MONTHYEARL-PI-23-034, Response to Request for Additional Information Regarding License Amendment Request to Revise Technical Specification 3.7.8, Cooling Water (Cl) System,2024-01-0202 January 2024 Response to Request for Additional Information Regarding License Amendment Request to Revise Technical Specification 3.7.8, Cooling Water (Cl) System, L-PI-23-035, Response to Request for Additional Information Regarding License Amendment Request to Revise Technical Specifications Section 5.6.6, Reactor Coolant System (RCS) Pressure and Temperature Limits Report2023-12-20020 December 2023 Response to Request for Additional Information Regarding License Amendment Request to Revise Technical Specifications Section 5.6.6, Reactor Coolant System (RCS) Pressure and Temperature Limits Report L-PI-23-033, Supplement to License Amendment Request to Revise Technical Specification 3.8.1, Surveillance Requirement 3.8.1.2, Note 32023-12-0505 December 2023 Supplement to License Amendment Request to Revise Technical Specification 3.8.1, Surveillance Requirement 3.8.1.2, Note 3 L-PI-23-025, License Amendment Request to Revise Technical Specification 3.8.1, Surveillance Requirement 3.8.1.2, Note 32023-09-28028 September 2023 License Amendment Request to Revise Technical Specification 3.8.1, Surveillance Requirement 3.8.1.2, Note 3 L-PI-23-023, Baffle Former Bolts Alternate Aging Management Strategy2023-09-11011 September 2023 Baffle Former Bolts Alternate Aging Management Strategy L-PI-23-018, License Amendment Request to Revise ISFSI Technical Specification 4.4 to Allow Use of a Code Alternative to ASME Code, NB-5130, Examination of Weld Edge Preparation Surfaces, for the TN-40HT2023-07-14014 July 2023 License Amendment Request to Revise ISFSI Technical Specification 4.4 to Allow Use of a Code Alternative to ASME Code, NB-5130, Examination of Weld Edge Preparation Surfaces, for the TN-40HT L-PI-23-006, License Amendment Request to Revise Technical Specification 3.7.8 Required Actions2023-06-22022 June 2023 License Amendment Request to Revise Technical Specification 3.7.8 Required Actions L-PI-23-016, 2022 10 CFR 50.46 LOCA Annual Report2023-06-14014 June 2023 2022 10 CFR 50.46 LOCA Annual Report L-PI-23-010, Annual Report of Individual Monitoring2023-04-27027 April 2023 Annual Report of Individual Monitoring L-PI-23-007, Supplement to Application to Revise Technical Specification Section 5.6.6, Reactor Coolant System (RCS) Pressure and Temperature Limits Report (PTLR)2023-03-28028 March 2023 Supplement to Application to Revise Technical Specification Section 5.6.6, Reactor Coolant System (RCS) Pressure and Temperature Limits Report (PTLR) L-PI-23-005, CFR 50.55a Requests Nos. 1-RR-5-15 and 2-RR-5-15, Proposed Use of Subsequent ASME Code Edition and Addenda in Accordance with 10 CFR 50.55a(g)(4)(iv)2023-03-0303 March 2023 CFR 50.55a Requests Nos. 1-RR-5-15 and 2-RR-5-15, Proposed Use of Subsequent ASME Code Edition and Addenda in Accordance with 10 CFR 50.55a(g)(4)(iv) L-PI-23-001, Day Steam Generator Tube Inspection Report2023-01-30030 January 2023 Day Steam Generator Tube Inspection Report L-PI-22-047, Resubmittal of Prairie Island Nuclear Generating Plant (PINGP) 2018 Unit 1 180-Day Steam Generator Tube Inspection Report2022-12-21021 December 2022 Resubmittal of Prairie Island Nuclear Generating Plant (PINGP) 2018 Unit 1 180-Day Steam Generator Tube Inspection Report L-PI-22-020, Application to Revise Technical Specification Section 5.6.6, Reactor Coolant System (RCS) Pressure and Temperature Limits Report (PTLR)2022-12-0202 December 2022 Application to Revise Technical Specification Section 5.6.6, Reactor Coolant System (RCS) Pressure and Temperature Limits Report (PTLR) L-PI-22-040, Supplement to Application to Revise Technical Specifications to Adopt TSTF-577, Revised Frequencies for Steam Generator Tube Inspections2022-10-0606 October 2022 Supplement to Application to Revise Technical Specifications to Adopt TSTF-577, Revised Frequencies for Steam Generator Tube Inspections L-PI-22-037, Updated Approach for Prairie Island Unit 1 and Unit 2 Baffle Former Bolts2022-09-20020 September 2022 Updated Approach for Prairie Island Unit 1 and Unit 2 Baffle Former Bolts L-PI-22-032, CFR 50.46 LOCA Annual Report2022-06-16016 June 2022 CFR 50.46 LOCA Annual Report L-PI-22-033, Response to Request for Additional Information Prairie Island Nuclear Generating Plant, Units 1 and 2, Amendment to Adopt 24-Month Operating Cycles2022-06-10010 June 2022 Response to Request for Additional Information Prairie Island Nuclear Generating Plant, Units 1 and 2, Amendment to Adopt 24-Month Operating Cycles L-PI-22-003, Application to Revise Technical Specifications to Adopt TSTF-577, Revised Frequencies for Steam Generator Tube Inspections2022-06-0707 June 2022 Application to Revise Technical Specifications to Adopt TSTF-577, Revised Frequencies for Steam Generator Tube Inspections L-PI-22-024, Supplement to Application for License Amendment to Implement 24-Month Operating Cycle2022-03-0707 March 2022 Supplement to Application for License Amendment to Implement 24-Month Operating Cycle L-PI-21-047, Response to Request for Additional Information 24-Month Cycle Amendment Prairie Island Nuclear Generating Plant, Units 1 and 22021-12-0707 December 2021 Response to Request for Additional Information 24-Month Cycle Amendment Prairie Island Nuclear Generating Plant, Units 1 and 2 L-PI-21-045, Response to Request for Additional Information Cooling Water System License Amendment Request2021-11-0404 November 2021 Response to Request for Additional Information Cooling Water System License Amendment Request L-PI-21-029, Exigent License Amendment Request to Revise Technical Specification 3.7.8 to Allow a One-Time Extension of the Completion Time of Required Action B.12021-10-0707 October 2021 Exigent License Amendment Request to Revise Technical Specification 3.7.8 to Allow a One-Time Extension of the Completion Time of Required Action B.1 L-PI-21-006, License Amendment Request to Revise Technical Specification 3.3.1, Reactor Trip System (RTS) Instrumentation, to Incorporate Installed Bypass Test Capability for the Power Range RTS Functions2021-10-0202 October 2021 License Amendment Request to Revise Technical Specification 3.3.1, Reactor Trip System (RTS) Instrumentation, to Incorporate Installed Bypass Test Capability for the Power Range RTS Functions L-PI-21-032, Response to Request for Additional Information Amendment Request to Adopt TSTF-471 and 571-T for Prairie Island2021-09-30030 September 2021 Response to Request for Additional