MONTHYEAR2CAN082301, Inservice Inspection Summary Report for the Arkansas Nuclear One, Unit 2, Twenty-Ninth Refueling Outage (2R29)2023-08-10010 August 2023 Inservice Inspection Summary Report for the Arkansas Nuclear One, Unit 2, Twenty-Ninth Refueling Outage (2R29) 1CAN032302, Inspection Summary Report for the Thirtieth Refueling Outage (1R30)2023-03-20020 March 2023 Inspection Summary Report for the Thirtieth Refueling Outage (1R30) 2CAN052202, Inservice Inspection Summary Report for the Twenty-Eighth Refueling Outage (2R28) - Revision 12022-05-31031 May 2022 Inservice Inspection Summary Report for the Twenty-Eighth Refueling Outage (2R28) - Revision 1 ML22126A0332022-05-10010 May 2022 Review of the Spring 2021 Steam Generator Tube Inspections During Refueling Outage 1R29 2CAN022201, Inservice Inspection Summary Report for the Twenty-Eighth Refueling Outage (2R28)2022-02-0808 February 2022 Inservice Inspection Summary Report for the Twenty-Eighth Refueling Outage (2R28) ML22034A8992022-02-0303 February 2022 Steam Generator Tube Inspection Reports in Support of TSTF-577 1CAN102104, Steam Generator Tube Inspection Report - 1R292021-10-22022 October 2021 Steam Generator Tube Inspection Report - 1R29 2CAN082103, Unit 2 - Fifth 10-Year Interval Snubber Program Plan2021-08-31031 August 2021 Unit 2 - Fifth 10-Year Interval Snubber Program Plan 1CAN072102, Inservice Inspection Summary Report for the Twenty-Ninth Refueling Outage (1R29)2021-07-19019 July 2021 Inservice Inspection Summary Report for the Twenty-Ninth Refueling Outage (1R29) 2CAN122001, Submittal of 40-Year Containment Building Tendon Surveillance and Concrete Inspection2020-12-0404 December 2020 Submittal of 40-Year Containment Building Tendon Surveillance and Concrete Inspection 2CAN112005, Unit 2 - Inservice Testing Plan for the Fifth 10-Year Interval2020-11-24024 November 2020 Unit 2 - Inservice Testing Plan for the Fifth 10-Year Interval 2CAN072001, Inservice Inspection Summary Report for the Twenty-Seventh Refueling Outage (2R27)2020-07-0808 July 2020 Inservice Inspection Summary Report for the Twenty-Seventh Refueling Outage (2R27) 1CAN012004, Inservice Inspection Summary Report for the Twenty-Eighth Refueling Outage2020-01-28028 January 2020 Inservice Inspection Summary Report for the Twenty-Eighth Refueling Outage 2CAN091901, Entergy Operations, Inc. - Request for Alternatives Subject to the Fifth 10-Year Interval of the Inservice Testing Program2019-09-0303 September 2019 Entergy Operations, Inc. - Request for Alternatives Subject to the Fifth 10-Year Interval of the Inservice Testing Program 2CAN021906, Steam Generator Tube Inspection Report2019-02-28028 February 2019 Steam Generator Tube Inspection Report 2CAN011903, Inservice Inspection Summary Report for the Twenty-Sixth Refueling Outage2019-01-23023 January 2019 Inservice Inspection Summary Report for the Twenty-Sixth Refueling Outage 1CAN101802, Submittal of 45th-Year Reactor Building Inspection Report2018-10-10010 October 2018 Submittal of 45th-Year Reactor Building Inspection Report 1CAN091802, Snubber Testing Program for Fifth Inservice Test Interval2018-09-24024 September 2018 Snubber Testing Program for Fifth Inservice Test Interval 1CAN081808, Inservice Testing Plan for the Fifth 10-Year Interval2018-08-27027 August 2018 Inservice Testing Plan for the Fifth 10-Year Interval 1CAN071802, Inservice Inspection Summary Report for the Twenty-Seventh Refueling Outage (1R27)2018-07-25025 July 2018 Inservice Inspection Summary Report for the Twenty-Seventh Refueling Outage (1R27) 2CAN101701, Inservice Inspection Summary Report for the Twenty-Fifth Refueling Outage (2R25)2017-10-0606 October 2017 Inservice Inspection Summary Report for the Twenty-Fifth Refueling Outage (2R25) 1CAN091703, Inservice Inspection, Pressure Test and Containment Inservice Inspection Program Plans for the Fifth 10-Year Interval2017-09-21021 September 2017 Inservice Inspection, Pressure Test and Containment Inservice Inspection Program Plans for the Fifth 10-Year