Letter Sequence Other |
---|
EPID:L-2018-LLO-0003, Summary of 1/15/2019 Public Meeting Regarding Pilgrim Nuclear Power Station Post-Shutdown Decommissioning Activities Report, Which Includes the Site-Specific Decommissioning Cost Estimate (Approved, Closed) |
|
MONTHYEARML18333A2402018-12-17017 December 2018 Application for Order Approving Direct and Indirect Transfer of Renewed Facility Operating License and Conforming License Amendment to Holtec Pilgrim, LLC (Owner) and Holtec Decommissioning International, LLC (Operator) Project stage: Other ML18337A1372018-12-17017 December 2018 Request for Withholding Info from Public Disclosure - 11/12/18 Affidavit Executed by A. Rosenlieb, Entergy and 11/14/18 Affidavit Executed by A. Ryan, Holtec International Enclosure 1P, Equity Purchase and Sale Agreement (L-2018-LLO-0003) Project stage: Other ML18333A0092018-12-19019 December 2018 Acceptance Review Letter, Application for Order for Direct and Indirect Transfers of Control of Licenses, Conforming License Amendment, and Request for Exemption from 10 CFR 50.82(a)(8)(i)(A) Project stage: Acceptance Review ML18337A4182019-01-0202 January 2019 FRN, Notice of Application for Order for Direct and Indirect Transfer of Renewed Facility Operating License and Conforming License Amendment to Holtec Pilgrim, LLC and Holtec Decommissioning International, LLC Project stage: Other ML18337A4302019-01-0202 January 2019 Letter, Notice of Application for Order for Direct and Indirect Transfer of Renewed Facility Operating License and Conforming License Amendment to Holtec Pilgrim, LLC and Holtec Decommissioning International, LLC Project stage: Other ML19017A1622019-01-15015 January 2019, 30 January 2019 Summary of 1/15/2019 Public Meeting Regarding Pilgrim Nuclear Power Station Post-Shutdown Decommissioning Activities Report, Which Includes the Site-Specific Decommissioning Cost Estimate Project stage: Request ML19017A1732019-01-30030 January 2019 Summary of 1/15/2019 Public Meeting Regarding Pilgrim Nuclear Power Station Post-Shutdown Decommissioning Activities Report, Which Includes the Site-Specific Decommissioning Cost Estimate Project stage: Meeting ML19207B3662019-07-26026 July 2019 NRR E-mail Capture - Pilgrim - RAI Direct and Indirect Transfer of Lic.; Conforming Lic. Amend.; Req. for Exemption 10 CFR 50.82(A)(8)(I)(A) for Holtec Decom. International, Llc Project stage: RAI ML19227A1032019-08-0707 August 2019 NRR E-mail Capture - Pilgrim Nuclear Power Station - Draft Wording for Potential Condition of License Transfer Order Project stage: Draft Other ML19198A2832019-08-13013 August 2019 Notification of Significant Licensing Action - Proposed Issuance of Order Approving a License Transfer Application for Which a Hearing Has Been Requested Project stage: Approval ML19226A3962019-08-14014 August 2019 NRR E-mail Capture - Pilgrim Nuclear Power Station -Consult with Commonwealth - Conforming Amendment in Support of Pilgrim License Transfer Application Project stage: Acceptance Review ML19170A1012019-08-22022 August 2019 Letter, Order Approving Direct and Indirect Transfer of Renewed Facility Operating License to Holtec Pilgrim, LLC, Owner and Holtec Decommissioning International, LLC, Operator Project stage: Other ML19170A2652019-08-22022 August 2019 Enclosure 1, Order Approving Direct and Indirect Transfer of Renewed Facility Operating License to Holtec Pilgrim, LLC, Owner and Holtec Decommissioning International, LLC, Operator (L-2018-LLO-0003) Project stage: Other ML19170A2502019-08-22022 August 2019 Enclosure 3, Safety Evaluation for Direct and Indirect Transfer of Renewed Facility Operating License to Holtec Pilgrim, LLC, Owner and Holtec