Information Amendment Request to Adopt TSTF-471 and 571-T for Prairie Island L-PI-21-016, Application for License Amendment to Implement 24-Month Operating Cycle2021-08-0606 August 2021 Application for License Amendment to Implement 24-Month Operating Cycle L-PI-21-027, 2020 10 CFR 50.46 LOCA Annual Report2021-06-28028 June 2021 2020 10 CFR 50.46 LOCA Annual Report L-PI-21-023, Independent Spent Fuel Storage Installation - 2020 Annual Radiological Environmental Monitoring Program Report2021-05-14014 May 2021 Independent Spent Fuel Storage Installation - 2020 Annual Radiological Environmental Monitoring Program Report L-PI-21-007, Application to Revise Technical Specifications to Adopt TSTF-471, Eliminate Use of the Term Core Alterations in Actions and Notes2021-04-19019 April 2021 Application to Revise Technical Specifications to Adopt TSTF-471, Eliminate Use of the Term Core Alterations in Actions and Notes L-PI-20-050, Request for a One-Time Exemption from 10 CFR 50, Appendix E, Biennial Emergency Preparedness Exercise Requirements, Due to COVID-19 Pandemic2020-10-0707 October 2020 Request for a One-Time Exemption from 10 CFR 50, Appendix E, Biennial Emergency Preparedness Exercise Requirements, Due to COVID-19 Pandemic L-PI-20-051, Supplement to Application to Revise Technical Specifications to Adopt TSTF-547, Clarification of Rod Position Requirements2020-09-28028 September 2020 Supplement to Application to Revise Technical Specifications to Adopt TSTF-547, Clarification of Rod Position Requirements L-PI-20-026, Response to Request for Additional Information: License Amendment Request to Revise Technical Specifications to Adopt Risk Informed Completion Times TSTF-505, Revision 2, Provide Risk-Informed Extended Completion Times - RITSTF Initiativ2020-09-0101 September 2020 Response to Request for Additional Information: License Amendment Request to Revise Technical Specifications to Adopt Risk Informed Completion Times TSTF-505, Revision 2, Provide Risk-Informed Extended Completion Times - RITSTF Initiative 4 L-PI-20-035, = Request for Revision to Reactor Vessel Material Surveillance Capsule Removal Schedule2020-07-28028 July 2020 = Request for Revision to Reactor Vessel Material Surveillance Capsule Removal Schedule L-PI-20-023, Independent Spent Fuel Storage Installation, Response to Request for Additional Information: License Amendment Request to Expand the Storage Capacity of the Independent Spent Fuel Storage Installation (ISFSI)2020-06-10010 June 2020 Independent Spent Fuel Storage Installation, Response to Request for Additional Information: License Amendment Request to Expand the Storage Capacity of the Independent Spent Fuel Storage Installation (ISFSI) L-PI-20-014, Supplement to License Amendment Request: Expand the Storage Capacity of the Independent Spent Fuel Storage Installation (ISFSI2020-04-29029 April 2020 Supplement to License Amendment Request: Expand the Storage Capacity of the Independent Spent Fuel Storage Installation (ISFSI L-PI-20-004, License Amendment Request to Revise Technical Specifications (TS) to Remove Note I from Limiting Condition for Operating (LCO) 3.4.12 and LCO 3.4.132020-03-30030 March 2020 License Amendment Request to Revise Technical Specifications (TS) to Remove Note I from Limiting Condition for Operating (LCO) 3.4.12 and LCO 3.4.13 L-PI-20-001, License Amendment Request to Address Issues Identified in Westinghouse Nuclear Safety Advisory Letter NSAL-09-5, Revision 1, and NSAL-15-12020-01-29029 January 2020 License Amendment Request to Address Issues Identified in Westinghouse Nuclear Safety Advisory Letter NSAL-09-5, Revision 1, and NSAL-15-1 L-PI-19-041, Application to Revise Technical Specifications to Adopt TSTF-547, Clarification of Rod Position Requirements2019-12-23023 December 2019 Application to Revise Technical Specifications to Adopt TSTF-547, Clarification of Rod Position Requirements L-PI-19-031, License Amendment Request: Revise Technical Specifications to Adopt Risk Informed Completion Times TSTF-505, Revision 2, Provide Risk-Informed Extended Completion Times - RITSTF Initiative 4b2019-12-16016 December 2019 License Amendment Request: Revise Technical Specifications to Adopt Risk Informed Completion Times TSTF-505, Revision 2, Provide Risk-Informed Extended Completion Times - RITSTF Initiative 4b L-PI-19-040, License Amendment Request: Revise Technical Specification 5.5.14 to Permanently Extend Containment Leakage Rate Test Frequency2019-10-0707 October 2019 License Amendment Request: Revise Technical Specification 5.5.14 to Permanently Extend Containment Leakage Rate Test Frequency L-PI-19-038, Submittal of Revised Pressure and Temperature Limits Report2019-09-19019 September 2019 Submittal of Revised Pressure and Temperature Limits Report L-PI-19-037, Response to Request for Additional Information: 10 CFR 50.55a Requests Nos. 1-RR-5-10 and 2-RR-5-10, Proposed Alternative to Reactor Vessel Inservice Inspection (ISI) Intervals2019-09-16016 September 2019 Response to Request for Additional Information: 10 CFR 50.55a Requests Nos. 1-RR-5-10 and 2-RR-5-10, Proposed Alternative to Reactor Vessel Inservice Inspection (ISI) Intervals L-PI-19-025, Request to Approve Site-Specific Probabilistic Risk Assessment (PRA) Model for Flowserve N-Seal Abeyance Seal and Dynamic Testing for the Prairie Island Nuclear Generating Plant (PINGP)2019-08-27027 August 2019 Request to Approve Site-Specific Probabilistic Risk Assessment (PRA) Model for Flowserve N-Seal Abeyance Seal and Dynamic Testing for the Prairie Island Nuclear Generating Plant (PINGP) L-PI-19-029, Supplement to Response to Request for Additional Information: Application to Adopt 10 CFR 50.69, Risk-Informed Categorization and Treatment of Structures, Systems and Components For...2019-08-0505 August 2019 Supplement to Response to Request for Additional Information: Application to Adopt 10 CFR 50.69, Risk-Informed Categorization and Treatment of Structures, Systems and Components For... L-PI-19-002, 10 CFR 50.55a Requests Nos. 1-RR-5-10 and 2-RR-5-10, Proposed Alternative to Reactor Vessel Inservice Inspection (ISI) Intervals for Prairie Island, Unit 1 and Unit 22019-06-13013 June 2019 10 CFR 50.55a Requests Nos. 1-RR-5-10 and 2-RR-5-10, Proposed Alternative to Reactor Vessel Inservice Inspection (ISI) Intervals for Prairie Island, Unit 1 and Unit 2 L-PI-19-014, Response to Request for Additional Information: Application to Adopt 10 CFR 50.69, Risk-Informed Categorization and Treatment of Structures, Systems and Components for Nuclear Power Reactors2019-04-29029 April 