NLS2018063, Submittal of 10 CFR 50.55a Relief Request PR5-02 Supplement

From kanterella
(Redirected from ML18319A095)
Jump to navigation Jump to search

Submittal of 10 CFR 50.55a Relief Request PR5-02 Supplement
ML18319A095
Person / Time
Site: Cooper Entergy icon.png
Issue date: 11/08/2018
From: Dent J
Nebraska Public Power District (NPPD)
To:
Document Control Desk, Office of Nuclear Reactor Regulation
References
NLS2018063
Download: ML18319A095 (7)


Text

Nebraska Public Power District Always there when you need us 10 CFR 50.55a NLS2018063 November 8, 2018 U.S. Nuclear Regulatory Commission Attention: Document Control Desk Washington, D.C. 20555-0001

Subject:

10 CFR 50.55a Relief Request PR5-02 Supplement Cooper Nuclear Station, Docket No. 50-298, DPR-46

Reference:

Letter NLS2018061 dated November 5, 2018, from John Dent, Jr., Nebraska Public Power District (NPPD) to Nuclear Regulatory Commission (NRC),

"10CFR 50.55a Relief Request PR5-02"

Dear Sir or Madam:

The purpose of this letter is for NPPD to supplement the emergent relief request made on November 5, 2018 (Reference).

Relief Request PR5-02 will be used only for the duration of Refueling Outage 30. The information requested by the NRC in relation to the referenced letter was provided via email on November 5, 2018. This same information is attached to this letter.

This letter contains no regulatory commitments.

Should you have any questions concerning this matter, please contact Jim Shaw, Licensing Manager, at (402) 825-2788.

Sincerely,

~1ff£1<- ~ /w?" ~J f1"' ~

John Dent, Jr.

Vice President Nuclear and Chief Nuclear Officer

/tf

Attachment:

Cooper Nuclear Station Relief Request PR5-02 Supplemental Information COOPER NUCLEAR STATION P.O. Box 98 /Brownville,. NE 68321-0098 Telephone: (402) 825-3811 / Fax: (402) 825-5211 www.nppd.com

NLS2018063 Page 2 of2 cc: Regional Administrator w/attachment USNRC - Region IV Cooper Project Manager w/attachment USNRC - NRR Plant Licensing Branch IV Senior Resident Inspector w/attachment USNRC-CNS NPG Distribution w/o attachment CNS Records w/attachment

NLS2018063 Attachment Page 1 of 5 Cooper Nuclear Station Relief Request PRS-02 Supplemental Information Cooper Nuclear Station (CNS) understands that the relief being requested is applicable only to Refueling Outage 30 and not for the entirety of the fifth 10 year inservice inspection interval. Any additional period(s) outside of CNS Refueling Outage 30 would require subsequent, stand-alone, relief requests.

The specific components for which relief is being requested are listed in the tables on the next page.

Drawings describing the location of the components for which relief is being requested have also been included as part of this attachment.

For the portions of piping operated at or above reactor pressure during normal operation that are not at test pressure, defense-in-depth for detection of possible through-wall leakage is provided by the following:

reactor core isolation cooling (RCIC), and main steam lines (MS), and temperature switches that actuate annunciators in the Control Room. It is designed to detect leaks in the major steam piping system, especially in remote or enclosed areas such as the steam tunnel. If a steam or water leak occurs, the temperature element would sense a rise in ambient temperature and cause an alarm in the Control Room. In addition, the continuous temperature signals are transmitted to Plant Management Information System (PMIS) for Safety Parameter Display System (SPDS) display.

  • Control Room operators monitor Main Steam Tunnel temperatures twice per shift (every six hours) and record in Operations Log when temperature exceeds 160 F.
  • Drywell unidentified and identified leak rates are monitored in accordance with Operations daily surveillance log every 8 hours9.259259e-5 days <br />0.00222 hours <br />1.322751e-5 weeks <br />3.044e-6 months <br />.

