MONTHYEARRS-17-053, Response to Request for Additional Information Regarding Generic Letter 2016-012017-04-27027 April 2017 Response to Request for Additional Information Regarding Generic Letter 2016-01 Project stage: Response to RAI ML17297A8472017-10-27027 October 2017 Request for Supplemental Information Regarding Generic Letter 2016-01, Monitoring of Neutron Absorbing Materials in Spent Fuel Pools (CAC No. MF9430; EPID L-2016-LRC-0001) Project stage: Other ML17285B1962017-10-27027 October 2017 Request for Additional Information Regarding Generic Letter 2016-01, Monitoring of Neutron-Absorbing Materials in Spent Fuel Pools. Project stage: RAI ML17304A0102017-11-0101 November 2017 Unit Nos.1 and 2 - Request for Additional Information Regarding Generic Letter 2016-01, Monitoring of Neutron-Absorbing Materials in Spent Fuel Pools (CAC Nos. MF9444 and MF9445; EPID L-2016-LRC-0001) Project stage: RAI ML17303B1582017-11-0707 November 2017 FENOC-Beaver Valley Power Station, Units 1 and 2, Davis-Besse Nuclear Power Station, Unit 1, Perry Nuclear Power Plant Unit 1 - Generic Letter 2016-01, Request for Supplemental Information Project stage: Other ML17307A3302017-11-20020 November 2017 Request for Supplemental Information Regarding Generic Letter 2016-01, Monitoring of Neutron Absorbing Materials in Spent Fuel Pools(Cac Nos. MF9920, MF9452, MF9437, MF9919, and MF9432; EPID L-2016-LRC-0001) Project stage: Other ML18025A7992018-01-25025 January 2018 Response to Request for Additional Information Regarding Generic Letter 2016-01 Project stage: Response to RAI NL-18-0085, Response to NRC RAIs Regarding Generic Letter 2016-012018-02-0505 February 2018 Response to NRC RAIs Regarding Generic Letter 2016-01 Project stage: Request ML18030B2382018-04-13013 April 2018 Closeout of Generic Letter 2016-01, Monitoring of Neutron-Absorbing Materials in Spent Fuel Pools Project stage: Other L-16-001, Units. 3 and 4, Response to Request for Supplemental Information Generic Letter 2016-01, Monitoring of Neutron-Absorbing Materials in Spent Fuel Pools.2018-05-24024 May 2018 Units. 3 and 4, Response to Request for Supplemental Information Generic Letter 2016-01, Monitoring of Neutron-Absorbing Materials in Spent Fuel Pools. Project stage: Request PLA-7704, Response to Generic Letter 2016-01, Request for Supplemental Information2018-05-24024 May 2018 Response to Generic Letter 2016-01, Request for Supplemental Information Project stage: Request L-18-121, Response to Request for Supplemental Information Regarding Generic Letter 2016-01 Monitoring of Neutron-Absorbing Materials in Spent Fuel Pools.2018-05-25025 May 2018 Response to Request for Supplemental Information Regarding Generic Letter 2016-01 Monitoring of Neutron-Absorbing Materials in Spent Fuel Pools. Project stage: Request AEP-NRC-2018-01, Response to Request for Additional Information Regarding Generic Letter 2016-012018-05-25025 May 2018 Response to Request for Additional Information Regarding Generic Letter 2016-01 Project stage: Response to RAI RS-18-067, Response to Request for Additional Information Regarding Generic Letter 2016-012018-05-29029 May 2018 Response to Request for Additional Information Regarding Generic Letter 2016-01 Project stage: Response to RAI ET 18-0016, Response to Generic Letter 2016-01, Monitoring of Neutron