November 6, 2018

Mr. G. T. Powell

President and Chief Executive Officer

STP Nuclear Operating Company

P.O. Box 330

Wadsworth, TX 77483

SUBJECT: SOUTH TEXAS PROJECT ELECTRIC GENERATING STATION - NRC

INTEGRATED INSPECTION REPORT 05000498/2018003 AND

0500499/2018003

Dear Mr. Powell:

On September 30, 2018, the U.S. Nuclear Regulatory Commission (NRC) completed an

inspection at your South Texas Project Electric Generating Station Units 1 and 2. On

October 11, 2018, the NRC inspectors discussed the results of this inspection with you and

other members of your staff. The results of this inspection are documented in the enclosed

report.

The NRC inspectors did not identify any findings or violations of more than minor significance.

This letter, its enclosure, and your response (if any) will be made available for public inspection

and copying at http://www.nrc.gov/reading-rm/adams.html and at the NRC Public Document

Room in accordance with 10 CFR 2.390, Public Inspections, Exemptions, Requests for

Withholding.

Sincerely,

/RA/

Nicholas H. Taylor, Branch Chief

Project Branch B

Division of Reactor Projects

Docket Nos. 50-498 and 50-499

License Nos. NPF-76 and NPF-80

Enclosure:

Inspection Report 05000498/2018003

and 05000499/2018003 w/Attachments:

1. Documents Reviewed

2. NRC Request for Information

U.S. NUCLEAR REGULATORY COMMISSION

Inspection Report

Docket Numbers: 05000498, 05000499

License Numbers: NPF-76, NPF-80

Report Numbers: 05000498/2018003; 05000499/2018003

Enterprise Identifier: I-2018-003-0004

Licensee: STP Nuclear Operating Company

Facility: South Texas Project Electric Generating Station, Units 1 and 2

Location: Wadsworth, Texas

Inspection Dates: July 1, 2018 to September 30, 2018

Inspectors: A. Sanchez, Senior Resident Inspector

J. Choate, Resident Inspector

P. Elkmann, Senior Emergency Preparedness Inspector

S. Hedger, Emergency Preparedness Inspector

A. Meyen, Physical Security Inspector

N. Greene, PhD, Senior Health Physicist

L. Carson II, Senior Health Physicist

C. Alldredge, Health Physicist

R. Rolph, US NRC Region I, Health Physicist

J. Braisted, PhD, Reactor Inspector

W. Cullum, Reactor Inspector

Approved By: Nicholas H. Taylor

Chief, Project Branch B

Division of Reactor Projects

Enclosure

SUMMARY

The U.S. Nuclear Regulatory Commission (NRC) continued monitoring the licensees

performance by conducting an integrated inspection at South Texas Project Units 1 and 2 in

accordance with the Reactor Oversight Process. The Reactor Oversight Process is the NRCs

program for overseeing the safe operation of commercial nuclear power reactors. Refer to

https://www.nrc.gov/reactors/operating/oversight.html for more information. NRC-identified and

self-revealed findings, violations, and additional items are summarized in the table below.

Licensee-identified non-cited violations are documented in the Inspection Results at the end of

this report.

List of Findings and Violations

No findings or violations of more than minor significance were identified during the inspection.

2

PLANT STATUS

Unit 1 began the inspection period at rated thermal power. On September 5, 2018, an

inadvertent boration of the reactor coolant system occurred while placing a demineralizer bed in

service that lowered reactor power to 98 percent power. The reactor operators returned the

reactor to rated thermal power later that evening. The reactor remained at rated thermal power

until September 22, 2018, when the reactor entered coastdown operation for the upcoming

refueling outage. Reactor power decreased to 94 percent power by the end of the inspection

period.

Unit 2 operated at rated thermal power for the entire inspection period.

INSPECTION SCOPES

Inspections were conducted using the appropriate portions of the inspection procedures (IPs) in

effect at the beginning of the inspection unless otherwise noted. Currently approved IPs with

their attached revision histories are located on the public website at http://www.nrc.gov/reading-

rm/doc-collections/insp-manual/inspection-procedure/index.html. Samples were declared

complete when the IP requirements most appropriate to the inspection activity were met

consistent with Inspection Manual Chapter (IMC) 2515, Light-Water Reactor Inspection

Program - Operations Phase. The inspectors performed plant status activities described in

IMC 2515, Appendix D, Plant Status and conducted routine reviews using IP 71152, Problem

Identification and Resolution. The inspectors reviewed selected procedures and records,

observed activities, and interviewed personnel to assess licensee performance and compliance

with Commission rules and regulations, license conditions, site procedures, and standards.

REACTOR SAFETY

71111.01Adverse Weather Protection

Summer Readiness (1 Sample)

The inspectors evaluated summer readiness of offsite and alternate alternating current (AC)

power systems.

71111.04Equipment Alignment

Partial Walkdown (5 Samples)

The inspectors evaluated system configurations during partial walkdowns of the following

systems/trains:

(1) Unit 2, train A essential chilled water system while train B was out of service for planned

maintenance on July 2, 2018

(2) Unit 2, train A standby diesel generator while the turbine-driven auxiliary feedwater

pump was out of service for planned maintenance on July 16, 2018

(3) Units 1 and 2, diesel driven fire pumps 1 and 3 during maintenance to replace test

header return valve FP-0029 on July 23, 2018

3

(4) Unit 2, train C essential chilled water system while train A was out of service for planned

maintenance on August 21, 2018

(5) Unit 2, train C standby diesel generator while train A was out of service for planned

maintenance on August 21, 2018

71111.05AQFire Protection Annual/Quarterly

Quarterly Inspection (4 Samples)

The inspectors evaluated fire protection program implementation in the following selected

areas:

(1) Unit 1, train B essential chilled water room, Fire Area 29, Fire Zone Z140 on

August 15, 2018

(2) Unit 1, component cooling water heat exchangers and common header, Fire Area 27,

Zone 142 on September 27, 2018

(3) Unit 1, train B battery and distribution rooms, Fire Area 03, Fire Zone Z043 on

September 28, 2018

(4) Unit 1, train B electrical penetration area, Fire Area 03, Fire Zone Z0301 on

September 28, 2018

71111.06Flood Protection Measures

Internal Flooding (1 Sample)

The inspectors evaluated internal flooding mitigation protections in the Units 1 and 2

essential chilled water spaces on August 27, 2018.

Cables (1 Sample)

The inspectors evaluated cable submergence protection in:

(1) Unit 1, train C manhole C0XYAE KEM50 on May 10, 2018

(2) Unit 1, train B manhole B0XYAB KEM52 on August 20, 2018

(3) Unit 1, train B manhole B0XYAB KEM51 on September 19, 2018

(4) Unit 2, train A manhole A0XYAB KEM58 on August 20, 2018

(5) Unit 2, train B manhole B0XYAB KEM 55 on August 30, 2018

71111.07Heat Sink Performance Heat Sink (Triennial) (4 Samples)

The inspectors evaluated heat exchanger/heat sink performance on the following

components from September 10 through September 13, 2018:

(1) Unit 1, train A spent fuel pool heat exchanger, Section 02.02.c

(2) Unit 1, train B reactor containment fan cooler, Section 02.02.c

4

(3) Unit 2, train B electrical auxiliary building main air handling unit, Section 02.02.c

(4) Units 1 and 2 essential cooling pond, Section 02.02d, specifically Sections 02.02.d.1,

02.02.d.4, and 02.02.d.7 were completed.

71111.11Licensed Operator Requalification Program and Licensed Operator Performance

Operator Requalification (1 Sample)

The inspectors observed and evaluated a Unit 2 operating crew during a scenario involving a

deaerator relief valve failing open followed by a loss of train D battery power and a loss of

coolant accident on August 29, 2018.