NLS2018063 Attachment Page 2 of 5 CNS PRS-02 Lists of Components Valves not in position required for normal reactor startup:

Position Required Position During Valve Description for Normal Reactor System Leakage Startup Test Outboard Feedwater RF-CV-13CV Open Closed Check Valve Inboard Feedwater RF-CV-14CV Open Closed Check Valve Outboard Feedwater RF-CV-15CV Open Closed Check Valve Outboard Main MS-AOV-A086A Steam Isolation Open Closed Valve Outboard Main MS-AOV-A086B Steam Isolation Open Closed Valve Outboard Main MS-AOV-A086C Steam Isolation Open Closed Valve Outboard Main MS-AOV-A086D Steam Isolation Open Closed Valve Inboard HPCI Steam HPCI-MOV-M015 Open Closed Supply Outboard HPCI HPCI-MOV-M016 Open Closed Steam Supply Inboard RCIC Steam RCIC-MOV-M015 Open Closed Supply Outboard RCIC RCIC-MOV-M016 Open Closed Steam Supply Other valves discussed in Relief Request:

Position Required Position During Valve Description for Normal Reactor System Leakage Startup Test Inboard Main Steam MS-MOV-M074 Open/Closed Open Drain Valve Outboard Main MS-MOV-M077 Open/Closed Open/Closed Steam Drain Valve HPCI Injection Check HPCI-CV-29CV Closed Closed Valve Inboard Feedwater RF-CV-16CV Open Open Check Valve

.=

2 3 4 5 6 7 8 9 10 11 12

~

1.

.l.

PRESSURE SENSING LINES UP TO ANO INCLUDING ROOT VALVES StW..L BE FURNISHED .ANO INSTALLED UNDER CONTRACT E- H - 4.

DEl£T[Q Ml. "'WS-1" PIPING SHOWN HERfOH IS ClASS,,IN NUCl..EAA Cl.ASS UN NUClEAR N-10 Cl.ASS IV POWER CI.ASSlnCATION WITHIN THE 1-ws-1~-2**

24-i.o . MS-1 (MAIN ST£AM TO TURBINE)

~

LIMITS SHOWN HEREON, M.J.. '"BS-2" * "'MS-2 PIPING SHOWN HEREON IS CALL IIN PIPING ClASSIFlCATION.

A A

4. SP<M-40 TO BE INSTAl.1.ED ClOSEO TO AD-86, 1il5-185 I
5. HIGH POINT VENTS
  • LOW POINT OfWNS ARE HOT SHOWN.

6.

7.

DELETEO.

f::J.. 'S WHERE SHOWN WITH NUMBERS REPRESENT POINTS OF CONNECTION TO DtlSTINC S'l"STDtil.

E-73-'8 SPEClnCATION DEF1NES WOftK FROM THIS POJ"1".

MS*AO*A086C S(E INSTR.

~

e. 1-WS-19 REF. C.E. OWC 11506011 SHT. 2 FOR INSTit PIPING ANO VIJ.Vf. INSTAUATION AT INSTR. RACK 25 SECTION A

,a""" ..

9. REF. C.E. OWC 11508014 SHT. 2 FOR INSTR. PIPING AND VALVE INSTAUATION AT INSTR. RACK 25-5e - SECTION A
10. REF'. C.E. OWC 11506014 SHT. J FOR INSTR. PIPING ANO VIJ.Vf. INSTAUATION AT INSTR. RACK 25-5<<5 - SECTION B
11. REF. G.E. OWC 115D6015 SHT. 2 FOR INSTR. PIPING ANO VALV£. INSTAL.lATION AT INSTR. RACK 25 SECTION A
12. REF. BURNS ANO RO£ DWC llD0-3 SHT. 149 FOR INSTR. PIPING AND VN..V£. IHSTAL.J.ATJON AT INSTR. RACK LR-11&t. ANO LR-1115B. CONT. ON 2002 SH. 1, ZONES
13. REF. BURNS ANO ROE 0WC ll.£70-3 SHT. 121A F'OR INSTR. PIPING ANO VALVE INSTAU.ATION. B-J I: B-7
14. DEl.£TED.

B 15. D0.£TED B

16. TESTABLE f\.ANC£S. 3"MS-1
17. INSTRUMENT, SM,IPI.£. TEST, ORAlN ANO VENT LINES ARE NOT ALWAYS THE SAME Cl.ASS AS THE MAIN LINE ANO THESE 80UN~IES 1-WS-125- 3*

!r ARE TOO NUMEROUS TO IDOmFY IN THIS MANNER (SEE ISi PROCRAM 80UNIMRI' DESCRIPTIONS F'OR DETAILS).

