MONTHYEAR2CAN012401, U.S. Additional Protocol2024-01-17017 January 2024 U.S. Additional Protocol 2CAN012403, Supplemental Information - Adopt Risk-Informed Completion Times TSTF-505, Revision 2, Provide Risk-Informed Extended Completion Times - RITSTF Initiative 42024-01-11011 January 2024 Supplemental Information - Adopt Risk-Informed Completion Times TSTF-505, Revision 2, Provide Risk-Informed Extended Completion Times - RITSTF Initiative 4 0CAN012401, Registration of Cask Use2024-01-10010 January 2024 Registration of Cask Use 1CAN122301, Responses to Request for Additional Information for Request for Alternative for Implementation of Extended Reactor Vessel Inservice Inspection Interval (ANO1-ISl-037)2023-12-14014 December 2023 Responses to Request for Additional Information for Request for Alternative for Implementation of Extended Reactor Vessel Inservice Inspection Interval (ANO1-ISl-037) 2CAN112302, Submittal of Amendment 31 to Safety Analysis Report2023-11-16016 November 2023 Submittal of Amendment 31 to Safety Analysis Report 0CAN102303, Registration of Cask Use2023-10-24024 October 2023 Registration of Cask Use 0CAN102302, (ANO) Emergency Plan Revision 49 and Emergency Plan On-Shift Staffing Analysis Revision 32023-10-11011 October 2023 (ANO) Emergency Plan Revision 49 and Emergency Plan On-Shift Staffing Analysis Revision 3 0CAN102301, Evacuation Time Estimate (ETE) Study2023-10-0404 October 2023 Evacuation Time Estimate (ETE) Study 1CAN092301, Supplemental Information - Adopt Risk-Informed Completion Times TSTF-505, Revision 2, Provide Risk-Informed Extended Completion Times - RITSTF Initiative 42023-09-21021 September 2023 Supplemental Information - Adopt Risk-Informed Completion Times TSTF-505, Revision 2, Provide Risk-Informed Extended Completion Times - RITSTF Initiative 4 0CAN092302, Supplement to Request for Alternative Frequency to Containment Unbonded Post-Tensioning System Inservice Inspection (ANO-CISI-002)2023-09-14014 September 2023 Supplement to Request for Alternative Frequency to Containment Unbonded Post-Tensioning System Inservice Inspection (ANO-CISI-002) 2CAN092301, Reply to a Notice of Violation2023-09-0808 September 2023 Reply to a Notice of Violation 0CAN092301, Emergency Plan Implementing Procedure Revision2023-09-0505 September 2023 Emergency Plan Implementing Procedure Revision 0CAN082301, Units 1 and 2 - Changes to the Quality Assurance Program Approval Form for Radioactive Material Package No. 03412023-08-17017 August 2023 Units 1 and 2 - Changes to the Quality Assurance Program Approval Form for Radioactive Material Package No. 0341 2CAN082301, Inservice Inspection Summary Report for the Arkansas Nuclear One, Unit 2, Twenty-Ninth Refueling Outage (2R29)2023-08-10010 August 2023 Inservice Inspection Summary Report for the Arkansas Nuclear One, Unit 2, Twenty-Ninth Refueling Outage (2R29) 0CAN072301, Registration of Cask Use2023-07-18018 July 2023 Registration of Cask Use 1CAN062304, Supplement Related to License Amendment Request to Remove Technical Specification Condition Allowing Two Reactor Coolant Pump Operation2023-06-29029 June 2023 Supplement Related to License Amendment Request to Remove Technical Specification Condition Allowing Two Reactor Coolant Pump Operation 0CAN062301, Status of Actions to Return to Compliance2023-06-26026 June 2023 Status of Actions to Return to Compliance 0CAN062302, Submittal of Revision 22 of the ANO Fire Hazards Analysis2023-06-20020 June 2023 Submittal of Revision 22 of the ANO Fire Hazards Analysis 1CAN062301, Request for Alternative for Implementation of Extended Reactor Vessel Inservice Inspection Interval (ANO1-ISI-037)2023-06-0808 June 2023 Request for Alternative for Implementation of Extended Reactor Vessel Inservice Inspection Interval (ANO1-ISI-037) 0CAN052303, Annual 10 CFR 50.46 Report for Calendar Year 20222023-05-24024 May 2023 Annual 10 CFR 50.46 Report for Calendar Year 2022 0CAN052302, Emergency