MONTHYEARML24031A0502024-01-31031 January 2024 COL Docs - FW Erroneous Description of Tier 2 Change Process in Construction Lessons-Learned Report ML24017A1122024-01-17017 January 2024 NRR E-mail Capture - Request for Access to Cyber Security Data - Vogtle, Units 3 and 4 ML23360A0042023-12-23023 December 2023 NRR E-mail Capture - Fyi - Office of Nuclear Regulatory Research (RES) Requests for Vogtle 3 & 4 ML23348A0782023-12-13013 December 2023 NRR E-mail Capture - Voluntary Request for Closed Meeting Regarding Cyber Security Assessments at Vogtle, Units 3 and 4 ML23342A0802023-12-0808 December 2023 NRR E-mail Capture - Request for Additional Information (RAI) - Vogtle, Unit 1 - Review of SG Tube Inspection Report for Refueling Outage 24 (L-2023-LRO-0067) ML23331A9992023-11-27027 November 2023 COL Docs - Re Re Re ML23079A125 - Vogtle Electric Generating Station, Unit 3, NRC Response Letter to P. Durand, Regarding Comment on Federal Register Notice License Amendment No. 189 ML23331A9492023-11-26026 November 2023 Email Dated November 26, 2023, from Bo Pham to SNC and NRC - Vogtle Seismic Hazard Report ML23326A2802023-11-22022 November 2023 COL Docs - Re Re ML23079A125 - Vogtle Electric Generating Station, Unit 3, NRC Response Letter to P. Durand, Regarding Comment on Federal Register Notice License Amendment No. 189 ML23331A9622023-11-22022 November 2023 Email Dated November 22, 2023, from SNC to NRC - Vogtle Seismic Hazard Report ML23320A0342023-11-16016 November 2023 COL Docs - Re Acceptance Review of Southern Nuclear Operating Companys License Amendment Request to Remove Combined License Appendix C (EPID No. 2023-LLA-0123) ML23320A2372023-11-0808 November 2023 NRR E-mail Capture - (External_Sender) Proposed LAR Regarding the Ultimate Heat Sink at Vogtle, Units 1 and 2 ML23312A2632023-11-0808 November 2023 COL Docs - Action Request for State of Georgia Comment by 5pm Monday, November 13, 2023 - Vogtle Units 3&4, LAR-22-002, TS 3.8.3, Inverters - Operating Completion Time Extension ML23311A1512023-11-0707 November 2023 COL Docs - Re Acceptance Review of Southern Nuclear Operating Companys License Amendment Request to Remove Combined License Appendix C (EPID No. 2023-LLA-0123) ML23304A2272023-10-31031 October 2023 NRR E-mail Capture - Request for State of Georgia Comment by 5pm Monday, Nov. 6, 2023 - License Amendment Request for Vogtle Unit 4 - to Remove Combined License Appendix C ML23289A1362023-10-16016 October 2023 COL Docs - Action Request for State of Georgia Comment by 5pm Friday, October 20, 2023 - Vogtle Units 3&4, LAR-23-006, Rev.1, More Restrictive Action for Tech. Spec. 3.1.9 ML23283A0332023-10-10010 October 2023 COL Docs - FW Vogtle Units 3 and 4 (LAR 23-009) ML23283A0452023-10-0808 October 2023 E-Mail Re Plant Vogtle - Neop Letter Dated October 8, 2023 - Vogtle 3 & 4 - TS 3.7.6 License Amendment Request ML23279A2082023-10-0505 October 2023 Issuance of Formal RAIs - Vogtle, Units 1 and 2 - Proposed LAR and Proposed Alternative Request to Revise TS 3.4.14.1 and IST ALT-VR-02 (EPIDs L-2023-LLA-0061 and L-2023-LLR-0023) ML23275A1002023-10-0202 October 2023 COL Docs - Re Action Summary of 9.27.23 Clarification Call with Southern Nuclear Company on LAR-22-0002, TS 3.8.3 Inverters - Operating Completion Time ML23270B1912023-09-27027 September 2023 COL Docs - Update Vogtle Units 3&4 Acceptance Letter for LAR-22-002 Technical Specification 3.8.3, Inverters Operating ML23263A1042023-09-20020 September 2023 COL Docs - FW Fyi for Tomorrow'S Psm Meeting ML23257A2092023-09-14014 September 2023 NRR E-mail Capture - Formal Issuance of 2nd Round RAIs for Surry Units 1&2 and North Anna Units 1&2 Emergency Plans LAR ML23257A0632023-09-13013 September 2023 NRR E-mail Capture - Acceptance Review of Southern Nuclear Operating Company'S License Amendment Request to Remove Combined License Appendix C ML23256A2682023-09-13013 