Decommissioning International, LLC, Operator (L-2018-LLO-0003) Project stage: Approval ML19170A1472019-08-22022 August 2019 Order, Safety Evaluation, and Draft Conforming Amendment for Direct and Indirect Transfer of Renewed Facility Operating License to Holtec Pilgrim, LLC, Owner and Holtec Decommissioning International, LLC, Operator (L-2018-LLO-0003) Project stage: Request ML19170A1492019-08-22022 August 2019 Enclosure 2, Draft Conforming Amendment for Direct and Indirect Transfer of Renewed Facility Operating License to Holtec Pilgrim, LLC, Owner and Holtec Decommissioning International, LLC, Operator (L-2018-LLO-0003) Project stage: Draft Other ML19170A2572019-08-22022 August 2019 Federal Register Notice, Order Approving Direct and Indirect Transfer of Renewed Facility Operating License to Holtec Pilgrim, LLC, Owner and Holtec Decommissioning International, LLC, Operator (L-2018-LLO-0003) Project stage: Other ML19234A3612019-08-22022 August 2019 Attachment 1 - License Transfer Cover Letter Project stage: Other ML19235A0502019-08-27027 August 2019 Issuance of Amendment No. 249 Order Approving Direct Transfer of Renewed Facility Operating License and ISFSI General License and Conforming Amendment Project stage: Approval ML19267A0102019-09-30030 September 2019 Correction of Error in Docket Number Associated with Issuance of Amendment No. 249 Order Approving Direct Transfer of Renewed Facility Operating License and Independent Spent Fuel Storage Project stage: Approval 2019-07-26
[Table View] |
|
---|
Category:Letter
MONTHYEARL-24-002, Late LLRW Shipment Investigation Report Pursuant to 10 CFR 20, Appendix G2024-02-0202 February 2024 Late LLRW Shipment Investigation Report Pursuant to 10 CFR 20, Appendix G ML23342A1182024-01-0909 January 2024 Independent Spent Fuel Storage Installation Security Inspection Plan L-23-019, Proof of Financial Protection 10 CFR 140.152023-12-18018 December 2023 Proof of Financial Protection 10 CFR 140.15 ML23334A1822023-11-30030 November 2023 Biennial Report for the Defueled Safety Analysis Report Update, Technical Specification Bases Changes, 10 CFR 50.59 Evaluation Summary, and Regulatory Commitment Change Summary November 2021 Through October 2023 L-23-012, Master Decommissioning Trust Agreement Changes for Indian Point Nuclear Generating Units 1, 2 and 3, Pilgrim Nuclear Power Station, Palisades Nuclear Plant and the Non-Qualified Trust for Big Rock Point2023-11-13013 November 2023 Master Decommissioning Trust Agreement Changes for Indian Point Nuclear Generating Units 1, 2 and 3, Pilgrim Nuclear Power Station, Palisades Nuclear Plant and the Non-Qualified Trust for Big Rock Point ML23306A0992023-11-0202 November 2023 and Indian Point Energy Center, Notification of Changes in Schedule in Accordance with 10 CFR 50.82(a)(7) L-23-011, 10 CFR 72.48 Biennial Change Summary Report2023-10-27027 October 2023 10 CFR 72.48 Biennial Change Summary Report IR 05000293/20234012023-08-31031 August 2023 NRC Inspection Report No. 05000293/2023401 & 2023001 (Cover Letter Only) IR 05000293/20230022023-08-0404 August 2023 NRC Inspection Report No. 05000293/2023002 L-23-008, Correction to Report on Status of Decommissioning Funding for Reactors and Independent Spent Fuel Storage Installations Holtec Decommissioning International, LLC (HDI)2023-05-23023 May 2023 Correction to Report on Status of Decommissioning Funding for Reactors and Independent Spent Fuel Storage Installations Holtec Decommissioning International, LLC (HDI) ML23136A7792023-05-15015 May 2023 Annual Radiological Environmental Operating Report, January 1 Through December 31, 2022 ML23135A2152023-05-15015 May 2023 Annual Radioactive Effluent Release