Absorbing Materials in Spent Fuel Pools Request for Supplemental Information2018-05-29029 May 2018 Response to Generic Letter 2016-01, Monitoring of Neutron Absorbing Materials in Spent Fuel Pools Request for Supplemental Information Project stage: Request RA-18-0011, Response to Request for Supplemental Information Regarding Duke Energy'S Response to GL 2016-01 Monitoring of Neutron-Absorbing Materials in Spent Fuel Pools2018-05-30030 May 2018 Response to Request for Supplemental Information Regarding Duke Energy'S Response to GL 2016-01 Monitoring of Neutron-Absorbing Materials in Spent Fuel Pools Project stage: Request CNRO-2018-00021, Response to Request for Supplemental Information Regarding Generic Letter 2016-01, Monitoring of Neutron Absorbing Materials in the Spent Fuel Pools for Indian Point Energy Center, Unit 3 and Waterford 3 Steam Electric Station2018-05-30030 May 2018 Response to Request for Supplemental Information Regarding Generic Letter 2016-01, Monitoring of Neutron Absorbing Materials in the Spent Fuel Pools for Indian Point Energy Center, Unit 3 and Waterford 3 Steam Electric Station Project stage: Request ULNRC-06440, Response to Generic Letter 2016-01, Monitoring of Neutron-Absorbing Materials in Spent Fuel Pools - Request for Supplemental Information2018-05-31031 May 2018 Response to Generic Letter 2016-01, Monitoring of Neutron-Absorbing Materials in Spent Fuel Pools - Request for Supplemental Information Project stage: Request CNL-18-061, Response to NRC Request for Supplemental Information Related to Generic Letter 2016-01, Monitoring of Neutron-Absorbing Materials in Spent Fuel Pools2018-05-31031 May 2018 Response to NRC Request for Supplemental Information Related to Generic Letter 2016-01, Monitoring of Neutron-Absorbing Materials in Spent Fuel Pools Project stage: Supplement ML18031A9952018-08-27027 August 2018 Closeout of Generic Letter 2016-01, Monitoring of Neutron-Absorbing Materials in Spent Fuel Pools (CAC No. MF9423; EPID L-2016-LRC-0001) Project stage: Other ML18030B1782018-08-27027 August 2018 Closeout of Generic Letter 2016-01, Monitoring of Neutron-Absorbing Materials in Spent Fuel Pools (CAC No. MF9441; EPID L-2016-LRC-0001) Project stage: Other ML18030B3612018-08-30030 August 2018 Closeout of Generic Letter 2016-01, Monitoring of Neutron-Absorbing Materials in Spent Fuel Pools (CAC No. MF9427; EPID L-2016-LRC-0001) Project stage: Other ML18269A3512018-09-26026 September 2018 Closeout of Generic Letter 2016-01, Monitoring of Neutron-Absorbing Materials in Spent Fuel Pools Project stage: Other ML18249A0802018-09-26026 September 2018 Closeout of Generic Letter 2016-01, Monitoring of Neutron-Absorbing Materials in Spent Fuel Pools (CAC Nos. MF9431 and MF9430; EPID L-2016-LRC-0001) Project stage: Other ML18249A4072018-09-26026 September 2018 Closeout of Generic Letter 2016-01, Monitoring of Neutron-Absorbing Materials in Spent Fuel Pools (CAC MF9920, MF9452, MF9451, MF9425, MF9406-MF9408; EPID L-2016-LRC-0001) Project stage: Other ML18249A0492018-09-26026 September 2018 Closeout of Generic Letter 2016-01, Monitoring of Neutron-Absorbing Materials in Spent Fuel Pools (CAC Nos. MF9449 and MF9450; EPID L-2016-LRC-0001) Project stage: Other ML18249A0612018-09-26026 September 2018 Closeout of Generic Letter 2016-01, Monitoring of