Letter Sequence Response to RAI |
---|
EPID:L-2018-LLR-0012, In-service Testing Program for Pumps, Valves, & Snubbers Fifth & Fourth 10-Year Interval Updates for Units 2 & 3 (Open) |
|
MONTHYEARML18066A0782018-03-0101 March 2018 In-service Testing Program for Pumps, Valves, & Snubbers Fifth & Fourth 10-Year Interval Updates for Units 2 & 3 Project stage: Request ML18078A0072018-03-19019 March 2018 Acceptance Review Determination (E-mail), Inservice Testing Program for Pumps, Valves, and Snubbers, Fifth and Fourth 10-Year Interval Updates (EPID: L-2018-LLR-0011 to L-2018-LLR-0022) Project stage: Acceptance Review ML18171A1532018-06-20020 June 2018 Request for Additional Information Via E-mail from R.Guzman to W.Craft Alternative Requests for Inservice Testing Program (E-mail from R.Guzman to W.Craft) (EPID: L-2018-LLR-0012-LLR-0022) Project stage: RAI RS-18-086, Response to Request for Additional Information Regarding License Amendment Request for Temporary Extensions to Technical Specifications Supporting Maintenance on Portions of the Core Standby Cooling System2018-07-16016 July 2018 Response to Request for Additional Information Regarding License Amendment Request for Temporary Extensions to Technical Specifications Supporting Maintenance on Portions of the Core Standby Cooling System Project stage: Response to RAI ML18205A1762018-07-19019 July 2018 Response to Request for Additional Information for Alternative Requests Associated with the In-Service Testing Program for Pumps, Valves, and Snubbers Fifth and Fourth 10-Year Interval Updates for Units 2 and 3 Project stage: Response to RAI ML18225A0662018-08-0606 August 2018 Response to Request for Additional Information for Alternative Requests Associated with the In-Service Testing Program for Pumps, Valves, and Snubbers Fifth and Fourth 10-Year Interval Updates Project stage: Response to RAI ML18285A1522018-10-12012 October 2018 /12/18 E-mail from M. Whitlock to R.Guzman MPS2 Relief Request V-01, Update to MPS2 Inservice Testing Plan Project stage: Request ML18290A6022018-11-13013 November 2018 Alternative Requests Related to the Fifth and Fourth 10-Year Interval Pump, Valve, and Snubber Inservice Testing Programs, Respectively (EPID L-2018-LLR- 0012 Through EPID L-2018-LLR-0022) Project stage: Other 2018-03-19
[Table View] |
|
---|
Category:Letter type:RS
MONTHYEARRS-23-120, Supplemental Information Letter for Part 73 Exemption Request - Responses to Request for Confirmatory Information2023-11-10010 November 2023 Supplemental Information Letter for Part 73 Exemption Request - Responses to Request for Confirmatory Information RS-23-103, Request for Exemption from Enhanced Weapons, Firearms Background Checks, and Security Event Notifications Implementation2023-10-13013 October 2023 Request for Exemption from Enhanced Weapons, Firearms Background Checks, and Security Event Notifications Implementation RS-23-097, Constellation Energy Generation, LLC, Advisement of Leadership Changes and Submittal of Updated Standard Practice Procedures Plans2023-10-12012 October 2023 Constellation Energy Generation, LLC, Advisement of Leadership Changes and Submittal of Updated Standard Practice Procedures Plans RS-23-080, Constellation Energy Generation, LLC, Application to Revise Technical Specifications to Adopt TSTF-264-A, Revision 0, 3.3.9 and 3.3.10 - Delete Flux Monitors Specific Overlap Requirement SRs2023-08-30030 August 2023 Constellation Energy Generation, LLC, Application to Revise Technical Specifications to Adopt TSTF-264-A, Revision 0, 3.3.9 and 3.3.10 - Delete Flux Monitors Specific Overlap Requirement SRs RS-23-087, Revision to Approved Alternatives Associated with the Use of the BWRVIP Guidelines in Lieu of Specific ASME Code Requirements on Reactor2023-08-0404 August 2023 Revision to Approved Alternatives Associated with the Use of the BWRVIP Guidelines in Lieu of Specific ASME Code Requirements on Reactor RS-23-084, Response to Request for Additional Information Regarding the Application to Revise Design Basis to Allow Use of Plastic Section Properties in Lower Downcomer Braces Analysis2023-07-24024 July 2023 Response to Request for Additional Information Regarding the Application to Revise Design Basis to Allow Use of Plastic Section Properties in Lower Downcomer Braces Analysis RS-23-077, Response to NRC Regulatory Issue Summary 2023-01, Preparation and Scheduling of Operator Licensing Examinations2023-06-16016 June 2023 Response to NRC Regulatory Issue Summary 2023-01, Preparation and Scheduling of Operator Licensing Examinations RS-23-042, Application to Revise Technical Specifications to Adopt TSTF-580, Provide Exception from Entering Mode 4 with No Operable RHR Shutdown Cooling2023-05-25025 May 2023 Application to Revise Technical Specifications to Adopt TSTF-580, Provide Exception from Entering Mode 4 with No Operable RHR Shutdown Cooling RS-23-049, Constellation Energy Generation, LLC, Report on Status of Decommissioning Funding for Reactors and Independent Spent Fuel Storage Installations2023-03-23023 March 2023 Constellation Energy Generation, LLC, Report on Status of Decommissioning Funding for Reactors and Independent Spent Fuel Storage Installations RS-23-048, Exigent Amendment Request to Revise Design Basis Related to Seismic Requirements2023-03-0707 March 2023 Exigent Amendment Request to Revise Design Basis Related to Seismic Requirements RS-23-045, Constellation Energy Generation, LLC Submittal of Fitness for Duty Performance Data Reports for 2022 Per 10 CFR 26.717(c) & 10 CFR 26.2032023-02-28028 February 2023 Constellation Energy Generation, LLC Submittal of Fitness for Duty Performance Data Reports for 2022 Per 10 CFR 26.717(c) & 10 CFR 26.203 RS-23-037, Annual 10 CFR 50.46 Report of Emergency Core Cooling System Evaluation Model Changes and Errors for LaSalle County Station2023-02-22022 February 2023 Annual 10 CFR 50.46 Report of Emergency Core Cooling System Evaluation Model Changes and Errors for