1S. CB IS PRIMARY CONTAINMEHT 80UNDRY.

n

~x~

241 .0 . MS-1 (~N STEAM TO TURBINE)

19. WHERE LINES ARE INT[RC()NNECTED AHO CONTJNUEO ON OTHER MS*AO*A086A

,a""" ..

WS-187 DRAWINGS, ZONE NUMBERS ARE APPROXIMAT[ ONLY.

20. BOUNDNfl' VALVE - RU. TO CALC. NEDC 00-029, ENG. EVAL EE 01-147
  • OWC CNS-WS-43 F'OR 1-ws-1000-24*

zi~i IOENTinCATION or THE MSIV l£AKACE PATHWAY TO THE CONDENSER 80UN~IES

  • SEISMIC QUALJnCATIONS.

io;~l

~%UN 2 1. AN IN-LINE PIP£ CAP HAS BEEN INSTAU.£D FOR ISOLATION or THE RHR ST[AM CONDENSING MOOE SYSTEM PIPING.

RU. CED &012122. MS* MOV-M077

,~

C 3-WS-1 ZONE 0 - 12 C

1~

THIS OWG. r -- --- - - -- -- - --- - -- - --- -- - - - "'I 1-Pl-1S MS-1 1 BCV MS- 17 BCV

1-Pl-lS MS- 10 BCV MS-15 BCV
E/S 1FPS1 ,-------+~:~~~:=~::~------~:~=~~~~:=t-c>--OO'l'------h'i-----~ ~---Lw.Jlr-ir\-',-,/+-~~=..,_- -a,,-t-=WS~-~*~*~BCV~----------.- --

MS- 14 BCV

- , E/S IFPS1 I

~-MS-211

....._......,._) T.C.

I

- - +- -- --, '

1" MS- 1

- ~ -- - --,

LJ FUJSHINC CONNECTION '

TO ' TO

~

FW>WATER -N ' FUDWATtR 1

i " CONTROi.

SYSTEM  ! ,~~ CONTROi.

=*

I 15-M iii

- ~ i

~ I RCIC-79 RCIC-78

-, r '

__ _J 11 er-HPCl*MOV*M016

~ i r-i' D ii WO J "' 1

]  : ,--#!,,~~

D

~ ~

DC: 1 0

~~

1 I 2 2'-M

&-41~

~' ~

4:i~

--*~- ! ~

I I

~

I I

_ _ _J

~ ~ --*>-

1 I I er- ~, "' , ....._,:zowv (8) j

~

I

~

I

_ _2 _J 15-M

,c

  • ____r£ 1 11 l'----------

I 2 L~~-J L___2 n-* icsrr I 11 t I I L_-#!11:!lt---'

&-41~

~*

2 15-M I I 2 ts-SI

_J 1 L _ _ _ _J L---_J 1 39RHR-1385 t --1------------' NOT[ *> 'csEE NOTE-101- t --1------------' E E

49RHR-.168A  ! PRIMARY CONTAINMENT ISOLATION SYSTEM PRIMARY CONTAINMENT ISOlATION SYSTEM E/P 10-1459 ... ~

1

3711 1-J

'-l>O-IT ~--i>O-'-.'-~- -~ ~ ~ - - - - ' ~ ~

,~

~~

"'1/1

~

r FOR PIPING INTERRELATION r

SEE 2040 SH. l 10 Ul-11*

2040 z:.E 2

~-z~To _

0 12 (SEE NOTt 12)

- ---T1 a* RH-2 <,-- -

2 >S:*ws-2

-20R\I (SEE NOTE 18)

~

~*-J 10 a* DRIP LEG H 9 r------L-----,

H l~RBll;Mf'ig\~ l~R~4g1g~ I I f**RHR-372 .£!.l~ACCUMULATOR f.*RHR-370 ~ f.* RHR-373 -

f*.RHR-371 er _. . r---, VALVE CONTROL SYSTDI

~ (SEE CE D'#C. 175M!>ISO) er 1 70-100 PSI CONTROl 1 , PARTS AIR SUPPLY _ 4. 5 t FOR IA INTERRELATION, L. - - :.J SEE OWC. 2010, SH. 2, r pAHf1 1 ZONE f-8

  • 0-12. - ~ -~ I i-- - - T CLOSE ON 6

~=~

L-J ISOlATION SIGIW.

