MONTHYEARDCL-24-010, Nuclear Material Transaction Report for New Fuel2024-01-29029 January 2024 Nuclear Material Transaction Report for New Fuel DCL-24-009, Nuclear Material Transaction Report for New Fuel2024-01-17017 January 2024 Nuclear Material Transaction Report for New Fuel DCL-24-008, Schedule Considerations for Review of the DCPP License Renewal Application2024-01-17017 January 2024 Schedule Considerations for Review of the DCPP License Renewal Application DCL-24-004, Supplement to License Amendment Request 23-01 Revision to Technical Specifications to Adopt Risk-Informed Completion Times TSTF-505, Revision 2, Provide Risk-Informed Extended Completion Times - RITSTF Initiative 4b2024-01-15015 January 2024 Supplement to License Amendment Request 23-01 Revision to Technical Specifications to Adopt Risk-Informed Completion Times TSTF-505, Revision 2, Provide Risk-Informed Extended Completion Times - RITSTF Initiative 4b DCL-23-129, Nuclear Material Transaction Report for New Fuel2023-12-27027 December 2023 Nuclear Material Transaction Report for New Fuel DCL-23-122, Request for Exemption from Enhanced Weapons, Firearms Background Checks, and Security Event Notifications Implementation2023-12-14014 December 2023 Request for Exemption from Enhanced Weapons, Firearms Background Checks, and Security Event Notifications Implementation DCL-23-128, Emergency Plan Update2023-12-13013 December 2023 Emergency Plan Update DCL-23-125, Core Operating Limits Report for Unit 1 Cycle 252023-12-0606 December 2023 Core Operating Limits Report for Unit 1 Cycle 25 DCL-23-121, Supplement to License Amendment Request 23-03, Revision to Technical Specification3.7.8, Auxiliary Saltwater System2023-11-16016 November 2023 Supplement to License Amendment Request 23-03, Revision to Technical Specification3.7.8, Auxiliary Saltwater System DCL-23-120, License Amendment Request 23-03 Revision to Technical Specification 3.7.8, Auxiliary Saltwater (Asw) System2023-11-14014 November 2023 License Amendment Request 23-03 Revision to Technical Specification 3.7.8, Auxiliary Saltwater (Asw) System DCL-23-118, License Renewal Application2023-11-0707 November 2023 License Renewal Application DCL-2023-520, Discharge Self-Monitoring at Diablo Canyon Power Plant (DCPP)2023-10-19019 October 2023 Discharge Self-Monitoring at Diablo Canyon Power Plant (DCPP) DCL-23-103, Independent Spent Fuel Storage Installation - Withdrawal of License Amendment Request 22-01, Request for Approval of Alternative Security Measures for Early Warning System2023-10-13013 October 2023 Independent Spent Fuel Storage Installation - Withdrawal of License Amendment Request 22-01, Request for Approval of Alternative Security Measures for Early Warning System DCL-23-092, Material Status Report for the Period Ending August 31, 20232023-09-28028 September 2023 Material Status Report for the Period Ending August 31, 2023 DCL-23-077, License Amendment Request 23-02 Application to Adopt 10 CFR 50.69, Risk-Informed Categorization and Treatment of Structures, Systems and Components for Nuclear Power Reactors2023-09-27027 September 2023 License Amendment Request 23-02 Application to Adopt 10 CFR 50.69, Risk-Informed Categorization and Treatment of Structures, Systems and Components for Nuclear Power Reactors DCL-23-083, Upcoming Meeting with Nuclear Security and Incident Response Staff2023-09-13013 September 2023 Upcoming Meeting with Nuclear Security and Incident Response Staff DCL-23-078, Nuclear Material Transaction Report for New Fuel2023-09-0606 September 2023 Nuclear Material Transaction Report for New Fuel DCL-23-070, Withdrawal of Request Regarding Senior Reactor Operator License Application2023-08-16016 August 2023 Withdrawal of Request Regarding Senior Reactor Operator License Application DCL-23-068, Nuclear Material Transaction Report for New Fuel2023-08-0909 August 2023 Nuclear