LaSalle County Station RS-23-003, Constellation Energy Generation, LLC, Summary of Changes to Quality Assurance Topical Report, NO-AA-10, and Decommissioning Quality Assurance Program, NO-DC-102023-01-31031 January 2023 Constellation Energy Generation, LLC, Summary of Changes to Quality Assurance Topical Report, NO-AA-10, and Decommissioning Quality Assurance Program, NO-DC-10 RS-22-085, Application to Revise Design Basis to Allow Use of Plastic Section Properties in Lower Downcomer Braces Analysis2023-01-12012 January 2023 Application to Revise Design Basis to Allow Use of Plastic Section Properties in Lower Downcomer Braces Analysis RS-23-006, Supplemental Information Regarding License Amendment Request Relocation of Pressure and Temperature Limit Curves to the Pressure and Temperature Limits Report2023-01-10010 January 2023 Supplemental Information Regarding License Amendment Request Relocation of Pressure and Temperature Limit Curves to the Pressure and Temperature Limits Report RS-22-126, Constellation Energy Generation, LLC - Request to Use Provisions of a Later Edition of the ASME Boiler and Pressure Vessel Code, Section XI2022-11-30030 November 2022 Constellation Energy Generation, LLC - Request to Use Provisions of a Later Edition of the ASME Boiler and Pressure Vessel Code, Section XI RS-22-109, Response to Request for Additional Information License Amendments Related to Fuel Storage2022-10-12012 October 2022 Response to Request for Additional Information License Amendments Related to Fuel Storage RS-22-092, Nine and Quad Cities - Application to Revise Primary Containment Isolation Instrumentation Technical Specifications in Accordance with TSTF-306, Revision 2, Add Action to LCO 3.3.6.1 to Give Option to Isolate the Penetration2022-10-0303 October 2022 Nine and Quad Cities - Application to Revise Primary Containment Isolation Instrumentation Technical Specifications in Accordance with TSTF-306, Revision 2, Add Action to LCO 3.3.6.1 to Give Option to Isolate the Penetration RS-22-093, Advisement of Leadership Changes for Constellation Energy Generation, LLC and Submittal of Updated Standard Practice Procedures Plans2022-08-18018 August 2022 Advisement of Leadership Changes for Constellation Energy Generation, LLC and Submittal of Updated Standard Practice Procedures Plans RS-22-083, Response to Request for Additional Information Related to the License Amendment Request to Change New Fuel Storage Vault and Spent Fuel Storage Pool Criticality Methodologies, with Proposed Changes to Technical2022-06-17017 June 2022 Response to Request for Additional Information Related to the License Amendment Request to Change New Fuel Storage Vault and Spent Fuel Storage Pool Criticality Methodologies, with Proposed Changes to Technical RS-22-051, Constellation Energy Generation, LLC - Update to Correspondence Addressees and Service Lists2022-04-12012 April 2022 Constellation Energy Generation, LLC - Update to Correspondence Addressees and Service Lists RS-22-049, Constellation Energy Generation, LLC, Supplemental Information to Correct Typographical Errors in Constellation'S Application to Revise Technical Specifications to Adopt TSTF-541 Revision 2, Add Exceptions to Surveillance Requirements for2022-04-0404 April 2022 Constellation Energy Generation, LLC, Supplemental Information to Correct Typographical Errors in Constellation'S Application to Revise Technical Specifications to Adopt TSTF-541 Revision 2, Add Exceptions to Surveillance Requirements for V RS-22-045, Constellation Energy Generation, LLC, Response to NRC Regulatory Issue Summary 2022-01, Preparation and Scheduling of Operator Licensing Examinations2022-03-25025 March 2022 Constellation Energy Generation, LLC, Response to NRC Regulatory Issue Summary 2022-01, Preparation and Scheduling of Operator Licensing Examinations RS-22-035, Supplemental Information Regarding Relief Request I4R-13 Relief from Code Examinations for 1B33-F060A and 1B33-F060B Repairs2022-03-0404 March 2022 Supplemental Information Regarding Relief Request I4R-13 Relief from Code Examinations for 1B33-F060A and 1B33-F060B Repairs RS-22-033, Response to Request for Additional Information Regarding Relief Request I4R-13 Relief from Code Examinations for 1B33-F060A and 1B33-F060B Repairs2022-03-0303 March 2022 Response to Request for Additional Information Regarding Relief Request I4R-13 Relief from Code Examinations for 1B33-F060A and 1B33-F060B Repairs RS-22-032, Relief Request I4R-13 Relief from Code Examinations for 1B33-F060A and 1B33-F060B Repairs2022-03-0202 March 2022 Relief Request I4R-13 Relief from Code Examinations for 1B33-F060A and 1B33-F060B Repairs RS-22-023, Constellation Energy Generation, LLC, Executed Trust Fund Agreement Amendment and Subordinate Trust Agreement2022-02-23023 February 2022 Constellation Energy Generation, LLC, Executed Trust Fund Agreement Amendment and Subordinate Trust Agreement RS-22-027, Constellation, Response to Request for Additional Information Regarding Application to Revise Technical Specifications to Adopt TSTF-541 Revision 2, Add Exceptions to Surveillance Requirements for Valves and Dampers Locked in the Actuated2022-02-23023 February 2022 Constellation, Response to Request for Additional Information Regarding Application to Revise Technical Specifications to Adopt TSTF-541 Revision 2, Add Exceptions to Surveillance Requirements for Valves and Dampers Locked in the Actuated P RS-22-018, Annual 10 CFR 50.46 Report of Emergency Core Cooling System Evaluation Model Changes and Errors for LaSalle County Station2022-02-22022 February 2022 Annual 10 CFR 50.46 Report of Emergency Core Cooling System Evaluation Model Changes and Errors for LaSalle County Station RS-22-019, Constellation Energy Generation, LLC - Update to Correspondence Addressees and Service Lists2022-02-16016 February 2022 Constellation Energy Generation, LLC - Update to Correspondence Addressees and Service Lists RS-22-015, Notification of