August 13, 2018

Mr. Bryan C. Hanson

Senior VP, Exelon Generation Company, LLC

President and CNO, Exelon Nuclear

4300 Winfield Road

Warrenville, IL 60555

SUBJECT: CLINTON POWER STATIONREQUEST FOR INFORMATION FOR AN NRC

DESIGN BASES ASSURANCE INSPECTION (PROGRAM): IMPLEMENTATION

OF THE ENVIRONMENTAL QUALIFICATION PROGRAM INSPECTION

REPORT 05000461/2018011

Dear Mr. Hanson:

On October 22, 2018, the U. S. Nuclear Regulatory Commission (NRC) will begin a

Triennial Baseline Design Bases Assurance Inspection (Program) at Clinton Power

Station. This inspection will be performed in accordance with NRC Baseline Inspection

Procedure 71111.21N, Attachment 1.

The Design Bases Assurance Inspection will focus on the implementation of the electrical

equipment Environmental Qualification (EQ) Program to verify you are maintaining the qualified

status of equipment during the life of the plant. The EQ components to be reviewed during this

baseline inspection will be identified during the in-office preparation week that occurs prior to the

onsite inspection week.

The inspection will include two weeks of onsite inspection. The inspection team will consist of

three NRC inspectors. The current inspection schedule is as follows:

Preparation week: October 15-19, 2018

Onsite inspection weeks: October 22-26, 2018, and November 5-9, 2018.

Experience with previous baseline design inspections of similar depth and length has shown

that this type of inspection is extremely resource intensive, both for the NRC inspectors and the

licensee staff. In order to minimize the inspection impact on the site and to ensure a productive

inspection for both parties, we have enclosed a request for information needed for the

inspection.

It is important that all of these documents are up-to-date and complete in order to minimize the

number of additional documents requested during the preparation and/or the onsite portions of

the inspection. Insofar as possible, this information should be provided electronically to the lead

inspector. The information request has been divided into three groups:

B. Hanson -2-

The first group lists information necessary for our initial inspection scoping

activities. This information should be provided to the lead inspector no later than

September 21, 2018. By September 28, 2018, the lead inspector will communicate

the initial selected set of approximately 12 EQ components.

The second group of documents requested is those items needed to support our

in-office preparation activities for the selected set of 9-12 EQ components. This set

of documents should be provided to the lead inspector at the Regional Office no later

than October 5, 2018. During the in-office preparation activities, the team may

identify additional information needed to support the inspection.

The last group includes the additional information above as well as plant specific

reference material. This information should be available to the team onsite on

October 22, 2018. It is also requested that corrective action documents and/or

questions developed during the inspection be provided to the lead inspector as the

documents are generated.

The lead inspector for this inspection is Mr. Benny Jose. We understand that our licensing

contact for this inspection is Mr. Nicholas Santos of your organization. If there are any

questions about the inspection or the material requested in the enclosure, please contact

the lead inspector at 630-829-9756 or via e-mail at Benny.Jose@nrc.gov.

This letter does not contain new or amended information collection requirements subject

to the Paperwork Reduction Act of 1995 (44 U.S.C. 3501 et seq.). Existing information

collection requirements were approved by the Office of Management and Budget, Control

Number 3150-0011. The NRC may not conduct or sponsor, and a person is not required to

respond to, a request for information or an information collection requirement unless the

requesting document displays a currently valid Office of Management and Budget Control

Number.

This letter and its enclosure will be made available for public inspection and copying at

http://www.nrc.gov/reading-rm/adams.html and at the NRC Public Document Room in

accordance with Title 10 of the Code of Federal Regulations, Part 2.390, Public Inspections,

Exemptions, Requests for Withholding.

Sincerely,

/RA/

Benny Jose, Senior Reactor Engineer

Engineering Branch 2

Division of Reactor Safety

Docket No. 50-461

License No. NPF-62

Enclosure:

Document Request for Design Bases

Assurance Inspection EQ Program

cc: Distribution via LISTSERV

B. Hanson -3-

Letter to Bryan C. Hanson from Benny Jose dated August 13, 2018

SUBJECT: CLINTON POWER STATIONREQUEST FOR INFORMATION FOR AN NRC

DESIGN BASES ASSURANCE INSPECTION (PROGRAM): IMPLEMENTATION

OF THE ENVIRONMENTAL QUALIFICATION PROGRAM INSPECTION

REPORT 05000461/2018011

DISTRIBUTION:

Jeremy Bowen

RidsNrrDorlLpl3

RidsNrrPMClinton Resource

RidsNrrDirsIrib Resource

Steven West

Darrell Roberts

Richard Skokowski

Allan Barker

DRSIII

DRPIII

ADAMS Accession Number ML: 18225A288

OFFICE RIII RIII RIII RIII

NAME BJose:cl

DATE 08/13/18

OFFICIAL RECORD COPY

DOCUMENT REQUST FOR DESIGN BASES ASSURANCE INSPECTION EQ PROGRAM

Inspection Report: 05000461/2018011

Inspection Dates: October 22-26, 2018, and November 5-9, 2018

Inspection Procedure: IP 71111.21N, Design Bases Assurance Inspection

(Program), Attachment 1, Environmental Qualification (EQ)

under 10 CFR 50.49 Programs, Processes, and Procedures

Lead Inspector: Benny Jose, Senior Reactor Engineer, DRS

630-829-9756

Benny.Jose@nrc.gov

I. Information Requested for Initial Inspection Scoping Activities

The following information is requested by September 21, 2018, or sooner, to facilitate

inspection preparation. If you have any questions regarding this information, please call

the team leader as soon as possible. (Please provide the information electronically in

pdf files, Excel, or other searchable formats, preferably on some portable electronic

media (e.g., CD-ROM, DVD, etc.). The portable electronic media should contain

descriptive names, and be indexed and hyperlinked to facilitate ease of use. Information

in lists should contain enough information to be easily understood by someone who

has knowledge of light water reactor technology).

1. Risk-ranking of top 50 components required to meet environmental qualifications

(EQ) from your site specific probabilistic safety analysis sorted by Fussell Vesely

Importance.

2. U.S. Nuclear Regulatory Commission Safety Evaluation Report(s) associated

with EQ.

3. Electronic copies of Updated Final Safety Analysis Report, Technical

Specifications, and Technical Specifications Bases. Specifically identify which

Updated Final Safety Analysis Report sections address EQ (including seismic).

4. Identify the various EQ standards (including year, edition, or revision) that the

station is committed to.

5. Site (and corporate if applicable) procedures associated with the Title 10 of the

Code of Federal Regulations, Part 50.49, EQ Program for electrical components.

Include procedures for procurement of qualified equipment, maintenance of

qualified equipment, modification to qualified equipment (including Equivalency

or Commercial Grade Dedication (CGD) Programs), and material storage and

shelf life controls.

6. Copy of EQ Design Basis Document, if applicable.

7. Copy of any open licensing commitments related to EQ, if applicable.

Enclosure

DOCUMENT REQUST FOR DESIGN BASES ASSURANCE INSPECTION EQ PROGRAM

8. EQ Master List. Specific issues to be identified include: safety classification

(safety-related or nonsafety-related), Regulatory Guide 1.97 instrumentation,

EQ qualification (e.g., DOR, NUREG 588, 50.49), original or replaced after

implementation of 50.49, and plant location.

9. List of any installed equipment removed from the EQ Master List and basis for

removal.

10. List of EQ solenoid valves that are normally continuously energized.

11. List or drawings of plant areas that are subjected to EQ, identifying design

(limiting) temperature, both normal and accident, high energy line break,

radiation levels, etc. that the associated equipment will have to be qualified to

meet EQ. If unit has obtained a power uprate (greater than 5 percent) provide

same information pre-update (earliest available if multiple uprates).

12. List of CGD evaluations performed, for which the dedicated parts have been

issued for installation (parts issued for the last 10 years) on EQ applications in

the plant. Include CGD evaluation number, name of part, component ID or

description of the component the part was issued to repair, work order, and date

issued or installed.

13. List of Corrective Action Documents related to the EQ Program or EQ of specific

components for the last 3 years.

14. Current management and engineering organizational chart.

II. Information Requested (for the approximate 9-12 selected components) to be

Available by October 5, 2018

1. EQ summary report for each component/subcomponent.

2. Qualification Maintenance Requirement Sheet or equivalent.

3. List of corrective action documents associated with each of the selected

components for the last 3 years.

4. Photos of any component in containment or high radiation areas, if available.

5. EQ file, including associated Qualification Test Reports.

6. Vendor manual (electronic copy or availability of hard copy during inspection).

7. Preventive maintenance template.

8. Last performed work order (WO) for each associated EQ preventive

maintenance.

9. List of corrective maintenance WOs for the last 5 years. Include WO number,

date performed, and brief one line description.

2

DOCUMENT REQUST FOR DESIGN BASES ASSURANCE INSPECTION EQ PROGRAM

10. If repair work (e.g., a motor rewind) was performed under a purchase order,

provide copy of the purchase order.

11. Thermal life calculation.

12. Any self-assessments of the EQ Program in the last 3 years.

This information should be separated for each selected component, especially if

provided electronically (e.g., folder with component name that includes EQ files,

Qualification Test Reports, calculations, corrective action documents, maintenance

history, etc.).

III. Additional Information to be Provided on October 22, 2018 Onsite

1. During the in-office preparation activities, the team may identify additional

information needed to support the inspection. The lead inspector will provide a

list of the additional information needed during the week of October15, 2018.

IV. Information Requested to be Provided Throughout the Inspection

1. Copies of any corrective action documents generated as a result of the teams

questions or queries during this inspection.

2. Copies of the list of questions submitted by the team members and the

status/resolution of the information requested (provide daily by 2:00 p.m.

during the inspection to each team member).

If you have questions regarding the information requested, please contact the lead inspector.

3