VIRGINIA ELECTRIC AND POWER COMPANY RICHMOND, VIRGINIA 23261 United States Nuclear Regulatory Commission Serial No.18-302 Attention: Document Control Desk SPS-LIC/CGL RO Washington, DC 20555-0001 Docket No. 50-280 License No. DPR-32 VIRGINIA ELECTRIC AND POWER COMPANY SURRY POWER STATION UNIT 1 INSERVICE INSPECTION OWNER'S ACTIVITY REPORT (OARl In accordance with the requirements of ASME Code Case N-532-5, Virginia Electric and Power Company (Dominion Energy Virginia) hereby submits the lnservice Inspection Owner's Activity Report (Form OAR-1) for Surry Unit 1 refueling outage S1 R28, which ended on May 31, 2018. This document contains the reporting requirements for the first refueling outage of the second period in the fifth ten-year inservice inspection interval for Surry l)nit ~.

If you have any questions concerning this information, please contact Mrs. Candee G. Lovett at (757) 365-2178.

Sincerely, Robert M. Garver II Director - Station Safety & Licensing Surry Power Station

Attachment:

Owner's Activity Report (Form OAR-1), Surry Unit 1 Refueling Outage S1 R28, Second Period of the Fifth ISi Interval Commitments made in this letter: None

Serial No.: 18-302 Docket No.: 50-280 Page 2 of 2 cc: U.S. Nuclear Regulatory Commission Region II Marquis One Tower 245 Peachtree Center Avenue NE Suite 1200 Atlanta, Georgia 30303-1257 Ms. K. R. Cotton Gross NRC Project Manager - Surry U. S. Nuclear Regulatory Commission One White Flint North Mail Stop 08 G-9A 11555 Rockville Pike Rockville, Maryland 20852-2738 Mr. R. J. Hall NRC Senior Project Manager - North Anna U. S. Nuclear Regulatory Commission One White Flint North Mail Stop 08 G-9A 11555 Rockville Pike Rockville, Maryland 20852-2738 NRC Senior Resident Inspector Surry Power Station Mr. R. A. Smith Authorized Nuclear Inspector Surry Power Station

Serial No.: 18-302 Docket No.: 50-280 ATTACHMENT OWNER'S ACTIVITY REPORT (FORM OAR-1 ),

SURRY UNIT 1 REFUELING OUTAGE 51 R28, SECOND PERIOD OF THE FIFTH 151 INTERVAL VIRGINIA ELECTRIC AND POWER COMPANY (DOMINION ENERGY VIRGINIA)

CASE CASES OF ASME BOILER AND PRESSURE VESSEL CODE N-532-5 FORM OAR-1 OWNER'S ACTIVITY REPORT Report Number_ ___,,1~-5~-~2~-1~CU=n=it~1=*~5=th~In~t=er~v~a~l.~2=n=d~P=e~rio=d=*~l=st~Re=p=o~rt=)_ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ __

Plant _ _ _ _____..S,,_u,_,_rry.,_,__P=ow=er._S""t.,,a=tio=n'"*'....,5=5"-7.,._0_,_H"""o""g_,I=sl.,.a..,,nd.,_,_,R,><oa,,,d,,.,_*...,,S,,,u"-'rry_,_,_.V...,A'-'-"2""38,,,8""3,.___ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ __

Unit No. 1 Commercial service date 12/22/1972 Refueling outage no. _ ____,,S=l~R=28,,__

(if applicable)

Current inspection interval -----------~------,-:-:--~...,....,5;<->t,,.,h'-:7:----:-:--.,-----------------

(lst, 2nd, 3rd, 4th, other)

Current inspection period 2nd (1st, 2nd, 3rd)

Edition and Addenda of Section XI applicable to the inspection plans 2004 Edition Date and revision of inspection plans Surry Unit 1, 5th Interval ISi Plan, Revision 3 April 11, 2018 Edition and Addenda of Section XI applicable to repair/replacement activities, if different than the inspection plans N/A Code Cases used for inspection and evaluation: -~S=e=e~S=u~rry~U~n=it~1~,~5=th~In=t~.I=S=I~P=la~n~,~R=ev~*~3~S=ect=io~n~6~n~o~r~c=om~p=le=te~l=is=t~o~f=co=d=e~c=a=se=s"-----

(if applicable, Including cases modified by Case N-532 and later revisions)