Completion of License Transfer and Request to Continue Processing Pending NRC Actions Previously Requested by Exelon Generation Company, LLC2022-02-0101 February 2022 Notification of Completion of License Transfer and Request to Continue Processing Pending NRC Actions Previously Requested by Exelon Generation Company, LLC RS-22-004, Supplement to Application to Adopt TSTF-554, Revision 1, Revise Reactor Coolant Leakage Requirements2022-01-0404 January 2022 Supplement to Application to Adopt TSTF-554, Revision 1, Revise Reactor Coolant Leakage Requirements RS-21-121, Proposed Changes to Decommissioning Trust Agreements and Master Terms2021-12-15015 December 2021 Proposed Changes to Decommissioning Trust Agreements and Master Terms RS-21-115, Supplemental Information for License Amendment Request Regarding New Fuel Storage Vault and Spent Fuel Storage Pool Criticality Methodologies, with Proposed Changes to Technical Specifications 4.3.1 and 5.6.52021-11-0404 November 2021 Supplemental Information for License Amendment Request Regarding New Fuel Storage Vault and Spent Fuel Storage Pool Criticality Methodologies, with Proposed Changes to Technical Specifications 4.3.1 and 5.6.5 RS-21-109, Request to Withhold Meeting Materials for the Non-Public Meeting Held on September 2, 20212021-10-14014 October 2021 Request to Withhold Meeting Materials for the Non-Public Meeting Held on September 2, 2021 RS-21-091, Implementation of Insider Threat Program Requirements Associated with the Voluntary Security Clearance Program and Advisement of Leadership Changes2021-09-13013 September 2021 Implementation of Insider Threat Program Requirements Associated with the Voluntary Security Clearance Program and Advisement of Leadership Changes RS-21-078, Response to Request for Additional Information for Application to Revise Technical Specification to Adopt TSTF-582, Reactor Pressure Vessel Water Inventory Control (RPV WIC) Enhancements, and TSTF-583-T, TSTF-582 Diesel2021-08-19019 August 2021 Response to Request for Additional Information for Application to Revise Technical Specification to Adopt TSTF-582, Reactor Pressure Vessel Water Inventory Control (RPV WIC) Enhancements, and TSTF-583-T, TSTF-582 Diesel RS-21-085, Response to Request for Additional Information Regarding License Amendment Request to Incorporate Licensing Topical Report NEDE-33885PA, Revision 1, GNF CRDA Application Methodology (EPID-L-2021-LLA-0016)2021-08-17017 August 2021 Response to Request for Additional Information Regarding License Amendment Request to Incorporate Licensing Topical Report NEDE-33885PA, Revision 1, GNF CRDA Application Methodology (EPID-L-2021-LLA-0016) RS-21-063, Application to Adopt TSTF-554, Revision 1, Revise Reactor Coolant Leakage Requirements2021-06-30030 June 2021 Application to Adopt TSTF-554, Revision 1, Revise Reactor Coolant Leakage Requirements RS-21-064, License Amendment Request Re New Fuel Storage Vault and Spent Fuel Storage Pool Criticality Methodologies - Cover Letter2021-06-30030 June 2021 License Amendment Request Re New Fuel Storage Vault and Spent Fuel Storage Pool Criticality Methodologies - Cover Letter RS-21-070, Proposed Alternative to Utilize Code Case N-8932021-06-30030 June 2021 Proposed Alternative to Utilize Code Case N-893 RS-21-055, Response to Third Round Request for Additional Information (Rals) for LaSalle License Amendment Request to Adopt Risk Informed Completion Times TSTF- 505, Revision 2, Provide Risk-Informed Extended.2021-05-10010 May 2021 Response to Third Round Request for Additional Information (Rals) for LaSalle License Amendment Request to Adopt Risk Informed Completion Times TSTF- 505, Revision 2, Provide Risk-Informed Extended. RS-21-054, Response to NRC Regulatory Issue Summary 2021-01, Preparation and Scheduling of Operator Licensing Examinations2021-04-29029 April 2021 Response to NRC Regulatory Issue Summary 2021-01, Preparation and Scheduling of Operator Licensing Examinations RS-21-050, Response to Request for Additional Information (RAI) Regarding Request for License Amendment Regarding Ultimate Heat Sink (EPID-L-2020-LLA-0165)2021-04-16016 April 2021 Response to Request for Additional Information (RAI) Regarding Request for License Amendment Regarding Ultimate Heat Sink (EPID-L-2020-LLA-0165) RS-21-045, Response to Request for Additional Information (RAI) Regarding Request for License Amendment Regarding Ultimate Heat Sink (EPID-L-2020-LLA-0165)2021-04-0707 April 2021 Response to Request for Additional Information (RAI) Regarding Request for License Amendment Regarding Ultimate Heat Sink (EPID-L-2020-LLA-0165) RS-21-040, Response to Second Round Request for Additional Information (Rais) for License Amendment Request to Adopt Risk Informed Completion Times TSTF-505, Revision 2, Provide Risk-Informed Extended Completion Times - RITSTF Initiative 4b2021-03-31031 March 2021 Response to Second Round Request for Additional Information (Rais) for License Amendment Request to Adopt Risk Informed Completion Times TSTF-505, Revision 2, Provide Risk-Informed Extended Completion Times - RITSTF Initiative 4b RS-21-043, Supplemental Information Regarding Relief Request I4R-12 Relief from Code Examinations for 2B33-F060A and 2B33-F060B Repairs, Revision 22021-03-26026 March 2021 Supplemental Information Regarding Relief Request I4R-12 Relief from Code Examinations for 2B33-F060A and 2B33-F060B Repairs, Revision 2 RS-21-042, Relief Request I4R-12 Relief from Code Examinations for 2B33-F060A and 2B33-F060B Repairs, Revision 22021-03-26026 March 2021 Relief Request I4R-12 Relief from Code Examinations for 2B33-F060A and 2B33-F060B Repairs, Revision 2 RS-21-039, Supplemental Information Regarding Application for Order Approving Transfers and Proposed Conforming License Amendments2021-03-25025 March 2021 Supplemental Information Regarding Application for Order Approving Transfers and Proposed Conforming License Amendments RS-21-035, Relief Request I4R-12 Relief from Code Examinations for 2B33-F060A and 2B33-F060B Repairs2021-03-0909 March 2021 Relief Request I4R-12 Relief from Code Examinations for 2B33-F060A and 2B33-F060B Repairs 2023-08-04