Plan Rev. 482023-05-11011 May 2023 Emergency Plan Rev. 48 0CAN052301, Units 1 and 2 - Annual Radiological Environmental Operating Report for 20222023-05-0909 May 2023 Units 1 and 2 - Annual Radiological Environmental Operating Report for 2022 2CAN052301, Cycle 30 Core Operating Limits Report (COLR)2023-05-0303 May 2023 Cycle 30 Core Operating Limits Report (COLR) 0CAN042302, Annual Occupational Radiation Exposure Report for 20222023-04-27027 April 2023 Annual Occupational Radiation Exposure Report for 2022 0CAN042301, Radioactive Effluent Release Report for 20222023-04-14014 April 2023 Radioactive Effluent Release Report for 2022 2CAN042301, License Amendment Request to Revise Technical Specifications to Adopt Risk-Informed Completion Times TSTF-505, Revision 2, Provide Risk-Informed Extended Completion Times - RITSTF Initiative 42023-04-0505 April 2023 License Amendment Request to Revise Technical Specifications to Adopt Risk-Informed Completion Times TSTF-505, Revision 2, Provide Risk-Informed Extended Completion Times - RITSTF Initiative 4 1CAN032301, License Amendment Request to Modify the Arkansas Nuclear One, Unit 1, Technical Specification 3.3.1, Reactor Protection System Instrumentation, Turbine Trip Function on Low Control Oil Pressure2023-03-30030 March 2023 License Amendment Request to Modify the Arkansas Nuclear One, Unit 1, Technical Specification 3.3.1, Reactor Protection System Instrumentation, Turbine Trip Function on Low Control Oil Pressure 2CAN032303, Responses to Request for Additional Information Concerning the Request for Alternative Regarding the Half-Nozzle Repair of Reactor Vessel Closure Head Penetration 462023-03-29029 March 2023 Responses to Request for Additional Information Concerning the Request for Alternative Regarding the Half-Nozzle Repair of Reactor Vessel Closure Head Penetration 46 2CAN032304, Supplement to the Request for Alternative Regarding the Half-Nozzle Repair of Reactor Vessel Closure Head Penetration 462023-03-29029 March 2023 Supplement to the Request for Alternative Regarding the Half-Nozzle Repair of Reactor Vessel Closure Head Penetration 46 2CAN032305, 03 Post Examination Analysis2023-03-23023 March 2023 03 Post Examination Analysis 1CAN032302, Inspection Summary Report for the Thirtieth Refueling Outage (1R30)2023-03-20020 March 2023 Inspection Summary Report for the Thirtieth Refueling Outage (1R30) 1CAN012301, Responses to Request for Additional Information for Request for Relief ANO1-ISI-0352023-01-30030 January 2023 Responses to Request for Additional Information for Request for Relief ANO1-ISI-035 2CAN012303, U.S. Additional Protocol2023-01-23023 January 2023 U.S. Additional Protocol 2CAN012302, Relief Request ANO2-RR-23-001, Half-Nozzle Repair of Reactor Vessel Closure Head Penetration 462023-01-20020 January 2023 Relief Request ANO2-RR-23-001, Half-Nozzle Repair of Reactor Vessel Closure Head Penetration 46 1CAN122201, License Amendment Request to Revise Technical Specifications to Adopt Risk-Informed Completion Times TSTF-505, Revision 2, Provide Risk-Informed Extended Completion Times - RITSTF Initiative 42022-12-22022 December 2022 License Amendment Request to Revise Technical Specifications to Adopt Risk-Informed Completion Times TSTF-505, Revision 2, Provide Risk-Informed Extended Completion Times - RITSTF Initiative 4 0CAN122202, Registration of Cask Use2022-12-21021 December 2022 Registration of Cask Use 0CAN122201, Reply to a Notice of Violation; EA-22-0992022-12-0808 December 2022 Reply to a Notice of Violation; EA-22-099 0CAN112201, Request for Alternative Frequency to Containment Unbonded Post-Tensioning System Inservice Inspection (ANO-CISI-002)2022-11-10010 November 2022 Request for Alternative Frequency to Containment Unbonded Post-Tensioning System Inservice Inspection (ANO-CISI-002) 1CAN102202, Application to Remove Technical Specification Condition Allowing Two Reactor Coolant Pump