Neutron-Absorbing Materials in Spent Fuel Pools (CAC Nos. MF9428 and MF9429; EPID L-2016-LRC-0001) Project stage: Other ML18249A0752018-09-26026 September 2018 Closeout of Generic Letter 2016-01, Monitoring of Neutron-Absorbing Materials in Spent Fuel Pools (CAC Nos. MF9410 and MF9411; EPID L-2016-LRC-0001) Project stage: Other ML18249A0912018-09-26026 September 2018 Closeout of Generic Letter 2016-01, Monitoring of Neutron-Absorbing Materials in Spent Fuel Pools (CAC Nos. MF9421 and MF9422; EPID L-2016-LRC-0001) Project stage: Other ML18249A1622018-09-26026 September 2018 Closeout of Generic Letter 2016-01, Monitoring of Neutron-Absorbing Materials in Spent Fuel Pools (CAC No. MF9424; EPID L-2016-LRC-0001) Project stage: Other ML18249A1782018-09-26026 September 2018 Closeout of Generic Letter 2016-01, Monitoring of Neutron-Absorbing Materials in Spent Fuel Pools (CAC No. MF9438; EPID L-2016-LRC-0001) Project stage: Other ML18249A2312018-09-26026 September 2018 Closeout of Generic Letter 2016-01, Monitoring of Neutron-Absorbing Materials in Spent Fuel Pools (CAC No. MF9448; EPID L-2016-LRC-0001) Project stage: Other ML18249A2422018-09-26026 September 2018 Closeout of Generic Letter 2016-01, Monitoring of Neutron-Absorbing Materials in Spent Fuel Pools (CAC Nos. MF9415 and MF9416; EPID L-2016-LRC-0001) Project stage: Other ML18249A3342018-09-26026 September 2018 Closeout of Generic Letter 2016-01, Monitoring of Neutron-Absorbing Materials in Spent Fuel Pools (CAC Nos. MF9435 and MF9436; EPID L-2016-LRC-0001) Project stage: Other ML18249A3652018-09-26026 September 2018 Closeout of Generic Letter 2016-01, Monitoring of Neutron-Absorbing Materials in Spent Fuel Pools (CAC No. MF9437; EPID L-2016-LRC-0001) Project stage: Other ML18249A3802018-09-26026 September 2018 Closeout of Generic Letter 2016-01, Monitoring of Neutron-Absorbing Materials in Spent Fuel Pools (CAC Nos. MF9412 and MF9413; EPID L-2016-LRC-0001) Project stage: Other ML18249A3832018-09-26026 September 2018 Closeout of Generic Letter 2016-01, Monitoring of Neutron-Absorbing Materials in Spent Fuel Pools (CAC Nos. MF9418 and MF9419; EPID L-2016-LRC-0001) Project stage: Other ML18249A3862018-09-26026 September 2018 Closeout of Generic Letter 2016-01, Monitoring of Neutron-Absorbing Materials in Spent Fuel Pools (CAC Nos. MF9433 and MF9434; EPID L-2016-LRC-0001) Project stage: Other ML18249A3922018-09-26026 September 2018 Closeout of Generic Letter 2016-01, Monitoring of Neutron-Absorbing Materials in Spent Fuel Pools (CAC MF9444, MF9445, MF9443, MF9440, MF9409; EPID L-2016-LRC-0001) Project stage: Other ML18253A0992018-09-26026 September 2018 Closeout of Generic Letter 2016-01, Monitoring of Neutron-Absorbing Materials in Spent Fuel Pools (CAC No. MF9414; EPID L-2016-LRC-0001) Project stage: Other ML18253A1302018-09-26026 September 2018 Closeout of Generic Letter 2016-01, Monitoring of Neutron-Absorbing Materials in Spent Fuel Pools (CAC Nos. MF9920 and MF9432; EPID L-2016-LRC-0001) Project stage: Other ML18249A1802018-09-26026 September 2018 Closeout of Generic Letter 2016-01, Monitoring of Neutron-Absorbing Materials in Spent Fuel Pools (CAC Nos. MF9456 and MF9457; EPID L-2016-LRC-0001) Project stage: Other 2018-04-13
[Table View] |
|
---|
Category:Letter