[Table view] Category:Response to Request for Additional Information (RAI)
MONTHYEARRS-23-120, Supplemental Information Letter for Part 73 Exemption Request - Responses to Request for Confirmatory Information2023-11-10010 November 2023 Supplemental Information Letter for Part 73 Exemption Request - Responses to Request for Confirmatory Information RS-23-084, Response to Request for Additional Information Regarding the Application to Revise Design Basis to Allow Use of Plastic Section Properties in Lower Downcomer Braces Analysis2023-07-24024 July 2023 Response to Request for Additional Information Regarding the Application to Revise Design Basis to Allow Use of Plastic Section Properties in Lower Downcomer Braces Analysis RS-22-109, Response to Request for Additional Information License Amendments Related to Fuel Storage2022-10-12012 October 2022 Response to Request for Additional Information License Amendments Related to Fuel Storage RS-22-083, Response to Request for Additional Information Related to the License Amendment Request to Change New Fuel Storage Vault and Spent Fuel Storage Pool Criticality Methodologies, with Proposed Changes to Technical2022-06-17017 June 2022 Response to Request for Additional Information Related to the License Amendment Request to Change New Fuel Storage Vault and Spent Fuel Storage Pool Criticality Methodologies, with Proposed Changes to Technical RS-22-033, Response to Request for Additional Information Regarding Relief Request I4R-13 Relief from Code Examinations for 1B33-F060A and 1B33-F060B Repairs2022-03-0303 March 2022 Response to Request for Additional Information Regarding Relief Request I4R-13 Relief from Code Examinations for 1B33-F060A and 1B33-F060B Repairs RS-22-027, Constellation, Response to Request for Additional Information Regarding Application to Revise Technical Specifications to Adopt TSTF-541 Revision 2, Add Exceptions to Surveillance Requirements for Valves and Dampers Locked in the Actuated2022-02-23023 February 2022 Constellation, Response to Request for Additional Information Regarding Application to Revise Technical Specifications to Adopt TSTF-541 Revision 2, Add Exceptions to Surveillance Requirements for Valves and Dampers Locked in the Actuated P NMP1L3447, Constellation Energy Generation, LLC - Response to Request for Additional Information - Proposed Relief Request Associated with Reactor Pressure Vessel Water Level Instrumentation Partial Penetration Nozzle Repairs2022-02-0202 February 2022 Constellation Energy Generation, LLC - Response to Request for Additional Information - Proposed Relief Request Associated with Reactor Pressure Vessel Water Level Instrumentation Partial Penetration Nozzle Repairs JAFP-21-0087, Response to Request for Additional Information Regarding Request for Approval of Transfer of Licenses and Conforming Amendments2021-09-16016 September 2021 Response to Request for Additional Information Regarding Request for Approval of Transfer of Licenses and Conforming Amendments RS-21-078, Response to Request for Additional Information for Application to Revise Technical Specification to Adopt TSTF-582, Reactor Pressure Vessel Water Inventory Control (RPV WIC) Enhancements, and TSTF-583-T, TSTF-582 Diesel2021-08-19019 August 2021 Response to Request for Additional Information for Application to Revise Technical Specification to Adopt TSTF-582, Reactor Pressure Vessel Water Inventory Control (RPV WIC) Enhancements, and TSTF-583-T, TSTF-582 Diesel RS-21-085, Response to Request for Additional Information Regarding License Amendment Request to Incorporate Licensing Topical Report NEDE-33885PA, Revision 1, GNF CRDA Application Methodology (EPID-L-2021-LLA-0016)2021-08-17017 August 2021 Response to Request for Additional Information Regarding License Amendment Request to Incorporate Licensing Topical Report NEDE-33885PA, Revision 1, GNF CRDA Application Methodology (EPID-L-2021-LLA-0016) NMP2L2773, Company - Response to Request for Additional Information2021-06-30030 June 2021 Company - Response to Request for Additional Information JAFP-21-0044, Response to Request for Additional Information Regarding Request for Approval of Transfer of Licenses and Conforming Amendments2021-06-11011 June 2021 Response to Request for Additional Information Regarding Request for Approval of Transfer of Licenses and Conforming Amendments RS-21-055, Response to Third Round Request for Additional Information (Rals) for LaSalle License Amendment Request to Adopt Risk Informed Completion Times TSTF- 505, Revision 2, Provide Risk-Informed Extended.2021-05-10010 May 2021 Response to Third Round Request for Additional Information (Rals) for LaSalle License Amendment Request to Adopt Risk Informed Completion Times TSTF- 505, Revision 2, Provide Risk-Informed Extended. JAFP-21-0032, Response to Request for Additional Information - Proposed Alternative Concerning ASME Section XI Repair/Replacement Documentation for Replacement of Pressure Retaining Bolting2021-04-20020 April 2021 Response to Request for Additional Information - Proposed Alternative Concerning ASME Section XI Repair/Replacement Documentation for Replacement of Pressure Retaining Bolting RS-21-050, Response to Request for Additional Information (RAI) Regarding Request for License Amendment Regarding Ultimate Heat Sink (EPID-L-2020-LLA-0165)2021-04-16016 April 2021 Response to Request for Additional Information (RAI) Regarding Request for License Amendment Regarding Ultimate Heat Sink (EPID-L-2020-LLA-0165) RS-21-045, Response to Request for Additional Information (RAI) Regarding Request for License Amendment Regarding Ultimate Heat Sink (EPID-L-2020-LLA-0165)2021-04-0707 April 2021 Response to Request for Additional Information (RAI) Regarding Request for License Amendment Regarding Ultimate