Operator Performance (1 Sample)

The inspectors observed and evaluated Unit 1 control room operations placing control rods in

manual and steam dumps in steam pressure mode while control rod speed loop was being

troubleshot and calibrated on August 7, 2018.

The inspectors observed and evaluated Unit 1 control room operations during a thunderstorm

and heavy rain, alarm response to a safety-related 125Vdc trouble alarm (grounding), and a

report of a fire and possible power line failure while the train C emergency diesel generator was

inoperable on August 29, 2018.

71111.12Maintenance Effectiveness

Routine Maintenance Effectiveness (2 Samples)

The inspectors evaluated the effectiveness of routine maintenance activities associated

with the following equipment and/or safety significant functions:

(1) Units 1 and 2, essential chilled water system repeat maintenance rule functional failure

for the auxiliary oil pump oil leakage on May 2, 2018

(2) Review of the 10 CFR 50.65.a(3) periodic evaluation completed on September 28, 2018

71111.13Maintenance Risk Assessments and Emergent Work Control (5 Samples)

The inspectors evaluated the risk assessments for the following planned and emergent

work activities:

(1) Unit 1, planned risk due to train C battery room heater non-functional and train C battery

power operable, but degraded, on July 30, 2018

(2) Unit 1, planned risk due to train A essential cooling water and essential chilled water

unavailable, on August 15, 2018

(3) Unit 1, planned risk due to train D 125Vdc battery and inverter IV-1202 in which the

licensee entered the Configuration Risk Management Program (CRMP) on

September 6, 2018

5

(4) Unit 1, emergent risk to the replacement of a failed power supply in control rod

cabinet 2BD on September 7, 2018

(5) Unit 1, planned risk due to replacement of the train B residual heat removal pump motor

in which operations entered the CRMP on September 24, 2018

71111.15Operability Determinations and Functionality Assessments (5 Samples)

The inspectors evaluated the following operability determinations and functionality

assessments:

(1) Unit 1, turbine driven auxiliary feedwater pump following the discovery of a turbine

outboard gland joint leaking on July 16, 2018

(2) Westinghouse Technical Bulletin 17-3 for 7300 Solid State Protection System input relay

coil suppression diodes on September 24, 2018

(3) Unit 1, train C reactor vessel water level thermocouple differential temperature issues on

September 25, 2018

(4) Unit 1, train A essential cooling water pump following the discovery of degraded

performance due to a leaking return header blowdown valve on August 17, 2015

(5) Unit 1, pressurizer surge line displacement during power operations on

September 28, 2018

71111.18Plant Modifications (1 Sample)

The inspectors evaluated the following temporary or permanent modifications:

(1) Unit 2, temporary enclosure around a reactor coolant system leak from a flow transmitter

drain line on September 4, 2018

71111.19Post Maintenance Testing (6 Samples)

The inspectors evaluated the following post maintenance tests:

(1) Unit 1, train C battery heating, ventilation, and air conditioning heating coil following

repair of the heating coil on July 31, 2018

(2) Unit 1, train C emergency diesel generator following replacement of an air start solenoid

valve and a Bimba valve (controls metering rods for fuel pumps) due to a failed rated

load surveillance test on August 29, 2018

(3) Unit 2, reactor coolant flow and feedwater flow in loops 1, 2, 3, and 4 following power

supply and card replacement in the 7300 process cabinet 1A on September 4, 2018

(4) Unit 1, train D battery inverter following planned preventative maintenance on

September 7, 2018

6

(5) Unit 1, control rod control circuit following control cabinet power supply replacement on

September 7, 2018

(6) Unit 1, train B essential chilled water system following preventative maintenance on

September 19, 2018

71111.20Refueling and Other Outage Activities (1 sample)

The inspectors evaluated refueling outage 1RE21 activities September 25, 2018. The

inspectors completed inspection procedure Section 03.01.a.

71111.22Surveillance Testing

The inspectors evaluated the following surveillance tests:

Routine (2 Samples)

(1) Unit 1, diesel fire pump 2 on July 25, 2018

(2) Unit 2, train A solid state protection system slave relay testing on July 28, 2018

In-service (3 Samples)

(1) Unit 2, turbine driven auxiliary feedwater pump on July 19, 2018

(2) Unit 1, train A component cooling water system valve operability test on

September 11, 2018

(3) Unit 2, train A auxiliary feedwater pump on August 23, 2018

71114.01Exercise Evaluation (1 Sample)

The inspectors evaluated the biennial emergency plan exercise conducted June 12 and 13,

2018. The exercise scenario simulated a damaged impeller on a reactor coolant pump

leading to fuel damage from loose parts in the reactor vessel, the inability to trip the reactor,

a breach of the reactor coolant system inside containment, the failure of ventilation dampers

in the fuel handling building to close, a break on the coolant recirculation line outside of

containment, and an unfiltered radiological release through the open fuel handling building

ventilation.

71114.04Emergency Action Level and Emergency Plan Changes (1 Sample)

The licensee submitted a summary of Emergency Plan changes (Revision ICN 20-19) to

the NRC on June 15, 2018. The inspectors conducted an in-office review of the changes

from June 19 to July 9, 2018. This evaluation does not constitute NRC approval.

The inspector evaluated South Texas Project Electric Generating Station, Change

ICN 20-20, submitted on June 19, 2018. The evaluation was performed in-office from

August 9 through September 10, 2018. This evaluation does not constitute NRC

approval.

7

71114.06Drill Evaluation

Drill/Training Evolution (1 Sample)

The inspectors evaluated the licensees simulator-based licensed operator requalification

training evolution that involved high reactor coolant system activity, a failed open main

steam generator safety, and a small break loss-of-coolant-accident which resulted in an

unusual event and an alert declaration on July 24, 2018.

Emergency Planning Drill (1 Sample)

The inspectors evaluated the licensees emergency response combined functional drill that

involved high reactor coolant activity (led to an alert declaration), steam generator tube

rupture (led to a site area emergency declaration), and a stuck open steam generator

power-operated relief valve (led to a general emergency declaration) on

September 19, 2018.

71114.08Exercise Evaluation - Scenario Review (1 Sample)

The inspectors reviewed and evaluated the proposed scenario for the biennial emergency

plan exercise on May 15, 2018. The proposed scenario was evaluated to determine

whether it provided the emergency response organization opportunities to demonstrate key

emergency response organization skills. This review does not constitute NRC approval.

The inspectors also discussed the proposed scenario with staff at FEMA Region VI.

RADIATION SAFETY

71124.05Radiation Monitoring Instrumentation

Walkdowns and Observations (1 Sample)

The inspectors evaluated radiation monitoring instrumentation during plant walkdowns.

Calibration and Testing Program (1 Sample)

The inspectors evaluated the licensees calibration and testing program.

71124.06Radioactive Gaseous and Liquid Effluent Treatment

Walkdowns and Observations (1 Sample)

The inspectors evaluated the licensees radioactive gaseous and liquid effluent treatment

systems during plant walkdowns.

Calibration and Testing Program (Process and Effluent Monitors) (1 Sample)

The inspectors evaluated the licensees gaseous and liquid effluent monitor instrument

calibration and testing.

8

Sampling and Analyses (1 Sample)

The inspectors evaluated radioactive effluent sampling and analysis activities.

Instrumentation and Equipment (1 Sample)

The inspectors evaluated radioactive effluent instrumentation and equipment.

Dose Calculations (1 Sample)

The inspectors evaluated dose calculations.

71124.07Radiological Environmental Monitoring Program

Site Inspection (1 Sample)

The inspectors evaluated the licensees radiological environmental monitoring program.

Groundwater Protection Initiative Implementation (1 Sample)

The inspectors evaluated the licensees groundwater monitoring program.

71124.08Radioactive Solid Waste Processing and Radioactive Material Handling, Storage,

and Transportation

Radioactive Material Storage (1 Sample)

The inspectors evaluated the licensees radioactive material storage.

