from the Beaver Valley Power Station (BVPS) and Perry Nuclear Power Plant (PNPP) were interviewed. While personnel from the other FENOC stations did not have specific recollection of the 2016 event, all personnel interviewed were aware of their requirements to report changes in medical status and the need to be complete and accurate when providing information to the Nuclear Regulatory Commission. A sampling of Security personnel from all three FENOC stations were also interviewed, and all were aware of the requirement to report changes in medical status. One individual out of the 43 Security personnel interviewed was not sure that the requirements of 10 CFR 50.9 for completeness and accuracy of information would apply to medical reporting, which was assessed and corrected as an individual issue. All other Security personnel interviewed knew of the requirement to be complete and accurate regarding any changes to their medical status.
For the effectiveness of action 4, a sampling of personnel outside of Operations and Security departments were interviewed. While these personnel do not have a requirement to report changes in medical status as is required by Operators and Security personnel, the individuals interviewed were all aware of the requirements of 10 CFR 50.9 for completeness and accuracy of information, including information provided for medical physicals that may be required for other duties such as a crane operator or use of a respirator.
Attachment L-18-246 Page 3 of 3 Based upon the satisfactory responses received during the interviews of selected licensed and non-licensed operators, security personnel, and other personnel at all three FENOC sites, the actions taken in response to Confirmatory Order items 1 through 4 were effective. In conjunction with the actions previously documented by FENOC in letter L-17-060 dated March 1, 2017, all actions required by Confirmatory Order EA-16-022 issued September 1, 2016 are complete.