CERTIFICATE OF CONFORMANCE I certify that (a) the statements made in this report are correct; (b) the examinations and tests meet the Inspection Plan as required by the ASME Code, Section XI; and (c) the repair/replacement activities and evaluations supporting the completion of S1R28 conform to the ,~efir;m,iJts of Section XI. ~ /, J/ O (refueling outage number)

Signed e~V't-- k. j,d},.J,J.f£J/

U o w n e r or Owner's ~nee, Title I ISi Progam Owner Date ___6 ~ + - - - # ~ ' - ' - - " 6 " - - - - - - - - - - - - - - - - - -

CERTIFICATE OF INSERVICE INSPECTION I, the undersigned, holding a valid commission issued by the National Board of Boiler and Pressure Vessel Inspectors and employed by The Hartford Steam Boiler Inspection and Insurance Company of Connecticut have inspected the items described in this Owner's Activity Report, and state that, to the best of my knowledge and belief, the Owner has performed all activities represented by this report in accordance with the requirements of Section XI.

By signing this certificate neither the Inspector nor his employer makes any warranty, expressed or implied, concerning the repair/replacement activities and evaluation described in this report. Furthermore, neither the Inspector nor his employer shall be liable in any manner for any personal injury or property damage or a loss of any kind arising from or connected with this inspection.

~~ Inspector's Signature Comm;ss;oes NB-7933 NS, IS; VABB3(R)

National Board, State, Province, and Endorsements

Page 1 of 1 CASE CASES OF ASME BOILER AND PRESSURE VESSEL CODE N-532-5 FORM OAR-1 OWNER'S ACTIVITY REPORT Table 1 Items with Flaws or Relevant Conditions That Required Evaluation for Continued Service Examination Category and Item Description Evaluation Description Item Number C-A, C1.10 1-RC-E-18.1 Weld 2-06 Steam Generator Girth Indication outside of ASME XI acceptance criteria; Weld confirmed to remain within Westinghouse Fracture Mechanics Evaluation dated June 24, 1986 (Condition Report# 1097832). Applied Code Case N-586-1 to address scope expansion; indication was determined to be fabrication related and not service induced.

Page 1 of 1 CASE CASES OF ASME BOILER AND PRESSURE VESSEL CODE N-532-5 FORM OAR-1 OWNER'S ACTIVITY REPORT Table 2 Abstract of Repair/replacement Activities Required for Continued Service Code Class Item Description Date Repair/Replacement Description of Work Completed Plan Number 1 01-RC-PP-2.00-RC-PI PE- Replace missing fastener. Rejectable 5/16/2018 2018-104 53-1502

  • condition identified during an ASME Section XI VT-3 examination.

1 01-RC-PP-2.00-RC-PI PE- Replace pipe as an unacceptable 5/6/2018 2018-088 56-1502 indication was found during MRP-146 examination.

1 01-SI-PP-2.00-SI-PIPE During an Augmented surface 5/7/2018 2018-093 1502 examination of a pipe to weld-o-let, unacceptable indications were found.

Clear indications and weld repair.

2 01-CH-PP-0.50-CH-PIPE- Fabricate and install a pipe clamp in 3/19/2017 2017-056 236-152 accordance with ASME Section XI Article IX for a through-wall leak.

2 01-RH-PP-10.00-RH-PIPE- Remove unacceptable indications 5/1/2018 2018-089 7-602 found during an Augmented examination.

3 01-SW-PP-24.00-WS- Perform weld repair on a through-wall 5/12/2018 2018-108 PIPE-30-10 hole in RS SW piping upstream of 1-SW-MOV-104C.

cc 01-BS-BLD-CONT-BLDG Perform concrete repairs. The 7/19/2016 2016-054*

location was a soft area (12" x 6") that was found below the SE lightning arrestor.

cc 01-BS-BLD-CONT-BLDG Perform concrete repairs where a 7/19/2016 2016-053*

stud/nut was found embedded in the concrete.

cc 01-BS-BLD-CONT-BLDG Perform concrete repairs. The 7/14/2016 2016-052*

location was a spall (3" x 8" x 1" deep) with loose material.

cc 01-BS-BLD-CONT-BLDG Perform concrete repairs. Loose 7/18/2016 2016-051

  • material existed at a construction joint (excavated area is 7" x 15" x4" deep).
  • The July 2016 dates are when the repairs were completed. The associated work orders were closed in July 2017 following documentation of the evaluations and repairs in an engineering technical evaluation.