Radioactive Waste System Walkdown (1 Sample)

The inspectors evaluated the licensees radioactive waste processing facility during plant

walkdowns.

Waste Characterization and Classification (1 Sample)

The inspectors evaluated the licensees radioactive waste characterization and

classification.

Shipment Preparations (1 Sample)

The inspectors evaluated the licensees radioactive material shipment preparation

processes.

Shipment Records (1 Sample)

The inspectors evaluated the licensees non-excepted package shipment records.

9

OTHER ACTIVITIES - BASELINE

71151Performance Indicator Verification (3 Sample)

The inspectors verified licensee performance indicators submittals listed below:

(1) MS06: Emergency AC Power Systems (07/01/2017 - 06/30/2018)

(2) MS07: High Pressure Injection Systems (07/01/2017 - 06/30/2018)

(3) MS08: Heat Removal Systems (07/01/2017 - 06/30/2018)

(4) EP01: Drill/Exercise Performance Sample (04/01/2017-03/31/2018)

(5) EP02: Emergency Response Organization Drill Participation Sample

(04/01/2017-03/31/2018)

(6) EP03: Alert And Notification System (ANS) Reliability Sample (04/01/2017-

03/31/2018)

71152Problem Identification and Resolution

Annual Follow-up of Selected Issues (1 Sample)

The inspectors reviewed the licensees implementation of its corrective action program

related to the following issues:

(1) The failure of the Unit 1 technical support center diesel generator output breaker to close

during surveillance testing on March 21, 2018, and again on June 18, 2018

71153Follow-up of Events and Notices of Enforcement Discretion

Events (2 Samples)

The inspectors evaluated the Unit 1 reactor operator response to an inadvertent boration of

the reactor coolant system while placing a demineralizer bed in service that lowered reactor

power to 98 percent power at the end of core life on September 5, 2018.

The inspectors evaluated the Unit 2 reactor operator response to a power supply failure in

the Westinghouse 7300 process cabinet 1A that resulted in four reactor coolant loop flow

and four feedwater flow transmitters failing low on September 4, 2018. The balance of plant

operator took immediate actions to control steam generator level and avoided a reactor trip.

EXIT MEETINGS AND DEBRIEFS

On May 11, 2018, the inspectors discussed the proposed biennial exercise scenario with

Ms. D. Bordelon, Branch Chief, Technological Hazards Branch, FEMA Region VI, and other

members of the FEMA regional staff.

10

On May 15, 2018, the inspectors discussed the results of the in-office review of the licensees

preliminary exercise scenario with Mr. J. Enoch, Manager, Emergency Preparedness, and other

members of the licensees staff.

On June 14, 2018, the inspectors discussed the biennial exercise conducted June 12, 2018,

with Ms. D. Bordelon, Branch Chief, Technological Hazards Branch, FEMA Region VI, and other

members of the FEMA regional staff.

On July 12, 2018, the inspectors presented the emergency preparedness exercise inspection

results to Mr. G. T. Powell, President and Chief Executive Officer, and other members of the

licensee staff.

On July 26, 2018, the inspectors presented the baseline radiation protection inspection results

to Mr. A. Capristo, Executive Vice President, and other members of the licensee staff. The

inspectors verified no proprietary information was retained or documented in this report.

On September 10, 2018, the emergency preparedness inspector communicated the emergency

plan evaluation results to Mr. S. Korenek, Emergency Planner, Emergency Response, and other

members of the licensee staff. The inspectors verified no proprietary information was retained

or documented in this report.

On September 13, 2018, the inspectors presented the triennial heat sink performance

inspection results to Mr. G. T. Powell, President and Chief Executive Officer, and other

members of the licensee staff. The inspectors verified no proprietary information was retained

or documented in this report.

On October 11, 2018, the resident inspector presented the quarterly resident inspector

inspection results to Mr. G. T. Powell, President and Chief Executive Officer, and other

members of the licensee staff. The inspectors confirmed that proprietary information was

controlled to protect from public disclosure.

11

DOCUMENTS REVIEWED

71111.04 - Partial Equipment Alignment

Procedures

Number Title Revision

0POP02-DG-0001 Emergency Diesel Generator 11(21) 68

0POP02-FP-0001 Fire Protection System Operation 43

Drawings

Number Title Revision

5V119V10001 HVAC Essential Chilled Water System 33

5Q159F22540 Standby Diesel Jacket Water 22

5Q159F22544 Standby Diesel Starting Systems and Alarms 1

5Q159F22546 Standby Diesel Starting Air 25

7Q270F00006 Fire Protection Storage and Pumps 22

71111.05AQFire Protection Quarterly

Procedures

Number Title Revision

0PGP03-ZF-0018 Fire Protection System Functionality Requirements 19

0-MAB29-FP-0140 Fire Preplan, Mechanical Auxiliary Building CCW Pump and 3

Chiller, Train B

0EAB03-FP-0031 Fire Preplan Electrical Auxiliary Building Electrical penetration 4

Area, Train B

0EAB03-FP-0043 Fire Preplan Electrical Auxiliary Building Channel III Battery and 3

Distribution Room

71111.06 Flood Protection Measures

Work Authorization Number (WAN)

553777 553283 553282 554117 559078

71111.07Heat Sink Performance Heat Sink (Triennial)

Condition Reports (CRs) (Reviewed)

07-16477 17-213 98-15552 15-23265 99-1977

17-12482 18-604 12-29783 16-4069 18-7562

Attachment 1

Condition Reports (CRs) (Issued)

18-7217 18-10613 18-10614 18-10615 18-10616

18-10618 18-10620 18-10638 18-10699 18-10712

Work Authorization Numbers

34518929 34252482 34590856 33830088 33045590

34595534 34331491 34084950 33709492 34370341

32514939 33593163 34666717 34639238 34713602

33946792

Design Change Notices

97-03085 98-00612 98-00613 98-00614 98-00615

98-00616 98-00617 98-00618

Procedures

Number Title Revision

0PGP03-ZE-0080 Essential Cooling Water System Reliability Program 2

0PGP03-ZO-0057 Operator Time Critical Action Program 2

0POP02-CC-0001 Component Cooling Water 51

0POP02-CH-0001 Essential Chilled Water Operations 57

0POP02-EW-0001 Essential Cooling Water Operations 76

0POP02-FC-0001 Spent Fuel Pool Cooling and Cleanup System 89

0POP02-HC-0001 Containment HVAC 29

0POP02-HE-0001 EAB HVAC Operations 38

0POP04-AE-0001 First Response to Loss of Any or All 13.8 KV or 4.16 KV Bus 44

0POP05-EO-ES01 Reactor Trip Response 29

0PSP15-CC-0001 Component Cooling Water System Pressure Test 8

Chapter 13 Closed Cooling Water Chemistry Strategic Plan 7

Drawings Revision

Number Title or Date

0-Y-0101 Essential Cooling Pond General Layout 0

0-Y-0103 Essential Cooling Pond Sections and Details 0

0-Y-0104 Essential Cooling Pond Sections and Details 0

0-Y-36101 Essential Cooling Pond General Layout 2

0-Y-36103 Essential Cooling Pond Sections and Details 7

A1-2

Drawings Revision

Number Title or Date

0-Y-6587 Essential Cooling Pond 0

13304 Modified DAA-P-7900 Backdraft Damper N

5R209F05018 Piping and Instrumentation Diagram Component Cooling 18

Water System

5R-20-9-Z-420421 RCFC CCW Supply and Return Logic Diagram 7

A-6382 Bolt Torque Sequence February 13,

1978

C-5053-2 Tube Bundle Details 2

D-5051-5 Spent Fuel Pool H.E. November 12,

1976

Calculations Revision

Number Title or Date

0PGP04-ZA-0307 Essential Chilled Water / EAB HVAC Design Basis Loads 6

with Capacity of 300 Tons per Train

2V149MC5674 Reactor Containment Fan Cooler System Failure Modes 1

and Effects Analysis (RCFC FMEA)