Heat Sink (EPID-L-2020-LLA-0165) RS-21-040, Response to Second Round Request for Additional Information (Rais) for License Amendment Request to Adopt Risk Informed Completion Times TSTF-505, Revision 2, Provide Risk-Informed Extended Completion Times - RITSTF Initiative 4b2021-03-31031 March 2021 Response to Second Round Request for Additional Information (Rais) for License Amendment Request to Adopt Risk Informed Completion Times TSTF-505, Revision 2, Provide Risk-Informed Extended Completion Times - RITSTF Initiative 4b RS-21-027, Response to Request for Additional Information Regarding Request for Exemption from Pre-Access Drug and Alcohol Testing Requirements in 10 CFR 26.652021-02-21021 February 2021 Response to Request for Additional Information Regarding Request for Exemption from Pre-Access Drug and Alcohol Testing Requirements in 10 CFR 26.65 ML21022A1302021-01-22022 January 2021 Response to Request for Additional Information Regarding the License Amendment Request to Adopt 10 CFR 50.69 RS-20-136, Response to Request for Additional Information Re License Amendment Requests for Amendments to Renewed Facility OL to Adopt 10CFR50.69 & to Adopt TSTF-505, Rev. 2 (EPID L-2020-LLA-0017 and EPID-L-2020-LLA-0018)2020-10-29029 October 2020 Response to Request for Additional Information Re License Amendment Requests for Amendments to Renewed Facility OL to Adopt 10CFR50.69 & to Adopt TSTF-505, Rev. 2 (EPID L-2020-LLA-0017 and EPID-L-2020-LLA-0018) RS-20-133, Response to Request for Additional Information Re License Amendment Request to Renewed Facility Operating Licenses to Adopt 10 CFR 50.692020-10-16016 October 2020 Response to Request for Additional Information Re License Amendment Request to Renewed Facility Operating Licenses to Adopt 10 CFR 50.69 RS-20-104, Supplement to the Request for a License Amendment Technical Specification 3.7.3, Ultimate Heat Sink2020-09-11011 September 2020 Supplement to the Request for a License Amendment Technical Specification 3.7.3, Ultimate Heat Sink RS-20-112, Response to Request for Additional Information Related to License Amendment Request to Adopt TSTF-5682020-09-0303 September 2020 Response to Request for Additional Information Related to License Amendment Request to Adopt TSTF-568 NMP2L2711, Byron Station; Calvert Cliffs; Clinton Power Station; LaSalle County Station; Limerick Generating Station; and Nine Mile Point Nuclear Station - Proposed Alternative to Utilize Code Case N-8792019-10-16016 October 2019 Byron Station; Calvert Cliffs; Clinton Power Station; LaSalle County Station; Limerick Generating Station; and Nine Mile Point Nuclear Station - Proposed Alternative to Utilize Code Case N-879 JAFP-19-0057, Response to Request for Additional Information - Proposed Alternative to Utilize Code Cases N-878 and N-8802019-06-0404 June 2019 Response to Request for Additional Information - Proposed Alternative to Utilize Code Cases N-878 and N-880 NMP1L3279, Response to Request for Additional Information - Proposed Alternatives to Utilize Code Cases N-878 and N-880 for Plants2019-05-0101 May 2019 Response to Request for Additional Information - Proposed Alternatives to Utilize Code Cases N-878 and N-880 for Plants RS-19-052, Supplement to the Response to Request for Additional Information Regarding License Amendment Request to Remove Operating Mode Restrictions for Performing Surveillance Testing of the Division 3 Battery and High ..2019-04-24024 April 2019 Supplement to the Response to Request for Additional Information Regarding License Amendment Request to Remove Operating Mode Restrictions for Performing Surveillance Testing of the Division 3 Battery and High .. RS-19-019, Response to Request for Additional Information Regarding Relief Request 13R-152019-04-0202 April 2019 Response to Request for Additional Information Regarding Relief Request 13R-15 JAFP-19-0006, Response to Request for Additional Information - Proposed Alternative to Utilize Code Cases N-878 and N-8802019-01-0808 January 2019 Response to Request for Additional Information - Proposed Alternative to Utilize Code Cases N-878 and N-880 RS-18-143, Supplemental Information Supporting License Amendment Requests for Approval of Changes to Emergency Plan Staffing Requirements2018-11-29029 November 2018 Supplemental Information Supporting License Amendment Requests for Approval of Changes to Emergency Plan Staffing Requirements RS-18-097, Response to Request for Additional Information and Supplemental Information-License Amendment.2018-07-27027 July 2018 Response to Request for Additional Information and Supplemental Information-License Amendment. RS-18-086, Response to Request for Additional Information Regarding License Amendment Request for Temporary Extensions to Technical Specifications Supporting Maintenance on Portions of the Core Standby Cooling System2018-07-16016 July 2018 Response to Request for Additional Information Regarding License Amendment Request for Temporary Extensions to Technical Specifications Supporting Maintenance on Portions of the Core Standby Cooling System RS-18-078, Supplemental Information Related to Application to Revise Technical Specifications to Adopt TSTF-542, Reactor Pressure Vessel Water Inventory Control2018-06-18018 June 2018 Supplemental Information Related to Application to Revise Technical Specifications to Adopt TSTF-542, Reactor Pressure Vessel Water Inventory Control RS-18-061, Response to Request for Additional Information Regarding Decommissioning Funding Plans for Independent Spent Fuel Storage Installations (Isfsis)2018-05-0202 May 2018 Response to Request for Additional Information Regarding Decommissioning Funding Plans for Independent Spent Fuel Storage Installations (Isfsis) RS-18-014, Supplement to Request to Revise Technical Specifications 2.1.1 for Minimum Critical Power Ratio Safety Limits2018-01-25025 January 2018 Supplement to Request to Revise Technical Specifications 2.1.1 for Minimum Critical Power Ratio Safety