Operation2022-10-31031 October 2022 Application to Remove Technical Specification Condition Allowing Two Reactor Coolant Pump Operation 1CAN102203, Cycle 31 Core Operating Limits Report2022-10-24024 October 2022 Cycle 31 Core Operating Limits Report 1CAN102201, Supplement to Proposed Technical Specifications 3.4.12 and 3.4.13 Revised Dose Calculations2022-10-13013 October 2022 Supplement to Proposed Technical Specifications 3.4.12 and 3.4.13 Revised Dose Calculations 0CAN092201, Supplement to License Amendment Request for Approval of Changes to the Emergency Plan Staffing Requirements2022-09-29029 September 2022 Supplement to License Amendment Request for Approval of Changes to the Emergency Plan Staffing Requirements 1CAN092201, Supplement to Request for Relief from American Society of Mechanical Engineers Section XI Volumetric Examination Requirements - Fifth 10-Year Interval, First Period2022-09-0808 September 2022 Supplement to Request for Relief from American Society of Mechanical Engineers Section XI Volumetric Examination Requirements - Fifth 10-Year Interval, First Period 0CAN082201, License Amendment Request for Approval of Changes to the Emergency Plan Staffing Requirements2022-08-30030 August 2022 License Amendment Request for Approval of Changes to the Emergency Plan Staffing Requirements 1CAN082201, Request for Relief from American Society of Mechanical Engineers Section XI Volumetric Examination Requirements - Fifth 10-Year Interval, First Period2022-08-24024 August 2022 Request for Relief from American Society of Mechanical Engineers Section XI Volumetric Examination Requirements - Fifth 10-Year Interval, First Period 2CAN072201, Response to Request for Additional Information Requests for Relief from American Society of Mechanical Engineers Section XI Volumetric Examination Requirements - Fourth 10-Year Interval, Second and Third Periods2022-07-20020 July 2022 Response to Request for Additional Information Requests for Relief from American Society of Mechanical Engineers Section XI Volumetric Examination Requirements - Fourth 10-Year Interval, Second and Third Periods 0CAN072201, Registration of Cask Use2022-07-14014 July 2022 Registration of Cask Use 0CAN062202, Registration of Cask Use2022-06-0909 June 2022 Registration of Cask Use 1CAN062201, Response to the Request for Additional Information Proposed Technical Specifications 3.4.12 and 3.4.13 Revised Dose Calculations2022-06-0202 June 2022 Response to the Request for Additional Information Proposed Technical Specifications 3.4.12 and 3.4.13 Revised Dose Calculations 1CAN052201, Request for Relief Related to American Society of Mechanical Engineers (ASME) Code Case N-729-6 Augmented Examination Requirements ANO1-ISI-0352022-05-31031 May 2022 Request for Relief Related to American Society of Mechanical Engineers (ASME) Code Case N-729-6 Augmented Examination Requirements ANO1-ISI-035 2024-01-17
[Table view] |
Text
Entergy Nuclear Operations, Inc.
Entergy Operations, Inc.
1340 Echelon Parkway Jackson, MS 39213 Tel 601-368-5516 Bryan S. Ford Senior Manager, Regulatory Assurance 1CAN101804 October 31, 2018 U.S. Nuclear Regulatory Commission Attn: Document Control Desk Washington, DC 20555
SUBJECT:
Request for Relief from American Society of Mechanical Engineers (ASME)
Section XI Visual Examination Requirements ANO1-ISI-032 Fourth 10-Year Interval, Third Period Arkansas Nuclear One, Unit 1 Docket No. 50-313 License No. DPR-51
Dear Sir or Madam:
Pursuant to 10 CFR 50.55a(g)(6)(i), Entergy Operations, Inc. (Entergy) requests relief from the requirements of the ASME, Boiler and Pressure Vessel Code, Section XI, pertaining to the visual examination of the Reactor Vessel Support at Arkansas Nuclear One, Unit 1 (ANO-1). It was determined that the examination is impractical due to the interference of nearby components and high dose rates in the area of the examination. Specifics of the relief request are provided in the attachment.