2019 Response to Request for Additional Information: Application to Adopt 10 CFR 50.69, Risk-Informed Categorization and Treatment of Structures, Systems and Components for Nuclear Power Reactors L-PI-19-003, Request for Revision to Reactor Vessel Material Surveillance Capsule Removal Schedule for Prairie Island Nuclear Generating Plant (PINGP)2019-02-0404 February 2019 Request for Revision to Reactor Vessel Material Surveillance Capsule Removal Schedule for Prairie Island Nuclear Generating Plant (PINGP) L-PI-19-006, Emergency License Amendment Request Regarding One-Time Extension for Technical Specification Completion Time Requirements2019-01-29029 January 2019 Emergency License Amendment Request Regarding One-Time Extension for Technical Specification Completion Time Requirements L-PI-19-005, Online Reference Portal for NRC Review of License Amendment Request to Implement 10 CFR 50.692019-01-15015 January 2019 Online Reference Portal for NRC Review of License Amendment Request to Implement 10 CFR 50.69 L-PI-18-063, Response to Request for Additional Information: Revise License Condition Associated with Implementation of NFPA 8052018-12-0606 December 2018 Response to Request for Additional Information: Revise License Condition Associated with Implementation of NFPA 805 2024-01-02
[Table view] Category:Response to Request for Additional Information (RAI)
MONTHYEARL-PI-23-034, Response to Request for Additional Information Regarding License Amendment Request to Revise Technical Specification 3.7.8, Cooling Water (Cl) System,2024-01-0202 January 2024 Response to Request for Additional Information Regarding License Amendment Request to Revise Technical Specification 3.7.8, Cooling Water (Cl) System, L-PI-23-035, Response to Request for Additional Information Regarding License Amendment Request to Revise Technical Specifications Section 5.6.6, Reactor Coolant System (RCS) Pressure and Temperature Limits Report2023-12-20020 December 2023 Response to Request for Additional Information Regarding License Amendment Request to Revise Technical Specifications Section 5.6.6, Reactor Coolant System (RCS) Pressure and Temperature Limits Report L-PI-23-033, Supplement to License Amendment Request to Revise Technical Specification 3.8.1, Surveillance Requirement 3.8.1.2, Note 32023-12-0505 December 2023 Supplement to License Amendment Request to Revise Technical Specification 3.8.1, Surveillance Requirement 3.8.1.2, Note 3 ML23262B0372023-09-19019 September 2023 Response to NRC Request for Additional Information Regarding the 2023 Monticello and Prairie Island Plant Decommissioning Funding Status Reports L-PI-22-034, Response to RAI, Alternative RR-08 Related to Pressure Isolation Valve Monitoring and Testing2022-07-14014 July 2022 Response to RAI, Alternative RR-08 Related to Pressure Isolation Valve Monitoring and Testing ML22161A9152022-06-10010 June 2022 and Prairie Island Nuclear Generating Plant, Units 1 and 2 - Response to a Request for Additional Information Xcel Energy Amendment Request to Create a Common Emergency Plan and Emergency Operations. L-PI-22-033, Response to Request for Additional Information Prairie Island Nuclear Generating Plant, Units 1 and 2, Amendment to Adopt 24-Month Operating Cycles2022-06-10010 June 2022 Response to Request for Additional Information Prairie Island Nuclear Generating Plant, Units 1 and 2, Amendment to Adopt 24-Month Operating Cycles L-PI-21-047, Response to Request for Additional Information 24-Month Cycle Amendment Prairie Island Nuclear Generating Plant, Units 1 and 22021-12-0707 December 2021 Response to Request for Additional Information 24-Month Cycle Amendment Prairie Island Nuclear Generating Plant, Units 1 and 2 L-PI-21-045, Response to Request for Additional Information Cooling Water System License Amendment Request2021-11-0404 November 2021 Response to Request for Additional Information Cooling Water System License Amendment Request L-PI-21-032, Response to Request for Additional Information Amendment Request to Adopt TSTF-471 and 571-T for Prairie Island2021-09-30030 September 2021 Response to Request for Additional Information Amendment Request to Adopt TSTF-471 and 571-T for Prairie Island L-PI-20-026, Response to Request for Additional Information: License Amendment Request to Revise Technical Specifications to Adopt Risk Informed Completion Times TSTF-505, Revision 2, Provide Risk-Informed Extended Completion Times - RITSTF Initiativ2020-09-0101 September 2020 Response to Request for Additional Information: License Amendment Request to Revise Technical Specifications to Adopt Risk Informed Completion Times TSTF-505, Revision 2, Provide Risk-Informed Extended Completion Times - RITSTF Initiative 4 L-PI-20-023, Independent Spent Fuel Storage Installation, Response to Request for Additional Information: License Amendment Request to Expand the Storage Capacity of the Independent Spent Fuel Storage Installation (ISFSI)2020-06-10010 June 2020 Independent Spent Fuel Storage Installation, Response to Request for Additional Information: License Amendment Request to Expand the Storage Capacity of the Independent Spent Fuel Storage Installation (ISFSI) ML20045E8942020-02-14014 February 2020 Response to a Request for Additional Information for Proposed 10 CFR 50.55a(z)(2) Alternatives to Utilize ASME Code Case N-786-3, Alternative Requirements for Sleeve Reinforcement of Class 2 and 3 Moderate-Energy Carbon Steel Piping, and AS ML20127J0002019-11-0707 November 2019 Xcel Reply to PIIC Expansion Application L-PI-19-037, Response to Request for Additional Information: 10 CFR 50.55a Requests Nos. 1-RR-5-10 and 2-RR-5-10, Proposed Alternative to Reactor Vessel Inservice Inspection (ISI) Intervals2019-09-16016 September 2019 Response to Request for Additional Information: 10 CFR 50.55a Requests Nos. 1-RR-5-10 and 2-RR-5-10, Proposed Alternative to Reactor Vessel Inservice Inspection (ISI) Intervals L-PI-19-029, Supplement to Response to Request for Additional Information: Application to Adopt 10 CFR 50.69, Risk-Informed Categorization and Treatment of Structures, Systems and Components For...2019-08-0505 August 2019 Supplement to Response to Request for Additional Information: Application to Adopt 10 CFR 50.69, Risk-Informed Categorization and Treatment of Structures, Systems and Components For... L-PI-19-014, Response to Request for Additional Information: Application to Adopt 10 CFR 50.69, Risk-Informed Categorization and Treatment of Structures, Systems and Components for Nuclear Power Reactors2019-04-29029 April 2019 Response to Request for