Limits RS-17-147, Response to Request for Additional Information Regarding LaSalle County Station Fourth Inservice Inspection Interval Relief Request 14R-012017-11-10010 November 2017 Response to Request for Additional Information Regarding LaSalle County Station Fourth Inservice Inspection Interval Relief Request 14R-01 RS-17-146, Additional Information Regarding License Amendment Request to Revise Suppression Pool Swell Design Analysis2017-10-19019 October 2017 Additional Information Regarding License Amendment Request to Revise Suppression Pool Swell Design Analysis RS-17-099, Response to Request for Additional Information Regarding LaSalle County Station License Amendment Request for Extension of Type a and Type C Containment Leak Rate Test Intervals (PRA Branch)2017-08-0808 August 2017 Response to Request for Additional Information Regarding LaSalle County Station License Amendment Request for Extension of Type a and Type C Containment Leak Rate Test Intervals (PRA Branch) RS-17-101, Response to Request for Additional Information Regarding License Amendment Request to Revise Suppression Pool Swell Design Analysis2017-07-28028 July 2017 Response to Request for Additional Information Regarding License Amendment Request to Revise Suppression Pool Swell Design Analysis RS-17-102, Response to Request for Supplemental Information Regarding Fourth Inservice Inspection Interval Relief Request 14R-012017-07-20020 July 2017 Response to Request for Supplemental Information Regarding Fourth Inservice Inspection Interval Relief Request 14R-01 RS-17-098, Response to Request for Additional Information Regarding License Amendment Request for Extension of Type a and Type C Containment Leak Rate Test Intervals (Sbpb Branch)2017-07-17017 July 2017 Response to Request for Additional Information Regarding License Amendment Request for Extension of Type a and Type C Containment Leak Rate Test Intervals (Sbpb Branch) RS-17-044, Response to Request for Additional Information Regarding Proposed Alternative for the Use of Encoded Phased Array Ultrasonic Examination Techniques in Lieu of Radiography2017-03-13013 March 2017 Response to Request for Additional Information Regarding Proposed Alternative for the Use of Encoded Phased Array Ultrasonic Examination Techniques in Lieu of Radiography RS-17-010, Response to Request for Additional Information Regarding LaSalle County Station Alternative Request RV-01 for the Lnservice Testing Program Fourth 10-Year Interval2017-02-0909 February 2017 Response to Request for Additional Information Regarding LaSalle County Station Alternative Request RV-01 for the Lnservice Testing Program Fourth 10-Year Interval RS-16-244, Additional Information Regarding Request for License Amendment to Address Secondary Containment Access Openings2016-12-12012 December 2016 Additional Information Regarding Request for License Amendment to Address Secondary Containment Access Openings RS-16-176, County, High Frequency Supplement to Seismic Hazard Screening Report, Response to NRC Request for Information Pursuant to 10 CFR 50.54(f) Regarding Recommendation 2.1 of the Near-Term Task Force Review of Insights from the Fukushima Dai-ic2016-12-0101 December 2016 County, High Frequency Supplement to Seismic Hazard Screening Report, Response to NRC Request for Information Pursuant to 10 CFR 50.54(f) Regarding Recommendation 2.1 of the Near-Term Task Force Review of Insights from the Fukushima Dai-ich RS-16-125, Spent Fuel Pool Evaluation Supplemental Report, Response to NRC Request for Information Pursuant to 10 CFR 50.54(f) Regarding Recommendation 2.1 of the Near-Term Task Force Review of Insights from the Fukushima Dai-ichi Accident2016-08-31031 August 2016 Spent Fuel Pool Evaluation Supplemental Report, Response to NRC Request for Information Pursuant to 10 CFR 50.54(f) Regarding Recommendation 2.1 of the Near-Term Task Force Review of Insights from the Fukushima Dai-ichi Accident RS-16-159, County, and Quad Cities - Response to Request for Additional Information Regarding License Amendment to Address Secondary Containment Access Openings2016-07-28028 July 2016 County, and Quad Cities - Response to Request for Additional Information Regarding License Amendment to Address Secondary Containment Access Openings RS-16-144, Response to Request for Additional Information on Severe Accident Mitigation Alternatives for License Renewal Environmental Review Dated July 6, 20162016-07-11011 July 2016 Response to Request for Additional Information on Severe Accident Mitigation Alternatives for License Renewal Environmental Review Dated July 6, 2016 RA-16-049, Response to Request for Additional Information Regarding Requests to Withhold Emergency Preparedness Documents from Public Disclosure2016-05-26026 May 2016 Response to Request for Additional Information Regarding Requests to Withhold Emergency Preparedness Documents from Public Disclosure RS-16-076, Response to Request for Additional Information Regarding License Amendment Request to Reduce the Reactor Steam Dome Pressure Specified in the Technical Specification 2.1.1, Reactor Core Sls.2016-04-11011 April 2016 Response to Request for Additional Information Regarding License Amendment Request to Reduce the Reactor Steam Dome Pressure Specified in the Technical Specification 2.1.1, Reactor Core Sls. 2023-07-24
[Table view] |
Text
4300 Winfield Road Warrenville, IL 60555 630 657 2000 Office RS-18-086 10 CFR 50.90 July 16, 2018 U.S. Nuclear Regulatory Commission ATTN: Document Control Desk Washington, DC 20555-0001 LaSalle County Station, Units 1 and 2 Renewed Facility Operating License Nos. NPF-11 and NPF-18 NRC Docket Nos. 50-373 and 50-374
Subject:
Response to Request for Additional Information Regarding License Amendment Request for Temporary Extensions to Technical Specifications Supporting Maintenance on Portions of the Core Standby Cooling System
References:
- 1. Letter from David M. Gullott (Exelon Generation Company, LLC) to U.S.
