MONTHYEARRBG-48271, Supplement to License Amendment Request to Adopt Risk Informed Completion Times TSTF-505, Revision 2, Provide Risk-Informed Extended Completion Times RITSTF Initiative 4b and Application to Adopt 10 CFR 50.69, Risk2024-01-12012 January 2024 Supplement to License Amendment Request to Adopt Risk Informed Completion Times TSTF-505, Revision 2, Provide Risk-Informed Extended Completion Times RITSTF Initiative 4b and Application to Adopt 10 CFR 50.69, Risk RBG-48267, Reply to a Notice of Violation, NRC Inspection Report 05000458/20230032023-12-0707 December 2023 Reply to a Notice of Violation, NRC Inspection Report 05000458/2023003 RBG-48264, Core Operating Limits Report (COLR) - Cycle 23, Revision 12023-11-0606 November 2023 Core Operating Limits Report (COLR) - Cycle 23, Revision 1 RBG-48260, Notification of Readiness for Supplemental Inspection2023-10-12012 October 2023 Notification of Readiness for Supplemental Inspection RBG-48258, Notification of Readiness for Supplemental Inspection2023-10-0505 October 2023 Notification of Readiness for Supplemental Inspection RBG-48259, Revision to Reply to Notice of Violation; EA-23-0552023-10-0303 October 2023 Revision to Reply to Notice of Violation; EA-23-055 RBG-48254, Report of Changes and Errors to 10CFR50.462023-09-21021 September 2023 Report of Changes and Errors to 10CFR50.46 RBG-48249, Reply to a Notice of Violation, EA-23-0712023-09-14014 September 2023 Reply to a Notice of Violation, EA-23-071 RBG-48253, Submittal of Owner'S Activity Report Form for Cycle 222023-09-12012 September 2023 Submittal of Owner'S Activity Report Form for Cycle 22 RBG-48247, Reply to Notice of Violation; EA-23-0552023-08-21021 August 2023 Reply to Notice of Violation; EA-23-055 RBG-48226, Core Operating Limits Report (COLR) - Cycle 23, Revision 02023-05-31031 May 2023 Core Operating Limits Report (COLR) - Cycle 23, Revision 0 RBG-48237, Response to NRC Integrated Inspection Report 05000458/20230012023-05-25025 May 2023 Response to NRC Integrated Inspection Report 05000458/2023001 RBG-48220, Submittal of 2022 Annual Radioactive Effluent Release Report2023-04-25025 April 2023 Submittal of 2022 Annual Radioactive Effluent Release Report RBG-48221, 2022 Annual Radiological Environmental Operating Report2023-04-25025 April 2023 2022 Annual Radiological Environmental Operating Report RBG-48142, License Amendment Request to Revise Technical Specifications to Adopt Risk Informed Completion Times TSFT-505, Revision 2, Provide Risk-Informed Extended Completion Times - RITSTF Initiative 4b2023-02-27027 February 2023 License Amendment Request to Revise Technical Specifications to Adopt Risk Informed Completion Times TSFT-505, Revision 2, Provide Risk-Informed Extended Completion Times - RITSTF Initiative 4b RBG-48143, Application to Adopt 10 CFR 50.69, Risk-Informed Categorization and Treatment of Structures, Systems and Components for Nuclear Power Reactors2023-02-27027 February 2023 Application to Adopt 10 CFR 50.69, Risk-Informed Categorization and Treatment of Structures, Systems and Components for Nuclear Power Reactors RBG-48198, Report of Changes and Errors to 10CFR50.462022-09-22022 September 2022 Report of Changes and Errors to 10CFR50.46 RBG-48187, Notification of Spent Fuel Cask Use2022-08-15015 August 2022 Notification of Spent Fuel Cask Use RBG-48184, Notification of Spent Fuel Cask Use2022-07-18018 July 2022 Notification of Spent Fuel Cask Use RBG-48178, Notification of Spent Fuel Cask Use2022-06-29029 June 2022 Notification of Spent Fuel Cask Use RBG-48166, Supplement to Special Report for Tritium Discovered Onsite2022-05-12012 May 2022 Supplement to Special Report for Tritium Discovered Onsite RBG-48149, 2021 Annual Radioactive Effluent Release Report2022-04-27027 April 2022 2021 Annual Radioactive Effluent Release Report RBG-48148, 2021 Annual Radiological Environmental Operating Report2022-04-27027 April 2022 2021 Annual Radiological Environmental Operating Report RBG-48134, Inservice Testing Program Relief Request VRR-RBS-2021-1 Pressure Isolation Valve Testing Frequency2021-11-29029 November 2021 Inservice Testing Program Relief Request VRR-RBS-2021-1 Pressure Isolation Valve Testing Frequency RBG-48136, Additional Information for the 2020 Annual Radioactive Effluent Release Report2021-11-12012 November 2021 Additional Information for the 2020 Annual Radioactive Effluent Release Report RBG-48137, Additional Information for the 2019 