AIR sumY VALVE I'*

IA CHECK VLV. MSIV RRT 11/YJ/fXJ J

IA-28CV ea-,

211

  • lO C

~ - - SCRAM SICNAL COOPER NUCLEAR STATION BURNS & ROE

~

l1 0 32 8M .IfilA!l.....h FLOW DIAGRAM ll l<

C TYP INSTRUMENTATION DETAIL FOR AIR OPERATED ISO. VALVES REACTOR BUILDING ~§ l5 0 MAIN STEAM SYSTEM 2041 I L 2 3 4 5 6 7 8 10 11 12 _J

2 3 4 5 6 7 8 9 10 11 12

! RC IC 1\JRBINE VENT IDN INATE IN TORUS AREA CONT. ON REN:TOR FUD CONT. ON 2004, SH. J ZONE B- 10

,m: NOT[ 10

~-RCJC- 192 203&, ZONE C- 3 A _\_

r- - ---,

RCIC-60 ~S-245 A

~' ' f4"RCIC- Hl1r

~- RCIC -1!2 49Rf°-1 1-RCIC-11 4- 4" :Y." RCIC-n _ - CONT. ON 2049, SH. 3 ZONE C-2 2"RCIC-18CV B B N- 4B

.Y.." RCIC-52

~- RC IC-18 1 f." RC IC- 189 N-4A I ~ - RC IC-1i0 12"Rf-1 0 I

I CONT. ON 13~~

2038, ZONE C-3 Cl.ASS UN NUClEAR C C 1w:1 .....

t--4 TO TURBINE MSC 1 ~-~:-~

27 29RCIC - 27WV 29RC- 2 1- RCIC-1 11-2" l"RCIC-l JCV eW- 1 1-RCIC-124-0*-"

N 8'"RCIC-15Ctl[ .o 8 IC- 37 D ~"RCJC-38 D 49Rc1c-:nJ ----- -- ,  : ~~ AUTO CLOSE :Y."RCIC-39 (OLD MR 587W)  :

"'°" recs T[ST MS- 2 BS- 2 I CONT. ON CONT. ON I 4"RC- J 2040, SH. 1 2040, SH. 2 4"RC- J I ZONE F-6 ZONE E- 6 I 4 "RHR- 21CY I

I lj(~

I

~ WO I c:::=r- ,..

E I 4"RHR-WOY- l6A t (Ol.O BA:R 586WV) i E 19RCIC- 12RV 1"RCIC-3J l I

-~ .~~~*1*

I 16RC- 4 l "RCIC-34 :

l4"RCIC- 14CV -_ I !iU, 1 Z1

.~ ~ Ji '

I l!~

- .!.~ - ~

J._

I 4"RC-4

( t--,,-_., RC=c\~c'-<,.~20c,2-- ~,.' -- -l-- - - - l -- - ' -- - ' - --- - >--<

~- ---- ---------------- --L--- ---,

20Ja~NrC-J ~  :

"i N!'!

'----c-=*"RCc=-~*~~---'- I~,,~no~-=+/-..._____:i t F

1- RCJC- 114-4" -- -----.

CONT. ON 2044, ZONE G-1 I I

I 1* RCIC - 40

~¥ il '

SUPPAtSSJPN CHAWBtR WATER L£VEl.

F I

I I

~- JjgWi; I 1. UNL£SS OTHERWISE INDICATED A.LL PRESSURE A.NO/ OR FlOW INSTRUMENT I 1" RCIC-4 1 ROOT LINES SHALL BE J/ 4": ROOT VALVES SHALL BE J/ 4" Vl5JX (XC(PT I A.S NOTED. LINE UP TO ANO INClUOINC ROOT VALVES SHALL 8E FVRNISHED I A.NO INSTAI.J..EO UNDER CONTRACT E- 6t- 4.

I ~* BS-2

2. AT SAMPLING POIJ,ITS, CONNECTORS, PROBES ANO ROOT VALVES SHM.L BE I F'URNISHED ANO INSTALLED UNDER CONTRACT E-69-4. PROBES SHA.LL BE RCIC STRAINER I F'URNISHED ANO INSTA.l.LEO IN ACCORDAHCE WITH CONTRA.CT PA.RA.. J.4.2 I A.HO owe. SP- 07211, nG. NUMBER A.S NOTED. CONTINUATION Of SA.MP\.£ I PIPING BV E-70-3.

I J. A.LL "Rf- 1° PIPING SHOWN HERE ON SHALL BE CLASS UN NUCLEAR A.HO I u Ct.ASS !VP POWER Ct.ASSlnCATIONS WITHIN THE LIMITS SHOWN HEREON.