September 2023 COL Docs - Acceptance Review of Southern Nuclear Operating Companys License Amendment Request to Remove Combined License Appendix C (EPID No. 2023-LLA-0123) ML23248A3482023-09-0505 September 2023 NRR E-mail Capture - for Your Action - Request for Additional Information (RAI) 6 - Vogtle - TSTF-339 LAR (L-2023-LLA-0053) ML23243A9862023-08-31031 August 2023 NRR E-mail Capture - Draft RAIs for EP Staff Augmentation Times LAR (L-2022-LLA-0166) ML23243A9172023-08-31031 August 2023 NRR E-mail Capture - (External_Sender) Re Question - Legal Contact(S) for Vogtle Electric Generating Plant, Units 3 & 4 ML23241A0452023-08-29029 August 2023 COL Docs - FW Draft LAR and Exemption Request Regarding Tier 1 and Tier 2 Requirements ML23229A2322023-08-17017 August 2023 COL Docs - FW Re LAR 22-002 Second Round RAI Approved ML23188A151 for Vogtle Units 3 & 4 ML23223A0142023-08-10010 August 2023 NRR E-mail Capture - Acceptance Review - SNC Fleet Exemption to 10 CFR 73.2, Physical Barriers ML23221A3982023-08-0909 August 2023 COL Docs - LAR 22-002 Second Round RAI Approved ML23188A151 ML23216A1592023-08-0404 August 2023 COL Docs - FW Acceptance Review - Requested Licensing Action Regarding TS Revision to Adopt WCAP-17661-P-A, Improved Relaxed Axial Offset Control and Constant Axial Offset Control Fq Surveillance TS (L-2022-LLA-0148 and L-2022-LLA-0149) ML23212A9642023-07-31031 July 2023 COL Docs - Action - Start of Annual Fees - Vogtle Unit 3 Completion of Power Ascension Testing and Declaration of Commercial Operations ML23216A0962023-07-26026 July 2023 Document Request for Vogtle 1 & 2 RP Inspection, Report No. 05000424/2023003 and 05000425/2023003 ML23220A0572023-07-26026 July 2023 Document Request for Vogtle Units 1 and 2 - Radiation Protection Inspection - Inspection Report 2023-03 ML23200A0112023-07-18018 July 2023 Document Request for Vogtle Unit 3 RP Inspection ML23198A1552023-07-17017 July 2023 NRR E-mail Capture - for Your Action - Request for Additional Information (RAI) - Hatch, Farley, and Vogtle, Units 1 and 2 Quality Assurance Topical Report (QATR) Submittal Dated June 15, 2023 ML23193A7832023-07-12012 July 2023 NRR E-mail Capture - for Your Action - Request for Additional Information (RAI) - Vogtle - TSTF-339 LAR (L-2023-LLA-0053) 2024-01-31
[Table view] Category:Inspection Plan
MONTHYEARML23291A1512023-10-18018 October 2023 Information Request for the Cyber Security Baseline Inspection, Notification to Perform Inspection 0520026/2024401 ML23243A0092023-08-31031 August 2023 Updated Inspection Plan for Vogtle Electric Generating Plant, Units 3 & 4 (Report 05200025 2023005 & 05200026 2023005) IR 05000424/20230052023-08-29029 August 2023 Updated Inspection Plan for Vogtle Electric Generating Plant, Units 1 & 2 - Report 05000424/2023005 and 05000425/2023005 ML23220A0572023-07-26026 July 2023 Document Request for Vogtle Units 1 and 2 - Radiation Protection Inspection - Inspection Report 2023-03 ML23199A1472023-07-19019 July 2023 (Vegp), Unit 4 - Transition to the Operating Reactor Assessment Program (NRC Report 05200026/2023010) ML23058A2292023-03-0101 March 2023 Annual Assessment Letter for Vogtle Electric Generating Plant, Unit 3 (Report 05200025/2022012) IR 05000424/20220062023-03-0101 March 2023 Annual Assessment Letter for Vogtle Electric Generating Plant Units 1 and 2, NRC Inspection Reports 05000424/2022006 and 05000425/2022006 ML23053A1342023-03-0101 March 2023 Annual Assessment Letter for Vogtle Electric Generating Plant, Unit 4 NRC Report 05200026/2022009 ML23003A1682022-11-10010 November 2022 Notification of Vogtle Commercial Grade Dedication Inspection IR 05000424/20220052022-08-24024 August 2022 Updated Inspection Plan for Vogtle Electric Generating Plant, Units 1 & 2 - Report 05000424/2022005 and 05000425/2022005 ML22188A1712022-07-29029 July 2022 (VEGP) Unit 3 - Transition to the Operating Reactor