Interval 1CAN031703, Steam Generator Tube Inspection Report - 1R262017-03-22022 March 2017 Steam Generator Tube Inspection Report - 1R26 1CAN031702, Reactor Building Inspection Summary Report - 1R262017-03-14014 March 2017 Reactor Building Inspection Summary Report - 1R26 1CAN031705, Inservice Inspection Summary Report for the Twenty-Sixth Refueling Outage (1R26)2017-03-14014 March 2017 Inservice Inspection Summary Report for the Twenty-Sixth Refueling Outage (1R26) 1CAN111602, Fifth Ten-Year Interval Inservice Testing Program, Relief Request VRR-ANO1-2017-12016-11-16016 November 2016 Fifth Ten-Year Interval Inservice Testing Program, Relief Request VRR-ANO1-2017-1 1CAN011602, Amended Inservice Inspection Summary Report for the Twenty-Fifth Refueling Outage (1R25)2016-01-18018 January 2016 Amended Inservice Inspection Summary Report for the Twenty-Fifth Refueling Outage (1R25) 1CAN051502, Inservice Inspection Summary Report for the Twenty-Fifth Refueling Outage (1R25)2015-05-28028 May 2015 Inservice Inspection Summary Report for the Twenty-Fifth Refueling Outage (1R25) 2CAN011503, Year Containment Building Tendon Surveillance and Concrete Inspection2015-01-16016 January 2015 Year Containment Building Tendon Surveillance and Concrete Inspection 2CAN081406, Inservice Inspection Summary Report for the Twenty-Third Refueling Outage (2R23)2014-08-21021 August 2014 Inservice Inspection Summary Report for the Twenty-Third Refueling Outage (2R23) 2CAN081404, Steam Generator Tube Inspection Report - 2R232014-08-18018 August 2014 Steam Generator Tube Inspection Report - 2R23 1CAN111301, Revised Inservice Inspection Summary Report for the Twenty-Fourth Refueling Outage (1R24)2013-11-0505 November 2013 Revised Inservice Inspection Summary Report for the Twenty-Fourth Refueling Outage (1R24) 1CAN101306, Unit 1, Steam Generator Tube Inspection Report - 1R242013-10-23023 October 2013 Unit 1, Steam Generator Tube Inspection Report - 1R24 1CAN101304, Inservice Inspection Summary Report for the Twenty-Fourth Refueling Outage (1R24)2013-10-21021 October 2013 Inservice Inspection Summary Report for the Twenty-Fourth Refueling Outage (1R24) 1CAN101301, Request for Relief from Volumetric Examination Frequency Requirements, Request for Relief ANO1-ISI-0232013-10-0808 October 2013 Request for Relief from Volumetric Examination Frequency Requirements, Request for Relief ANO1-ISI-023 1CAN041305, Unit 1, Response to Request for Additional Information Related to Fall 2011 Steam Generator Tube Inservice Inspections2013-04-30030 April 2013 Unit 1, Response to Request for Additional Information Related to Fall 2011 Steam Generator Tube Inservice Inspections 2CAN121204, Inservice Inspection Summary Report for the Twenty-Second Refueling Outage (2R22)2012-12-13013 December 2012 Inservice Inspection Summary Report for the Twenty-Second Refueling Outage (2R22) 1CAN031203, Unit 1, Steam Generator Tube Inspection Report - 1R232012-03-22022 March 2012 Unit 1, Steam Generator Tube Inspection Report - 1R23 2CAN051102, Inservice Inspection Summary Report for the Twenty-First Refueling Outage2011-05-25025 May 2011 Inservice Inspection Summary Report for the Twenty-First Refueling Outage 2CAN011105, Program Section SEP-ISI-105 for ASME Section XI, Division 1, Arkansas Nuclear One, Unit 2, Inservice Inspection Program2011-01-25025 January 2011 Program Section SEP-ISI-105 for ASME Section XI, Division 1, Arkansas Nuclear One, Unit 2, Inservice Inspection Program ML1036305792010-12-29029 December 2010 Notification of Inspection (NRC Inspection Report 050-368/2011002) and Request for Information ML1022504182010-07-29029 July 2010 Steam Generator Tube Inspection Report - 1R22 1CAN061004, Inservice Inspection Summary Report for the Twenty-Second Refueling Outage (1R22)2010-06-29029 June 2010 Inservice Inspection Summary Report for the Twenty-Second Refueling Outage (1R22) 2CAN031006, Inservice Testing Plan for the Fourth 10-Year Interval2010-03-25025 March 2010 Inservice Testing Plan for the Fourth 10-Year