MONTHYEARML24025A0922024-01-25025 January 2024 Requalification Program Inspection L-23-267, Submittal of Discharge Monitoring Report (Npdes), Permit No. PA00256152023-12-18018 December 2023 Submittal of Discharge Monitoring Report (Npdes), Permit No. PA0025615 IR 05000334/20230112023-12-0404 December 2023 Age-Related Degradation Inspection Report 05000334/2023011 and 05000412/2023011 L-23-229, Request for Additional Information Regarding the Spring 2023 Generic Letter 95-05 Voltage-Based Alternate Repair Criteria and Steam Generator F-Star Reports2023-11-29029 November 2023 Request for Additional Information Regarding the Spring 2023 Generic Letter 95-05 Voltage-Based Alternate Repair Criteria and Steam Generator F-Star Reports IR 05000334/20233012023-11-27027 November 2023 Initial Operator Licensing Examination Report 05000334/2023301 L-23-247, Discharge Monitoring Report (NPDES) Permit No. PA00256152023-11-17017 November 2023 Discharge Monitoring Report (NPDES) Permit No. PA0025615 IR 05000334/20230032023-11-0606 November 2023 Integrated Inspection Report 05000334/2023003 and 05000412/2023003 L-23-227, Discharge Monitoring Report (NPDES) Permit No. PA0025615 for Third Quarter 20232023-10-20020 October 2023 Discharge Monitoring Report (NPDES) Permit No. PA0025615 for Third Quarter 2023 ML23279A0612023-10-0505 October 2023 Paragon Energy Solutions LLC, Part 21 Final Report Re Potential Defect with Eaton Jd and Hjd Series Molded Case Circuit Breakers (Mccbs) ML23198A3592023-10-0202 October 2023 Issuance of Amendment Nos. 322 and 212 Analytical Methodology to the Core Operating Limits Report for a Full Spectrum Loss of Coolant Accident (EPID L-2022-LLA-0129) - Nonproprietary IR 05000334/20234022023-09-29029 September 2023 Security Baseline Inspection Report 05000334/2023402 and 05000412/2023402 (Cover Letter Only) ML23237B4222023-09-28028 September 2023 Energy Harbor Nuclear Corp. - Vistra Operations Company LLC - Letter Regarding Order Approving Transfer of Licenses and Draft Conforming License Amendments ML23269A1242023-09-27027 September 2023 Request for Withholding Information from Public Disclosure IR 05000334/20234012023-09-21021 September 2023 Cybersecurity Inspection Report 05000334/2023401 and 05000412/2023401 (Cover Letter Only) ML23263A0192023-09-20020 September 2023 Operator Licensing Examination Approval ML23243A9272023-09-19019 September 2023 Review of the Fall 2022 Steam Generator Tube Inspection Report ML23249A1842023-09-18018 September 2023 Authorization and Safety Evaluation for Alternative Request No. 2-TYP-4-RV-06 L-23-208, Submittal of Discharge Monitoring Report Cnpdes), Permit No. PA00256152023-09-14014 September 2023 Submittal of Discharge Monitoring Report Cnpdes), Permit No. PA0025615 L-23-167, Twenty-Third Refueling Outage Inservice Inspection Summary Report2023-09-13013 September 2023 Twenty-Third Refueling Outage Inservice Inspection Summary Report L-23-205, Supplement to Application for Order Consenting to Transfer of Licenses and Conforming License Amendments2023-09-12012 September 2023 Supplement to Application for Order Consenting to Transfer of Licenses and Conforming License Amendments IR 05000334/20230052023-08-31031 August 2023 Updated Inspection Plan for Beaver Valley Power Station Units 1 and 2 (Report 05000334/2023005 and 05000412/2023005) L-23-172, Quality Assurance Program Manual2023-08-31031 