Assessment Program (NRC Report 05200025/2022009) IR 05000424/20210062022-03-0202 March 2022 Annual Assessment Letter for Vogtle Electric Generating Plant Units 1 and 2 (Report No 05000424/2021006 and 05000425/2021006) ML22054A3232022-03-0202 March 2022 Annual Assessment Letter for Vogtle Electric Generating Plant Units 3 and 4 - NRC Report 05200025/2021012 and 05200026/2021012 ML21120A0082021-04-29029 April 2021 Requalification Program Inspection Vogtle Nuclear Plant IR 05000424/20190112021-04-0707 April 2021 Biennial Problem Identification and Resolution Inspection Report 05000424/2019011 and 05000425/2021010 ML21075A0032021-03-12012 March 2021 Emergency Preparedness Exercise Inspection Request for Information for - Brunswick, Catawba, North Anna, Oconee, Vogtle 1 & 2 IR 05000424/20200062021-03-0303 March 2021 Annual Assessment Letter for Vogtle Electric Generating Plant, Units 1 & 2 - Report 05000424/2020006 and 05000425/2020006 IR 05000424/20200112020-10-26026 October 2020 NRC Triennial Fire Protection Inspection Report 05000424/2020011 and 05000425/2020011 ML20063L6052020-03-0303 March 2020 Annual Assessment Letter for Vogtle Electric Generating Plant Units 3&4 (NRC Report 05200025/2019-006 and 05200025/2019-006) IR 05000424/20190062020-03-0303 March 2020 Annual Assessment Letter for Vogtle Electric Generating Plant, Units 1 & 2 - Report 05000424/2019006 and 05000425/2019006 IR 05000424/20190052019-08-27027 August 2019 Updated Inspection Plan for Vogtle Electric Generating Plant Reports 05000424/2019005 and 05000425/2019005 ML19123A1382019-05-0303 May 2019 Occupational Radiation Safety Baseline Inspection 2019002 Document Request ML19065A3072019-03-0606 March 2019 Notification of Inspection and Request for Information for NRC Problem Identification and Resolution Inspection IR 05000424/20180062019-03-0404 March 2019 Annual Assessment Letter for Vogtle Electric Generating Plant - Report 05000424/2018006 and 05000425/2018006 ML19063D3462019-03-0404 March 2019 Annual Assessment Letter for Vogtle Electric Generating Plant Units 3 & 4 (NRC Report 05200025/2018006 and 05200026/2018006) ML19030A7392019-01-28028 January 2019 RFI IR 05000424/20180052018-08-23023 August 2018 Updated Inspection Plan for Vogtle Electric Generating Plant Units 1 and 2 - NRC Inspection Reports 05000424/2018005 and 05000425/2018005 ML18215A1242018-08-0303 August 2018 Radiation Safety Baseline Inspection RFI 2018004 (Public) ML18082A0612018-03-20020 March 2018 Emergency Preparedness Inspection and Request for Information ML18059A7212018-03-0202 March 2018 Annual Assessment Letter for Vogtle Electric Generating Plant Units 2 and 3 (NRC Report 05200025/2017005 and 05200026/2017005 ML18059A1672018-02-28028 February 2018 EOC Assessment Letter IR 05000424/20170052017-08-28028 August 2017 Updated Inspection Plan NRC Inspection Report 05000424/2017005 and 05000425/2017005 ML17233A2492017-08-17017 August 2017 Notification of Inspection Report and Request for Information ML17143A3262017-05-19019 May 2017 Requalification Program Inspection 05000424/2017002 and 05000425/2017002 IR 05000424/20160062017-03-0101 March 2017 Annual Assessment Letter for Vogtle Electric Generating Plant, Units 1 and 2 (Report 05000424/2016006 and 05000425/2016006) IR 05000424/20160052016-08-31031 August 2016 Mid-Cycle Assessment Letter for Vogtle Electric Generating Plant Units 1 and 2 - NRC Inspection Report 05000424/2016005 and 05000425/2016005 IR 05000424/20150062016-03-0202 March 2016 Annual Assessment Letter for Vogtle Electric Generating Plant Unit 1 and Unit 2 (Report 05000424/2015006 and 05000425/2015006) ML16032A0382016-01-29029 January 2016 Vogtle Electric Generating Plant, Unit 2, Notification Of Inspection and Request for Information ML16008A1462016-01-0808 January 2016 Vogtle Electric Generating Plant Emergency Preparedness Inspection and Request for Information