Interval 1CAN021002, Response to Second Set of Requests for Additional Information on the Third 10-Year Inservice Inspection Interval Relief Requests2010-02-0909 February 2010 Response to Second Set of Requests for Additional Information on the Third 10-Year Inservice Inspection Interval Relief Requests 2CAN120901, Inservice Inspection Summary Report for the Twentieth Refueling Outage (2R20)2009-12-0707 December 2009 Inservice Inspection Summary Report for the Twentieth Refueling Outage (2R20) 1CAN030907, Steam Generator Tube Inspection Report - 1R212009-03-30030 March 2009 Steam Generator Tube Inspection Report - 1R21 1CAN030902, Inservice Inspection Summary Report for the Twenty-First Refueling Outage (1R21)2009-03-0404 March 2009 Inservice Inspection Summary Report for the Twenty-First Refueling Outage (1R21) CNRO-2009-00002, Relief Request CEP-ISI-011 for Third 120 Month Inservice Inspection Interval2009-03-0404 March 2009 Relief Request CEP-ISI-011 for Third 120 Month Inservice Inspection Interval 2CAN070802, Inservice Inspection Summary Report for the Nineteenth Refueling Outage (2R19)2008-07-0101 July 2008 Inservice Inspection Summary Report for the Nineteenth Refueling Outage (2R19) 2023-08-10
[Table view] Category:Letter type:
MONTHYEAR2CAN012401, U.S. Additional Protocol2024-01-17017 January 2024 U.S. Additional Protocol 2CAN012403, Supplemental Information - Adopt Risk-Informed Completion Times TSTF-505, Revision 2, Provide Risk-Informed Extended Completion Times - RITSTF Initiative 42024-01-11011 January 2024 Supplemental Information - Adopt Risk-Informed Completion Times TSTF-505, Revision 2, Provide Risk-Informed Extended Completion Times - RITSTF Initiative 4 0CAN012401, Registration of Cask Use2024-01-10010 January 2024 Registration of Cask Use 1CAN122301, Responses to Request for Additional Information for Request for Alternative for Implementation of Extended Reactor Vessel Inservice Inspection Interval (ANO1-ISl-037)2023-12-14014 December 2023 Responses to Request for Additional Information for Request for Alternative for Implementation of Extended Reactor Vessel Inservice Inspection Interval (ANO1-ISl-037) 2CAN112302, Submittal of Amendment 31 to Safety Analysis Report2023-11-16016 November 2023 Submittal of Amendment 31 to Safety Analysis Report 0CAN102303, Registration of Cask Use2023-10-24024 October 2023 Registration of Cask Use 0CAN102302, (ANO) Emergency Plan Revision 49 and Emergency Plan On-Shift Staffing Analysis Revision 32023-10-11011 October 2023 (ANO) Emergency Plan Revision 49 and Emergency Plan On-Shift Staffing Analysis Revision 3 0CAN102301, Evacuation Time Estimate (ETE) Study2023-10-0404 October 2023 Evacuation Time Estimate (ETE) Study 1CAN092301, Supplemental Information - Adopt Risk-Informed Completion Times TSTF-505, Revision 2, Provide Risk-Informed Extended Completion Times - RITSTF Initiative 42023-09-21021 September 2023 Supplemental Information - Adopt Risk-Informed Completion Times TSTF-505, Revision 2, Provide Risk-Informed Extended Completion Times - RITSTF Initiative 4 0CAN092302, Supplement to Request for Alternative Frequency to Containment Unbonded Post-Tensioning System Inservice Inspection (ANO-CISI-002)2023-09-14014 September 2023 Supplement to Request for Alternative Frequency to Containment Unbonded Post-Tensioning System Inservice Inspection (ANO-CISI-002) 2CAN092301, Reply to a Notice of Violation2023-09-0808 September 2023 Reply to a Notice of Violation 0CAN092301, Emergency Plan Implementing Procedure Revision2023-09-0505 September 2023 Emergency Plan Implementing Procedure Revision 0CAN082301, Units 1 and 2 - Changes to the Quality Assurance Program Approval Form for Radioactive Material Package No. 03412023-08-17017 August 2023 Units 1 and 2 - Changes to the Quality Assurance Program Approval Form for Radioactive Material Package No. 0341 2CAN082301, Inservice Inspection Summary Report for the Arkansas Nuclear One, Unit 2, Twenty-Ninth Refueling Outage (2R29)2023-08-10010 August 2023 Inservice