August 2023 Quality Assurance Program Manual ML23129A1722023-08-25025 August 2023 Request for Withholding Information from Public Disclosure for Beaver Valley Power Station, Units 1 and 2; Davis Besse Nuclear Power Station, Unit 1; and Perry Nuclear Power Plant, Unit 1 IR 05000334/20230022023-08-0909 August 2023 Integrated Inspection Report 05000334/2023002 and 05000412/2023002 ML23219A0592023-08-0707 August 2023 Steam Generator Inspection Reports - Spring 2023 Spring Refueling Outrage L-23-188, Energy Harbor Nuclear Corp., Supplement to Application for Order Consenting to Transfer of Licenses and Conforming License Amendments2023-08-0707 August 2023 Energy Harbor Nuclear Corp., Supplement to Application for Order Consenting to Transfer of Licenses and Conforming License Amendments L-23-179, Submittal of Discharge Monitoring Report, (NPDES) Permit No. PA00256152023-07-18018 July 2023 Submittal of Discharge Monitoring Report, (NPDES) Permit No. PA0025615 ML23188A0982023-07-17017 July 2023 Correction to the Safety Evaluation Issued Related to Amendment Nos. 321 and 211 Consolidate Fuel Decay Time Technical Specifications in a New Limiting Condition for Operation Titled Decay Time ML23188A0672023-07-10010 July 2023 Project Manager Assignment L-23-165, Discharge Monitoring Report (NPDES) Permit No. PA00256152023-06-26026 June 2023 Discharge Monitoring Report (NPDES) Permit No. PA0025615 L-23-139, Response to Request for Additional Information Regarding Fall 2022 180-Day Steam Generator Tube Inspection Report2023-06-13013 June 2023 Response to Request for Additional Information Regarding Fall 2022 180-Day Steam Generator Tube Inspection Report ML23157A1072023-06-0707 June 2023 Request for Information and Notification of Conduct of IP 71111.21.N.04, Age-Related Degradation, Reference Inspection Report 05000334/2023011 and 05000412/2023011 ML23143A0272023-05-23023 May 2023 Licensed Operator Positive Fitness-For-Duty Test L-23-055, Submittal of the Updated Final Safety Analysis Report, Revision 342023-05-23023 May 2023 Submittal of the Updated Final Safety Analysis Report, Revision 34 ML23102A1472023-05-22022 May 2023 Issuance of Amendment Nos. 321 and 211 Consolidate Fuel Decay Time Technical Specifications in a New Limiting Condition for Operation Titled Decay Time L-23-065, Annual Financial Report2023-05-22022 May 2023 Annual Financial Report ML23135A7872023-05-19019 May 2023 Summary of Conference Calls Regarding the Spring 2023 Steam Generator Tube Inspections L-23-137, Discharge Monitoring Report (NPDES) Permit No. PA00256152023-05-18018 May 2023 Discharge Monitoring Report (NPDES) Permit No. PA0025615 ML23124A1742023-05-17017 May 2023 Energy Harbor Fleet Vistra License Transfer - Request for Withholding Information from Public Disclosure for Commance Peak Plant, Units 1 & 2, Beaver Valley Station, Units 1 & 2, Davis Besse Station, Unit 1 and Perry Plant, Unit 1 L-23-125, Cycle 24 Core Operating Limits Report2023-05-17017 May 2023 Cycle 24 Core Operating Limits Report ML23124A3882023-05-16016 May 2023 Summary of Regulatory Audit in Support of License Amendment Request to Revise Technical Specification 5.6.3, Core Operating Limits Reports (COLR) and TS 4.2.1 Fuel Assemblies ML23129A0112023-05-16016 May 2023 Notice of Consideration of Approval of Indirect and Direct