Report, January 1 Through December 31, 2022 L-23-004, HDI Annual Occupational Radiation Exposure Data Reports - 20222023-04-24024 April 2023 HDI Annual Occupational Radiation Exposure Data Reports - 2022 L-23-003, Report on Status of Decommissioning Funding for Reactors and Independent Spent Fuel Storage Installations2023-03-31031 March 2023 Report on Status of Decommissioning Funding for Reactors and Independent Spent Fuel Storage Installations ML23088A0382023-03-29029 March 2023 Stations 1, 2, & 3, Palisades Nuclear Plant, and Big Rock Point - Nuclear Onsite Property Damage Insurance ML23069A2782023-03-13013 March 2023 Request for Scoping Comments Concerning the Environmental Review of Monticello Nuclear Generating Plant, Unit 1 Subsequent License Renewal Application ML22361A1022023-02-24024 February 2023 Reactor Decommissioning Branch Project Management Changes for Some Decommissioning Facilities and Establishment of Backup Project Manager for All Decommissioning Facilities IR 05000293/20220042023-02-15015 February 2023 NRC Inspection Report No. 05000293/2022004 ML22356A0712023-01-31031 January 2023 Issuance of Exemption for Pilgrim Nuclear Power Station ISFSI Regarding Annual Radioactive Effluent Release Report - Cover Letter ML22347A2782022-12-21021 December 2022 Independent Spent Fuel Storage Installation Security Inspection Plan Dated December 21, 2022 L-22-042, Oyster, Pilgrim, Indian Point, Palisades and Big Rock Point - Proof of Financial Protection 10 CFR 140.152022-12-14014 December 2022 Oyster, Pilgrim, Indian Point, Palisades and Big Rock Point - Proof of Financial Protection 10 CFR 140.15 L-22-041, Supplemental Information to Enhance Exemption Request Detail for Pilgrim ISFSI Annual Radioactive Effluent Release Report Due Date Extension2022-12-0909 December 2022 Supplemental Information to Enhance Exemption Request Detail for Pilgrim ISFSI Annual Radioactive Effluent Release Report Due Date Extension IR 05000293/20220032022-11-18018 November 2022 NRC Inspection Report No. 05000293/2022003 L-22-036, Decommissioning Trust Fund Agreement2022-11-0808 November 2022 Decommissioning Trust Fund Agreement ML22276A1762022-10-24024 October 2022 Decommissioning International Proposed Revisions to the Quality Assurance Program Approval Forms for Radioactive Material Packages ML22266A1922022-09-23023 September 2022 and Pilgrim Nuclear Power Station - Request to Withdraw Prior Submissions from NRC Consideration ML22272A0352022-09-22022 September 2022 S. Lynch-Benttinen Letter Regarding U.S. Citizen Intent to Sue U.S. Fish and Wildlife and NOAA Fisheries Representing the Endangered Species (Na Right Whale) Which Will Be Adversely Affected by Holtec International Potential Actions ML22269A4202022-09-22022 September 2022 Citizen Lawsuit ML22241A1122022-08-29029 August 2022 Request for Exemption from 10 CFR 72.212(a)(2), (b)(2), (b)(3), (b)(4), (B)(5)(i), (b)(11), and 72.214 for Pilgrim ISFSI Annual Radioactive Effluent Release Report IR 05000293/20220022022-08-12012 August 2022 NRC Inspection Report No. 05000293/2022002 ML22215A1772022-08-0303 August 2022 Decommissioning International (HDI) Proposed Revisions to the Quality Assurance Program Approval Forms for Radioactive Material Packages ML22206A1512022-08-0101 August 2022 NRC Office of Investigations Case Nos. 1-2022-002 & 1-2022-006 ML22221A2592022-08-0101 August 2022 LTR-22-0217-1-NMSS - Town of Duxbury Letter Opposing the Irradiated Water Release from Pilgrim (Docket No. 05000293) ML22193A1662022-07-28028 July 2022 LTR-22-0154-1 - Heather Govern, VP, Clean Air and Water Program, Et Al., Letter Regarding Radioactive Wastewater Disposal from the Pilgrim Nuclear Power Station (Docket No. 05000293) ML22175A1732022-07-28028 July 2022 LTR-22-0153-1 - Response Letter to D. Turco, Cape Downwinders, from A. Roberts, NRC, Regarding Holtec-Pilgrim Plans to Dump One Million Gallons of Radioactive Waste Into Cape Cod Bay ML22154A4882022-06-0101 June 2022 Letter from Conservation Law Foundation Regarding Irradiated Water Release from Pilgrim ML22154A1622022-05-26026 May 2022 Letter and Email from Save Our Bay/Diane Turco Regarding Irradiated Water Release from Pilgrim ML22136A2602022-05-16016 May 2022 Submittal of Annual Radiological Environmental Operating Report for January 1 Through December 31, 2021 ML22136A2572022-05-16016 May 2022 Submittal of Annual Radioactive Effluent Release Report for January 1 Through December 31, 2021 ML22102A0932022-05-12012 May 2022 LTR-22-0067 Response to Matthew P. Levesque, President, Barnstable Town Council Regarding Irradiated Water Release from Pilgrim IR 05000293/20220012022-05-11011 May 2022 NRC Inspection Report No. 05000293/2022001 ML22104A0542022-04-30030 April 2022 LTR-22-0093 Response to Sheila Lynch-Benttinen, Regarding Irradiated Water Release from Pilgrim L-22-026, Occupational Radiation Exposure Data Report - 20212022-04-29029 April 2022 Occupational Radiation Exposure Data Report - 2021 ML22152A2592022-04-25025 April 2022 Zaccagnini Letter Dated 04/25/22 ML22152A2642022-04-19019 April 2022 Flynn Letter Dated 04/19/22 ML22091A1062022-04-0101 April 2022 Nuclear Onsite Property Damage Insurance (10 CFR 50.54(w)(3)) L-22-022, and Indian Point Nuclear Generating Stations 1, 2, & 3 - Report on Status of Decommissioning Funding for Reactors and Independent Spent Fuel Storage Installations - Holtec.2022-03-25025 March 2022 and Indian Point Nuclear Generating Stations 1, 2, & 3 - Report on Status of Decommissioning Funding for Reactors and Independent Spent Fuel Storage Installations - Holtec. ML22130A6762022-03-14014 March 2022 Decola Ltr Dtd 03/14/22 Re Potential Discharge of Radioactive Water from Pilgrim Nuclear Power Station ML22041B0762022-03-0707 March 2022 03-07-22 - Letter to the Honorable William R. Keating, Responds to Letter Regarding Proposed Release of Irradiated Water at Pilgrim Nuclear Power Station Into Cape Cod Bay ML22054A2962022-02-23023 February 2022 Annual ISFSI Radioactive Effluent Release Report for 2021 2024-02-02
[Table view] Category:Proprietary Information Review
MONTHYEARML19203A2032019-08-14014 August 2019 Request for Withholding Information from Public Disclosure - 7/1/19 Affidavit Executed by Brian Moore, Global Nuclear Fuel - Americas, LLC ML18337A1372018-12-17017 December 2018 Request for Withholding Info from Public Disclosure - 11/12/18 Affidavit Executed by A. Rosenlieb, Entergy and 11/14/18 Affidavit Executed by A. Ryan, Holtec International Enclosure 1P, Equity Purchase and Sale Agreement (L-2018-LLO-0003) ML17263A0342017-09-29029 September 2017 Pilgrim Nuclear Power Station - Request for Withholding from Public Disclosure - Four Affidavits Executed by Global Nuclear Fuel - Americas dated 7/28/17 Re Core Operating Limits Report Revision 33, 34, 35 and 36 (CAC MG0209, MG0210, MG0214, and MG0213) ML15037A5232015-03-27027 March 2015 Request for Withholding Information from Public Disclosure ML15051A0232015-02-25025 February 2015 Request for Withholding Information from Public Disclosure (Tac No. MF5431) ML14297A5292014-10-28028 October 2014 Request for Withholding Information from Public Disclosure (Tac No. MF3237) ML1107000132011-03-28028 March 2011 Request for Withholding Information from Public Disclosure - Pilgrim Nuclear Power Station Revised TSs for Setpoint Tolerance Increase Dated March 15, August 30, September 21, 2010, and January 31, 2011 - GEH Proprietary Documents ML1001908342010-01-22022 January 2010 Entergy Nuclear Operations, Inc. - Request for Withholding Information from Public Disclosure for Extension of Orders Approving Indirect Transfer of Control of Licenses (TAC Nos. ME2515 Through ME2522) ML0900900552009-01-15015 January 2009 Request for Withholding Information from Public Disclosure ML0736500192008-01-0707 January 2008 Entergy Nuclear Operations, Inc.