Additional Information: Application to Adopt 10 CFR 50.69, Risk-Informed Categorization and Treatment of Structures, Systems and Components for Nuclear Power Reactors L-PI-18-063, Response to Request for Additional Information: Revise License Condition Associated with Implementation of NFPA 8052018-12-0606 December 2018 Response to Request for Additional Information: Revise License Condition Associated with Implementation of NFPA 805 L-PI-18-051, Response to Request for Additional Information: Application for Technical Specification Change Regarding Risk-Informed Justification for the Relocation of Specific Surveillance Frequency Requirements to a Licensee Controlled Program2018-09-17017 September 2018 Response to Request for Additional Information: Application for Technical Specification Change Regarding Risk-Informed Justification for the Relocation of Specific Surveillance Frequency Requirements to a Licensee Controlled Program L-PI-18-038, Supplement to License Amendment Request to Revise License Condition Associated with Implementation of NFPA 8052018-07-10010 July 2018 Supplement to License Amendment Request to Revise License Condition Associated with Implementation of NFPA 805 ML18131A2232018-05-11011 May 2018 Prairie and Monticello - Response to Request for Additional Information Regarding Proposed Alternative to Utilize Code Case N-513-4, Evaluation Criteria for Temporary Acceptance of Flaws in Moderate Energy Class 2 or 3 Piping Section XI, Di L-PI-17-042, Response to Request for Additional Information Regarding License Amendment Request to Revise the NDE Inspection Interval for Special Lifting Devices2017-11-0606 November 2017 Response to Request for Additional Information Regarding License Amendment Request to Revise the NDE Inspection Interval for Special Lifting Devices ML17279A1212017-10-0404 October 2017 Enclosure 2 to L-PI-17-041, Westinghouse-Prepared RAI Responses CE-17-3, Rev. 1, Attachment 2 and Enclosure 3, Marked-Up Technical Specification Page 4.0-7 L-PI-17-035, License Amendment Request to Revise the Emergency Action Level (EAL) Scheme - Supplement and Response to Requests for Additional Information2017-09-27027 September 2017 License Amendment Request to Revise the Emergency Action Level (EAL) Scheme - Supplement and Response to Requests for Additional Information L-PI-17-032, Response to Request for Additional Information Regarding License Amendment Request to Revise Emergency Plan Staff Augmentation Response Times2017-09-20020 September 2017 Response to Request for Additional Information Regarding License Amendment Request to Revise Emergency Plan Staff Augmentation Response Times L-PI-17-007, Response to Request for Additional Information on License Amendment Request to Adopt NFPA 805 Performance-Based Standard for Fire Protection for Light Water Reactors2017-03-0606 March 2017 Response to Request for Additional Information on License Amendment Request to Adopt NFPA 805 Performance-Based Standard for Fire Protection for Light Water Reactors L-PI-17-002, Response to Request for Additional Information Regarding License Amendment Request to Revise Technical Specification 3.8.7 to Remove Non-Conservative Required Action2017-02-16016 February 2017 Response to Request for Additional Information Regarding License Amendment Request to Revise Technical Specification 3.8.7 to Remove Non-Conservative Required Action L-PI-16-100, Response to NRC Request for Information - License Amendment Request for Spent Fuel Pool Criticality Technical Specification Changes2017-02-16016 February 2017 Response to NRC Request for Information - License Amendment Request for Spent Fuel Pool Criticality Technical Specification Changes L-PI-16-090, Response to Request for Additional Information on License Amendment Request to Adopt NFPA 805 Performance-Based Standard for Fire Protection for Light Water Reactors2016-12-14014 December 2016 Response to Request for Additional Information on License Amendment Request to Adopt NFPA 805 Performance-Based Standard for Fire Protection for Light Water Reactors ML16351A2102016-12-13013 December 2016 External Flooding Assessment Focused Evaluation. (Redacted) ML16288A0972016-10-14014 October 2016 and Monticello - Response to Generic Letter 2016-01, Monitoring of Neutron-Absorbing Materials in Spent Fuel Pools L-PI-16-076, Supplement to the Response to March 12, 2012, Request for Information Enclosure 2, Recommendation 2.1, Flooding, Required Response 2, Flood Hazard Reevaluation Report2016-09-29029 September 2016 Supplement to the Response to March 12, 2012, Request for Information Enclosure 2, Recommendation 2.1, Flooding, Required Response 2, Flood Hazard Reevaluation Report ML16279A4792016-09-29029 September 2016 Flood Hazard Reevaluation Report - Response to Requested Information L-PI-16-067, License Amendment Request to Adopt NFPA 805 Performance-Based Standard for Fire Protection for Light Water Reactors- Response to Request for Additional Information2016-08-17017 August 2016 License Amendment Request to Adopt NFPA 805 Performance-Based Standard for Fire Protection for Light Water Reactors- Response to Request for Additional Information L-PI-16-063, Seventh Six-Month Status Report in Response to March 12, 2012 Commission Order Modifying Licenses with Regard to Requirements for Mitigation Strategies for Beyond-Design-Basis External Events2016-08-17017 August 2016 Seventh Six-Month Status Report in Response to March 12, 2012 Commission Order Modifying Licenses with Regard to Requirements for Mitigation Strategies for Beyond-Design-Basis External Events L-PI-16-005, License Amendment Request to Adopt NFPA 805 Performance-Based Standard for Fire Protection for Light Water Reactors - Response to Request for Additional Information2016-05-24024 May 2016 License Amendment Request to Adopt NFPA 805 Performance-Based Standard for Fire Protection for Light Water Reactors - Response to Request for Additional Information ML16144A8062016-05-23023 May 2016 Supplement to License Amendment Request for Spent Fuel Pool Criticality Technical Specification Changes: Response to RAI-2 (Enclosure 1) & Marked-Up Technical Specification Page (Enclosure 2) L-PI-16-040, Supplement to License Amendment Request for Spent Fuel Pool Criticality Technical Specification Changes: Westinghouse-Prepared Response to RAI, CE-16-237, Attachment 2 (Enclosure 4)2016-05-23023 May 2016 Supplement to License Amendment Request for Spent Fuel Pool Criticality Technical Specification Changes: Westinghouse-Prepared Response to RAI, CE-16-237, Attachment 2 (Enclosure 4) ML16133A0412016-05-0909 