5V149MC5910 Containment Abnormal Temperature 0, 2

MC-06482A Essential Chilled Water Minimum Flow Requirements for 0

EAB, CRE, FHB, and MAB Coolers

MC-6470 RCFC Pressure Increase Following LOOP 0

NC-7106 Spent Fuel Pool Heatup Analysis 3

Miscellaneous

Documents Revision

Number Title or Date

17000849 PM to visually monitor sago pond weed September

11, 2018

2V149VB00114 Design Basis Document RCB HVAC System 4

2V211VS0001 Specification for Reactor Containment Fan 2

Cooler 2V211VS001

5R219MQ1022 Design Criteria for Spent Fuel Pool Cooling and Cleanup 5

5R289MB01006 Design Basis Document Essential Cooling Water System 8

CC-4 IST Bases Document - Valves 6

CR-12-11656-37 2012 Essential Cooling Pond Inspection Report October 9,

2012

CREE 99-1977-2 Post-DBA Operation with No RCFC 0

A1-3

Miscellaneous

Documents Revision

Number Title or Date

DCP 96-10411-11 Evaluate Piping Stresses Due to Increased Pressure 0

DCP 96-10411-5 Update to Vendor Calculation NESE205 - Code Calculation 0

for Cooling Coil

DCP-95-8208-5 Increase Closure Time on MOVs (CCMOV0032 & 0

CCMOV0447)

ST-HL-AE-3341 Service Water System Problems Affecting Safety-Related January

Equipment 29, 1990

ST-HL-AE-5336 Compliance of Refueling Practices With Licensing Basis April 4,

1996

VTD-A220-0027 Instruction Manual for the Installation, Operation, and 2

Maintenance of the Reactor Containment Fan Cooler

VTD-A340-0001 AWV Model DAA-P-7900 Backdraft Damper Revised June 5,

Operating & Maintenance Manual 1980

VTD-W351-0006 Instruction Manual for Westinghouse NSSS Heat 1

Exchangers

71111.11QOperator Requalification

Condition Reports (CR)

18-9026

Work Authorization Number (WAN)

594022

A1-4

Procedures

Number Title Revision

0POP04-MS-0001 Excessive Steam Demand 13

0POP04-TM-0001 Turbine Load Rejection 18

0POP04-TM-0005 Fast Load Reduction 34

0PMP08-RS-0660 RCS Rod Speed Control Calibration Loop (S-0660) 22

0POP04-VA-0001 Loss of 120 VAC Class Vital Distribution 32

0POP04-RC-0003 Excessive RCS Leakage 23

0POP05-E-EO00 Reactor Trip or Safety Injection 24

0POP05-EO-EO10 Loss of Reactor or Secondary Coolant 23

0POP05-EO-ES12 Post LOCA Cooldown and Depressurization 19

0ERP01-ZV-IN01 Emergency Classification 10

1POP09-AN-03M2 1-03M-2 Response Instructions 32

Documents

Number Title Revision

Scenario RST218.16 RCS LOCA to ES12 0

71111.12Maintenance Effectiveness

Condition Reports (CRs)

17-22662 18-7536

Procedures

Number Title Revision

SEG-009 Maintenance Rule Basis Document Guideline 6

SEG-002 Maintenance Rule equipment History Review

0PGP04-ZE-0313 Maintenance Rule Program

71111.13 - Maintenance Risk Assessments and Emergent Work Control

RAsCal Sequence Numbers

3238 3205 3234 3206 3235

3198 3231 3231 3201 3232

A1-5

Procedures

Number Title Revision

0POP02-CV-0004 Chemical and Volume Control System Subsystem 87

0PGP03-ZA-0090 Work Process Program 42

0PGP03-ZG-RMTS Risk Managed Technical Specification Program 2

0POP01-ZO-0006 Risk Managed Actions (RMAs) 24

0PGP03-ZA-0091 Configuration Risk Management Program 14

71111.15 - Operability Determinations and Functionality Assessments

Condition Reports (CRs)

18-8533 17-22601 18-3616

Work Authorization Number (WAN)

586707

Procedures

Number Title Revision

0PSP03-AF-0007 Auxiliary Feedwater Pump 14(24) Inservice Test 51

0PGP03-ZA-0133 Station Leak Management Program 5

0PSP05-AM-0050 Reactor Vessel Water Level Calibration 19

0PMP05-RH-0001A Residual Heat Removal Pump 2B Motor Inspection 0

Drawings Revision

Number Title or Date

5S141f00024 SHT. 2 Auxiliary Feedwater 5

5A141F00024 SHT. 1 Auxiliary Feedwater 13

Miscellaneous

Documents Revision or

Number Title Date

MC6426 IVC/AFW Cooling Load and Room Heat-Up 0

TB-17-3 7300 NAL Board Influenced by Voltage Transients Caused by October 23,

Unsuppressed Solid State Protection System Input Relay Coil 2017

71111.18 - Plant Modifications

A1-6

Condition Reports (CR)

18-10183

Work Authorization Number (WAN)

596738

Procedures

Number Title Revision

0PGP03-ZO-0009 Temporary Leak Repair 7

71111.19 - Post Maintenance Testing

Condition Reports (CRs)

18-10029 00-10707 18-10463 01-11834 98-7133

04-15971 18-10325 18-10371

Work Authorization Number (WAN)

584335 595897 552504 549316 547039

551744 596637 596675 596639 596688

Procedures

Number Title Revision

0PGP03-ZF-0001A Hot Work Program 5

0PGP03-ZA-0514 Controlled System or Barrier Impairment 17

0PGP03-ZF-0018 Fire Protection System Functionality Requirements 19

0PGP03-DJ-0001 Class 1E Battery Monitoring and Maintenance Program 2

0PGP03-ZA-0010 Performing and Verifying Station Activities 38

0POP01-ZA-001 Plant Operations Department Administrative Guidelines 50

0PSP03-DG-0018 Standby Diesel 12(23) Twenty-Four Hour Load Test 50

0POP11-DJ-0002 Online Class 1E 125V DC Battery and Inverter Removal from 13

Service and Restoration

0PMP05-VA-0006 120 VAC NSSS Vital 10 KVA Inverter/Rectifier Maintenance 17

0PMP05-VA-0007 120 VAC NSSS Vital Inverter/Rectifier (10KVA) Performance 16

Test

0PMP05-CH-0003 York Chiller Inspection & Maintenance 300 Tons 13

71111.20 - Refueling and Other Outage Activities

A1-7

Procedures

Number Title Revision

0PGP03-ZG-0008 Power Operations 68

71111.22 - Surveillance Testing

Condition Reports (CRs)

18-5583 18-8940 18-7676 18-8933 18-8940

Procedures

Number Title Revision

0PSP03-AF-0007 Auxiliary Feedwater Pump 14(24) Inservice Test 51

0PDP01-ZE-0002 Environmental Equipment Qualification Program 5

0PTP03-FP-0106 Fire Protection Water System Functional Test 18

0PGP03-ZF-0018 Fire Protection System Functionality Requirements 19

0PSP03-SP-0008A SSPS Train A Quarterly Slave Relay Test 29

0PAP01-ZA-0101 Plant Procedure Writers Guide 7

0POP01-ZA-0016 Emergency Operating Procedure Writers Guide 6

0PSP03-CC-0007 Component Cooling Water System Train 1A(2A) Valve 24

Operability test

Drawings Revision

Number Title or Date

7Q270F00006 Fire Protection Storage and Pumps 22

71114.01 - Exercise Evaluation

Condition Reports (CRs)