10 CFR 50.55a(g)(5)(iv) requires that the basis for the determination of impracticality be submitted to the NRC for review and approval within 12 months after the expiration of the 120-month inspection interval. This relief is for the fourth ANO-1 10-year Inservice Inspection (ISI) interval, third period. The third period started on May 31, 2014 and was scheduled to end May 30, 2017. In accordance with ASME Section XI IWA-2430(d)(3) the third period was extended for this examination category to align with refuel outage 1R27. The third period ended May 30, 2018. The basis for the determination of impracticality is included in the attachment.
There are no new regulatory commitments made in this submittal.
If you have any questions or require additional information, please contact Stephenie Pyle at 479-858-4704.
Sincerely, ORIGINAL SIGNED BY BRYAN S. FORD BSF/dbb
1CAN101804 Page 2 of 2
Attachment:
Request for Relief - ANO1-ISI-032 cc: Mr. Kriss Kennedy Regional Administrator U. S. Nuclear Regulatory Commission, Region IV 1600 East Lamar Boulevard Arlington, TX 76011-4511 NRC Senior Resident Inspector Arkansas Nuclear One P.O. Box 310 London, AR 72847 U. S. Nuclear Regulatory Commission Attn: Mr. Thomas Wengert MS O-08B1A One White Flint North 11555 Rockville Pike Rockville, MD 20852
Attachment to 1CAN101804 Request for Relief ANO1-ISI-032
Attachment to 1CAN101804 Page 1 of 5 REQUEST FOR RELIEF ANO1-ISI-032 Components /
Reactor Vessel Support Skirt-to-Flange Weld and Bolting / ISI #01-035 Numbers:
Code Classes: American Society of Mechanical Engineers (ASME) Code Class 1
References:
ASME Section XI 2001 Edition w/ 2003 Addenda, Table IWF-2500-1 Examination F-A Category:
Item Number(s) F1.40
==
Description:==
Supports Other Than Piping Supports (Class 1, 2, 3, and MC)
Unit / Inspection Arkansas Nuclear One, Unit 1 (ANO-1) / Fourth (4th) 10-Year Interval, Interval Applicability: Third (3rd) Inspection Period I. CODE REQUIREMENTS ASME Section XI, Table IWF-2500-1, Examination Category F-A, Supports:
Item F1.40, Supports Other Than Piping Supports (Class 1, 2, 3, and MC), requires a visual examination of the support, as depicted in Figure IWF-1300-1.
II. RELIEF REQUEST Pursuant to 10 CFR 50.55a(g)(6)(i), Entergy Operations, Inc. (Entergy) requests relief from achieving the code required coverage when performing a visual examination (VT-3) of the component identified in Table 1.
III. BASIS FOR RELIEF During the ANO-1 twenty-seventh refueling outage (1R27) in the spring of 2018, ISI #01-035 (Reactor Vessel Support Skirt-to-Flange Weld and Bolting) was examined in compliance with the requirements of ASME Section XI, Table IWF-2500-1, Examination Category F-A. However, 100% coverage of the required examination area could not be obtained. Entergy filed a similar relief request (ANO1-ISI-020) for the limited examination of this support during the third ISI interval. The NRC approved that relief request in letter dated May 5, 2010 (ML101170119, TAC No. ME1444). The previous components (ISI #01-032,01-033, 01-034) listed in Table 3.6-1 of the May 5, 2010, letter that approved ANO1-ISI-020 have been combined herein into a single component (01-035) for the fourth interval to better align with the code requirement.
Attachment to 1CAN101804 Page 2 of 5 Examination of ISI #01-035 was limited due to its location in an area with general area radiation dose rates of 500-600 millirem per hour (mR/h) that is congested with incore instrumentation piping. Access to the support is approximately 12 feet above the floor level. Limited access and high dose rates make it impractical to safely erect and work from a scaffold to remove insulation panels to allow for better access. As a result, a fiberscope was deployed from under the vessel to perform the examination to the extent practical. Access from the outer diameter of the vessel is not practical due to plant configuration.