Inspection Summary Report for the Arkansas Nuclear One, Unit 2, Twenty-Ninth Refueling Outage (2R29) 0CAN072301, Registration of Cask Use2023-07-18018 July 2023 Registration of Cask Use 1CAN062304, Supplement Related to License Amendment Request to Remove Technical Specification Condition Allowing Two Reactor Coolant Pump Operation2023-06-29029 June 2023 Supplement Related to License Amendment Request to Remove Technical Specification Condition Allowing Two Reactor Coolant Pump Operation 0CAN062301, Status of Actions to Return to Compliance2023-06-26026 June 2023 Status of Actions to Return to Compliance 0CAN062302, Submittal of Revision 22 of the ANO Fire Hazards Analysis2023-06-20020 June 2023 Submittal of Revision 22 of the ANO Fire Hazards Analysis 1CAN062301, Request for Alternative for Implementation of Extended Reactor Vessel Inservice Inspection Interval (ANO1-ISI-037)2023-06-0808 June 2023 Request for Alternative for Implementation of Extended Reactor Vessel Inservice Inspection Interval (ANO1-ISI-037) 0CAN052303, Annual 10 CFR 50.46 Report for Calendar Year 20222023-05-24024 May 2023 Annual 10 CFR 50.46 Report for Calendar Year 2022 0CAN052302, Emergency Plan Rev. 482023-05-11011 May 2023 Emergency Plan Rev. 48 0CAN052301, Units 1 and 2 - Annual Radiological Environmental Operating Report for 20222023-05-0909 May 2023 Units 1 and 2 - Annual Radiological Environmental Operating Report for 2022 2CAN052301, Cycle 30 Core Operating Limits Report (COLR)2023-05-0303 May 2023 Cycle 30 Core Operating Limits Report (COLR) 0CAN042302, Annual Occupational Radiation Exposure Report for 20222023-04-27027 April 2023 Annual Occupational Radiation Exposure Report for 2022 0CAN042301, Radioactive Effluent Release Report for 20222023-04-14014 April 2023 Radioactive Effluent Release Report for 2022 2CAN042301, License Amendment Request to Revise Technical Specifications to Adopt Risk-Informed Completion Times TSTF-505, Revision 2, Provide Risk-Informed Extended Completion Times - RITSTF Initiative 42023-04-0505 April 2023 License Amendment Request to Revise Technical Specifications to Adopt Risk-Informed Completion Times TSTF-505, Revision 2, Provide Risk-Informed Extended Completion Times - RITSTF Initiative 4 1CAN032301, License Amendment Request to Modify the Arkansas Nuclear One, Unit 1, Technical Specification 3.3.1, Reactor Protection System Instrumentation, Turbine Trip Function on Low Control Oil Pressure2023-03-30030 March 2023 License Amendment Request to Modify the Arkansas Nuclear One, Unit 1, Technical Specification 3.3.1, Reactor Protection System Instrumentation, Turbine Trip Function on Low Control Oil Pressure 2CAN032303, Responses to Request for Additional Information Concerning the Request for Alternative Regarding the Half-Nozzle Repair of Reactor Vessel Closure Head Penetration 462023-03-29029 March 2023 Responses to Request for Additional Information Concerning the Request for Alternative Regarding the Half-Nozzle Repair of Reactor Vessel Closure Head Penetration 46 2CAN032304, Supplement to the Request for Alternative Regarding the Half-Nozzle Repair of Reactor Vessel Closure Head Penetration 462023-03-29029 March 2023 Supplement to the Request for Alternative Regarding the Half-Nozzle Repair of Reactor Vessel Closure Head Penetration 46 2CAN032305, 03 Post Examination Analysis2023-03-23023 March 2023 03 Post Examination Analysis 1CAN032302, Inspection Summary Report for the Thirtieth Refueling Outage (1R30)2023-03-20020 March 2023 Inspection Summary Report for the Thirtieth Refueling Outage (1R30) 1CAN012301, Responses to Request for Additional Information for Request for Relief ANO1-ISI-0352023-01-30030 January 2023 Responses to Request for Additional Information for Request for Relief ANO1-ISI-035 2CAN012303, U.S. Additional Protocol2023-01-23023 January 2023 U.S. Additional Protocol 2CAN012302, Relief Request ANO2-RR-23-001, Half-Nozzle Repair of Reactor Vessel Closure Head Penetration 462023-01-20020 January 2023 Relief Request ANO2-RR-23-001, Half-Nozzle