RA-18-088, Radiological Emergency Plan Addendum Revision. Includes EP-AA-1010, Addendum 3, Revision 4, Emergency Action Levels for Oyster Creek.

From kanterella
(Redirected from ML18274A088)
Jump to navigation Jump to search
Radiological Emergency Plan Addendum Revision. Includes EP-AA-1010, Addendum 3, Revision 4, Emergency Action Levels for Oyster Creek.
ML18274A088
Person / Time
Site: Oyster Creek
Issue date: 09/25/2018
From: David Helker
Exelon Generation Co
To:
Office of Nuclear Material Safety and Safeguards, Office of Nuclear Reactor Regulation
References
EP-AA-1010, Add 3, Rev 4, RA-18-088
Download: ML18274A088 (2)


Text

Exelon Generation 200 Exelon Way Kennett Square. PA 19348 www.exeloncorp.com 10 CFR 50.54(q)(5) 10 CFR 50.4 10 CFR 72.44(f)

RA-18-088 ,

September 25, 2018 U.S. Nuclear Regulatory Commission ATTN: Document Control Desk Washington, DC 20555-0001 Oyster Creek Nuclear Generating Station Renewed Facility Operating License No. DPR-16 NRG Docket Nos. 50-219 and 72-15

Subject:

Exelon Nuclear Radiological Emergency Plan Addendum Revision In accordance with 10 CFR 50.4(b)(5), "Emergency Plan and related submissions," Exelon Generation Company, LLC (Exelon) is submitting an Emergency Plan Addendum revision for Oyster Creek Nuclear Generating Station (OCNGS) as listed in the table below.

  • Document*

EP-AA-1010, Addendum 3 4 Emergency Action Levels for Oyster Creek Station The changes to the Emergency Plan Addendum were evaluated under the requirements of 10 CFR 50.54(q) and were determined not to result in a reduction in the effectiveness of the Emergency Plan for OCNGS. This notification is being submitted within 30 days of implementation of the changes as required by 10 CFR 50.54(q)(5). The changes continue to meet the applicable planning standards established in 10 CFR 50.47(b) and 10 CFR 50, Appendix E.

In addition, as required by 10 CFR 50.54(q)(5), this submittal includes a summary analysis of the changes to the Emergency Plan Addendum (Attachment 1).

This submittal also satisfies the reporting requirements associated with '10 CFR 72.44(f),

which stipulates that within six months after any change is made to the Emergency Plan, the licensee shall submit a report containing a description of the changes to the Director, , Ir::

Division of Spent Fuel Management. f X"t'J tJfo155Z4' tJl-f-tvrvf ~5

U.S. Nuclear Regulatory Commission Emergency Plan Addendum Revision NRG Docket Nos. 50-219 and 72-15 September 25, 2018 Page2 A copy of the revised Emergency Plan Addendum and supporting change summary analysis are included in the attachments to this letter.

There are no regulatory commitments in this submittal.

If you have any questions or require additional information, please contact Richard Gropp at (610) 765-5557.

Respectfully, fl.a)~

David P. Helker Manager, Licensing and Regulatory Affairs Exelon Generation Company, LLC Attachments: 1) 10 CFR 50.54(q)(5) Procedure Change Summary Analysis

2)
  • EP-AA-1010, Addendum 3, Revision 4, "Emergency Action Levels for Oyster Creek Station" cc: w/ Attachment 1 only Regional Administrator - NRG Region I Director, NRG Division of Spent Fuel Management, ONMSS NRG Senior Resident Inspector - Oyster Creek Nuclear Generating Station NRG Project Manager, NRR - Oyster Creek Nuclear Generating Station Director, Bureau of Nuclear Engineering - New Jersey Department of Environmental Protection Mayor of Lacey Township, Forked River, NJ