In order to examine the skirt-to-flange weld and bolting (formerly ISI #01-033 and 01-034), the fiberscope was inserted through narrow cut-outs in the support skirt. The examination of the accessible portions of the skirt-to-flange weld and bolting revealed no unacceptable indications.
The support skirt circumferential weld (formerly ISI #01-032) was not accessible for examination due to the surrounding insulation blocks and environmental conditions (i.e. high radiation and congestion due to incore instrumentation piping). Further, the positioning of the fiberscope through the access hole would not allow for the performance of a qualified VT-3 examination due to unsatisfactory distance and viewing angle. The examination performed on the subject support would detect general degradation, if it existed, demonstrating an acceptable level of integrity.
IV. PROPOSED ALTERNATIVE EXAMINATIONS No alternative examination is proposed at this time. Entergy has examined these welds to the extent practical and will continue to perform pressure testing on the subject components as required by the ASME Section XI Code.
V. CONCLUSION 10 CFR 50.55a(g)(6)(i) states:
The Commission will evaluate determinations under paragraph (g)(5) of this section that Code requirements are impractical. The Commission may grant such relief and may impose such alternative requirements as it determines is authorized by law and will not endanger life or property or the common defense and security and is otherwise in the public interest giving due consideration to the burden upon the licensee that could result if the requirements were imposed on the facility.
Entergy believes that it is impractical to obtain greater examination coverage on the subject components. To effectively obtain significant additional coverage would necessitate modification and/or replacement of the component. The examination performed on the subject support would detect general degradation, if it existed, demonstrating an acceptable level of integrity. In addition, pressure testing on the subject components as required by the ASME Section XI Code will assist in identifying integrity deficiencies. Entergy requests the proposed relief be authorized pursuant to 10 CFR 50.55a(g)(6)(i).
Attachment to 1CAN101804 Page 3 of 5 Table 1 Limited F-A Examinations Component Description Additional Information Estimated %
Item Comp. Item Coverage of Examination Exam Method and Search Surface Scan Plan Exam Results Number ID Description Code Required Summary Limitations Units Examination Volume F1.40 01-035 Reactor 50 Examination of the Not This support weld Not None No Vessel required area as Applicable. and bolting was Applicable. required. unacceptable Support depicted in Visual exam examined with a Visual indications Skirt-to- Fig. IWF-1300-1 performed fiberscope exam were recorded.
Flange Weld was limited due to only. deployed through performed Acceptable.
and Bolting the geometric cut-outs in the skirt. only.
configuration and Removal of environmental insulation blocks for conditions. better access was See attached impractical.
sketch derived from General area dose NDE report 1-ISI- rates of 500 -
VT-18-026 on file at 600 mr/Hr coupled ANO. with a confined area congested with incore instrumentation piping preclude safe scaffold installation.
Reference Figure 1 and Figure 2 below
Attachment to 1CAN101804 Page 4 of 5 Figure 1 N
Location of tunnel X
W E Y
S 1871/2 DIA.
Required Examination for this IWF support other than piping supports is as depicted in IWF-1300-1. The Total Circumference of Support Skirt = approximately () 3.14 175.5 = 551.07 inches. Area accessible for inspection was from X to Y (as depicted above) in a counter-clockwise direction or approximately 344.5 inches around the circumference due to access restrictions and geometry of the building structure. Of these 344.5 inches it is estimated that approximately 176 inches intermittently around the circumference was not obstructed due to geometrical configuration and viewed during the exam or approximately 32% of total circumference of the support (ID and OD included). The total number of bolting assemblies is 96 (48 inside and 48 outside). Of the 96 bolting assemblies only 62 were accessible for examination and examined or 64%. Estimated Total Examination area obtained is approximately 50% based on the remote visual examination and drawing dimensions.
Attachment to 1CAN101804 Page 5 of 5 Figure 2 RPV Support Skirt 01-035 Insulation Package IWF Support Examination Boundary Access Port Fiber Scope .
Illustration Y
X Z
4 in There are 12 Access Ports around the circumference of the Reactor Vessel Skirt. The Access ports that were accessible were utilized in gaining examination coverage with a remote fiber scope camera to view the external surfaces and bolting as illustrated above.