Material Transaction Report for New Fuel DCL-23-066, Nuclear Material Transaction Report for New Fuel2023-08-0303 August 2023 Nuclear Material Transaction Report for New Fuel DCL-23-065, Letter DCL-23-065 Request That Exam Material Be Withheld from Public Disclosure2023-07-27027 July 2023 Letter DCL-23-065 Request That Exam Material Be Withheld from Public Disclosure DCL-23-064, Nuclear Material Transaction Report for New Fuel2023-07-26026 July 2023 Nuclear Material Transaction Report for New Fuel DCL-23-054, License Amendment Request 23-01 Revision to Technical Specifications to Adopt Risk-Informed Completion Times TSTF-505, Revision 2, Provide Risk-Informed Extended Completion Times - RITSTF Initiative 4b2023-07-13013 July 2023 License Amendment Request 23-01 Revision to Technical Specifications to Adopt Risk-Informed Completion Times TSTF-505, Revision 2, Provide Risk-Informed Extended Completion Times - RITSTF Initiative 4b DCL-23-055, Nuclear Material Transaction Report for New Fuel2023-07-0606 July 2023 Nuclear Material Transaction Report for New Fuel DCL-23-042, Independent Spent Fuel Storage Installation, Submittal of Quality Assurance Program Description, Revision 02023-05-24024 May 2023 Independent Spent Fuel Storage Installation, Submittal of Quality Assurance Program Description, Revision 0 DCL-23-032, Independent Spent Fuel Storage Installation Docket No. 72-27, Materials License Number SNM-2514 Humboldt Bay Independent Spent Fuel Storage Installation - NRC Requested Notification of Withdrawal from Voluntary Program2023-05-22022 May 2023 Independent Spent Fuel Storage Installation Docket No. 72-27, Materials License Number SNM-2514 Humboldt Bay Independent Spent Fuel Storage Installation - NRC Requested Notification of Withdrawal from Voluntary Program DCL-23-041, 10 CFR 50.46 Annual Report of Emergency Core Cooling System Evaluation Model Changes for Peak Cladding Temperature for 20222023-05-22022 May 2023 10 CFR 50.46 Annual Report of Emergency Core Cooling System Evaluation Model Changes for Peak Cladding Temperature for 2022 DCL-23-038, Revision to the Unit 1 Reactor Vessel Material Surveillance Program Withdrawal Schedule2023-05-15015 May 2023 Revision to the Unit 1 Reactor Vessel Material Surveillance Program Withdrawal Schedule DCL-23-034, 2022 Annual Nonradiological Environmental Operating Report2023-05-0101 May 2023 2022 Annual Nonradiological Environmental Operating Report DCL-23-036, 2022 Annual Radiological Environmental Operating Report2023-05-0101 May 2023 2022 Annual Radiological Environmental Operating Report DCL-23-025, 2022 Annual Radioactive Effluent Release Report2023-05-0101 May 2023 2022 Annual Radioactive Effluent Release Report DCL-2023-512, Submittal of Receiving Water Monitoring Program 2022 Annual Report2023-04-27027 April 2023 Submittal of Receiving Water Monitoring Program 2022 Annual Report DCL-23-035, Response to Request for Additional Information on Request Regarding Senior Reactor Operator License Application2023-04-24024 April 2023 Response to Request for Additional Information on Request Regarding Senior Reactor Operator License Application DCL-23-028, Technical Specification Bases, Revision 142023-04-24024 April 2023 Technical Specification Bases, Revision 14 DCL-2023-511, Report on Discharge Monitoring for the First Quarter of 20232023-04-20020 April 2023 Report on Discharge Monitoring for the First Quarter of 2023 DCL-23-031, Submittal of Annual Report of Occupational Radiation Exposure for 20222023-04-19019 April 2023 Submittal of Annual Report of Occupational Radiation Exposure for 2022 DCL-23-024, Independent Spent Fuel Storage Installation, Response to Nrg Request for Additional Information for Revision to License Amendment Request 22-01 Request for Approval of Alternative Security Measures for Early Warning System2023-04-0404 April 2023 Independent Spent Fuel