Y." RCI C-4.J I

~ A.LL "BS-2" PIPING SHOWN HEREON IS Ct.ASS IIN PIPING ClA.SSlnCATION.

G 4. HIGH POINT VEJ,ITS A.HO LOW POINT ORA.INS NOT SHOWN. G

¥4" RCIC-44 5. VALVES IOENTlflED A.S V2&8X SHAU. CONFORM TO TI-IE REQUIREMENTS Of RCIC- JO RCIC-69 CONTRACT E 4 SPEClflCATION PA.RA.. J.2.8.8. GROUP A- 7 VALVES.

T[ST WHERE STAINLESS STm. VALVES A.RE F'URNISHED BV THE COHTRM:TOR RHR - 203 UNOER PARA. 3.2.8.8, THE STA.1Nl.£SS mEL INITRCONNECTI NG PIPING 1-RCJC-1 09 -2 SHA.LL CONF'ORM TO CONTRACT E- 69-4 SPECIFlCATION REOUIREMDmi f'OR CLASS IN, RF-1S SYSTEM PIPING.

19Rc:IC- 1ORV 6. INSTAL.L ORlflCE Fl.ANGE ONLY WITH SPACER.

1-RCIC-104- 1)2° 7 . 0El.£T'ED.

e. DEL£T[().
9. REffRENCf CAA.WING 11506015 SH. 3 fOR INSTRUMENT PIPING ANO VALVE INSTALLATION AT INSTRUMENT RA.CK 25-5'! - S£CT10N 8.

J's=rRCIC-25 ~* 10. REFERENCE DRAWI NG 11506015 SH. 2 f'OR INSTRUMENT PIPING ANO VALVE INSTALLATION AT INSTRUMENT RACK 25 SECTION A.

~- RCIC- 24 11 . REFERENCE DRAWING M15 1 SH. 15 f'OR SAMPLE P IP ING A.NO VALVE INSTAL.L-H ATION A.T SA.MP\..£ RACK SR- 1C. H RCIC-76 l &"RCIC- 11 CV 12. INSTRUMENT, SAMPl..£, TEST. ORA.IN A.HO VENT LINES ARE NOT N..WAYS THE SA.ME ClA.SS A.S THE WA.IN LINE A.HO THESE BOUNOAAIES A.RE TOO NUMEROUS Efilt-r ,

1D t-J : 10 RHR- 206 RHR - 205 RCIC-1 80 TO IDENTIFY IN THIS WANNER (SEE ISi PROGRAM BOUNOAAY OESCRIPTIONS FOR OETA.ILS).

1J . WHERE LINES A.RE INTERCONNECTED ANO CONTINUED ON OTHER FROM E/S 10-1 ~ ~ -- J RHR - 207

' CONT. ON 2038, ZONE J-4 '--,--~RC~!~~-~.~~-,-*- - - -- =--- -=--~ - =

TO EQUIPM£NT

MP ORA.WINGS, ZONE NUMBERS A.RE APPROXIMATE ONLY.
14. RHR STEAM CONDENSING MOOE IS NO LONGER A.H OPERATIONAL. MOOE.

T[ST _ _ __ _ ._ _ 2028, ZONE H- 3 AS BUILT 4 5 4 00 3 6 3 6

~-RCIC- 27 f,(RCJC- 26 STATUS: ~

6~-4 RCIC PUMP SUPPLY fROM SUPRESSJON CHAMBER * -4 STAT\JS llo\Tt: 10/ 10/ 20 18 1-RCIC-102- 6" 1-RCIC-1 02- 6" OS APfl'RCMD: WIUNRUH VER: AB REV: 57 SIZE: f' R[VJSJONS TO THlS DRAWING J

REQUIRES A REVISION TO THE CORRESPONDING ISOKEY.

COOPER NUCLEAR STATION FLOW DIAGRAM REACTOR CORE ISOLATION COOLANT AND REACTOR FEED SYSTEMS


BURNS & ROE 2043

~§ I

~

11!

