GE-Hitachi Nuclear Energy Americas, LLC - Response to NRC Inspection Report 050-00018/2018-001; 050 00070/2018-001; 050-00183/2018-001 and Notice of Violation
ML18346A704
Person / Time
Site: Vallecitos Nuclear Center, Vallecitos
Issue date: 01/25/2019
From: Janine Katanic
Division of Nuclear Materials Safety IV
To: Feyrer M
GE-Hitachi Nuclear Energy Americas
S. Anderson
References
IR 2018001
Download: ML18346A704 (3)


See also: IR 05000018/2018001

Text

.

January 25, 2019

Mr. Matt Feyrer, Site Manager

Vallecitos Nuclear Center

GE Hitachi Nuclear Energy Americas, LLC

6705 Vallecitos Road

Sunol, CA 94586

SUBJECT: GE HITACHI NUCLEAR ENERGY AMERICAS, LLC RESPONSE TO NRC

INSPECTION REPORT 050-00018/2018-001; 050-00070/2018-001;

050-00183/2018-001 AND NOTICE OF VIOLATION

Dear Mr. Feyrer:

On September 19, 2018, the U.S. Nuclear Regulatory Commission (NRC) cited GE Hitachi

Nuclear Energy Americas, LLC, (GE Hitachi) for its failure to implement procedures for

certain activities covering the Vallecitos Boiling Water Reactor. Inspection Report

050-00018/2018-001; 050-00070/2018-001; 050-00183/2018-001 (Agencywide Document and

Access Management System [ADAMS] Accession No. ML18261A410) with enclosed Notice of

Violation required you to respond in writing within 30 days. You responded by letter dated

October 19, 2018 (ADAMS Accession No. ML18292A751). During a telephonic conference on

December 19, 2018, between GE Hitachi and the NRC, you were requested to provide

additional information to describe your corrective actions. You provided supplemental

information regarding your response to the Notice of Violation by letter dated January 23, 2019

(ADAMS Accession No. ML19023A306) as discussed.

After reviewing the information you provided in your responses to the Notice of Violation, we

have concluded that your completed and proposed corrective actions appear to adequately

address the regulatory noncompliance as described in the Notice of Violation. We will review

your implementation of these corrective actions during a future inspection to determine whether

full compliance has been restored and whether compliance will be maintained.

M. Feyrer 2

In accordance with 10 CFR 2.390 of the NRCs Agency Rules of Practice and Procedure, a

copy of this letter will be made available electronically for public inspection in the NRC Public

Document Room or from the NRCs Agencywide Documents Access Management System

(ADAMS), accessible from the NRC Web site at http://www.nrc.gov/reading-rm/adams.html.

Sincerely,

/RA/

Janine F. Katanic, PhD, CHP, Chief

Fuel Cycle and Decommissioning Branch

Division of Nuclear Materials Safety

Docket: 050-00018; 050-00070; and 050-00183

License: DPR-1; TR-1; and DR-10

ML18346A704

SUNSI Review ADAMS: Sensitive Non-Publicly Available Keyword

By: SGA Yes No Non-Sensitive Publicly Available NRC-002

OFFICE DNMS:FCDB DNMS:FCDB DNMS:C:FCDB

NAME SGAnderson RSBrowder JFKatanic

SIGNATURE /RA/ /RA/ /RA/

DATE 1/24/19 1/24/19 1/25/19