Storage Installation, Response to Nrg Request for Additional Information for Revision to License Amendment Request 22-01 Request for Approval of Alternative Security Measures for Early Warning System DCL-23-022, 2023 Annual Statement of Insurance for Pacific Gas and Electric Companys Diablo Canyon Power Plant2023-03-29029 March 2023 2023 Annual Statement of Insurance for Pacific Gas and Electric Companys Diablo Canyon Power Plant DCL-23-023, Decommissioning Funding Report for Diablo Canyon Power Plant, Units 1 and 22023-03-28028 March 2023 Decommissioning Funding Report for Diablo Canyon Power Plant, Units 1 and 2 DCL-23-021, Independent Spent Fuel Storage Installation, Emergency Plan Update2023-03-23023 March 2023 Independent Spent Fuel Storage Installation, Emergency Plan Update DCL-23-020, Responses to NRC Questions Regarding License Renewal Efforts2023-03-17017 March 2023 Responses to NRC Questions Regarding License Renewal Efforts DCL-23-009, Owner'S Activity Report for Unit 2 Twenty-Third Refueling Outage2023-02-22022 February 2023 Owner'S Activity Report for Unit 2 Twenty-Third Refueling Outage DCL-23-008, Request Regarding Senior Reactor Operator License Application2023-02-22022 February 2023 Request Regarding Senior Reactor Operator License Application DCL-2023-503, Annual Sea Turtle Report2023-01-26026 January 2023 Annual Sea Turtle Report DCL-2023-502, (DCPP) 4th Quarter 2022 Report on Discharge Self-Monitoring2023-01-18018 January 2023 (DCPP) 4th Quarter 2022 Report on Discharge Self-Monitoring DCL-22-091, Revised Steam Generator Tube Inspection Report for Twenty-First Refueling Outage2022-12-20020 December 2022 Revised Steam Generator Tube Inspection Report for Twenty-First Refueling Outage DCL-22-089, Core Operating Limits Report for Unit 2 Cycle 242022-12-20020 December 2022 Core Operating Limits Report for Unit 2 Cycle 24 DCL-22-085, Request to Resume Review of the License Renewal Application or, Alternatively, for an Exemption from 10 CFR 2.109(b), Concerning a Timely Renewal Application2022-10-31031 October 2022 Request to Resume Review of the License Renewal Application or, Alternatively, for an Exemption from 10 CFR 2.109(b), Concerning a Timely Renewal Application DCL-22-041, Site-Specific Decommissioning Cost Estimate, Revision 12022-10-12012 October 2022 Site-Specific Decommissioning Cost Estimate, Revision 1 DCL-22-042, Post-Shutdown Decommissioning Activities Report, Revision 12022-10-12012 October 2022 Post-Shutdown Decommissioning Activities Report, Revision 1 2024-01-29
[Table view] |
Text
mPacific Gas and Electric Campany"'
Michael A. Ginn Manager Emergency Planning Diablo Canyon Power Plant P.O. Box 56' Avila Beach, CA 93424 805.545.3446 Internal: 691.3446 Fax: 805.545.6265 .
September 26, 2018 PG&E Letter DCL-18-074 PG&E Letter DIL-18-012 U.S. Nuclear Regulatory Commission
)
10 CFR 50.54, 10 CFR 72.32 ATTN: Document Control Desk Washington, DC 20555-0001 Docket No. 50-275, OL-DPR-80 Docket No. 50-323, OL-DPR-82 Diablo Canyon Units 1 and 2 DocRet No. 72-26, Materials License No. SNM-2511 Diablo Canyon Independent Spent Fuel Storage Installation Emergency Plan and Implementing Procedures Update
Dear Commissioners and Staff:
In accordance with 10 CFR 50.54(q)(5) and the requirements of 10 CFR 72.32, Pacific Gas and Electric Company (PG&E) is providing a summary of the analysis of changes to Emergency Plan (E-Plan) and its Implementing Procedures. The revised documents and the associated enclosures *are listed below:
-.,
- Enclosure 2 - Summary of the Analysis of Changes to Em~rgency Plan Section 4, Revision 4.17, "Emergency Conditions" "
- Enclosure 3 - Summary of the Analysis of Changes to Emergency Plan Section 6, Revision 4.19, "Emergency Measures"
- Enclosure 4 - Summary of the Analysis of Changes to Emergency Plan Appendix D, Revision 5.01, "EAL Technical Basis Manual"