May 2016 Response to March 12, 2012, Request for Information Enclosure 2, Recommendation 2.1, Flooding, Required Response 2, Flood Hazard Reevaluation Report L-08-001, Response to Requests for Additional Information - License Amendment Request to Revise Technical Specifications to Adopt TSTF-523, Generic Letter 2008-01, Managing Gas Accumulation, Revision 2, Using the Consolidated..2016-04-14014 April 2016 Response to Requests for Additional Information - License Amendment Request to Revise Technical Specifications to Adopt TSTF-523, Generic Letter 2008-01, Managing Gas Accumulation, Revision 2, Using the Consolidated.. L-PI-16-029, Response to Requests for Additional Information - License Amendment Request to Revise Technical Specifications to Adopt TSTF-523, Generic Letter 2008-01, Managing Gas Accumulation, Revision 2,,Using the Consolidated..2016-03-31031 March 2016 Response to Requests for Additional Information - License Amendment Request to Revise Technical Specifications to Adopt TSTF-523, Generic Letter 2008-01, Managing Gas Accumulation, Revision 2,,Using the Consolidated.. L-PI-16-004, License Amendment Request to Adopt NFPA 805 Performance-Based Standard for Fire Protection for Light Water Reactors- Response to Request for Additional Information2016-01-20020 January 2016 License Amendment Request to Adopt NFPA 805 Performance-Based Standard for Fire Protection for Light Water Reactors- Response to Request for Additional Information L-PI-16-001, Enclosure 2: Responses to Open and Pending Items from the NRC Audit Report2016-01-14014 January 2016 Enclosure 2: Responses to Open and Pending Items from the NRC Audit Report L-PI-15-105, License Amendment Request (LAR) to Revise Technical Specifications (TS) to Adopt TSTF-523, Generic Letter 2008-01, Managing Gas Accumulation, Using the Consolidated Line Item Improvement Process - Response to Request..2015-12-30030 December 2015 License Amendment Request (LAR) to Revise Technical Specifications (TS) to Adopt TSTF-523, Generic Letter 2008-01, Managing Gas Accumulation, Using the Consolidated Line Item Improvement Process - Response to Request.. L-PI-15-052, License Amendment Request to Adopt NFPA 805 Performance-Based Standard for Fire Protection for Light Water Reactors - Response to Request for Additional Information - 90-Day Responses2015-06-19019 June 2015 License Amendment Request to Adopt NFPA 805 Performance-Based Standard for Fire Protection for Light Water Reactors - Response to Request for Additional Information - 90-Day Responses L-PI-14-113, Updated Final Response to NRC Request for Information Per 10CFR50.54(f) Re Seismic Aspects of Recommendation 2.3 of the Near-Term Task Force Review of Insights from the Fukushima Dai-ichi Accident2015-01-16016 January 2015 Updated Final Response to NRC Request for Information Per 10CFR50.54(f) Re Seismic Aspects of Recommendation 2.3 of the Near-Term Task Force Review of Insights from the Fukushima Dai-ichi Accident 2024-01-02
[Table view] |
Text
1717 Wakonade Drive East Welch, MN 55089
~ Xcel Energy*
RESPONSIBLE BY NATURE 800.895.4999 xcelenergy.com September 17, 2018 L-PI-18-051 10 CFR 50.90 ATTN: Document Control Desk U.S. Nuclear Regulatory Commission Washington, DC 20555-0001 Prairie Island Nuclear Generating Plant, Units 1 and 2 Docket Nos. 50-282 and 50-306 Renewed Facility Operating License Nos. DPR-42 and DPR-60 Response to Request for Additional Information: Application for Technical Specification Change Regarding Risk-Informed Justification for the Relocation of Specific Surveillance Frequency Requirements to a Licensee Controlled Program (EPID: L-2018-LLA-0065)
References:
- 1. Letter from NSPM to NRC Document Control Desk, License Amendment Request:
Application for Technical Specification Change Regarding Risk-Informed Justification for the Relocation of Specific Surveillance Frequency Requirements to a Licensee Controlled Program, dated March 15, 2018 (ADAMS Accession No. ML18074A308)
- 2. Email from NRC to NSPM, Request for Additional Information RE: Prairie Island TSTF-425 License Amendment Request, dated August 23, 2018 (ADAMS Accession No. ML18235A298)
Pursuant to 10 CFR 50.90, Northern States Power Company, a Minnesota corporation (NSPM), doing business as Xcel Energy, requested to amend the Renewed Facility Operating Licenses DPR-42 and DPR-60 for the Prairie Island Nuclear Generating Plant (PINGP), Units 1 and 2 (Reference 1). Specifically, the proposed amendment would modify the PINGP Technical Specifications (TS) by relocating specific surveillance frequencies to a licensee-controlled program. On August 23, 2018, the NRC provided Requests for Additional Information (RAIs) (Reference 2) to support the staffs review of the Reference 1 application.
The enclosure to this letter provides NSPMs response to the NRC RAIs.
The NSPM responses to the RAIs do not change the conclusions of the proposed No Significant Hazards Consideration and the Environmental Considerations evaluations provided in Reference 1.
Please contact Sara Scott, Licensing Manager, at 612-330-6698, if additional information or clarification is required.
Document Control Desk Page 2 Summary of Commitments This letter makes no new commitments and no revisions to existing commitments.
I declare under penalty of perjury that the foregoing is true and correct.
ft;l~
Scott Sharp Site Vice President, Prairie Island Nuclear Generating Plant Northern States Power Company - Minnesota Enclosure cc: Administrator, Region Ill, USNRC Project Manager, Prairie Island Nuclear Generating Plant, USNRC Resident Inspector, Prairie Island Nuclear Generating Plant, USNRC State of Minnesota
L-PI-18-051 NSPM Enclosure Response to Request for Additional Information:
Application for Technical Specification Change Regarding Risk-Informed Justification for the Relocation of Specific Surveillance Frequency Requirements to a Licensee Controlled Program 1.0 Background Pursuant to 10 CFR 50.90, Northern States Power Company, a Minnesota corporation (NSPM), doing business as Xcel Energy, requested to amend the Renewed Facility Operating Licenses DPR-42 and DPR-60 for the Prairie Island Nuclear Generating Plant (PINGP), Units 1 and 2 (Reference 1). Specifically, the proposed amendment would modify the PINGP Technical Specifications (TS) by relocating specific surveillance frequencies to a licensee-controlled program. On August 23, 2018, the NRC provided Requests for Additional Information (RAIs) (Reference 2) to support the staffs review of the Reference 1 application.
The NSPM responses to the NRC RAIs are provided below.