ML16008A1202016-01-0808 January 2016 Vogtle Electric Generating Plant - Notification of Inspection and Request for Information IR 05000424/20150052015-09-0101 September 2015 Mid-Cycle Assessment Letter for Vogtle Electric Generating Plant Units 1 and 2 (Inspection Report No. 05000424/2015005 and 05000425/2015005 ML15110A0332015-04-17017 April 2015 Notification of Conduct of a Triennial Fire Protection Baseline Inspection, U. S. Nuclear Regulatory Commission Inspection Report Nos. 05000424/2015007 and 05000425/2015007 IR 05000424/20140012015-03-0404 March 2015 Annual Assessment Letter for Vogtle Electric Generating Plant Unit 1 and Unit 2 (NRC Inspection Report 05000424/2014001 and 05000425/2014001) ML14245A1782014-09-0202 September 2014 Mid-Cycle Letter IR 05000424/20130012014-03-0404 March 2014 Annual Assessment Letter for Vogtle Electric Generating Plant Unit 1 and Unit 2 (NRC Inspection Report 05000424/2013001 and 05000425/2013001) ML13254A0312013-09-10010 September 2013 Informs That NRC Will Perform an Inspection of ISFSI Dry Run Activities at the Voglts Plant ML13246A2092013-09-0303 September 2013 Mid Cycle Assessment Letter IR 05000424/20120012013-03-0404 March 2013 Annual Assessment Letter for Vogtle Electric Generating Plant Unit 1 and Unit 2 (NRC Inspection Report 05000424/2012001 and 425/2012001) ML13028A1502013-01-25025 January 2013 Emergency Preparedness Inspection and Request for Information ML13010A5532013-01-10010 January 2013 Notification of Inspection and Request for Information 2023-08-31
[Table view] |
Text
ML18215A124 Vogtle Electric Generating Plant Southern Nuclear Operating Co., Inc.
Radiation Safety Baseline Inspection Initial Information Request Inspection Report: 2018004 During the weeks of September 17 - 21 and October 1 - 5, 2018, the NRC will perform a baseline Radiation Safety Inspection at Vogtle Electric Generating Plant (NRC Inspection Procedures 71124.01, 71124.02, 71124.03, 71124.04, 71124.05 and the radiation safety sections of 71152).
Experience has shown that this inspection is resource-intensive for both the NRC inspectors and your staff. In order to minimize the impact to your onsite resources and to ensure a productive inspection, we are requesting in advance documents needed for this activity. It is important that all of these documents are up-to-date, and complete, thereby minimizing the number of additional documents requested during the preparation, and/or the onsite portions of the inspection. The NRC requests that these documents be provided to the inspectors no later than September 6, 2018.
If there are any questions about this inspection or the material requested, please contact the lead inspector, William Pursley at 404-997-4517, or the Plant Support Branch 1 Chief, Brian Bonser at 404-997-4653.
In accordance with Title 10 of the Code of Federal Regulations (10 CFR) 2.390, Public inspections, exemptions, requests for withholding, a copy of this document will be available electronically for public inspection in the NRC Public Document Room, or from the Publicly Available Records component of NRC's Agencywide Documents Access and Management System (ADAMS); accessible from the NRC Web site at http://www.nrc.gov/reading-rm/adams.html.
PAPERWORK REDUCTION ACT STATEMENT This document does not contain new or amended information collection requirements subject to the Paperwork Reduction Act of 1995 (44 U.S.C. 3501 et seq.). Existing information collection requirements were approved by the Office of Management and Budget under control numbers 3150-0008, 3150-0011, 3150-0014, 3150-0044, and 3150-0135.
PUBLIC PROTECTION NOTIFICATION The NRC may not conduct or sponsor, and a person is not required to respond to, a request for information or an information collection requirement, unless the requesting document displays a currently valid Office of Management and Budget control number.