16-09927 16-10085 16-10119 16-10746 16-13401

16-15454 16-16045 17-14092 17-14845 17-15175

17-15177 17-15639 17-15956 17-15971 17-15974

17-18119 17-19076 17-19408 17-20136 17-20654

17-22006 17-23936 18-00745 18-02642 18-02752

18-03385 18-05590 18-05947 18-05948 18-06103

18-06387 18-06388 18-07528 18-07598 18-07599

18-07647 18-07645 18-07655 18-07657 18-07659

18-07662 18-07668 18-07669 18-07700 18-07737

18-07742

A1-8

Procedures

Number Title Revision

South Texas Project Emergency Plan, ICN 20-19 June 1,

2017

0PGP03-ZX-0002 Condition Reporting Process, 52

ZV-0017 Expected Protected Area Exposures during Emergencies, 2

ZV-0019 Scenario Design and Development, 4

ZV-0027 Drill and Exercise Performance Objectives and 5

Demonstration Criteria,

0PGP05-ZV-0001 Emergency Response Exercises and Drills, 17

0PGP05-ZV-0003 Emergency Response Organization, 19

0PGP05-ZV-0006 Emergency Notification and Response System 3

0ERP01-ZV-EF01 Radiological Director 13

0ERP01-ZV-EF03 Radiological Director 13

0ERP01-ZV-TS01 TSC Manager 18

0ERP01-ZV-OS01 OSC Coordinator 9

0ERP01-ZV-OS03 Radiological Coordinator 10

0ERP01-ZV-OS06 Emergency Teams 10

0ERP01-ZV-OF02 Joint Information Center Activation, Operation, and 14

Deactivation

0ERP01-ZV-RE01 Recovery Operations 12

0ERP01-ZV-IN01 Emergency Classification 10

0ERP01-ZV-IN02 Notification to Offsite Agencies 34

0ERP01-ZV-IN03 Emergency Response Organization Notification 18

0ERP01-ZV-IN04 Assembly and Accountability 16

0ERP01-ZV-IN05 Site Evacuation 17

0ERP01-ZV-IN06 Radiological Exposure Guidelines 7

0ERP01-ZV-IN07 Offsite Protective Action Recommendations 17

0ERP01-ZV-SH01 Shift Manager 31

Miscellaneous

Documents Revision

Number Title or Date

Blue Team Dress Rehearsal Final Report May 1, 2018

Combined Functional Drill, Final Report, Blue Team, April 9, 2018

March 1, 2018

A1-9

71114.04 - Emergency Plan and Emergency Action Level Changes

Condition Reports (CRs)

18-07593 18-08045

Procedures

Number Title Revisions

ZV-0023 10 CFR 50.54(q) Screening Reference Document 0

0PGP05-ZV-0010 Emergency Plan Change 18

0ERP01-ZV-OS01 OSC Coordinator 9

0ERP01-ZV-OS02 Assistant OSC Coordinator 2

0ERP01-ZV-OS06 Emergency Teams 10

0PGP03-ZV-0001 Severe Weather Plan 0, 21

0PGP03-ZV-0002 Hurricane Plan 8

A1-10

Miscellaneous

Documents Revision

Number Title or Date

NOC-AE-18003586 South Texas Project, Units 1 and 2; Docket Nos. July 19, 2018

STN 50-498; STN 50-499; Changes to South Texas

Project Electric Generating Station Emergency Plan

South Texas Project Electric Generating Station 0, 12, ICN

Emergency Plan 20-20

NOC-AE-17003490 South Texas Project Units 1 and 2, Docket Nos. June 15, 2017

STN 50-498; STN 50-499, Changes to South Texas

Project Electric Generating Station Emergency Plan and

Implementing Procedure

Form 1, Screen Emergency Plan Change ICN 20-19 May 15, 2017

Evaluation Form (CR Number: 17-13142)

Form 2, Effectiveness Emergency Plan Change ICN 20-19 May 15, 2017

Evaluation Form (CR Number: 17-13142)

Form 1, Screen Emergency Plan Change ICN 20-19 May 4, 2017

Evaluation Form (CR Number: 17-13142)

Form 2, Effectiveness Emergency Plan Change ICN 20-19 May 4, 2017

Evaluation Form (CR Number: 17-13142)

Form 1, Screen Emergency Plan Change ICN 20-19 May 4, 2017

Evaluation Form (CR Number: 15-25466)

Form 2, Effectiveness Emergency Plan Change ICN 20-19 May 4, 2017

Evaluation Form (CR Number: 15-25466)

Form 1, Screen Emergency Plan Change ICN 20-19 May 4, 2017

Evaluation Form (CR Number 15-800)

Form 1, Screen Emergency Plan Change ICN 20-19 May 4, 2017

Evaluation Form (CR Number: 16-10746)

Form 2, Effectiveness Emergency Plan Change ICN 20-19 May 4, 2017

Evaluation Form (CR Number: 16-10746)

Form 1, Screen Emergency Plan Change ICN 20-19 May 15, 2017

Evaluation Form (CR Number: 17-13142)

Procedure 71 Matagorda County Annex W Implementing Procedures, 12

(STI 33867119) Reception Center Operations

Letter from Matagorda County, Texas, to November 7,

Ms. V. Wagnon, Emergency Response Division, STP 2017

Nuclear Operating Company

Letter from Matagorda Regional Medical Center to December 12,

Ms. V. Wagnon, Emergency Response Division, STP 2017

Nuclear Operating Company

A1-11

Letter from American Red Cross, Greater Houston Area October 12,

Chapter, to Ms. V. Wagnon, STP Nuclear Operating 2017

Company

Letter from Palacios Independent School District to September 14,

Ms. V. Wagnon, Emergency Response Division 2017

71114.06 - Drill Evaluation

Procedures Revision

Number Title or Date

0ERP01-ZV-IN01 Emergency Classification 10

0ERP01-ZV-IN02 Notifications to Offsite Agencies 34

0ERP01-ZV-SH01 Shift Manager 31

0POP04-RC-0001 Radiation Monitoring 12

0POP04-MS-0001 Excessive Steam Demand 13

0POP05-EO-EO00 Reactor Trip or Safety Injection 24

0POP05-EO-EO10 Loss of Reactor or Secondary Coolant 23

0POP05-EO-EO20 Faulted Steam Generator 12

Miscellaneous

Documents Revision

Number Title or Date

RST 218.13 Enhanced E-Plan July 24, 2018

71114.08 - Exercise Evaluation, Scenario Review

No additional documents were reviewed

71124.05 - Radiation Monitoring Instrumentation

Condition Reports (CRs)

