Notification of Action Completion for Confirmatory Order EA-17-077 - Item C.4
ML18226A084
Person / Time
Site: Millstone  Dominion icon.png
Issue date: 08/07/2018
From: Stoddard D
Dominion Energy Co, Dominion Energy Nuclear Connecticut
To:
NRC Region 1
References
17-465G, EA-17-077
Download: ML18226A084 (2)


Text

)

Dominion Energy Nuclear Connecticut, Inc.

5000 Dominion Boulevard, Glen Allen, VA 23060 ~ Dominion Dominion Energy.com

~ Energy August 7, 2018 U.S. Nuclear Regulatory Commission Serial No. 17-465G Regional Administrator; Region I NSSL/TFO R1 2100 Renaissance Blvd, Suite 100 Docket Nos. 50-336 Kin.g of Prussia, PA 19406-2713 50-423 License *Nos. DPR-65 NPF-49 DOMINION ENERGY NUCLEAR CONNECTICUT, INC.

MILLSTONE POWER STATION UNITS 2 AND 3 NOTIFICATION OF ACTION COMPLETION FOR CONFIRMATORY ORDER EA-17-077 - ITEM C.4 Oil November 21, 2017, the Nuclear Regulatory Commission (NRC) issued Confirmatory Order EA-17-077 to Dominion Energy Nuclear Connecticut, Inc. (DENG).

Section V of the Confirmatory Order requires DENG to complete Item C.4 within 240 days of issuance of the Confirmatory Order, and to notify the NRC in writing within 30 days of completion. Implementation of Item C.4 is dependent on implementation of Item C.3.

In accordance with Item C.3, DENC retained a safety culture expert external to the Dominion Energy Inc. organization. The safety culture expert reviewed the organizational effectiveness survey implemented from November 2017 to January 2018, and compared the results to the safety culture assessment in the root cause related to armorer performance. This comparison was used to develop and implement additional safety culture survey questions. Data was collected by March 19, 2018, to support Item C.4.

On July 16, 2018, DENG completed an organizational effectiveness .evaluation of the Millstone security organization. The evaluation team included four members, two of which were external to Dominion Energy Inc., including the safety culture expert from Item C.3. The evaluation reviewed results of the safety culture survey developed in Item C.3, including trending within the Millstone security organization and benchmarking with other Dominion nuclear sites, along with the root cause evaluation of armorer performance, with particular emphasis on the traits of a healthy nuclear safety culture.

The evaluation also reviewed the clarity for the security staff about lines of responsibility and reporting, and the performance and quality of how individual job performance results are evaluated, documented, and communicated. . Based on conclusions identified in the evaluation, an action plan that includes measures of effectiveness was developed and entered into the Station's corrective action program. As specified in Item C.4, the results of the evaluation and a copy of the action plan will be available to the NRC for review during an inspection.

\ Serial No. 17-465G

" Docket Nos. 50-336/423 Page 2 of 2 If you have any questions concerning this matter, please contact Michael Whitlock at (804) 273-3123.

Sincerely, Daniel G. Stoddard Senior Vice President and Chief Nuclear Officer Commitments made in this letter: None cc: U.S. Nuclear Regulatory Commission Document Control Desk Washington, DC 20555-0001 Richard V. Guzman Senior Project Manager U.S. Nuclear Regulatory Commission One White Flint North, Mail Stop 08 C 2 11555 Rockville Pike Rockville, MD 20852-2738 NRC Senior Resident Inspector Millstone Power Station