Repair of Reactor Vessel Closure Head Penetration 46 1CAN122201, License Amendment Request to Revise Technical Specifications to Adopt Risk-Informed Completion Times TSTF-505, Revision 2, Provide Risk-Informed Extended Completion Times - RITSTF Initiative 42022-12-22022 December 2022 License Amendment Request to Revise Technical Specifications to Adopt Risk-Informed Completion Times TSTF-505, Revision 2, Provide Risk-Informed Extended Completion Times - RITSTF Initiative 4 0CAN122202, Registration of Cask Use2022-12-21021 December 2022 Registration of Cask Use 0CAN122201, Reply to a Notice of Violation; EA-22-0992022-12-0808 December 2022 Reply to a Notice of Violation; EA-22-099 0CAN112201, Request for Alternative Frequency to Containment Unbonded Post-Tensioning System Inservice Inspection (ANO-CISI-002)2022-11-10010 November 2022 Request for Alternative Frequency to Containment Unbonded Post-Tensioning System Inservice Inspection (ANO-CISI-002) 1CAN102202, Application to Remove Technical Specification Condition Allowing Two Reactor Coolant Pump Operation2022-10-31031 October 2022 Application to Remove Technical Specification Condition Allowing Two Reactor Coolant Pump Operation 1CAN102203, Cycle 31 Core Operating Limits Report2022-10-24024 October 2022 Cycle 31 Core Operating Limits Report 1CAN102201, Supplement to Proposed Technical Specifications 3.4.12 and 3.4.13 Revised Dose Calculations2022-10-13013 October 2022 Supplement to Proposed Technical Specifications 3.4.12 and 3.4.13 Revised Dose Calculations 0CAN092201, Supplement to License Amendment Request for Approval of Changes to the Emergency Plan Staffing Requirements2022-09-29029 September 2022 Supplement to License Amendment Request for Approval of Changes to the Emergency Plan Staffing Requirements 1CAN092201, Supplement to Request for Relief from American Society of Mechanical Engineers Section XI Volumetric Examination Requirements - Fifth 10-Year Interval, First Period2022-09-0808 September 2022 Supplement to Request for Relief from American Society of Mechanical Engineers Section XI Volumetric Examination Requirements - Fifth 10-Year Interval, First Period 0CAN082201, License Amendment Request for Approval of Changes to the Emergency Plan Staffing Requirements2022-08-30030 August 2022 License Amendment Request for Approval of Changes to the Emergency Plan Staffing Requirements 1CAN082201, Request for Relief from American Society of Mechanical Engineers Section XI Volumetric Examination Requirements - Fifth 10-Year Interval, First Period2022-08-24024 August 2022 Request for Relief from American Society of Mechanical Engineers Section XI Volumetric Examination Requirements - Fifth 10-Year Interval, First Period 2CAN072201, Response to Request for Additional Information Requests for Relief from American Society of Mechanical Engineers Section XI Volumetric Examination Requirements - Fourth 10-Year Interval, Second and Third Periods2022-07-20020 July 2022 Response to Request for Additional Information Requests for Relief from American Society of Mechanical Engineers Section XI Volumetric Examination Requirements - Fourth 10-Year Interval, Second and Third Periods 0CAN072201, Registration of Cask Use2022-07-14014 July 2022 Registration of Cask Use 0CAN062202, Registration of Cask Use2022-06-0909 June 2022 Registration of Cask Use 1CAN062201, Response to the Request for Additional Information Proposed Technical Specifications 3.4.12 and 3.4.13 Revised Dose Calculations2022-06-0202 June 2022 Response to the Request for Additional Information Proposed Technical Specifications 3.4.12 and 3.4.13 Revised Dose Calculations 1CAN052201, Request for Relief Related to American Society of Mechanical Engineers (ASME) Code Case N-729-6 Augmented Examination Requirements ANO1-ISI-0352022-05-31031 May 2022 Request for Relief Related to American Society of Mechanical Engineers (ASME) Code Case N-729-6 Augmented Examination Requirements ANO1-ISI-035 2024-01-17
[Table view] |
Text
Entergy Operations, Inc.