L 2 3 4 5 6 7 8 9 10 11 12 _j

i 2 5 6 7 8 9 10 11 12

~-.i,H,cPC,el__cMl=Be,IN,sE__!S!!!L_ _!.!10'-'"PY=

- 1,__ _ mtMINit.TE IN TORUS Nl,£A f'llD WATER A SUPPLY A S£E NOT£ 10 CONT. ON

=f "' \,

2004, SH. J

~ r_,

~ r* 1-,_:.::._i

~:H__.:.:H:_;PC;. . 5- 24<<1 ~ - - - - - - ~ ,-~HPC.;,;IO,ci"~-'°~11',-1-~1~0*~--------~==:....,,llc.N-"N"'UCUNI=,.,,_--~

CHECK PHYSICAL owes f"OR LOCATION or Ct.ASS LIMns \

ZONE A-II I _____ -JO ____ _

l

~

10-.W-1 l"HPCl - 312 y TO HPCI FtOOR ORAIN

~ - 1"Rf'-57 1"Rr-ncs 1"HPCl-311 CONT. ON 2038, ZONE J-e C Rf - 7.50 2"Rf' 2~PQ:: 1IIC\I CONT ON 'j ..t,,,,.+4-- -M l"'HPCl-253 2"HPC1-,acv - ~:~* r-a 3

~ l c

B B 149HP-1-HPC1-101-14*

HPCl- 11

~

  • HPCl-26 HPCl-329 PC-211 PC-292 PC-21!!11 HPCl-252 PC-289 HPCl-"4 CONT. ON PC-294 PC-295 PC-2&4 PC-285 :zoJe.

ZONE J-7 C C CONT'D f ROM ZONE E- t 2 HPCl-25-4 HPCl-102 4"HP-2 1-HPCl-110-4* 4~P-4 HPCI ttsT RETURN LINE J'4"HPCl-8J 4 PCl-2~ I

~ BAR~

~-HPCl-&4 TIST 1

l;ii

-~

  • 1-HPCl-109-ljl~

l; .i D D ei-J oc b ,Jf." HPCJ-19 u ~ TO EQUIP.

DRAIN, S£E owe. 20JI, ,J4" HPCl-111 el-- ....

oc z ZONE J- 7

~ " HPCl-22

_ _ _1 ! ) ~ -

1 E

~ _J

.~

i:8

~i ~~L

~l 1-WS-117-101

ON ZONE H-5 S£E ZONE A-1, A-2, 8-1

  • 8-2 ""' CONTI~TION l E

~i

~ 1

'14" HPCl-11RV

,. HPCl-115

'14" l',"

HPCl-251 1-HPCl-115- " ~TE 15 HPCl-250

    • i= 1"'HP-4 TO FlOOR MAIN WATERLINE

- ~

. l l"HPCl-l2

-~ 1.

.tl!lI£S; UNLESS OTHERWISE INDICATED AU. PRESSURE AN O/DA 19HF'CI-JJ 1"'BS- 2 FLOW INSTRUMENT ROOT LINES SHAU. BE J/4*. ROOT 1-HPCI-117-1 VALVES SHALL BE J/4*'1/2$JX EXCEPT AS NOTED. LINE

' UP TO ANO INCLUDING ROOT VN..V! S>W.L BE flJRNISHEO

~

CONT. ON ANO INSTALLED UNDER CONT. E-et-4.

zoJe.

ZONE J-9

  • es-2 2. AT Sol.MPUNC POINTS, CONNECTIONS, PR08ES ANO ROOT VN..VES SHAU. BE FURNISHED ANO INSTN..LEO UNDER 1-HPCl-129-F COHTIW:T E-81-4. PROBES SHALL BE FURNISHED ANO F 10"'HPCl-12CV VALV[ STEAM INSTN..L£0 IN ACCORD,trHCE Wffii CONTRACT PARA. 3. 4.2 I.EAl(Ofl' ANO owe. SP-0721 1 FlG. NUMBER AS N0l£0. CONT. Of 2'"HPC-.50 S-.WPLE PIPING SY E-70-J.

t-t HPCl-283 J. AU. -a5- 2* PIPINC SHOWN HERE ON IS Cl.ASS IIN HPCJ-2 NUClEAR ANO Cl.ASS NP POWER ClASSIFlCATIONS WITHIN e* TEMP. FUJSHINC THE LIMrTS SHOWN HEREON.

FROM owe. 2041, ZONE H-J c 4. HIGH POINT V!NTS AN O I.OW POINT DRAINS AA£ NOT SHOWN.

BLIND F1..ANG[

"PY-\

REUEf VALVE STANDBY GAS CONT. ON

~~' H-1

'I T~

!~

5.