2.0 Responses to Requests for Additional Information NRC Question 1: to the license amendment request, Section 2.3, Applicability of Peer Review Findings and Observations (F&Os), states that a findings closure review was conducted in October 2017 in accordance with Appendix X (ADAMS Accession No. ML17086A451) to NEI 05-04. The Nuclear Regulatory Commission (NRC) has not officially endorsed the guidance in Appendix X; however, is permitting licensees to use the guidance on an interim basis subject to conditions of acceptance outlined in NRCs letter to Nuclear Energy Institute dated May 3, 2017 (ADAMS Accession No. ML17079A427). Provide the following information to confirm that the October 2017 closure review was performed consistent with the NRC accepted process, as discussed in the May 3, 2017 letter:
a) Clarify whether a focused-scope peer review was performed concurrently with the F&O closure process. If so, provide the following:
- i. Summary of the scope of the peer review.
ii. Detailed descriptions of any new F&Os generated from the peer review and the associated dispositions for the application.
NSPM Response:
The F&O closure review performed in October 2017 on the PINGP Internal Events and Fire PRAs did not include a concurrent focused-scope peer review. Independent of the October closure review, a focused-scope peer review of the PINGP Fire PRA was completed in January 2018 (Reference 1, Attachment 2, Sections 2.3.1 and 2.3.2).
Page 1 of 10
L-PI-18-051 NSPM Enclosure b) Confirm that the closure review team was provided with a written assessment and justification of whether the resolution of each F&O, within the scope of the independent assessment, constitutes a probabilistic risk assessment (PRA) upgrade or maintenance update, as defined in American Society of Mechanical Engineers/American Nuclear Society (ASME/ANS) RA-Sa-2009, Addenda to ASME/ANS RA-S-2008, Standard for Level 1/Large Early Release Frequency Probabilistic Risk Assessment for Nuclear Power Plant Applications, as qualified by Regulatory Guide (RG) 1.200, Revision 2, An Approach for Determining the Technical Adequacy of Probabilistic Risk Assessment Results for Risk-Informed Activities, (ADAMS Accession No. ML090410014). If the written assessment and justification for the determination of each F&O was not performed and reviewed by the F&O closure review team, provide all the finding-level F&Os and the dispositions of these F&Os as it pertains to the impact on the TSTF-425 application. Alternatively, perform an Independent Assessment F&O closure review consistent with Appendix X, as accepted, with conditions, by the NRC letter dated May 3, 2017, and provide any additional open F&Os and associated dispositions as a result of this review.
NSPM Response:
For both the PINGP Internal Events and Fire PRAs F&O closure reviews, written assessment and justification documents, called F&O resolution roadmaps, were developed by NSPM and reviewed by the F&O closure review team. The purpose of the roadmap documents was to facilitate a constructive F&O closure Independent Assessment using NEI 05-04/07-12, Appendix X. The roadmap documents provided the information as defined under Pre-Review Activities in NEI 05-04/07-12, Appendix X, including a written assessment and justification of whether each finding constituted a PRA upgrade or maintenance update as defined in the ASME/ANS PRA standard.
c) Appendix X, Section X.1.3 includes five criteria for selecting members of the closure review team. Describe how the selection of members for the October 2017 independent assessment met the five criteria.
NSPM Response:
The five criteria for F&O closure assessment review team members presented in Appendix X, Section X.1.3, are discussed separately below:
- 1. Appendix X: Every member of the independent assessment team should be independent of the PRA associated with the F&Os being reviewed, per the criteria of independent in the ASME/ANS PRA Standard. These members may be contractors, utility personnel, or employees of other utilities, and may include members of peer review teams that previously reviewed the models being assessed.
Page 2 of 10
L-PI-18-051 NSPM Enclosure
Response
The PINGP Internal Events PRA finding closure assessment team consisted of four contracted PRA engineers. None of these team members had involvement in the development of the Internal Events PRA that was reviewed.
The PINGP Fire PRA finding closure assessment team consisted of eleven contracted PRA and Fire Protection engineers, which included the four contracted PRA engineers who also supported the Internal Events PRA finding closure assessment. None of these team members had involvement with the PINGP Fire PRA development.
- 2. Appendix X: Every member of the independent assessment group should meet the relevant peer reviewer qualifications as stated in the ASME/ANS PRA Standard for the technical elements associated with the F&Os being reviewed.
Response
Each reviewer of the two F&O closure teams had a minimum of 15 years experience in PRA or Fire Protection analysis. All of the PRA members had prior peer review experience and most had prior finding closure assessment experience. The lead reviewer for both reviews had experience serving as both a lead reviewer for full-scope peer reviews as well as multiple F&O closure assessments. Review team members were selected on the basis of the specific technical skills needed for the F&Os that were identified by NSPM for assessment. Specialty reviewers were used as needed (e.g., fire modeling, cable selection, etc.) to assess specific F&Os.
- 3. Appendix X: The overall review team experience includes two qualified reviewers for each F&O. An exception to this is allowed for the closure of an F&O related to a single supporting requirement (SR), in which case, a single independent reviewer is acceptable, in alignment with the peer review guidance in the main body of this document and in accordance with the ASME/ANS PRA Standard.
Response
All of the F&Os that were assessed as part of the Internal Events PRA and Fire PRA were evaluated by a minimum of two reviewers with requisite experience in the technical area being reviewed. In addition, other members of the review team participated in each consensus session. This allowed for additional technical inputs to be provided as needed during the development of the consensus evaluation and closure for each F&O.
- 4. Appendix X: Each member of the independent assessment team should be knowledgeable about the F&O independent assessment process used to assess the adequacy of the F&O resolution.
Page 3 of 10
L-PI-18-051 NSPM Enclosure
Response
All of the PRA members of finding closure assessment teams had supported previous peer reviews, and most had supported other Appendix X finding closure assessments. Fire protection assessment team members had previously supported Fire PRA peer reviews or NFPA-805 transitions.
- 5. Appendix X: The total number of reviewers is a function of the scope and number of finding F&Os to be reviewed for closure.
Response
The PINGP Internal Events finding closure assessment reviewed 31 findings with a team of four reviewers. The Fire PRA finding closure assessment reviewed 41 findings with a team of 11 reviewers. As noted above, specialty reviewers (Fire Protection reviewers) assessed only a limited number for F&Os that pertained to items such as cable selection and fire modeling issues.
d) Explain how closure of the F&Os was assessed to ensure that the capabilities of the PRA elements, or portions of the PRA within the elements, associated with the closed F&Os now meet capability category II (CC-II) for supporting requirements (SRs) from ASME/ANS RA-Sa-2009, as endorsed, with clarifications and qualifications, by RG 1.200, Revision 2.
NSPM Response:
The review team examined the changes made to the PINGP PRA models, data, and documentation that addressed the findings to determine if the issues identified in the peer reviews were adequately addressed such that the CC-II requirements of the ASME/ANS PRA Standard, including clarifications imposed by NRC Regulatory Guide (RG) 1.200, were met. The review team found instances in which the F&O resolutions did not fully meet the CC-II requirements, resulting in those F&Os remaining open. The F&Os remaining open after the finding closure review were provided in Reference 1.
e) Discuss whether the F&O closure review scope included all finding-level F&Os, including those finding-level F&Os that are associated with Met SRs. If not, identify and provide detailed descriptions for any F&Os that were excluded from the F&O closure review scope, and their associated disposition for the application.