1448 S.R. 333 Russellville, AR 72802 Tel 479-858-4704 Stephenie L. Pyle Manager, Regulatory Assurance Arkansas Nuclear One 1CAN101802 October 10, 2018 ATTN: Document Control Desk U.S. Nuclear Regulatory Commission Washington, DC 20555
SUBJECT:
45th-Year Reactor Building Inspection Report Arkansas Nuclear One, Unit 1 Docket No. 50-313 License No. DPR-51
Dear Sir or Madam:
Entergy Operations, Inc. (Entergy) conducted the Arkansas Nuclear One, Unit 1 (ANO-1) 45th-Year Tendon Surveillance and Concrete Inspection in association with the spring 2018 refueling outage (1R27). Pursuant to the requirements of IWL-3300 of the American Society of Mechanical Engineers (ASME) Section XI, 2007 Edition with 2008 Addenda, as modified by 10 CFR 50.55a and ANO-1 Technical Specification (TS) 5.6.6, an engineering report was prepared to document the evaluation of the examinations that did not meet the acceptance standards of the ANO-1 Containment Inspection Program. In accordance with ANO-1 TS 5.6.6, the results of this engineering evaluation are to be submitted to the NRC within 30 days of the completion of the evaluation which was completed on October 2, 2018.
The scope of this report is limited to examinations of concrete containments covered by the rules of ASME Section XI, Subsection IWL. Examination of the containment metallic liner and Class MC components is accomplished under the rules of ASME Section XI, Subsection IWE.
As such, these examinations are not in the scope of this report.
While no indications were found that challenge current structural integrity or leak tightness of the containment, four indications were found that required evaluation under IWL-3300. A summary of the results is provided in the attachment to this letter.
Based on the results of the engineering evaluation of the 45th-Year Tendon Surveillance and Concrete Inspection, Entergy has concluded that the ANO-1 Reactor Building is capable of performing its design function and is expected to remain capable of performing its design function until completion of the 50th-Year Tendon Surveillance and Concrete Inspection.
Additionally, the observed indications do not suggest the presence of degradation in inaccessible areas.
1CAN101802 Page 2 of 2 No new regulatory commitments are included in this letter.
If there are any questions or if additional information is needed, please contact me.
Sincerely, ORIGINAL SIGNED BY STEPHENIE L. PYLE SLP/dbb
Attachment:
Summary of Engineering Evaluation associated with the ANO-1 45th-Year Reactor Building Tendon Surveillance and Concrete Inspection cc: Mr. Kriss Kennedy Regional Administrator U. S. Nuclear Regulatory Commission Region IV 1600 East Lamar Boulevard Arlington, TX 76011-4511 NRC Senior Resident Inspector Arkansas Nuclear One P. O. Box 310 London, AR 72847 U. S. Nuclear Regulatory Commission Attn: Mr. Thomas Wengert MS O-08B1A One White Flint North 11555 Rockville Pike Rockville, MD 20852
Attachment to 1CAN101802 Summary of Engineering Evaluation associated with the ANO-1 45th-Year Reactor Building Tendon Surveillance and Concrete Inspection
Attachment to 1CAN101802 Page 1 of 4 Summary of Engineering Evaluation associated with the ANO-1 45th-Year Reactor Building Tendon Surveillance and Concrete Inspection Entergy Operations, Inc. (Entergy) conducted the Arkansas Nuclear One, Unit 1 (ANO-1) 45th-Year Tendon Surveillance and Concrete Inspection in association with the spring 2018 refueling outage (1R27). While no indications were found that challenge current structural integrity or leak tightness of the Reactor Building, there were three indications that required evaluation under IWL-3300 (reported below).