- Enclosure 5 - Summary of the Analysis of Changes to Emergency Plan Appendix D, Revision 5.02, "EAL Technical Basis Manual"
- Enclosure 6 - Summary of the Analysis of Changes 'to Emergency Plan Appendix F, Revision 4.06, "ERO On-Shift Staffing Analysis Report" At-45 A member of the STARS Alliance NJt.-1 ~s z /p Callaway* Diablo Canyon* Palo Verde* Wolf Creek fl)lfd- ,
tJH 5 s
Document Control Desk PG&E Letter DCL-18-074 September 26, 2018 PG&E-Letter DIL-18-012 Page 2 /
- Enclosure 7 - Summary of the Analysis of Changes to Emergency Plan Appendix G, Revision 4.02, "Protective Action Recommendation (PAR)
Strategy Bases"
- Enclosure 8 - Emergency Plan Section 4, Revision 4.17, "Emergency Conditions"
- Enclosure 9 - Emergency Plan Section 6, Revision 4.19, "Emergency Measures"
- Enclosure 10 - Emergency Plan Appendix D, Revision 5.02, "EAL Technical Basis Manual"
- Enclosure 11 - Emergency Plan Appendix F, Revision 4.06, "ERO On-Shift Staffing Analysis Report"
- Enclosure 12 - Emergency Plan Appendix G, Revision 4.02, "Protective Action Recommendation (PAR) Strategy Bases"
- Enclosure 14 - Summary of the Analysis, of Changes to Emergency Plan Implementing Procedure EP G-1, Revision 45, "Emergency Classification and Emergency Plan Activation"
- Enclosure 15 - Summary of the Analysis of Changes to Emergency Plan Implementing Procedure EP G-2, Revision 51, "Interim Emergency Response Organization"
- Enclosure 16 - Summary of the Analysis of Changes to Emergency Plan Implementing Procedure EP G-3, Revision 60, "Emergency Notification of Off-Site Agencies"
- Enclosure 17 - Summary of the Analysis of Changes to Emergency Plan Implementing Procedure EP RB-10, Revision 21, "Protective Action Recommendations"
- Enclosure 18 - Summary of the Analysis of Changes to Emergency Plan Implementing Procedure EP RB-14A, Revision 3, "Initial Detection of Fuel Cladding Damage" A member of the STARS Alliance Callaway* Diablo Canyon
Document Control Desk PG&E Letter DCL-18-074 September 26, 2018 PG&E Letter DIL-18-012 Page 3
- Enclosure 19 - Summary of the Analysis of Changes to Emergency Plan Implementing Procedure EP RB-16, Revision 16, "Operating Instructions for the EARS Computer Program"
\
- Enclosure 20 - Summary of the Analysis of Changes to Emergency Plan Implementing Procedure EP RB-17, Revision 1, "Operating Instructions for QuickDose"
- Enclosure 21 - S,ummary of the Analysis of Changes to Emergency Plan Implementing Procedure EP R-2, Revision 36, "Release of Airborne Radioactive Materials Initial Assessment"
- Enclosure 23 - Summary of the Analysis of Changes to Emergency Plan Implementing Procedure EP EF-3, Revision 46, "Activation and Operation of the Emergency Operations Facility" PG&E evaluated the changes for a reduction in effectiveness, as defined in 10 CFR 50.54(q), and concluded that the changes do not reduce the effectiveness of the E-Plan. The E-Plan continues to meet the requirements in Appendix E of 10 CFR 50 and the planning standards of 10 CFR 50.47(b).
Therefore, prior NRC approval of the associated changes was not required.
This update does not contain any privacy and proprietary information in accordance with NRC Generic Letter 81-27, "Privacy and Proprietary Material in Emergency Plans."
PG&E makes no new or revised regulatory commitments (as defined by NEI 99-04) in this letter.
If there are questions regarding this update, please contact me at (805) 545-3446.
Sincerely,
~ __;__ A G---.
Michael A. Ginn Emergency Planning Manager A member of the STARS Alliance Callaway
Document Control Desk PG&E Letter DCL-18-074 September 26, 2018 PG&E Letter DIL-18-012 Page4 armb/4743/50960128 Enclosures cc/enc: William C. Allen, NMSS Project Manager Kriss M. Kennedy, NRG Region IV Administrator Christopher W. Newport, NRG Senior Resident Inspector Balwant K. Singal, NRG Senior Project Manager Senior Emergency Preparedness Inspector (RGN-IV/DR)