Document Request List Licensee: Vogtle Electric Generating Plant Docket Numbers: 05000424 and 425 Inspection Dates: September 17 - 21 and October 1 - 5, 2018 Documents Due to Region II by: September 6, 2018 Inspection Procedures (IPs): 71124.01 Radiological Hazard Assessment and Exposure Controls 71124.02 Occupational ALARA Planning and Controls 71124.03 In-Plant Airborne Radioactivity Control and Mitigation 71124.04 Occupational Dose Assessment 71124.05 Radiation Monitoring Instrumentation 71151 Performance Indicator Verification Lead Inspector: William Pursley Health Physicist US NRC Region II (404) 997-4517 William.Pursley@nrc.gov Note: The current version of these documents is expected unless specified otherwise.
Electronic media is preferred if readily available. Note that the inspectors cannot accept data provided on USB or flash drives due to NRC IT security policies. Please organize the information as it is arranged below to the extent possible. Experience has shown that a poorly organized CD leads to a less efficient inspection and places additional burden on licensee staff. Pay particular attention to the date ranges for the items requested as they may change from item to item. If there are questions regarding the documents requested, or if the documents cannot be provided by the due date, please do not hesitate to contact the lead inspector.
Documentation for the inspection procedures from March 1, 2016 to the present is requested for all procedures, except 71124.01, which should be from September 1, 2017 to present, 71124.05 which should be from November 1, 2016 to present and 71151 which should be from November 1, 2017 to present. This reflects the last time these areas were inspected. We would prefer as much of the information as possible in electronic form. An index to the CD contents is also helpful. For those items requesting a list of documents/areas, the inspector will select documents/areas from the list for on-site review.
Miscellaneous
- 1. Listing of primary site contact(s) for each inspection area including name(s) and telephone numbers.
- 2. List of Radiation Protection (RP) Procedures
- 3. Schedule of major maintenance/work activities during the weeks of the inspection.
- 4. Most recent 10 CFR Part 61 analytical results for plant radioactive waste streams.
- 5. All internal and external RP program assessments since March 1, 2016.
- 6. Corrective Action Program (CAP) procedure(s)
Page 2 of 4
71124.01 - Radiological Hazard Assessment and Exposure Controls (Last Inspected September 2017)
- 1. List of active routine and 1R21 outage Radiation Work Permits (RWPs).
- 2. Copies of RP Procedures for access and key controls, posting, labeling, surveys, RWPs and ED setpoints, contamination control, release of material and personnel from the RCA, diving, high risk activities and any RP procedures for specific plant evolutions (eg.
Crudburst, Resin Transfer, Rx Head Movement, etc.).
- 3. Copies of the last two routine surveys from the ISFSI facility, U1 & U2 RHR rooms and Containment Penetration Rooms.
- 4. Copy of radioactive source inventory, most recent leak test survey and any National Source Tracking System (NSTS) transactions since September 1 2017.
- 5. List of all non-fuel items stored in spent fuel pool.
- 6. List of CAP report numbers and brief descriptions for issues related to RP controls, radworker or RP tech human performance, posting and surveys generated since September 1, 2017.
71124.02 - ALARA Planning and Controls (Last Inspected March of 2016)
- 1. Site and/or corporate ALARA Program and all associated procedures for maintaining dose ALARA including permanent and temporary shielding processes.
- 2. List of top five dose jobs for 1R21 and associated ALARA planning packages.
- 3. ALARA planning and reviews conducted for the last ISFSI campaign
- 4. 2017 annual ALARA report and most recent refueling outage report.
- 5. Completed ALARA packages for the last outage for five work activities that had the greatest collective dose, and/or presented significant radiological risk.
- 6. ALARA goals for 2018.
- 7. ALARA Committee meeting minutes associated with 1R21.
- 8. Plant source term reduction strategy and results achieved since March 1, 2016.
- 9. List of CAP report numbers and brief descriptions generated since March 1, 2016 related to the ALARA program.
71124.03 - In-Plant Airborne Radioactivity Control and Mitigation (Last Inspected March of 2016)
- 1. Site and corporate procedures/manuals associated with airborne radiation monitoring instrumentation use, maintenance and setpoint determination.
- 2. Site and corporate procedures/manuals for all plant respiratory protection equipment in use.
- 3. Copies of vendor certifications for plant personnel qualified to service SCBA equipment if applicable.
- 4. Records of certification of air quality for equipment used to provide breathing air for air-supplied respirators and/or filling SCBA bottles since March 1, 2016.
- 5. Two most recent surveillances on the installed ventilation systems for the Technical Support Center and the U-1 Fuel Handling Building including flow verifications and filter Page 3 of 4
efficiencies as well as the basis for setpoints for the radiation monitors in these systems/facilities:
- 6. List of CAP report numbers and brief descriptions generated since March 1, 2016 involving airborne radiation monitoring, plant ventilation equipment used to identify or mitigate plant airborne radioactive material and respiratory protection equipment.