Annual Radioactive Effluent Release Report2021-11-12012 November 2021 Additional Information for the 2019 Annual Radioactive Effluent Release Report RBG-48128, Reply to a Notice of Violation; EA-21-017, 030 and 0502021-10-29029 October 2021 Reply to a Notice of Violation; EA-21-017, 030 and 050 RBG-48129, Payment of a Civil Penalty2021-10-21021 October 2021 Payment of a Civil Penalty RBG-48112, Report of Changes and Errors to 10CFR50.462021-09-16016 September 2021 Report of Changes and Errors to 10CFR50.46 RBG-48110, Core Operating Limits Report (COLR) - Cycle 22, Revision 12021-08-19019 August 2021 Core Operating Limits Report (COLR) - Cycle 22, Revision 1 RBG-48104, Fitness for Duty Blind Quality Assurance Specimen Testing Error2021-06-30030 June 2021 Fitness for Duty Blind Quality Assurance Specimen Testing Error RBG-48099, Submittal of Owner'S Activity Report Form for Cycle 212021-06-16016 June 2021 Submittal of Owner'S Activity Report Form for Cycle 21 RBG-48083, Application to Add License Condition Concerning Receipt, Possession, and Use of Byproduct Materials2021-06-15015 June 2021 Application to Add License Condition Concerning Receipt, Possession, and Use of Byproduct Materials RBG-48093, Corrected 2020 Annual Radiological Environmental Operating Report2021-05-20020 May 2021 Corrected 2020 Annual Radiological Environmental Operating Report RBG-48082, 2020 Annual Radiological Environmental Operating Report2021-04-20020 April 2021 2020 Annual Radiological Environmental Operating Report RBG-48081, 2020 Annual Radioactive Effluent Release Report2021-04-20020 April 2021 2020 Annual Radioactive Effluent Release Report RBG-48078, Core Operating Limits Report (COLR) - Cycle 22, Revision 02021-03-14014 March 2021 Core Operating Limits Report (COLR) - Cycle 22, Revision 0 RBG-48075, Notification of Deviation from BWRVIP Guidelines2021-02-24024 February 2021 Notification of Deviation from BWRVIP Guidelines RBG-48074, Spent Fuel Storage Radioactive Effluent Release Report for 20202021-02-22022 February 2021 Spent Fuel Storage Radioactive Effluent Release Report for 2020 RBG-48061, One-Time Schedular Exemption Request from 10 CFR 50, Appendix E Biennial Emergency Preparedness Exercise Requirements Due to COVID-19 Public Health Emergency2020-12-0303 December 2020 One-Time Schedular Exemption Request from 10 CFR 50, Appendix E Biennial Emergency Preparedness Exercise Requirements Due to COVID-19 Public Health Emergency RBG-48054, Application to Adopt GL 86-10 Standard License Condition for Fire Protection Program2020-11-0202 November 2020 Application to Adopt GL 86-10 Standard License Condition for Fire Protection Program RBG-48049, Reply to a Notice of Violation; EA-20-0582020-10-26026 October 2020 Reply to a Notice of Violation; EA-20-058 RBG-48038, Request for One-Time Exemption from 10 CFR 50, Appendix E Biennial Emergency Preparedness Evaluated Offsite Exercise Requirements Due to Covid 19 Pandemic2020-10-0606 October 2020 Request for One-Time Exemption from 10 CFR 50, Appendix E Biennial Emergency Preparedness Evaluated Offsite Exercise Requirements Due to Covid 19 Pandemic RBG-48042, Submittal of Rev. 48 to Emergency Plan2020-09-22022 September 2020 Submittal of Rev. 48 to Emergency Plan RBG-48039, Report of Changes and Errors to 10CFR50.462020-09-16016 September 2020 Report of Changes and Errors to 10CFR50.46 RBG-48033, Application to Revise Technical Specifications to Adopt TSTF-582, Reactor Pressure Vessel Water Inventory Control (RPV WIC) Enhancements2020-09-0404 September 2020 Application to Revise Technical Specifications to Adopt TSTF-582, Reactor Pressure Vessel Water Inventory Control (RPV WIC) Enhancements RBG-48023, Submittal of Revs. 46 and 47 to Emergency Plan and Revised Emergency Implementing Procedures2020-06-0909 June 2020 Submittal of Revs. 46 and 47 to Emergency Plan and Revised Emergency Implementing Procedures RBG-48019, 2019 Annual Radioactive Effluent Release Report2020-04-30030 April 2020 2019 Annual Radioactive Effluent Release Report RBG-48020, Annual Radiological Environmental Operating Report2020-04-30030 April 2020 Annual Radiological Environmental Operating Report RBG-48018, Withdrawal of License Amendment Request to Extend the RBS Emergency Plan Implementation Date2020-04-24024 April 2020 Withdrawal of License Amendment Request to Extend the RBS Emergency Plan Implementation Date 2024-01-12
[Table view] |
Text
- --- Entergx Entergy Operations, Inc.