License Transfer for Comanche Peak Plant, Units 1 & 2, Beaver Valley Station, Units 1 & 2, Davis Besse Station, Unit 1 and Perry Plant, Unit 1 (EPID L-2023-LLM-0000) (Letter) L-23-132, Response to NRC Regulatory Issue Summary 2023-01 Preparation and Scheduling of Operator Licensing Examinations2023-05-10010 May 2023 Response to NRC Regulatory Issue Summary 2023-01 Preparation and Scheduling of Operator Licensing Examinations IR 05000334/20230012023-05-0808 May 2023 Integrated Inspection Report 05000334/2023001 and 05000412/2023001 L-23-129, Response to Request for Additional Information for 10 CFR 50.55a Request 2-TYP-4-RV-06 for Alternative Repair Methods for Reactor Pressure Vessel Head Penetrations2023-05-0505 May 2023 Response to Request for Additional Information for 10 CFR 50.55a Request 2-TYP-4-RV-06 for Alternative Repair Methods for Reactor Pressure Vessel Head Penetrations ML23118A3812023-04-28028 April 2023 10 CFR 50.55a Request 2-TYP-4-RV-06 for Alternative Repair Methods for Reactor Pressure Vessel Head Penetrations L-23-115, Submittal of 2022 Annual Radioactive Effluent Release Report, 2022 Annual Radiological Environmental Operating Report, and 2022 Annual Environmental Operating Report (Non-Radiological2023-04-27027 April 2023 Submittal of 2022 Annual Radioactive Effluent Release Report, 2022 Annual Radiological Environmental Operating Report, and 2022 Annual Environmental Operating Report (Non-Radiological L-23-126, Discharge Monitoring Report (Npdes), Permit No. PA00256152023-04-22022 April 2023 Discharge Monitoring Report (Npdes), Permit No. PA0025615 CP-202300181, ISFSI, Beaver Valley, Units 1 and 2, ISFSI, Davis-Besse, Unit 1, ISFSI, Perry, Unit 1, ISFSI, Corrected Affidavit for Application for Order Consenting to Transfer of Licenses and Conforming License Amendments2023-04-20020 April 2023 ISFSI, Beaver Valley, Units 1 and 2, ISFSI, Davis-Besse, Unit 1, ISFSI, Perry, Unit 1, ISFSI, Corrected Affidavit for Application for Order Consenting to Transfer of Licenses and Conforming License Amendments ML23107A2502023-04-18018 April 2023 Requalification Program Inspection 2024-01-25
[Table view] |
Text
UNITED STATES NUCLEAR REGULATORY COMMISSION WASHINGTON, D.C. 20555-0001 September 26, 2018 0MB Control No. 3150-0231 Mr. Richard D. Bologna Site Vice President FirstEnergy Nuclear Operating Company Beaver Valley Power Station Mail Stop A-BV-SSB P.O. Box 4, Route 168 Shippingport, PA 15077
SUBJECT:
BEAVER VALLEY POWER STATION, UNITS 1 AND 2-CLOSEOUT OF GENERIC LETTER 2016-01, "MONITORING OF NEUTRON-ABSORBING MATERIALS IN SPENT FUEL POOLS" (CAC NOS. MF9456 AND MF9457; EPID L-2016-LRC-0001)
Dear Mr. Bologna:
On April 7, 2016, the U.S. Nuclear Regulatory Commission (NRC) issued Generic Letter (GL) 2016-01, "Monitoring of Neutron-Absorbing Materials in Spent Fuel Pools" (Agencywide Documents Access and Management System (ADAMS) Accession No. ML16097A169), to address the degradation of neutron-absorbing materials (NAMs) in wet storage systems for reactor fuel at power and non-power reactors.
The generic letter requested that licensees provide information to allow the NRC staff to verify continued compliance through effective monitoring to identify and mitigate any degradation or deformation of NAMs credited for criticality control in spent fuel pools (SFPs).