-Request for Withholding Information from Public Disclosure for Indirect Transfer of Control of Licenses (TAC Nos. MD6178 Through MC6185) ML0727500322007-10-11011 October 2007 Entergy Nuclear Operations, Inc. - Request for Withholding Information from Public Disclosure for Indirect Transfer of Control of Licenses (TAC Nos. MD6178 Through MD6185) ML0724104462007-08-31031 August 2007 General Electric Company'S Request for Withholding Information from Public Disclosure for Pilgrim Nuclear Power Station ML0724104192007-08-31031 August 2007 General Electric Company'S Request for Withholding Information from Public Disclosure for Pilgrim Nuclear Power Station ML0429504052004-12-0808 December 2004 Withholding from Public Disclosure, General Electric Report GE-NE-0000-0027-5301, Pilgrim Nuclear Power Station Single Loop Operation, (Proprietary) ML0235400352002-12-20020 December 2002 Request for Withholding Information from Public Disclosure ML0228401372002-10-0909 October 2002 Service List, Withholding from Public Disclosure, General Electric Report, NEDC-33050P, Safety Analysis Report for Pilgrim Nuclear Power Station Thermal Power Organization, Dated July 2002 ML0227700372002-10-0909 October 2002 Withholding from Public Disclosure, General Electric Report, NEDC-33050P, Safety Analysis Report for Pilgrim Nuclear Power Station Thermal Power Organization, Dated July 2002 ML0226601372002-10-0202 October 2002 Withholding from Public Disclosure, General Electric Proprietary Document, NEDC-33050P, Safety Analysis Report for Pilgrim Nuclear Power Station Thermal Power Optimization, Dated July 2002 2019-08-14
[Table view] |
Text
UNITED STATES NUCLEAR REGULATORY COMMISSION WASHINGTON, D.C. 20555-0001 December 17, 2018 Mr. Brian R. Sullivan Site Vice President Entergy Nuclear Operations, Inc.
Pilgrim Nuclear Power Station 600 Rocky Hill Road Plymouth, MA 02360-5508
SUBJECT:
PILGRIM NUCLEAR POWER STATION - REQUEST FOR WITHHOLDING INFORMATION FROM PUBLIC DISCLOSURE (EPID L-2018-LL0-0003)
Dear Mr. Sullivan:
By letter dated November 16, 2018, 1 to the U.S. Nuclear Regulatory Commission (NRC),
Entergy Nuclear Operations, Inc. (Entergy), submitted an affidavit dated November 12, 2018, executed by Andrew J. Rosenlieb, Vice President, Entergy Nuclear Generation Company, and an affidavit dated November 14, 2018, executed by Andrew R. Ryan, Esquire, General Counsel, Holtec International (Holtec), requesting that information contained in the following document be withheld from public disclosure pursuant to Title 10 of the Code of Federal Regulations (10 CFR) Part 2, Section 2.390:
Enclosure 1P - Equity Purchase and Sale Agreement by and among Nuclear Asset Management Company, LLC, Holtec International, Entergy Nuclear Holding Company #1, and Entergy Nuclear Generation Company, dated as of July 30, 2018" (Proprietary)
The letter and the nonproprietary version of Enclosure 1, "Equity Purchase and Sale Agreement by and among Nuclear Asset Management Company, LLC, Holtec International, Entergy Nuclear Holding Company #1, and Entergy Nuclear Generation Company, dated as of July 30, 2018" (Non-Proprietary) (without exhibits)," have been placed in the NRC's Public Document Room and added to the NRC Library in ADAMS.
