ML18284A196

From kanterella
Jump to navigation Jump to search
Rev. 50 to Updated Final Safety Analysis Report
ML18284A196
Person / Time
Site: Surry  Dominion icon.png
Issue date: 10/01/2018
From: Mark D. Sartain
Virginia Electric & Power Co (VEPCO)
To:
Document Control Desk, Office of Nuclear Reactor Regulation
Shared Package
ML18284A261 List:
References
18-291
Download: ML18284A196 (6)


Text

SECURITY-RELATED INFORMATION - WITHHOLD UNDER 10 CFR 2.390 VIRGINIA ELECTRIC AND POWER COMPANY RICHMOND, VIRGINIA 23261 October 1, 2018 United States Nuclear Regulatory Commission Serial No.: 18-291 Attention: Document Control Desk NCM/EMM:vlh Washington, DC 20555-0001 Docket Nos.: 50-280/281 License Nos.: DPR-32/37 VIRGINIA ELECTRIC AND POWER COMPANY {DOMINION ENERGY VIRGINIA}

SURRY POWER STATION UNITS 1 AND 2 UPDATED FINAL SAFETY ANALYSIS REPORT REVISION 50 Pursuant to 10 CFR 50.71(e), Dominion Energy Virginia submits Revision 50 to the Updated Final Safety Analysis Report (UFSAR) for Surry Power Station.

Two CD-ROMs are attached to this submittal. Attachment 1 contains a CD-ROM labeled, "Surry Power Station Updated Final Safety Analysis Report, Revision 50, Docket Nos. 50-280/281, Security-Related Information - Withhold Under 10 CFR 2.390," and contains the following files:

000 SPS UFSAR Frontmatter.pdf 1,550,336 bytes 001 SPS UFSAR Chapter 1.pdf 598,016 bytes 002 SPS UFSAR Chapter 2.pdf 5,511,168 bytes 003 SPS UFSAR Chapter 3.pdf 3, 168,256 bytes 004 SPS UFSAR Chapter 4.pdf 2,091,008 bytes.

005 SPS UFSAR Chapter 5.pdf 2,418,688 bytes 006 SPS UFSAR Chapter 6.pdf 1,914,880 bytes 007 SPS UFSAR Chapter 7.pdf 2,123,776 bytes 008 SPS UFSAR Chapter 8.pdf 3,065,856 bytes 009 SPS UFSAR Chapter 9.pdf 7,512,064 bytes 010 SPS UFSAR Chapter 10.pdf 3, 123,200 bytes 011 SPS UFSAR Chapter 11.pdf 2,394,112 bytes 012 SPS UFSAR Chapter 12.pdf 245,760 bytes 013 SPS UFSAR Chapter 13.pdf 479,232 bytes 014 SPS UFSAR Chapter 14.pdf 13,948,928 bytes 015 SPS UFSAR Chapter 15.pdf 8,402,944 bytes 016 SPS UFSAR Chapter 16.pdf 98,304 bytes 017 SPS UFSAR Chapter 17.pdf 73,728 bytes 018 SPS UFSAR Chapter 18.pdf 647,168 bytes contains Security-Related Information that Dominion Energy Virginia requests be withheld from public disclosure in accordance with 10 CFR 2.390.

ATTACHMENT 1 TO THIS LETTER CONTAINS SECURITY-RELATED INFORMATION WHICH IS TO BE WITHHELD FROM PUBLIC DISCLOSURE UNDER 10 CFR 2.390.

UPON SEPARATION FROM ATTACHMENT 1, TH.IS LETTER IS DECONTROLLED.

Serial No.: 18-291 Docket Nos.: 50-280/281 UFSAR Revision 50 Page 2 of 4 contains a CD-ROM labeled, "Surry Power Station Updated Final Safety Analysis Report, Revision 50 - Redacted, Docket Nos. 50-280/281," and contains the following files:

000 SPS UFSAR Frontmatter.pdf 1,550,336 bytes, publicly available.

001 SPS UFSAR Chapter 1.pdf 598,016 bytes, publicly available.

002 SPS UFSAR Chapter 2.pdf 5,511,168 bytes, publicly available.

003 SPS UFSAR Chapter 3.pdf 3, 168,256 bytes, publicly available.

004 SPS UFSAR Chapter 4.pdf 2,091,008 bytes, publicly available.

005 SPS UFSAR Chapter 5.pdf 2,418,688 bytes, publicly available.

006 SPS UFSAR Chapter 6.pdf 1,914,880 bytes, publicly available.

007 SPS UFSAR Chapter 7.pdf 2,123,776 bytes, publicly available.

008 SPS UFSAR Chapter 8.pdf 3,065,856 bytes, publicly available.

009 SPS UFSAR Chapter 9.pdf 7,512,064 bytes, publicly available.

010 SPS UFSAR Chapter 1O.pdf 3,123,200 bytes, publicly available.

011 SPS UFSAR Chapter 11.pdf 2,394,112 bytes, publicly available.

012 SPS UFSAR Chapter 12.pdf 245,760 bytes, publicly available.

013 SPS UFSAR Chapter 13.pdf 479,232 bytes, publicly available.

014 SPS UFSAR Chapter 14.pdf 13,948,928 bytes, publicly available.

015 SPS UFSAR Chapter 15.pdf 8,282, 112 bytes, publicly available.

016 SPS UFSAR Chapter 16.pdf 98,304 bytes, publicly available.

017 SPS UFSAR Chapter 17.pdf 73,728 bytes, publicly available.

018 SPS UFSAR Chapter 18.pdf 647,168 bytes, publicly available.

Third-party documents included by reference in the Surry UFSAR and contained in these files may not be text searchable.

Serial No.: 18-291 Docket Nos.: 50-280/281 UFSAR Revision 50 Page 3 of 4 Should you have any questions regarding this submittal, please contact Mr. Gary Miller at (804) 273-2771.

Sincerely, Mark D. Sartain Vice President - Nuclear Engineering and Fleet Support Commitments made in this letter: None.

Attachments

1. CD-ROM labeled, "Surry Power Station Updated Final Safety Analysis Report, Revision 50, Docket Nos. 50-280/281, Security-Related Information-Withhold Under 10 CFR 2.390"
2. CD-ROM labeled, "Surry Power Station Updated Final Safety Analysis Report, Revision 50 - Redacted, Docket Nos. 50-280/281" COMMONWEALTH OF VIRGINIA COUNTY OF HENRICO The foregoing document was acknowledged before me, in and for the County and Commonwealth aforesaid, today by Mark D. Sartain, who is Vice President - Nuclear Engineering and Fleet Support, of Virginia Electric and Power Company. He has affirmed before me that he is duly authorized to execute and file the foregoing document in behalf of that Company, and that the statements in the document are true to the ~9-;t of his kno~dge and belief.

Acknowledged before me this / -= day of u_e,fz>l,c r , 2018.

My Commission Expires: ,&y 3/ 1

)/J;/,;J . .

~I!£<*~~

Notary Public VICKILHULL NOTARY PUBLIC REG. # 1405'2 COMMONWEALTH OF VIRGINIA *

.MY COMMISSlON EXPIRES 1131/2022

Serial No.: 18-291 Docket Nos.: 50-280/281 UFSAR Revision 50 Page 4 of 4 cc: (w/Atts. 1 & 2)

U.S. Nuclear Regulatory Commission Region II Marquis One Tower 245 Peachtree Center Avenue, NE Suite 1200 Atlanta, GA 30303-1257 Ms. K. R. Cotton Gross NRG Project Manager One White Flint North Mail Stop 08 G-9A 11555 Rockville Pike Rockville, Maryland 20852-2738 Ms. Yen-Ju Chen NRG Senior Project Manager U. S. Nuclear Regulatory Commission Two White Flint North 11545 Rockville Pike Mail Stop 4834 Rockville, MD 20852-2738 NRC Senior Resident Inspector Surry Power Station

Serial No.: 18-291 Docket NQs.: 50-280/281 UFSAR Revision 50 ATTACHMENT 2 CD-ROM labeled, "Surry Power Station Updated Final Safety Analysis Report, Revision 50 - Redacted, Docket Nos. 50-280/281" Virginia Electric and Power Company (Dominion Energy Virginia)

Surry Power Station Units 1 and 2

Serial No.: 18-291 Docket Nos.: 50-280/281 UFSAR Revision 50 ATTACHMENT 1 CD-ROM labeled, "Surry Power Station Updated Final Safety Analysis Report, Revision 50, Docket Nos. 50-280/281, Security-Related Information - Withhold Under 10 CFR 2.390" Virginia Electric and Power Company (Dominion Energy Virginia)

Surry Power Station Units 1 and 2 ATTACHMENT 1 TO THIS LETTER CONTAINS SECURITY-RELATED INFORMATION WHICH IS TO BE WITHHELD FROM PUBLIC DISCLOSURE UNDER 10 CFR 2.390.

UPON SEPARATION FROM ATTACHMENT 1, THIS PAGE IS DECONTROLLED.