ML18193A552

From kanterella
Jump to navigation Jump to search
Figure 10.1-1, Process Flow Diagram Steam and Power Conversion System (Sheet 1 of 2).
ML18193A552
Person / Time
Site: Palo Verde  Arizona Public Service icon.png
Issue date: 02/28/1975
From:
Arizona Public Service Co
To:
Office of Nuclear Reactor Regulation
References
Download: ML18193A552 (1)


Text

STEAM DUMP VALVES TO AT M OSP HE R E TO ATMOSPHERE 2

REHEATERS 10 TO ATMOSPHERE MAIN TURBINE STOP INTERCEPT STOP INTERC PT STOPINTERCEPT CONTAINMENT 22 CONTROL ISOLATION 1ST 2ND VALVE VALVE VALVE MAIN FEEOWATER VALVES CONTROL VALVE VALVES MAIN MOISTU ~ E STEAM MAIN STEAM MAIN ISOLATION TURBINE SEPARATOR STEAM SAFETY VALVES VALVES STOP GENERATOR I PER LINE) VALVES LONI PRESSURE TURBINE A LOW PRESSURE TURBINE 6 LCW PRESSURE TJRBINE 0 15 B 9 STEAM DUMP H G ~ 2 R EBS U R E I

VALVES TO TURBINE REHEATERS 4 4 4 4 4 4 16 16 16 16 16 16 ATIVOSPHERE 3 3 3 3 3 3 1ST 2ND 2 2 2 2 2 17 MAIN I I I I I I TO TURBI ~ E ATMOSPHERE MOISTURE STOP SEPARATQP 22 VALVES BLOINDOWN TO CONDENSATE CLEANUP TO ATMOSPHERE 22 MAI~ TURBINE CONTROL VALVES 6b 20 15 6 9 FROM CIRCULATING YIATER SYSTEM 22 TURBINE BYPASS 22 TURBINE BYPASS 12 TURBINE BYPASS 22 TO CIRCULATING WATER SYSTEM MAIN STEAM MAIN STEAM VALVES VALVES VALVES SAFETY ISOLATION CWS CWS VALVES TO STEAM VALVES ATMOSPHERE GE ~ ERATOR 4PER LINE) 19 19 13 19 MAIN MAIN 14 MAIN CONDENSER CONDENSER CONDENSER 16 17 MAKEUP FEED DEMINERALIZED ATE INATER MAKEUP TANK k'FMA

  • 17 MAIN TURBINE 500 000 G SLOWDOWN TO GLAND STEAM 21 CONDENSATE EXHAUSTER CLEANUP AUXI LI AR Y MOTOR FEEDWATER VACUUM PUMP PUMPS AIR EJECTOR AIR EJECTOR AIR EJECTOR TO AND FROM TURBINE COOLING 17 CONDENSATE CONDENSATE CONDENSATE WATER SYSTEM 14 PU MP PUMP PU MP AU X I L I A R Y MOTOR FEEDWATER PUMP AIR EJECTOR HEATER HEATER HEATER HEATER FROM TURBINE CONDENSER TO TURBINE FEEDWATER PUMPS COOLING WATER SYSTEM 4 3 2 I COOLING WATER SYSTEM HEATER HEATER HEATER 7 6 5 19 15 13 12 TQ HEATER DRAIN ATMOSPHERE TANK 10 HEATER HEATER HEATER HEATER FEEDBIATER 4 3 2 HEATER PUMP CONDENSATE DR A I N TURBINE 20 CLEANUP PUMP SYSTEM 19 MOISTURE PR E.

CHARCOAL POST SEPARATOR BEO FILTERS FILTERS ADSORBERS BLOWER HEATER HEATER 21 HEATER HEATER HEATER HEATER HEATER MCES FILTRATION SYSTEM 7 6 5 4 3 2 I 12 Arizona Nuclear Power Project FEEDWATER 15 PUMP 19 Palo Verde Nuclear Generating Station TURBINE 10 Units 1, 2 & 3 HIGH PRESSURE FEEDWATER HEATERS HEATE R DRAIN 20 LOIN PRESSURE FEEDBIATER HEATERS TANK PROCESS FLOW DIAGRAM HEATER STEAM AND POWER CONVERSION SFSTEM DRAIN PUMP (Sheet 1 of 2)

CHANGE Figure 10.1-1 0407-1 'I A 1

I9 F F5-I 05 February 28, 1975 Amendment 4