Proposed License Amendment Request Temporary, One-Time 21-Day Allowed Outage Time for Replacement of Reserve Station Service Transformer C and Associated Cabling Deletion of Proposed License Condition
ML18277A171
Person / Time
Site: Surry  Dominion icon.png
Issue date: 10/03/2018
From: Mark D. Sartain
Virginia Electric & Power Co (VEPCO)
To:
Document Control Desk, Office of Nuclear Reactor Regulation
References
18-239A
Download: ML18277A171 (2)


Text

1-:-. -

VIRGINIA ELECTRIC AND POWER COMPANY RICHMOND, VIRGINIA 23261 10CFR50.90 October 3, 2018 U. S. Nuclear Regulatory Commission Serial No.: 18'-239A Attention: Document Control Desk NRA/GDM: RO Washington, DC 20555-0001 Docket Nos.: 50-2a,0/281 License Nos.: DPR-32/37 VIRGINIA ELECTRIC AND POWER COMPANY

  • SURRY POWER STATION UNITS 1 AND 2 PROPOSED LICENSE AMENDMENT REQUEST TEMPORARY. ONE-TIME 21-DAY ALLOWED OUTAGE TIME FOR REPLACEMENT OF RESERVE STATION SERVICE TRANSFORMER C AND ASSOCIATED CABLING DELETION OF PROPOSED LICENSE CONDITION By letter dated November 7, 2017 (Serial No.17-435), Virgini~ Electric and Power Company (Dominion Energy Virginia) submitted a license amendment request (LAR) to provide a temporary, *one-time 21-day allowed outage time (AOT) for *replacement of Reserve Station Service Transformer (RSST) C and associated cabling. In addition to the proposed changes to Technical Specification (TS) 3.16 to include the temporary 21-day RSST C AOT, the LAR included a proposed License Condition 3.V that reiterated the specifics of the temporary TS change. Upon further consideration and discussion with the NRC, Dominion Energy Virginia has determined the proposed License Condition V is unnecessary as the proposed temporary RSST C 21-day AOT is adequately addressed in the proposed TS changes. Therefore, the proposed License Condition 3.V is hereby withdrawn from our LAR.

The information provided in this letter does not affect the conclusions of the significant hazards consideration or the environmental assessment included in the November 7, 2017 LAR.

Should you have any questions or require additional

  • Information, please contact Mr. Gary D. Miller at (804) 273-2771.

Respectfully,

. ~ -* VICKI L. HULL Mark D. Sartain NOTARY PUBLIC Vice President Nuclear Engineering and Fleet Support REG.# 140542 COMMONWEALTH OF VIRGINIA MY COMMISSlON EXPIRES 1131#2022 COMMONWEALTH OF VIRGINIA COUNTY OF HENRICO The foregoing document was acknowledged before me, in and for the County and Commonwealth aforesaid, today by Mr. Mark D. Sartain, who is Vice President - Nuclea~ Engineering and Fleet Support, of Virginia Electric and Power Company. He has affirmed before me that he is duly authorized to execute and file the foregoing document in behalf of that company, and that the statements in the document are true to the best of his knowledge and belief.

Acknowledged before me this 3 r/ day of Ot..fol:>ev ,2018.

My Commission Expires:

  • 5 ,;l :l, 11::~.~~ NotaryubHc

Serial No. 18-239A Docket Nos. 50-280/281 Deletion of Proposed License Condition Page 2 of 2 Commitments contained in this letter: None cc: U.S. NuclearRegulatory Commission - Region II Marquis One Tower 245 Peachtree Center Avenue, NE Suite 1200 Atlanta, GA 30303-1257 State Health Commissioner Virginia Department of Health James Madison Building - ih floor 109 Governor Street Suite 730 Richmond, VA 23219

. Ms. A. Schiller NRC Project Manager- Surry U.S. Nuclear Regulatory Commission One White Flint North Mail Stop 07 E-5 11555 Rockville Pike Rockville, MD- 20852-2738 Mr. J. R. Hall NRC Senior Project Manager.- North Anna U.S. Nuclear Regulatory Commission One White Flint North Mail Stop 08 B-1A 11555 Rockville Pike Rockville, MD 20852-2738 NRC Senior Resident Inspector Surry Power Station

  • >