16-14361 16-14363 16-15090 16-15117 16-15149

16-15448 16-05703 17-00514 17-13733 17-15060

17-15478 17-16951 17-17443 17-17496 17-21204

17-21451 17-21637 17-22536 17-23899 17-00833

18-01325 18-00429 18-00640

A1-12

Procedures

Number Title Revision

0PRP05-RA-0002 Radiation Monitoring System Alarm Response 22

0PRP05-RA-0025 Non-Technical Specification Monitor Set Points 8

0PRP05-ZO-0025 Operation of the Eberline Model 1000B Calibrator 6

0PRP05-ZO-0094 Operation of Portable Area Monitors 3

0PRP05-ZO-0124 Operation of the Shepherd 89-400 Calibrator 1

0PRP05-ZR-0010 Health Physics Instrumentation Program 26

0PTP04-ZC-0022 Calibration of Area Alarm Monitors / Underwater Meters 11

0PTP04-ZC-0025 Calibration of the J.L. Shepherd 89-400 Calibration Source 2

0PTP04-ZC-0036 Calibration of the Eberline AMS-4 Air Monitoring System 6

0PTP04-ZC-0038 Calibration of the Eberline PPM-1 Portable Personnel 1

Monitor

0PTP04-ZC-0044 Calibration of Counting Instruments 9

0PTP04-ZC-0047 Calibration of the Siemens Environmental Systems 15

Limited/ Thermo Electron Corporation Electronic Personal

Dosimeter

0PTP04-ZC-0053 Calibration of Handheld Survey Meters / Ion Chambers 3

0PTP04-ZC-0054 Calibration of Area Monitors and Underwater Meters 0

0PTP04-ZC-0062 Maintenance Calibration of SAM Series Small Article 1

Monitors

0PTP04-ZC-0064 Monitor Calibration of Canberra Argos-5AB Whole Body 2

Monitors

0PTP04-ZC-0065 Monitor Calibration of Canberra GEM-5 Gamma Exit 0

Monitors

0PTP04-ZC-0066 Calibration of Ludlum 3030P Alpha-Beta Sample Counter 1

0PRP02-ZR-0011 Calibration of WBC System 6

0PRP10-ZL-0022 Quality Control of Radiological Laboratory Equipment 9

Calibration Records

Work Number Title Date

N1RA-RT-8100 Loop/Instrument N1RA-RT-8100 Area Radiation May 7, 2018

Monitor

RA-1-87015882 Electrical Penetration Area Radiation Transmitter April 6, 2017

155-00003-003 GEM-5 Gamma Portal Monitor- Unit 1 Egress January 8, 2018

A1-13

Calibration Records

Work Number Title Date

155-00004-008 ARGOS-5AB - Personnel Contamination Monitor - February 16, 2018

Unit 1 Egress

155-00105-011 Eberline PCM1C - Personnel Contamination Monitor February 12, 2018

- Unit 1 Hot Chem Lab

155-00149-009 SAM13 - the Tool & Equipment Monitor formerly July 10, 2018

known as Small Article Monitor

Whole Body Counter Calibration Records

Number Title Date

U0502 Accuscan Calibration Verification 0PRP02-ZR-0011 June 21, 2018

U0502 Ortec Stand Fast Calibration 0PRP02-ZR-0011 June 19, 2018

71124.06 - Radioactive Gaseous and Liquid Effluent Treatment

Condition Reports (CRs)

16-14361 16-15448 16-15117 17-01109 17-13049

17-23899 18-01649 18-02556 18-06605 18-06879

18-07624

Procedures

Number Title Revisions

OPSP07-VE-0002 Gaseous Effluent Particulate and Iodine Sampling and 19

Analysis

OPSP07-VE-0005 Gaseous Effluent Dose Assessment 8

OPCP07-ZS-0010 Waste Monitor Tank Sampling 4

OPSP07-WL-LPD Liquid Effluent Permit 19

OPSP05-RA-8010A Unit Vent Particulate and Iodine Effluent Monitor 16 &17

Calibration (RT 8010A)

OPSP05-RA-8010B MAB Unit Vent Wide Range Gas Monitor (RT 8010B) 19 & 20

OPSP05-RA-8038 Liquid Waste Processing System No. 1 Monitor 15 & 16

Calibration (RT -8038)

A1-14

Audits and Self-Assessments

Number Title Date

LER 2017-002-00 Inoperable Control Room Envelope Makeup January 22, 2018

Filtration System Heating Coil

Effluent Release Permits

Permit Number Type Release System Date

2731 Liquid Waste Monitor Tank - 2F October 23, 2017

2768 Liquid Waste Monitor Tank -1F January 14, 2018

2834 Liquid Waste Monitor Tank -2E May 31, 2018

Calibrations and Surveillances

Work Order System Date(s)

500654 Unit 1, Unit Vent Particulate and Iodine Monitor June 12, 2017

532858 RT-8010A October 19, 2017

470609 Unit 2, Unit Vent Particulate and Iodine Monitor February 5, 2016

500357 RT-8010A July 20, 2017

454013 Unit 1, Unit Vent Wide Range Particulate and Iodine July 16, 2015

490785 Monitor RT-8010B January 12, 2017

489573 Unit 2, Unit Vent Wide Range Particulate and Iodine January 27, 2017

582605 Monitor RT-8010B February 6, 2018

477937 Unit 1, Liquid Waste Processing Monitor RT-8038 May 3, 2016

504294 September 20, 2017

473187 Unit 2, Liquid Waste Processing Monitor RT-8038 March 1, 2016

502680 August 3, 2017

Miscellaneous

Documents

Number Title Date

STI 34430426 2016 Radioactive Effluent Release Report April 5, 2017

STI 34589689 2017 Radioactive Effluent Release Report April 17, 2018

STI 34564851 Offsite Dose Calculation Manual Revision 20 February 1, 2018

71124.07 - Radiological Environmental Monitoring Program

Condition Reports (CRs)

16-14830 17-00229 17-01466 17-15605 17-15749

17-19558 17-21812 17-24091 17-24113 18-00093

18-02069 18-04004 18-07292

A1-15

Procedures

Number Title Revision

0PGP03-ZO-0053 Radiological Ground Water Protection Program 6

0PRP10-ZL-0002 Quality Assurance for the Radiological Laboratory 15

0PRP10-ZL-0006 Sample Receipt, Accountability and Storage 13

0PRP10-ZL-0010 Preparation of Samples for Tritium Analysis by Liquid 14

Scintillation Counting

0PRP10-ZL-0011 Preparation of Samples for Gamma Analysis 10

0PRP10-ZL-0022 Quality Control of Radiological Laboratory Equipment 9

0PRP10-ZL-0030 Interlaboratory Radioassay Measurement Assurance Program 3

0PRP10-ZO-0003 Operation and Calibration of the Radiological Laboratorys 15

Gamma Counting System

0PRP10-ZU-0001 Radiological environmental monitoring program Sample 10

Collection

Audits and Self-Assessments

Number Title Date

MN-17-0-106455 Quality Monitoring Report: Offsite Dose Calculation November 6,

Manual and Effluent Monitoring 2017

MN-18-0-106601 Quality Monitoring Report: Radiological Laboratory and February 19,

radiological environmental monitoring program Samples 2018

MN-18-0-106927 Quality Monitoring Report: Annual Environmental May 30,

Operating Report 2018

0PGP03-ZX-0003 Assessment Benchmark Report: QA Biannual radiological May 31,

environmental monitoring program Assessment 2018

Calibrations and Surveillances

Number Title Date

PO 222036 Certificate of Calibration for Digital Air Sampler: 12656, 12661, February 14,

12667, 12668, 12669, 12670, 12671, 26057 2018

WAN 548067 Structural Integrity Inspection of Primary Meteorological April 25, 2018

Tower

WAN 452308 Below Grade Anchorage Inspection of Primary Meteorological September

Tower 24, 2014

34583270 Primary Meteorological System Calibration November 30,

(60 Meter Tower) 2017

34675520 Primary Meteorological System Calibration May 15, 2018

(60 Meter Tower)