Pursuant to the requirements of IWL-3300 of the American Society of Mechanical Engineers (ASME) Section XI, 2007 Edition with 2008 Addenda, as modified by 10 CFR 50.55a and ANO-1 Technical Specification (TS) 5.6.6, an engineering report was prepared to document the evaluation of the examinations that did not meet the acceptance standards of the ANO-1 Containment Inspection Program. The engineering report was completed on October 2, 2018.
In accordance with ANO-1 TS 5.6.6, the results of this evaluation are to be submitted to the NRC within 30 days of the completion of the evaluation.
- 1. Drops of Water Detected on the Shop End of Tendon 21H55 IWL-3221.3(e) states that there must be no evidence of free water at the tendon anchorage.
The inspection of the field end of the tendon revealed a small amount of free water (< 1 oz.)
on the end of the tendon and anchorage area. A water sample could not be obtained for testing due to the small amount observed. As a part of the surveillance inspection process, the corrosion protection medium was removed from the anchorage area and a sample was retained for testing. The results of the grease testing showed that water soluble chlorides, nitrates, and sulfides, as well as the water content and neutralization values were all within the acceptable limits for the protection medium. The corrosion and crack inspection recorded no cracking with Level 1 corrosion (bright metal with no visible corrosion) and Level 2 corrosion (reddish brown color with no pitting).
The amount of moisture observed at the tendon is considered insignificant as defined in ANO procedure SEP-CISI-ANO-001 (Containment Tendon Inspections).
CAUSE OF CONDITION [IWL-3310(a)]:
It is possible that the tendon can gasket was leaking, although there is no reporting of a grease leak at this location. The most probable cause of the small accumulation of water is that it formed through condensation on the inside of the tendon can.
APPLICABILITY OF CONDITION TO THE OTHER UNIT [IWL-3310(b)]
ANO, Unit 2 (ANO-2), being of the same design and in the same environment as the ANO-1 Reactor Building, is susceptible to condensation forming in the tendon cans.
Based on the results of the tendon surveillances to date, there is no known evidence that indicates that the presence of a small amount of moisture caused by condensation has an adverse effect on the tendon pre-stress system. The current required periodic tendon surveillances are considered sufficient to detect any adverse conditions or trends should they develop.
Attachment to 1CAN101802 Page 2 of 4 ACCEPTABILITY OF CONTAINMENT [IWL-3310(c)]
Based on the above evaluation, it is concluded that the presence of the free water had no negative effect on tendon 21H55, and the tendon has its full capacity to maintain the required post tensioned force. As a result, the Reactor Building is acceptable without further evaluation or repair/replacement activities.
REQUIREMENTS FOR REPAIR REPLACEMENT [IWL-3310(d)]
Based on the above discussion, the Reactor Building is acceptable without further evaluation or repair/replacement activities.
ADDITIONAL EXAMINATION REQUIREMENTS [IWL-3310(e)]
No additional examinations are warranted for this condition.
- 2. Grease Samples on the Field Ends of Tendons V008 and V032 Exhibited Neutralization Numbers below Detectable Limits (< 0.500)
IWL-3221.4 and Table ILW-2525-1 requires that the Reserve alkalinity (Base number) must be at least 50% of the installed value, or no less than zero if the as-installed value was 5 or less. For ANO-1 the latter acceptance value applies.
