RA-18-0166, Supplement to Non-Voluntary License Amendment Request (LAR) to Correct Non-Conservative Technical Specification 3.4.11 - PORVs

From kanterella
(Redirected from ML18262A207)
Jump to navigation Jump to search

Supplement to Non-Voluntary License Amendment Request (LAR) to Correct Non-Conservative Technical Specification 3.4.11 - PORVs
ML18262A207
Person / Time
Site: Mcguire, McGuire  Duke energy icon.png
Issue date: 09/13/2018
From: Teresa Ray
Duke Energy Carolinas
To:
Document Control Desk, Office of Nuclear Reactor Regulation
References
RA-18-0166
Download: ML18262A207 (5)


Text

Thomas D. Ray, P.E.

(~DUKE

~ ENERGY Site Vice President McGuire Nuclear Station Duke Energy MGOlVP I 12700 Hagers Ferry Road Huntersville, NC 28078 O: 980.875.4805 f: 980.875.4809 Tom.Ray@duke-energy.com Serial No: RA-18-0166 September 13, 2018 10 CFR 50.90 U.S. Nuclear Regulatory Commission Washington, DC 20555-001 ATTENTION: Document Control Desk

Subject:

Duke Energy Carolinas, LLC (Duke Energy)

McGuire Nuclear Station, Units 1 and 2 Docket No. 50-369 and 50-370 Supplement to Non-Voluntary License Amendment Request (LAR) to Correct Non-Conservative Technical Specification 3.4.11 - PORVs By letter dated February 26, 2018, Duke Energy submitted a LAR for the McGuire Nuclear Station, Unit 1 Renewed Operating License NPF-9, and Unit 2 Renewed Operating License NPF-17. Specifically, this LAR was requested to correct Non-Conservative Technical Specification 3.4.11, "Pressurizer Power Operated Relief Valves (PORVs)."

Enclosure 2 (Marked Technical Specification Pages) and Enclosure 3 (Clean Technical Specification Pages) of the above LAR contained some typographical errors. The Note for SR 3.4.11.1 in Enclosure 2 should have referred to Condition F instead of Condition E. The Note for new Condition Kin Enclosure 3 should have referred to Required Action F.2 instead of Required Action E.2. The Note for SR 3.4.11.1 in Enclosure 3 should have referred to Condition F instead of Condition E.

The purpose of this supplement is to provide the replacement pages to correct the errors as described above. This supplement contains no NRC commitments and does not impact the No Significant Hazards Consideration Determination Analysis included in the February 26, 2018 submittal. If you have any questions, please contact P.T. Vu at (980) 875-4302.

I declare under penalty of perjury that the foregoing is true and correct. Executed on September 13, 2018.

Thomas D. Ray, P.E; Site Vice President McGuire Nuclear Station Attachment www.duke-energy.com

U.S. Nuclear Regulatory Commission September 13, 2018 Page 2 cc w/ .attachment:

Catherine Haney Administrator, Region II U.S. Nuclear Regulatory Commission Marquis One Tower 245 Peachtree Center Ave., NE, Suite 1200 Atlanta, GA 30303-1257 Andy Hutto NRC Senior Resident Inspector McGuire Nuclear Station Michael Mahoney, Project Manager michael.mahoney@nrc.gov W. L. Cox, Ill, Section Chief North Carolina Department of Environment and Natural Resources lee.cox@dhhs.nc.gov

ATTACHMENT Replacement Technical Specification Pages

Pressurizer PORVs 3.4.11 ACTIONS (continued)

J. One Train B PORV J.1 Perform Required Actions 1 hour1.157407e-5 days <br />2.777778e-4 hours <br />1.653439e-6 weeks <br />3.805e-7 months <br /> inoperable and not B.1 and B.2.

capable of being manually cycled AND AND J.2 Perform Required Actions 1 hour1.157407e-5 days <br />2.777778e-4 hours <br />1.653439e-6 weeks <br />3.805e-7 months <br /> G.1 and G.2.

The other Train B block valve inoperable. AND J.3.1 Restore PORV to 72 hours8.333333e-4 days <br />0.02 hours <br />1.190476e-4 weeks <br />2.7396e-5 months <br /> OPERABLE status.

OR J.3.2 Restore block valve to 72 hours8.333333e-4 days <br />0.02 hours <br />1.190476e-4 weeks <br />2.7396e-5 months <br /> OPERABLE status.

K. Three block valves ------------------NOTE-------------------

inoperable. Required Action K.1 is not applicable to block valves made inoperable by Required Action F.2.

K.1 Place associated PORV 1 hour1.157407e-5 days <br />2.777778e-4 hours <br />1.653439e-6 weeks <br />3.805e-7 months <br /> switches in closed position and verify PORVs closed.

AND K.2 Restore one block valve to 2 hours2.314815e-5 days <br />5.555556e-4 hours <br />3.306878e-6 weeks <br />7.61e-7 months <br /> OPERABLE status.

L. Required Action and L.1 Be in MODE 3. 6 hours6.944444e-5 days <br />0.00167 hours <br />9.920635e-6 weeks <br />2.283e-6 months <br /> associated Completion Time of Condition G, AND H, I, J or Knot met.

L.2 Bein MODE 4. 12 hours1.388889e-4 days <br />0.00333 hours <br />1.984127e-5 weeks <br />4.566e-6 months <br /> McGuire Units 1 and 2 3.4.11-5 Amendment Nos.

Pressurizer PORVs 3.4.11 SURVEILLANCE REQUIREMENTS SURVEILLANCE FREQUENCY SR 3.4.11.1 ------------------------------NOTE----------------------. -------------

Not required to be met with block valve closed in accordance with the Required Action of Condition A, B, C, D, or F.

Perform a complete cycle of each block valve. . In accordance with the Surveillance Frequency Control Program SR 3.4.11.2 ------------------------------NOTE------------------------------------

Required to be performed in MODE 3 or MODE 4 when the temperature of all RCS cold legs is > 300°F and the block valve closed.

Perform a complete cycle of each PORV. In accordance with the Surveillance Frequency Control ProQram SR 3.4.11.3 Verify the nitrogen supply for each PORV is OPERABLE In accordance with by: the Surveillance Frequency Control

a. Manually transferring motive power from the air Program supply to the nitrogen supply,
b. Isolating and venting the air supply, and
c. Operating the PORV through one complete cycle.

McGuire Units 1 and 2 3.4.11-6 Amendment Nos.