NSPM Response:
The finding closure assessment for Internal Events and Fire PRA models evaluated all finding-level F&Os, including those in which the underlying SRs were assessed as Met.
Page 4 of 10
L-PI-18-051 NSPM Enclosure f) For any SRs that were found to be only met at CC I by previous peer review team(s),
summarize the disposition of these SRs and how it was concluded they now meet CC II. Include discussion of whether all associated F&Os described what was needed to achieve CC II and how the F&O reviewed and closed by the F&O closure team.
NSPM Response:
For the Internal Events PRA finding closure review, two of the 31 F&Os pertained to SRs that were initially assessed at CC-I. Both F&Os were determined to now meet CC-II. These F&Os were:
F&O 01-22: SR LE-C3 was assessed as CC-I because the PRA did not consider possible repair actions in the large early release frequency (LERF) evaluation. An assessment and detailed discussion on the potential for equipment repair for the top 95% of LERF sequences was added to the Quantification notebook, which is pointed to from the LERF notebook.
F&O 02-10: SR HR-D2 was assessed as CC-I because not all risk-significant pre-initiator Human Error Probabilities (HEPs) were quantified using detailed assessments. The resolution was that detailed assessments were added for all risk-significant pre-initiator HEPs.
Five of the 41 F&Os for the Fire PRA F&O closure review included SRs that were initially assessed at CC-I. Two of these F&Os were assessed to still only meet CC-I and, therefore, remain open. The other three were determined to now meet CC-II.
These three were:
F&O CS-B1-01: SR CS-B1 was assessed as CC-I since overcurrent coordination and breaker protection analyses were not complete at the time of the peer review. These evaluations are now completed.
F&O FSS-D9-01: SR FSS-D9 was assessed as CC-I since evaluation of potential smoke damage to electronics had not been performed. The PRA now evaluates smoke damage and includes failure due to such damage where applicable.
F&O FSS-F3-01: SR FSS-F3 was assessed as CC-I since a completed quantitative assessment of fire scenarios (including structural steel failures) was not available at the time of the peer review. The quantitative assessments have now been completed in accordance with CC-II requirements.
As with all of the F&Os reviewed by the closure assessment team, each F&O resolution was reviewed against the concerns raised in the F&O as well as the specific SRs that were referenced in the F&O to ensure that the resolution addressed the documented issues and met the CC-II requirements of each SR.
Page 5 of 10
L-PI-18-051 NSPM Enclosure NRC Question 2:
Section 2.3.3 of the LAR states PINGP fire PRA will be utilized in a supplementary role (as discussed further in Section 3.0) since the fire PRA model is based on the PINGP plant configuration assuming completion of all NFPA-805 design improvements. Table S-2 of NFPA 805 LAR Attachment S Modifications and Implementation Items outlines those design improvements that are scheduled for completion by second refueling outage per issuance of NFPA 805 license amendment (August 8, 2017). Responses to the following will provide additional clarification with regard to use of the Fire PRA:
a) Provide those plant modifications listed in Table S-2 that are currently scheduled for completion beyond the second refueling outage.
NSPM Response:
As required, the plant modifications listed in Table S-2 are currently scheduled for completion within the timeframe specified by the license condition.
b) NEI 04-10 Step 10 Initial Assessment for Fire Events states that if the plant has a Fire PRA, then the next step of the screening process is to determine whether the SSC is evaluated in the fire PRA.
- i. Provide detailed justification that explains the basis for why PINGP opts to not follow the guidance outlined in NEI 04-10 Step 10 with regard to determining the use of Fire PRA on case by case basis.
NSPM Response:
NEI 04-10, Revision 1 (Reference 3), provides guidance for the assessment of fire risk impacts using several different approaches. This includes the use of a qualitative or bounding risk analysis per Step 10 of the guidance. The NEI document allows for the use of a qualitative screening analysis as an initial evaluation method.
For implementation of NEI 04-10, Revision 1, with respect to the PINGP fire risk, if the qualitative information is deemed sufficient to support the acceptability of the Surveillance Test Interval (STI) change, it will be used to provide the basis for the qualitative conclusions to the Integrated Decisionmaking Panel (lDP). Since only qualitative considerations are provided in this case, the impacts of the STI change on fire events will not be incorporated into the cumulative impact evaluation as noted in NEI 04-10, Revision 1, Step 10a. However, in accordance with NEI 04-10, Revision 1, Step 10a, if this qualitative information is not deemed sufficient for assessing the fire risk contribution, then a bounding analysis (Step 10b) would be performed using the PINGP fire Individual Plant Examination of External Events (IPEEE) evaluation to estimate the impact of the STI change on fire risk.
Page 6 of 10
L-PI-18-051 NSPM Enclosure As noted in the Reference 1 LAR, the PINGP Fire PRA is compliant with RG 1.200, Revision 2. However, the credited NFPA-805 modifications have not yet been implemented at the site. Therefore, the Fire PRA does not represent the current as-built, as-operated plant and cannot be used as the basis for fire risk impact at this time. NSPM proposed that in addition to the above discussed process, the Fire PRA model for PINGP be used to perform quantitative risk assessment sensitivity cases on the STI changes that can be adequately characterized by the Fire PRA model. NSPM intends to evaluate each STI change that can be evaluated within the scope of the Fire PRA model to confirm the conservatism of the bounding fire IPEEE evaluation. This approach was selected as it ensures the current fire risk estimate is bounding, and that once all NFPA-805 design modifications are installed and implemented, the risk evaluation of each implemented STI change remains valid with respect to the original STI evaluations performed using the IPEEE insights.
As discussed in the LAR submittal, the PINGP Fire PRA has been peer reviewed and has had an Appendix X closure review. The remaining open F&O findings were submitted with the application. Once the Fire PRA credited NFPA-805 plant modifications are installed, the Fire PRA model will be used to perform the quantitative risk assessment in accordance with the NEI 04-10 process. The fire IPEEE would no longer be used for evaluating fire risk impacts for future STI changes.
ii. In the case that minimal number or low risk significant design improvements remain after the second refueling outage, provide an updated process for how the fire PRA will be used for TSTF-425 surveillance changes.
NSPM Response:
As noted in response to 2.a, all plant modifications listed in Table S-2 are currently scheduled for completion within the license condition timeframe.
However, the fire risk evaluation approach described in response to RAI 2.b.i would also apply to this situation.