The original protection medium grease for the tendons at ANO-1 was Visconorust 2090-P, and the acceptance value for the surveillance was that it shall be no less than 0. Because the actual neutralization numbers were below detectable limits (< 0.500), the results for the required test are inconclusive. To ensure that the grease had not significantly deteriorated, an acid test was performed in accordance with American Society for Testing and Materials (ASTM) D 974-04, Standard Test Method for Acid and Base Number by Color-indicator Titration, on an additional grease sample from each of these tendons. The results of the test revealed acid numbers of 3.53 for tendon V008 and 3.81 for tendon V032. While there is no known industry standard that states any acceptance criteria for an acid test, particularly related to IWL inspections, the ASTM standard test method lists a range of possible acid and base numbers from 0 to 250.
The reported acid numbers are considered practically neutral. The function of the grease coating on the tendons is to protect the tendon components from corrosion. The inspection revealed no evidence of active corrosion or that constituents of the grease had caused any degradation of the post-tensioning system.
CAUSE OF CONDITION [IWL-3310(a)]:
The Visconorust 2090P grease that was originally used on these tendons contained a low base number (< 5) at installation. As the service life of the grease has increased, additional degradation products have formed in the grease which has decreased the base number of the grease.
Attachment to 1CAN101802 Page 3 of 4 APPLICABILITY OF CONDITION TO THE OTHER UNIT [IWL-3310(b)]
The tendon corrosion protection medium specified for ANO-2 is Visconorust 2090P-4.
This later version of 2090P grease contains more desirable properties, such as a base number of 35 or more. The condition of having neutralization numbers that are below detectable limits is not generally applicable to ANO-2.
ACCEPTABILITY OF CONTAINMENT [IWL-3310(c)]
The anchorage inspection report recorded Level 1 corrosion on tendon V008, and Level 1 and 2 corrosion on tendon V032. These corrosion levels correspond to bright metal with no visible corrosion for Level 1, and reddish brown color with no pitting for Level 2. The results of the grease sampling was acceptable, with the exception of the neutralization numbers below detectable limits. The visual inspection of tendons did not show any evidence of active corrosion, or that there has been any degradation of the post-tensioning system. Therefore, this condition is considered acceptable.
REQUIREMENTS FOR REPAIR REPLACEMENT [IWL-3310(d)]
A new tendon cap and gasket were installed on the tendon ends, and the cans were refilled with 2090P-4 grease. No repair or replacement actions are required.
ADDITIONAL EXAMINATION REQUIREMENTS [IWL-3310(e)]
No additional examinations are warranted for this condition.
- 3. Tendon 2D213 Accepted more than 10% of the Net Tendon Duct Volume Grease when being Refilled The requirement for acceptability is outlined in IWL-3221.4 which states that the absolute difference between the amount removed and the amount replaced shall not exceed 10% of the tendon net duct volume. After inspection, tendon 2D213 was refilled with grease, and the absolute difference recorded was 38.8%.
CAUSE OF CONDITION [IWL-3310(a)]:
The cause of the low grease level in the tendon is known, as the tendon can was previously identified as leaking.
APPLICABILITY OF CONDITION TO THE OTHER UNIT [IWL-3310(b)]
The ANO-2 Containment Building was constructed with an enhanced tendon can design that has an improved sealing ability. ANO-2 does not have the tendon can grease leak issues similar to ANO-1.
Attachment to 1CAN101802 Page 4 of 4 ACCEPTABILITY OF CONTAINMENT [IWL-3310(c)]
The visual inspection of the tendon identified Level 1 and 2 corrosion, which corresponds to bright metal with no visible corrosion for Level 1 and a reddish-brown color with no pitting for Level 2. There was no water identified or reported in the tendon caps of this tendon, and the grease samples that were analyzed were acceptable. The condition is acceptable because the cause of the condition is known and all inspection and testing results were acceptable.
REQUIREMENTS FOR REPAIR REPLACEMENT [IWL-3310(d)]
The tendon can and gasket was replaced with the tendon duct and cans being refilled with grease. No repair or replacement activity is required.
ADDITIONAL EXAMINATION REQUIREMENTS [IWL-3310(e)]
No additional examinations or actions are warranted for this condition.
Based on the results of the engineering evaluation of the 45th-Year Tendon Surveillance and Concrete Inspection, Entergy has concluded that the ANO-1 Reactor Building is capable of performing its design function and is expected to remain capable of performing its design function until completion of the 50th-Year Tendon Surveillance and Concrete Inspection.
Additionally, the observed indications do not suggest the presence of degradation in inaccessible areas.