NRC, "License Amendment Request for Temporary Extensions to Technical Specifications Supporting Maintenance on Portions of the Core Standby Cooling System," dated January 24, 2018
- 2. Email from B. Vaidya (U.S. NRC) to R. Sprengel (Exelon Generation Company, LLC), "LaSalle Units 1 and 2, EPID-L-2018-LLR-0012, LAR RE: CSCS, Request for Additional Information (RAI)," dated June 14, 2018 In Reference 1, Exelon Generation Company, LLC (EGC) requested an amendment to Renewed Facility Operating License Nos. NPF-11 And NPF-18 for LaSalle County Station (LSCS), Units 1 and 2, respectively. In Reference 2, the NRC requested that EGC provide additional information to support their review of the subject License Amendment Request. As noted in Reference 2, a response was requested by July 16, 2018. The requested information is provided in Attachment 1. The body of Reference 2 includes a correct reference to EPID-L-2018-LLA-0012, different than the email title.
EGC has reviewed the information supporting the No Significant Hazards Consideration and the Environmental Consideration that was previously provided to the NRC in Reference 1. The additional information provided in this submittal does not affect the conclusion that the proposed license amendment does not involve a significant hazards consideration. This additional information also does not affect the conclusion that neither an environmental impact statement nor an environmental assessment need be prepared in support of the proposed amendment.
In accordance with 10 CFR 50.91, "Notice for public comment; State consultation,"
paragraph (b), EGC is notifying the State of Illinois of this additional information by transmitting a copy of this letter and its attachment to the designated State Official.
July 16, 2018 U.S. Nuclear Regulatory Commission Page 2 There are no regulatory commitments contained in this letter. Should you have any questions concerning this letter, please contact Ryan M. Sprengel at (630) 657-2814.
I declare under penalty of perjury that the foregoing is true and correct. Executed on the 15th day of July 2018.
David M. Gullatt Manager - Licensing Exelon Generation Company, LLC : Response to Request for Additional Information cc: Regional Administrator - NRC Region Ill NRC Senior Resident Inspector - LaSalle County Station Illinois Emergency Management Agency
ATTACHMENT 1 Response to Request for Additional Information In Reference 1, Exelon Generation Company, LLC (EGC) requested an amendment to Renewed Facility Operating License Nos. NPF-11 And NPF-18 for LaSalle County Station (LSCS), Units 1 and 2, respectively. In Reference 2, the NRC requested that EGC provide additional information to support their review of the subject License Amendment Request. As noted in Reference 2, a response was requested by July 16, 2018. The requested information is provided below.
Request for Additional Information Applicable Regulatory Requirements Appendix A, General Design Criteria for Nuclear Power Plants, to Title 10 of the Code of
)HGHUDO5HJXODWLRQV &)5 3DUWGeneral Design Criterion (GDC) 2, Design bases for protection against natural phenomena, states:
Structures, systems, and components important to safety shall be designed to withstand the effects of natural phenomena such as earthquakes, tornadoes, hurricanes, floods, tsunami, and seiches without loss of capability to perform their safety functions. The design bases for these structures, systems, and components shall reflect: (1) Appropriate consideration of the most severe of the natural phenomena that have been historically reported for the site and surrounding area, with sufficient margin for the limited accuracy, quantity, and period of time in which the historical data have been accumulated, (2) appropriate combinations of the effects of normal and accident conditions with the effects of the natural phenomena and (3) the importance of the safety functions to be performed.
10 CFR Part 50.36, "Technical specifications," establish the requirements related to the content of the TSs. Section 50.36(c)(2)(ii) states:
Limiting conditions for operation. Limiting conditions for operation are the lowest functional capability or performance levels of equipment required for safe operation of the facility. When a limiting condition for operation of a nuclear reactor is not met, the licensee shall shut down the reactor or follow any remedial action permitted by the technical specifications until the condition can be met.
Issue The licensee stated:
The portion of DGCW return piping to be replaced is directly connected to the lake and below normal cooling lake level, replacement will require isolation. Isolation will be accomplished by hot tapping, installing temporary line stops (stopples), and then installing new isolation valves.
The associated carbon steel piping surfaces and the nature of impurities in lake water could make leak tight seating of the stops difficult. Additionally, the hot tap hardware during the hot tap process would add temporary additional seismic weight and moment loads to the pipe and pipe joints.