A1-16

Miscellaneous

Documents Revision

Number Title or Date

2016 Radioactive Effluent Release Report April 5, 2017

2016 Annual Radiological Environmental Operating April 2017

Report

2017 Radioactive Effluent Release Report April 17, 2018

2017 Annual Radiological Environmental Operating April 2018

Report

STI 34564851 Offsite Dose Calculation Manual 20

2017 Land Use Census November 16,

2017

34577948 I&C Maintenance Qualification Checkout Card November 20,

2017

STPEGS UFSAR: Chapter 2.3 19

0PRP10-ZL-0030 STPNOC 4th Quarter 2017 Measurement Assurance January 2,

Program (MAP) Samples 2018

0PRP10-ZL-0030 STPNOC 1st Quarter 2018 Measurement Assurance March 28, 2018

Program (MAP) Samples

10-22057-5 10 CFR 50.59 Evaluation: Primary and Backup Met July 24, 2017

Tower Computer Upgrade

Tower Systems Inc. Inspection Report for 60M Rohn April 25, 2018

  1. 80 Guyed Tower

Groundwater Protection Plan South Texas Project June 4, 2018

71124.08 - Radioactive Solid Waste Processing, and Radioactive Material Handling, Storage,

and Transportation

Condition Reports

16-15125 17-14550 17-17816 17-18115 17-24019

12-05672 18-01038 18-01066 18-01874 18-03951

18-04328

Procedures

Number Title Revision

SEG-0001 System Engineering Administrative Guideline 16

WCG-0001 Work Screening and Processing 29

WGC-0002 Work Management Scheduling 40

0PGP03-ZA-0090 Work Process Program 42

0PGP03-ZA-0115 Hazardous Material Transportation Incident Response 02

A1-17

Procedures

Number Title Revision

0PGP03-ZO-0017 Radioactive Waste Process Control Program 08

0PGP03-ZR-0053 Radioactive Material Control Program 20

0POP02-WS-0002 High Integrity Container (HIC) Dewatering for Shipment 14

and Burial

0POP02-WS-0003 Waste Transfer to the Portable Solidification System 23

OPRP03-ZR-0001 Determination of Radioactive Material Curie Content, 11

Reportability, DOT Sub-Type, and Waste Classification

OPRP03-ZR-0002 Radioactive Waste Shipments 24

OPRP03-ZR-0009 10 CFR 61 Sampling and Analysis Program 08

OPRP03-ZR-0010 Sorting and Processing of Radioactive Material 16

OPRP03-ZR-0011 Shipment of Radioactive Material 20

OPRP03-ZR-0012 Processing, Tracking, and Loading of Spent Radioactive 08

Filters

OPRP03-ZR-0014 On-Site Staging Facilities Operations 10

OPRP03-ZR-0016 Receipt Inspection of Polyethylene Reusable Waste 00

Containers

OPRP04-ZR-0015 Radiological Posting and Warning Devices 35

OPRP07-ZR-0013 Filter Replacement (Filters Stored in Room 218-J) 08

OPRP07-ZR-0014 Filter Replacement (Alternate Storage Locations) 10

OPRP07-ZR-0025 Preparation and Shipment of High Integrity Containers 11

and Polyethylene Reusable Waste Containers

OPRP11-ZR-0003 Radioactive Material Transportation Accidents 05

Audits and Self-Assessments

Number Title Date

MN-18-106590 Quality Monitoring Report February 8, 2018

Snap Shot Self-Assessment Radwaste Shipping June 6, 2018

Program concerning NRC Inspection

Procedure 71124 Attachment 08

A1-18

Radioactive Material and Waste Shipments

Number Title Date

STP-0-17-060 48 In-Core Detectors / LSA II Class B December 13, 2017

STP-1-16-062 Cask Dewatered Resin / WCS; Andrews, Texas December 14, 2016

STP-1-18-033 Cask Dewatered Resin / WCS; Andrews, Texas June 14, 2018

STP-2-17-004 Cask Dewatered SFP Class B Resin / WCS; Andrews, February 16, 2017

Texas

STP-2-17-048 DAW LSA II/ WCS; Andrews, Texas August 9, 2017

STP-0-17-020 UniTech Laundry Trailer, Oak Ridge, Tennessee February 16, 2017

Miscellaneous

Documents Revision

Number Title or Date

2016 Annual Radioactive Effluent Release Report April 5, 2017

2017 Annual Radioactive Effluent Release Report April 17, 2018

STPEGS UFSAR: Chapter 11 19

71151 - Performance Indicator Verification

Condition Reports (CRs)

18-07598 18-07599

Procedures Revision

Number Title or Date

ZV-0013 Alert Radio Maintenance and Distribution, 1

ZV-0025 ERO Performance Tracking Guide, 1

0PGP05-ZV-0013 Performance Indicator Tracking Guide, Revision 8 8

0PGP05-ZV-0007 Prompt Notification System, 11

0PGP05-ZV-0016 Prompt Notification System Implementing Procedure, 12

SEG-0007 Mitigating System Performance Indicator Collection, 10

Processing and Maintenance of Data

A1-19

Miscellaneous

Documents Title Date

MSPI Derivation Report (Emergency AC Power System)- August 1,2018

Unavailability Index

MSPI Derivation Report (Emergency AC Power System)- August 1, 2018

Unreliability Index

MSPI Derivation Report (High Pressure Injection System)- August 1, 2018

Unavailability Index

MSPI Derivation Report (High Pressure Injection System)- August 1, 2018

Unreliability Index

71152 - Problem Identification and Resolution

Condition Reports (CRs)

18-7612 18-3343

71153 - Follow-up of Events and Notices of Enforcement Discretion

Condition Reports (CRs)

18-10325 18-10360

Procedures

Number Title Revision

0POP04-FW-0001 Loss of Steam Generator Level Control 28

0POP04-VA-0001 Loss of 120VAC Class Vital Distribution 32

0POP04-RP-0003 Failure of RCS Loop Flow Transmitter 4

A1-20

The following items are requested for the

Public Radiation Safety Inspection

at South Texas Project

Dates of Inspection: July 23 thru 27, 2018

Integrated Report 2018003

Inspection areas are listed in the attachments below.

Please provide the requested information on or before July 2, 2018.

Please submit this information using the same lettering system as below. For example, all

contacts and phone numbers for Inspection Procedure 71124.01 should be in a file/folder titled

1- A, applicable organization charts in file/folder 1- B, etc.

If information is placed on ims.certrec.com, please ensure the inspection exit date entered is at

least 30 days later than the onsite inspection dates, so the inspectors will have access to the

information while writing the report.

In addition to the corrective action document lists provided for each inspection procedure listed

below, please provide updated lists of corrective action documents at the entrance meeting.

The dates for these lists should range from the end dates of the original lists to the day of the

entrance meeting.

If more than one inspection procedure is to be conducted and the information requests appear

to be redundant, there is no need to provide duplicate copies. Enter a note explaining in which

file the information can be found.

If you have any questions or comments, please contact Natasha Greene at (817) 200-1154 or

Natasha.Greene@nrc.gov.

PAPERWORK REDUCTION ACT STATEMENT

This letter does not contain new or amended information collection requirements subject

to the Paperwork Reduction Act of 1995 (44 U.S.C. 3501 et seq.). Existing information

collection requirements were approved by the Office of Management and Budget,

control number 3150-0011.

Attachment 2

5. Radiation Monitoring Instrumentation (71124.05)

Date of Last Inspection: November 28, 2016

A. List of contacts and telephone numbers for the following areas:

1. Effluent monitor calibration

2. Radiation protection instrument calibration

3. Installed instrument calibrations

4. Count room and Laboratory instrument calibrations

B. Applicable organization charts

C. Copies of audits, self-assessments, vendor or Nuclear Procedures Issues Committee

(NUPIC) audits for contractor support and licensee event reports (LER), performed since

the date of the last inspection related to:

1. Area radiation monitors, continuous air monitors, criticality monitors, portable survey

instruments, electronic dosimeters, teledosimetry, personnel contamination monitors,

or whole body counters

2. Installed radiation monitors

D. Procedure index for:

1. Calibration, use, and operation of continuous air monitors, criticality monitors,

portable survey instruments, temporary area radiation monitors, electronic

dosimeters, teledosimetry, personnel contamination monitors, and whole body

counters.

2. Calibration of installed radiation monitors

E. Please provide specific procedures related to the following areas noted below.

Additional procedures may be requested by number after the inspectors reviews the

procedure index.