71124.04: Occupational Dose Assessment (Last Inspected March of 2016)
- 1. Site and corporate Procedures/Guidance Documents for internal and external dose monitoring/evaluation.
- 2. The plants prospective evaluation, if applicable, determining if monitoring is required by 10CFR 20.1502.
- 3. The last two DLR/ED correlations.
- 4. On site passive area radiation monitoring data/evaluations demonstrating compliance with 10 CFR 20.1502 for unmonitored personnel.
- 5. Most recent evaluations of neutron spectra for the ISFSI and containment at power.
- 6. List of individuals and exposures for individuals receiving >500 mrem TEDE, >100 mrem neutron, >10 mrem CEDE and >500 mrem SDE in 2017 or 2018.
- 7. National Voluntary Laboratory Accreditation Program (NVLAP) accreditation documentation for current dosimetry used by the site.
- 8. List of all personnel contamination events, dispersed contamination/discrete particles, identified since March 1, 2016. [Note: only a listing should be provided for use by the inspectors to select a sample of issues for in-depth review during the onsite inspection].
- 9. List CAP document numbers and brief descriptions generated since March 1, 2016, for internal or external dosimetry issues/events.
71124.05 - Radiation Monitoring Instrumentation (Last Inspected November of 2016)
- 1. Provide a list of current portable instruments including electronic dosimetry on site and the procedures/guidance documents for their use, issue and calibration.
- 2. Procedures/Guidance documents for use and calibration of countroom and fixed contamination monitoring equipment and the sites evaluation of the internal dose sensitivity of the exit portal monitors.
- 3. Procedures/Guidance and the most recent calibration of the portable instrument calibrator.
- 4. The last two records of WBC calibration.
- 5. Interlaboratory crosscheck results for countroom equipment
- 6. The last two calibration records for the Unit One Containment High-range Area Monitor and calibration source documentation including paperwork showing traceability to a National Institute of Standards & Technology (NIST) standard and/or traceability to the primary calibration, as applicable.
- 7. List of the area radiation monitors and setpoints currently in service. Several will be selected for on-site review of the calibration records.
- 8. Source certificates/documentation for the radioactive sources used to calibrate the monitors requested for item 7 above showing NIST traceability.
Page 4 of 4
- 9. Latest system health report for the Radiation Monitoring system.
- 10. List of CAP report numbers and brief descriptions generated since November 1, 2016, related to portable and fixed instruments, area radiation monitors, CAMs, WBCs, and count room instruments.
71151 - Performance Indicator (PI) Verification
- 1. Site procedures/manuals for gathering and reporting PI data.
- 2. Monthly/Quarterly PI reports since November 1, 2017, and copies of associated corrective action reports for any RETS/ODCM Radiological Effluent occurrences.
- 3. List of all corrective action documents since November 1, 2017, using keywords such as:
HRA, LHRA, VHRA, unintended dose, unlocked door, etc.
- 4. List of all electronic dosimeter (ED) dose rate alarms and ED dose alarms since November 1, 2017 which includes dose or dose rate alarm received, and the alarm setpoint(s).
- 5. List of condition reports (e.g. NCRs, CRs, ARs etc.) generated since November 1, 2017, using keywords abnormal/ unmonitored effluent release, etc.
Inspector Contact Information: Mailing Address:
William Pursley U.S. Nuclear Regulatory Commission Health Physicist US NRC Region II (404) 997-4517 ATTN: Mr. William Pursley William.Pursley@nrc.gov 245 Peachtree Center Ave., N.E Suite 1200 Atlanta, GA 30303 Page 5 of 4
Pursley, William From: Pursley, William Sent: Friday, July 27, 2018 6:32 PM To: 'Dixon, Jim R. (Vogtle RP)'; Walden, Kevin C.
Cc: 'MIWILLIA@southernco.com'
Subject:
VOG 201804 RP Document Request.pdf Attachments: VOG 201804 RP Document Request.pdf Jim/Kevin, Attached is the information request for the upcoming Plant Vogtle RP Occupational Baseline Inspection beginning Sept 17. In addition to myself, Bob Kellner will be with me the first week. Adam Nielsen and Jeff Griffis will be with me the second week. Please let me know that you received this request via phone or email. Also, if you have any questions or need clarification on any of the information requested, do not hesitate to contact me.
- Regards, Bill William Pursley USNRC RII Health Physicist 404 997-4517 1