The November 12, 2018, affidavit stated that the submitted information should be considered exempt from mandatory public disclosure for the following reasons:
- i. Enclosure 1P contains confidential commercial information, the disclosure of which would adversely affect Entergy.
ii. This information has been held in confidence by Entergy.
1 Agencywide Documents Access and Management System (ADAMS) Accession No. ML18320A031.
B. Sullivan iii. Entergy customarily keeps such information in confidence, and there is a rational basis for holding such information in confidence. The information is not available from public sources and could not be gathered readily from other publicly available information.
iv. Public disclosure of this information would create substantial harm to Entergy's business interests because such information has significant commercial value to Entergy and its disclosure could adversely affect other Entergy transactions.
The November 14, 2018, affidavit stated that the submitted information should be considered exempt from mandatory public disclosure for the following reasons:
- i. Enclosure 1P contains confidential commercial information, the disclosure of which would adversely affect Holtec.
ii. This information has been held in confidence by Holtec.
iii. Holtec customarily keeps such information in confidence, and there is a rational basis for holding such information in confidence. The information is not available from public sources and could not be gathered readily from other publicly available information.
iv. Public disclosure of this information would create substantial harm to Holtec's business interests because such information has significant commercial value to Holtec and its disclosure could adversely affect other Holtec transactions.
We have reviewed your application and the material in accordance with the requirements of 10 CFR 2.390 and, on the basis of the statements in the affidavits, have determined that the submitted information sought to be withheld contains proprietary commercial information and should be withheld from public disclosure.
Therefore, the version of the submitted information marked as proprietary will be withheld from public disclosure pursuant to 10 CFR 2.390(b )(5) and Section 103(b) of the Atomic Energy Act of 1954, as amended.
Withholding from public inspection shall not affect the right, if any, of persons properly and directly concerned to inspect the documents. If the need arises, we may send copies of this information to our consultants working in this area. We will, of course, ensure that the consultants have signed the appropriate agreements for handling proprietary information.
If the basis for withholding this information from public inspection should change in the future such that the information could then be made available for public inspection, you should promptly notify the NRC. You also should understand that the NRC may have cause to review this determination in the future, for example, if the scope of a Freedom of Information Act request includes your information. In all review situations, if the NRC makes a determination adverse to the above, you will be notified in advance of any public disclosure.
B. Sullivan If you have any questions regarding this matter, I may be reached at 301-415-3100.
G. Lamb, Senior Project Manager p cial Projects and Process Branch i ision of Operating Reactor Licensing ice of Nuclear Reactor Regulation Docket No. 50-219 cc: Andrew R. Ryan, General Counsel Holtec International Holtec Technology Campus 1 Holtec Boulevard Camden, NJ 08104 Listserv
ML18337A137 *via email OFFICE NRR/DORL/LSPB/PM NRR/DORL/LSPB/LA NRR/DLP/PFPB/BC (A)*
NAME JLamb JBurkhardt MDusaniwskyj DATE 12/3/18 12/4/18 12/3/18 OFFICE NRR/DORL/LSPB/BC NRR/DORL/LSPB/PM NAME DBroaddus JLamb DATE 12/12/18 12/17/18