6.

7.

"'CP* INDICATES LOCATION Of CAlHOOIC PROTECTION L£ADS TO BE INSTALLED IN ACCORDANCE WITH PARA.

1.4.14.2 CONTRACT £-lt- 4.

0El...£TED.

DELETED.

CONT. ON 1- HPCl-125-J* 20J7, &. FDA ADOmONAI.. INST'RUMOOATION INCtuOIHC ALARMS.

ZONE E-1 TEMPERATURE ANO VIBRATION INSTRUMENTATION ASSOCI-G ATED w/HPCI TURBINE. SEE G.E. owe. 729E291 B.C., SH. 2. G II. Rff. G.E. DWC. 115CI011 SH. 2 FOR INSTR. PIPING ANO s.o. 1e9l-ff'Cl -12 VAL.YE INSTALLATION AT INSTRUMENT RACK 25-.50, SE:C. A.

10. Rff. C.E. OWC. 1150I011 SH. J fOR INSTRUMENT PIPING SEE NOTE 18 /\ l;(~ HPCl-11 ANO VALVE INSTAI..LATION AT INSTRUMENT RACK 25-50, QS*,. HPCl-8 7 SEC. B.
11. DESIGN PRESSUM: fllOM PCV-50 TO R0-1JJ 41: R0-134

@_ -r- .., 1e'"HPCl-5&MV IS 250 PSIC PER DC M-023.

CT I .. (OLD MR 557W) 12. ROOT VN..VE HPCI-V-58 IS CAPPED AT RACK 25-50, FROM LS 2J -111A ik B f--~ ~

  • HP-4 S£C. B.

'\, ~ - HPCt-~~HPC1-1F 1J. ~~~~~* ~~E~~NTH~o=LI~~~~

~*s1CNAL. THESE BOUNOMIES ARE TOO NUMEROUS TO IDEHTIFY IN 19HP-4 FRON CONO. THIS MANNER (S[E ISi PROGAAM BOUNDARY OCSCRIPTIONS 1- HPCJ-107-1

  • STOAAGE TANKS fOR DETAILS).

LS 23-74,t. 41: B, 11*HPCl-11C\I ANO LS 2J-7!1A 41: B, 14. CB IS PRIMAAY CONTAINMENT 80IJNl)it.RV.

H CONT. CN 15. AU. PIPING OPEN TO PENETRATION X-206' ANO X-2068 H 20411, SH. 2 ON THIS ORAWJHC IS PART Of PRIMARY CONTAINMOO TO REACTOR Bl.DC. ZONES c-e

  • BOUNDARY.

EQUIP, DRAIN SUMP c -1 0 SEE owe. 202a. 11. WHERE LINES ARE INTERCONNEC'Tm ANO CONTlNUEO ON ZONE J-2 OTHER DRAWINGS, ZONE NUMBERS AR!. APPROXIMATE ONLY.

17. RHR STEAM CONDENSING IS NO L.ONG£R AN OP£RATIONAL WODE.
18. TUB INC INSTAU.(Q FOR lEVD. SWITCH CAUBRATION.

NJTHORJZED CONflGURATION PER EE03-72.

4"'HP-4 111. INDICATIONS ARE Al.SO AVAIL.ABLE IN THE ~ ROOM.

4riPCl- 1JCV (Rff: 71i11E271 SH e)

REVlSIOHS TO THIS DRAWING 454003637 REQUIRES A REVlSJON TO THE STATUS: RitleoN CORRESPONDING lSOKEY. STATUS 0.-.TE: 10/J0/ 20UI OS APPftOYCD: Gt..H,tr£lt.£ AS BUILT VER: M, RtV: 79 SIZE: F 1 ~P- 4 HPCI PUMP SUPPLY f"ROM SUPPftESSION CHNrolBER 1- HPCl- 100- 18* 1- HPCl-102- 115*

FLOW DIAGRA~ - HIGH PRESSURE BURNS & ROE i CONT. ON COOLANT INJECTION AND 11S"HPCl-10CV 2038, ZONE J-7 REACTOR FEED SYSTE~S l---=:J!!l!!!'= -.L._~~~---1~§ 11S~PCl-17W (OU, . . . ....,,, COOPER NUC LEAR STATION 2044 I L 2 3 4 5 6 7 8 9 10 11 12 _J