NRC Question 3:
Provide the following information with regard to remaining open F&Os described in the Table 2-1:
a) Finding CS-A10-01 states that cables routed through 16 fire compartments have not been identified nor has the methodology been specified. The resolution indicates that this supporting requirement is met at CC-1 using a conservative approach. Describe the conservative approach used in lieu of developing cable routing information for 16 fire compartments.
Page 7 of 10
L-PI-18-051 NSPM Enclosure NSPM Response:
Sixteen fire compartments are subsets of larger fire areas. In this case, cable routing was by fire area, which failed more cables than necessary in some fire scenarios.
Subsequent to the F&O closure review, a new Fire PRA model (Revision 5.3) was approved in April 2018. To specifically resolve the F&O, this revision of the Fire PRA model incorporated the results of additional plant walkdowns and drawing reviews performed in order to refine cable routing reflected in the PINGP Fire PRA model. The cable to fire compartment table was updated as well as the documentation of the issue.
The cables in these 16 fire compartments are now mapped to fire compartment; not fire area. Therefore, the conservative approach is no longer being relied upon.
b) Finding FSS-D7-01 indicates that the F&O closure review team determined to keep this finding open since the unreliability of the detection system for the deluge system is not incorporated in the PRA. In a letter dated May 24, 2016 (ADAMS Accession No. ML16152A046) to the NRC, Xcel Energy notes in Table 1, PRA RAI 01.g the following:
The non-suppression probability has been calculated as sum of the unreliability and the unavailability values corresponding to each credited automatic detection and suppression system. This approach has been implemented in all the scenarios analyzed with detailed fire modeling crediting automatic suppression in the Fire PRA. This statement is inconsistent with the finding observed by the closure review team. Provide the following information regarding characterization of suppression systems:
- i. Provide results of extent of condition analysis to determine additional detection systems that did not factor unreliability into the PRA calculation. If other detection systems, beside deluge system, are discovered to not factor unreliability, provide sensitivity analysis that shows risk impact for each system.
NSPM Response:
Pre-action fire suppression systems PA-14 and PA-15 are the only water-based fire suppression systems with deluge valves actuated by the fire detection system that are credited in the Fire PRA model. The Fire PRA finding closure team did not close finding FSS-D7-01 in October 2017 because the unreliability of the detection system for the deluge system had not been incorporated into the Fire PRA quantification.
Subsequent to the October 2017 F&O closure review, a new Fire PRA model was approved (April 2018) that incorporated the updated unreliability for the pre-action suppression systems (PA-14 and PA-15). The process used to calculate the fire ignition frequencies for structural steel fire scenarios was re-performed.
The non-suppression probability for the deluge systems was revised to correct the identified errors. All frequencies reported in the structural steel documentation now match the Fire PRA model.
Page 8 of 10
L-PI-18-051 NSPM Enclosure Prior to March 2017, the Carbon Dioxide (CARDOX) Fire Suppression System was actuated by dedicated thermal detectors that were not part of the Fire Detection System. Therefore, unavailability of the fire detection system did not impact the CARDOX suppression systems ability to automatically actuate.
CARDOX was modified to be actuated by the fire detection system in March 2017. The site specific calculation for the unavailability of the CARDOX system has been updated to reflect the most recent six years of unavailability data for the CARDOX suppression system and for the detection system that actuates CARDOX. Generic unreliability for fire detection and suppression system were used. After updating the CARDOX unavailability calculation, the new values are similar to and bounded by the previous values used in the Fire PRA quantification. Therefore, no additional sensitivity study is required for CARDOX.
No other fire suppression systems credited in the Fire PRA model omitted the unreliability of the fire detection system required to actuate the suppression system. Therefore, no sensitivity analysis is required.
ii. With regard to deluge system, describe how the risk impacts of omitting unreliability in the calculation would be conservatively assessed for STI change evaluations; and provide a complete list of STI cases for which this assessment would have to be performed.
NSPM Response:
The Fire PRA model was updated in April 2018 to correct the unreliability and unavailability for PA-14 and PA-15 to match the quantification. Based on the use of appropriate unavailability and unreliability values, no special assessments for deluge valves are required for STI change evaluations.
iii. Provide an approximate timeline for closure of this F&O.
NSPM Response:
The unreliability and unavailability values for pre-action systems PA-14 and PA-15 were updated in the Fire PRA model revision approved in April 2018. The unreliability and unavailability of the CARDOX system is planned to be incorporated into the next Fire PRA model update in accordance with the appropriate NSPM procedure for model maintenance and update.
c) Finding SY-A17-01 indicates that the closure review team determined that the F&O related to Flowserve N-9000 reactor coolant pump (RCP) seals should remain open. Provide clarification that describes the current basis for modeling N-9000 RCP seals and technical justification for any PRA credit if abeyance seal modifications are employed or provide sensitivity that removes PRA credit.
Page 9 of 10
L-PI-18-051 NSPM Enclosure NSPM Response:
A sensitivity study has been performed to remove credit for the abeyance seal in the current PRA model of record that shows no more than 6% increase to Internal Events Core Damage Frequency (CDF)/LERF (Unit 1 and Unit 2) and no more than 3%
increase to Fire CDF/LERF (Unit 1 and Unit 2).
Internal Events Results with Abeyance Failed Rev 5.3 Rev 5.3 Percent Top Event (Abeyance Delta (Baseline) Change Failed)
U1 CDF 1.28E-05 1.33E-05 5.00E-07 4%
U1 LERF 2.15E-07 2.19E-07 4.00E-09 2%
U2 CDF 1.25E-05 1.32E-05 7.00E-07 6%
U2 LERF 1.86E-07 1.92E-07 6.00E-09 3%
Fire PRA Results with Abeyance Failed Rev 5.3- Rev 5.3-APP1 Percent Top Event APP1 (Abeyance Delta Change (Baseline) Failed)
U1 CDF 6.60E-05 6.68E-05 8.00E-07 1%
U1 LERF 9.60E-07 9.67E-07 7.00E-09 1%
U2 CDF 6.59E-05 6.76E-05 1.70E-06 3%
U2 LERF 9.26E-07 9.40E-07 1.40E-08 2%
3.0 REFERENCES
- 1. Letter from NSPM to NRC Document Control Desk, License Amendment Request:
Application for Technical Specification Change Regarding Risk-Informed Justification for the Relocation of Specific Surveillance Frequency Requirements to a Licensee Controlled Program, dated March 15, 2018 (ADAMS Accession No. ML18074A308)
- 2. Email from NRC to NSPM, Request for Additional Information RE: Prairie Island TSTF-425 License Amendment Request, dated August 23, 2018 (ADAMS Accession No. ML18235A298)
- 3. Nuclear Energy Institute (NEI) 04-10, Risk-Informed Technical Specifications Initiative 5b, Risk-Informed Method for Control of Surveillance Frequencies, Revision 1, dated April 2007 (ADAMS Accession No. ML071360456)
Page 10 of 10