River Bend Station 5485 U.S. Highway 61 N SI. Francisville, LA 70nS Tel 225-381-4374 Timothy Schenk Regulatory Assurance Manager RBG-47878 July 10, 2018 Attn : Document Control Desk U.S. Nuclear Regulatory Commission 11555 Rockville Pike Rockville , MD 20852-2738
Subject:
Notification of Deviation from BWRVIP-76, "BWR Vessel and Internals Project, BWR Core Shroud Inspection and Flaw Evaluation Guidelines" River Bend Station, Unit 1 Docket No. 50-458 License No. NPF-47
Dear Sir or Madam :
This letter provides notification of a deviation from the Boiling Water Reactor Vessel and Internals Project (BWRVIP) guidelines for River Bend Station. This is a deviation from the performance of inspection in accordance with the examination schedules of BWRVIP-76 Revision 1-A, "BWR Vessel and Internals Project, BWR Core Shroud Inspection and Flaw Evaluation Guidelines," (EPRI Report 3002005566, April 2015) .
This is a deviation from a "needed" element of the BWRVIP program to perform inspections in accordance with the guidance of BWRVIP-76-1-A. The upper sides of the H3 & H6B Core Shroud welds were not fully inspected during the RF-19 (2017) refueling outage. The inspection of the H3 weld has been scheduled for the next outage which is Refuel Outage 20 (2019) and the H6B weld will be inspected in the next scheduled BWRVIP-76-1-A inspections in 2027.
This deviation from the BWRVIP guidelines has been reviewed and approved in accordance with Entergy procedures and NEI 03-08 guidance. This is a notification of deviation only, and no action is being requested from the NRC.
The attachment to this letter provides a summary of the regulatory commitment made in this submittal. Should you have any questions regarding this deviation , please contact me at (225) 381-4177.
TAS/twf
RBG-47878 Page 2 of 2 ATTACHMENT:
- 1. List of Regulatory Commitments cc:
U.S. Nuclear Regulatory Commission Attn : Ms. Lisa M. Regner, Project Manager 09-D-14 One White Flint North 11555 Rockville Pike Rockville, MD 20852 U.S. Nuclear Regulatory Commission Region IV 1600 East Lamar Blvd.
Arlington , TX 76011-4511 NRC Senior Resident Inspector Attn : Mr. Jeff Sowa 5485 U.S. Highway 61 , Suite 1 St. Francisville, LA 70775 Public Utility Commission of Texas Attn : PUC Filing Clerk 1701 N. Congress Avenue P. O. Box 13326 Austin , TX 78711 -3326 RBF1 0139
Attachment 1 RBG-47878 List of Regulatory Commitments
List of Regulatory Commitments The following table identifies those actions committed to by Entergy in this document. Any other statements in this submittal are provided for information purposes and are not considered to be regulatory commitments.
TYPE (Check one) SCHEDULED ONE- CONTINUING COMPLETION COMMITMENT TIME COMPLIANCE DATE ACTION The inspection of the upper 00 H3 Core Shroud X RF-20 weld has been scheduled for the next outage which is Refuel Outage 20 (2019).
The inspection of the upper side of the H6B Core X RF-24 Shroud weld has been scheduled for Refuel Outage 24 (2027).