1. Calibration of portable ion chambers

2. Whole body counter calibration

3. Laboratory instrumentation quality control

F. A summary list of corrective action documents (including corporate and sub-tiered

systems) written since the date of the last inspection, related to the following programs:

1. Area radiation monitors, continuous air monitors, criticality monitors, portable survey

instruments, electronic dosimeters, teledosimetry, personnel contamination monitors,

whole body counters

2. Installed radiation monitors

3. Count room radiation instruments

NOTE: The lists should indicate the significance level of each issue and the search

criteria used. Please provide in document formats which are searchable so that

the inspectors can perform word searches.

G. Most recent calibration data for the whole body counters.

H. Radiation Monitoring System health report for the previous 12 months

A2-2

6. Radioactive Gaseous and Liquid Effluent Treatment (71124.06)

Date of Last Inspection: November 28, 2016

A. List of contacts and telephone numbers for the following areas:

1. Radiological effluent control

2. Engineered safety feature air cleaning systems

B. Applicable organization charts

C. Audits, self-assessments, vendor or NUPIC audits of contractor support, and LERs

written since the date of the last inspection, related to:

1. Radioactive effluents

2. Engineered Safety Feature Air cleaning systems

D. Procedure indexes for the following areas

1. Radioactive effluents

2. Engineered Safety Feature Air cleaning systems

E. Please provide specific procedures related to the following areas noted below.

Additional procedures may be requested by number after the inspectors reviews the

procedure indexes.

1. Sampling of radioactive effluents

2. Effluent monitor setpoint determination

3. Generating radioactive effluent release permits

4. Laboratory instrumentation quality control

5. In-place testing of HEPA filters and charcoal adsorbers

F. List of corrective action documents (including corporate and sub-tiered systems) written

since the date of the last inspection, associated with:

1. Radioactive effluents

2. Effluent radiation monitors

3. Engineered Safety Feature Air cleaning systems

NOTE: The lists should indicate the significance level of each issue and the search

criteria used. Please provide in document formats which are searchable so that

the inspectors can perform word searches.

G. Annual Radioactive Effluent Release Reports for calendar years 2016 and 2017, or the

two most recent reports.

H. Current revision of the Offsite Dose Calculation Manual

I. The 2016 and 2017 inter-laboratory comparison results for laboratory quality control

performance of effluent sample analysis, or the two most recent results.

J. Effluent sampling schedule for the week of the inspection

K. New entries into 10 CFR 50.75(g) files since the date of the last inspection

L. Operations department (or other responsible dept.) log records for effluent monitors

removed from service or out of service

M. Listing or log of liquid and gaseous release permits since the date of the last inspection

N. A list of the technical specification-required air cleaning systems with the two most

recent surveillance test dates of in-place filter testing (of HEPA filters and charcoal

A2-3

adsorbers) and laboratory testing (of charcoal efficiency) and the work order numbers

associated with the surveillances

O. System Health Report for radiation monitoring instrumentation. Also, please provide a

specific list of all effluent radiation monitors that were considered inoperable for 7 days

or more since the date of the last inspection. If applicable, please provide the relative

Special Report and condition report(s).

P. A list of significant changes made to the gaseous and liquid effluent process monitoring

system since the date of the last inspection. If applicable, please provide the

corresponding updated final safety analysis report section (UFSAR) in which this change

was documented.

Q. A list of any occurrence in which a non-radioactive system was contaminated by a

radioactive system since the date of the last inspection. Please include any relevant

condition report(s).

A2-4

7. Radiological Environmental Monitoring Program (71124.07)

Date of Last Inspection: January 9, 2017

A. List of contacts and telephone numbers for the following areas:

1. Radiological environmental monitoring

2. Meteorological monitoring

B. Applicable organization charts

C. Audits, self-assessments, vendor or NUPIC audits of contractor support, and LERs

written since the date of the last inspection, related to:

1. Radiological environmental monitoring program (including contractor environmental

laboratory audits, if used to perform environmental program functions)

2. Environmental TLD processing facility

3. Meteorological monitoring program

D. Procedure index for the following areas:

1. Radiological environmental monitoring program

2. Meteorological monitoring program

E. Please provide specific procedures related to the following areas noted below.

Additional procedures may be requested by number after the inspectors reviews the

procedure indexes.

1. Sampling, collection and preparation of environmental samples

2. Sample analysis (if performed onsite)

3. Laboratory instrumentation quality control

F. A summary list of corrective action documents (including corporate and sub-tiered

systems) written since the date of the last inspection, related to the following programs:

1. Radiological environmental monitoring

2. Meteorological monitoring

NOTE: The lists should indicate the significance level of each issue and the search

criteria used. Please provide in document formats which are searchable so that

the inspectors can perform word searches.

G. Copies of the two most recent calibration packages for the meteorological tower

instruments

H. Copies of the 2016 and 2017 Annual Radiological Environmental Operating Reports and

Land Use Census, and current revision of the Offsite Dose Calculation Manual.

I. Copy of the environmental laboratorys inter-laboratory comparison program results for

2016 and 2017, or the two most recent results, if not included in the annual radiological

environmental operating report

J. Data from the environmental laboratory documenting the analytical detection sensitivities

for the various environmental sample media (i.e., air, water, soil, vegetation, and milk)

K. Quality Assurance audits (e.g., NUPIC) for contracted services

L. Current NEI Groundwater Initiative Plan and status

A2-5

M. Technical requirements manual or licensee controlled specifications which list the

meteorological instruments calibration requirements

N. If applicable, per NEI 07-07, provide any reports that document any spills/leaks to

groundwater since the date of the last inspection.

A2-6

8. Radioactive Solid Waste Processing, and Radioactive Material Handling, Storage,

and Transportation (71124.08)

Date of Last Inspection: November 28, 2016

A. List of contacts and telephone numbers for the following areas:

1. Solid Radioactive waste processing

2. Transportation of radioactive material/waste

B. Applicable organization charts (and list of personnel involved in solid radwaste

processing, transferring, and transportation of radioactive waste/materials)

C. Copies of audits, department self-assessments, and LERs written since the date of the

last inspection related to:

1. Solid radioactive waste management

2. Radioactive material/waste transportation program

D. Procedure index for the following areas:

1. Solid radioactive waste management

2. Radioactive material/waste transportation

E. Please provide specific procedures related to the following areas noted below.

Additional procedures may be requested by number after the inspectors reviews the

procedure indexes.

1. Process control program

2. Solid and liquid radioactive waste processing

3. Radioactive material/waste shipping

4. Waste stream sampling and analysis

F. A summary list of corrective action documents (including corporate and sub-tiered

systems) written since the date of the last inspection, related to:

1. Solid radioactive waste

2. Transportation of radioactive material/waste

NOTE: The lists should indicate the significance level of each issue and the search

criteria used. Please provide in document formats which are searchable so that

the inspectors can perform word searches.

G. Copies of training lesson plans for 49 CFR 172 subpart H, for radwaste processing,

packaging, and shipping.

H. A summary of radioactive material and radioactive waste shipments made from the date

of the last inspection, to present

I. Waste stream sample analysis results and resulting scaling factors for 2016 and 2017,

or the two most recent results.

J. A listing of onsite radwaste storage facilities. Please include a summary or list of the

items stored in each facility.

A2-7

ML18310A040

SUNSI Review ADAMS: Non-Publicly Available Non-Sensitive Keyword:

By: NTaylor Yes No Publicly Available Sensitive NRC-002

OFFICE SRI:DRP/B RI:DRP/B C:DRS/PSB2 C:DRS/OB C:DRS/IPAT C:DRS/EB1

NAME ASanchez JChoate HGepford VGaddy GMiller TFarnholtz

SIGNATURE AAS JMC HJG vgg GBM TRF

DATE 11/01/18 10/31/18 10/25/18 10/26/18 10/25/18 10/25/2018

OFFICE C:DRS/EB2 BC:DRP/B

NAME GWerner NTaylor

SIGNATURE GEW NHT

DATE 10/30/2018 11/6/18