By letter dated October 31, 2016 (ADAMS Accession No. ML16305A344), as supplemented by letter dated May 25, 2018 (ADAMS Accession No. ML18145A039), FirstEnergy Nuclear Operating Company (the licensee), responded to GL 2016-01 for Beaver Valley Power Station (Beaver Valley), Units 1 and 2. In the licensee's response to GL 2016-01, as supplemented, the licensee stated that, for Beaver Valley, Unit 1, it relies on continual monitoring industry operating experience, including ongoing participation in the Electric Power Research Institute (EPRI)
Neutron Absorber Users Group (NAUG) and its related programs, to evaluate the condition of the Boral in its SFP. The licensee indicated that the NAUG, through EPRI, has completed a study which analyzes the criticality impact of blisters and pits on Boral. This study is described in EPRI document 3002013119, "Evaluation of the Impact of Neutron Absorber Material Blistering and Pitting on Spent Fuel Pool Reactivity," May 2018 (ADAMS Accession No. ML18226A292). The licensee also stated that the NAUG, through EPRI, is developing an industry-wide program to gather water chemistry and Boral coupon data for SFPs. This program is described in EPRI document 3002013122, "Roadmap for the lndustrywide Learning Aging Management Program (i-LAMP) for Neutron Absorber Materials in Spent Fuel Pools,"
May 2018 (ADAMS Accession No. ML18226A291 ). The licensee stated that relevant issues
R. Bologna emerging from such industry efforts will be monitored through the licensee's Operating Experience Program and Corrective Action Program.
The stated purpose of this program is to inform the condition of the Boral at sites with no coupon, or in-situ, testing of its Boral, with results from other sites using the "sister pool criteria."
The NRC staff notes that aspects of the industry-wide program referenced in EPRI Report 3002013122 (i.e., the Boral coupon database, water chemistry database, sister pool criteria, etc.) are not yet complete and some guidelines might not be fully developed until 2020.
While the program as described in EPRI Report 3002013122 is not yet complete, the NRC staff did use the information found in EPRI Report 300203119 to support the conclusion that no additional information is needed, at this time, to address the five areas of information described in Appendix A to GL 2016-01 for Boral.
The NRC staff also notes that the studies documented in EPRI Reports 3002013119 and 3002013122 are intended to be generic analyses and were not provided as site-specific analyses. Therefore, the results of the analyses, or any part of those analyses, have currently not been shown as directly applicable to Beaver Valley. In addition, the NRC staff did not review whether the EPRI Reports could be used to justify equipment operability, design basis changes, or licensing changes requested pursuant to Title 10 of the Code of Federal Regulations, Section 50.90, "Application for amendment of license, construction permit, or early site permit." However, the NRC staff's review determined that the EPRI reports provide the information required to satisfy the request in GL 2016-01 for Boral, at this time.
For Beaver Valley, Unit 2, the licensee credits Metamic for criticality control and has an established NAM monitoring program. The NRC staff's review determined that the provided response sufficiently addressed the five areas of information described in Appendix A of GL 2016-01 for Metamic. In particular, the described monitoring program for the Metamic includes the following key features:
- Neutron attenuation testing of coupons.
- Established processes to ensure that the licensee will take the appropriate corrective actions if any potentially non-conforming material is discovered.
- A testing frequency not to exceed 10 years.
- Acceptance criteria to ensure maintenance of the 5-percent subcriticality margin for the SFP.
The NRC staff found that the licensee intends to continue monitoring the condition of its NAMs as described in its response.
R. Bologna For Beaver Valley, Units 1 and 2, the NRC staff's review determined that the information provided sufficiently addressed the five areas of information described in Appendix A to GL 2016-01. Based on the review of the information provided, the NRC staff concludes no further information is requested regarding GL 2016-01.
Sincerely, Douglas A. Broaddus, Chief Special Projects and Process Branch Division of Operating Reactor Licensing Office of Nuclear Reactor Regulation Docket Nos. 50-334 and 50-412 cc: Listserv
ML18249A180 *via email OFFICE NRR/DORULSPB/PM NRR/DORULPL 1PM NRR/DORULAiT NRR/DORULSPB/LA NAME SWall BVenkataraman PTalukdar JBurkhardt DATE 9/25/18 9/25/18 9/12/18 9/14/18 OFFICE NRR/DMLR/MCCB/BC* NRR/DIRS/IRGB/BC* NRR/DSS/SNPB/BC* NRR/DORULSPB/BC NAME SBloom BPham Rlukes DBroaddus DATE 9/25/18 9/25/18 9/19/18 9/26/18