1
ATTACHMENT 1 Response to Request for Additional Information Request for Additional Information a) Identify and discuss the possible impact on plant safety caused by expected leakage past the line stops.
b) What precautions will be needed and implemented to mitigate the effects of leakage?
c) Considering the added weight and moment of the hot tap hardware, what actions will be taken or analysis will be performed to ensure plant safety during a seismic event, including a seismic induced loss of offsite power?
d) Since the pipes to be replaced are not isolable and below lake level, what contingency plans are there to combat flooding caused by possible gross failure of line stops or pipe?
Response
a) Identify and discuss the possible impact on plant safety caused by expected leakage past the line stops.
The subject Core Standby Cooling System (CSCS) piping operates at low pressures and is not included in the population where through wall leakage is postulated in accordance with NUREG 0800 (Standard Review plan, Section 3.6.1 and 3.6.2, BTP SPLB 3-1). For these lines, a catastrophic line break is not considered to be a credible event. The non-code mechanical line stops for the installation of the additional new Emergency Core Cooling System (ECCS) cooler discharge valves (one per outage) are designed to meet or exceed the same pressure requirements for the current system and will be seismically mounted. Gross failure is not anticipated as each non-code mechanical line stop is installed in an open-ended return line with a maximum estimated pressure of 16 psig. Leakage past the line stop is possible and is considered.
The non-code mechanical line stops will be located in the respective units' Residual Heat Removal (RHR) B/C Room or in the Reactor Building raceway areas with a floor elevation of 673' 4". The areas are flood protected from the Divisional ECCS rooms by watertight floodwalls to an elevation of 686' 7", and have water level alarms and duplex sump pumps. The areas have approximately 1000 ft3 and 4800 ft3 of unoccupied space per foot of elevation, respectively. If the line stop begins to leak, the leakage is anticipated to be minor and will be contained on the outage unit in the affected corner room or reactor building raceway. No leakage would be in the rooms that would affect the DG cooling water pump in the affected division or any equipment in the redundant division. In the event that all sump pumps were lost, action must be taken to mitigate the leakage prior to filling the raceway to a level (686' 7") where water will begin to enter the corner rooms for redundant ECCS equipment. The available flood protected volume (i.e., up to elevation 686' 7") provides adequate time for the implementation of compensatory actions and ensures potential flooding does not impact redundant equipment in surrounding areas.
These design features, compensatory actions, and the inherent robust design of the mechanical line stops are considered adequate to ensure that flooding does not occur that could impact redundant Systems, Structures, and Components during the planned CSCS valve installation.
2
ATTACHMENT 1 Response to Request for Additional Information b) What precautions will be needed and implemented to mitigate the effects of leakage?
- 1. Leak check of line stop prior to cutting piping
- 2. Stage materials at jobsite for leakage mitigation such as bands, plugs
- 3. Verify area sump pumps are functional
- 4. Staging of equipment to evacuate minor leakage that could interfere with work The integrity of the non-code mechanical line stops will be leak tested prior to cutting the unisolable piping. Should leakage occur, it would be minor and equipment will be staged, such as a vacuum nozzle, to evacuate the minor leakage that could interfere with welding. Leakage control materials will be pre-staged at each location in the unlikely event the mechanical line stops were to begin leaking significantly while the line is breeched. Implementation of leakage control measures can be accomplished since the maximum operating pressure at the location of CSCS valve installation is estimated to be less than 16 psig. In addition, each area/room where the new valves are scheduled to be installed will be verified to have functional sump pump(s) during the time that the line stop is installed.
Work will continually be performed until the code isolation is restored; therefore, any leakage will be apparent and addressed in a timely manner. Any leakage that is incurred will be on the outage unit and would not be exposed to conditions from the operating unit; thereby, allowing access for compensatory actions should leakage from the line stop occur.
c) Considering the added weight and moment of the hot tap hardware, what actions will be taken or analysis will be performed to ensure plant safety during a seismic event, including a seismic induced loss of offsite power?
The hot tap hardware will be seismically analyzed and supported to withstand a design basis seismic event. Each configuration of the line stop machine will be analyzed. Seismic restraints will be installed as required to ensure that the line stop machine remains intact during a seismic event and that the existing piping is not compromised. The non-code mechanical line stop machine does not require a power source to hold the line stop in place. If off-site power is lost, the line stop will remain in position.
d) Since the pipes to be replaced are not isolable and below lake level, what contingency plans are there to combat flooding caused by possible gross failure of line stops or pipe?
- 1. Verify area sump pumps are functional
- 2. Bands for cuts in piping and damage control plugs for when the line is removed will be staged at the jobsite for immediate use Gross failure of the line stops and piping is not anticipated as discussed in the response to question a); however, in addition to the precautions listed in the response to question b),
preparations for gross failure will also be made. Damage control plugs will be pre-staged at the work location in the unlikely event that the mechanical line stop becomes ineffective during maintenance evolutions while the CSCS line is physically removed. Mechanical sealing bands will also be pre-staged at each line stop location. These bands will be capable of isolating partially cut lines in the event of a mechanical line stop failure. In addition, each area/room 3
ATTACHMENT 1 Response to Request for Additional Information where the CSCS valves are scheduled to be installed will be verified to have functional sump pump(s) during the entire CSCS valve replacement work window.
References
- 1. Letter from David M. Gullott (Exelon Generation Company, LLC) to U.S. NRC, "License Amendment Request for Temporary Extensions to Technical Specifications Supporting Maintenance on Portions of the Core Standby Cooling System," dated January 24, 2018
- 2. Email from B. Vaidya (U.S. NRC) to R. Sprengel (Exelon Generation Company, LLC),
"LaSalle Units 1 and 2, EPID-L-2018-LLR-0012, LAR RE: CSCS, Request for Additional Information (RAI)," dated June 14, 2018 4