|
---|
Category:Letter
MONTHYEARML24019A2012024-01-19019 January 2024 Fourth 10-Year Interval, Second Period Owners Activity Report Number 1R24 ML24019A1362024-01-18018 January 2024 Inservice Inspection Request for Information ML24012A2452024-01-12012 January 2024 Response to Request for Additional Information to Proposed Method to Manage Environmentally Assisted Fatigue for the Pressurizer Surge Line ML24010A1532024-01-10010 January 2024 Information Request for the Cybersecurity Baseline Inspection, Notification to Perform Inspection ML23341A0062023-12-21021 December 2023 Project Manager Assignment IR 05000528/20230112023-12-18018 December 2023 License Renewal Inspection Report 05000528/2023011 ML23335A0782023-11-30030 November 2023 Independent Spent Fuel Storage Installation - Request for Exemption from Enhanced Weapons, Firearms Background Checks, and Security Event Notifications Implementation ML23325A1602023-11-17017 November 2023 Supplemental Submittal - Relief Request 70 Proposed Alternatives for Pressurizer Lower Shell Temperature Nozzle IR 05000528/20234032023-11-13013 November 2023 NRC Security Inspection Report 05000528 2023403, 05000529 2023403, 05000530 2023403 (Full Report) ML23311A2082023-11-0909 November 2023 Reassignment of U.S. Nuclear Regulatory Commission Branch Chief in the Division of Operating Reactor Licensing for Plant Licensing Branch IV ML23299A3052023-10-26026 October 2023 Response to Request for Additional Information Relief Request 70 Proposed Alternatives for Pressurizer Lower Shell Temperature Nozzle IR 05000528/20230032023-10-17017 October 2023 Integrated Inspection Report 05000528 2023003 and 05000529 2023003 and 05000530 2023003 ML23270B9232023-09-28028 September 2023 Notification of Age-Related Degradation Inspection (05000528/2024012, 05000529/2024012, and 05000530/2024012) and Request for Information ML23251A2332023-09-13013 September 2023 Notification of Post Approval Site Inspection for License Renewal and Request for Information Inspection (05000528/2023011) ML23241B0182023-09-13013 September 2023 Use of Honeywell Mururoa V4F1 and MTH2 Supplied Air Suits within Respiratory Protection Program IR 05000528/20243012023-09-0606 September 2023 Notification of NRC Initial Operator Licensing Examination 05000528/2024301; 05000529/2024301; 05000530/2024301 IR 05000528/20230102023-08-22022 August 2023 Biennial Problem Identification and Resolution Inspection Report 05000528/2023010, 05000529/2023010 and 05000530/2023010 IR 05000528/20230052023-08-21021 August 2023 Updated Inspection Plan for Palo Verde Nuclear Generating Station, Units 1, 2, and 3 (Report 05000528/2023005 and 05000529/2023005 and 05000530/2023005) ML23222A2762023-08-10010 August 2023 Independent Spent Fuel Storage Installation, Registration of Dry Spent Fuel Transportable Storage Canister Identification Numbers AMZDFX175 and AMZDFX176 and Vertical Concrete Cask Identification Numbers AMZDNE175, and AMZDNE176 ML23199A2942023-08-0909 August 2023 Issuance of Amendment Nos. 221, 221, and 221, to Revise Technical Specifications to Adopt TSTF-107, Separate Control Rods That Are Untrippable Versus Inoperable IR 05000528/20230022023-08-0808 August 2023 Integrated Inspection Report 05000528/2023002 and 05000529/2023002 and 05000530/2023002 ML23207A2482023-07-26026 July 2023 License Renewal Pressurizer Surge Line Inspection ML23188A1872023-07-0707 July 2023 Fourth 10-Year Interval, Second Period Owners Activity Report Number 2R24 ML23166B0832023-07-0505 July 2023 Independence Spent Fuel Storage Installation - Issuance of Exemption ML23181A1602023-06-30030 June 2023 2 to Updated Final Safety Analysis Report, and Revision 3 to Operations Quality Assurance Program Description ML23180A2222023-06-29029 June 2023 Application to Revise Technical Specifications (TS) 3.5.1, Safety Injection Tanks (Sits) - Operating, TS 3.5.2, Safety Injection Tanks (Sits) - Shutdown, and TS 3.6.5, Containment Air Temperature ML23181A0772023-06-29029 June 2023 Program Review - Simulator Testing Methodology ML23157A1292023-06-0101 June 2023 Annual Report of Guarantee of Payment of Deferred Premium ML23144A3722023-05-24024 May 2023 Response to Regulatory Issue Summary (RIS) 2023-01, Preparation and Scheduling of Operator Licensing Examinations ML23143A3912023-05-23023 May 2023 Independent Spent Fuel Storage Installation - Request for Exemption from NAC-MAGNASTOR Certificate of Compliance 72-1031 - Cask Lid Batch 3 Design Requirements ML23145A2772023-05-17017 May 2023 10-PV-2023-05 Post-Exam Comments ML23132A3392023-05-12012 May 2023 Application to Revise Technical Specifications 3.3.11 to Adopt TSTF-266-A, Revision 3, Eliminate the Remote Shutdown System Table of Instrumentation and Controls IR 05000528/20230012023-05-0808 May 2023 and Independent Spent Fuel Storage Installation - Integrated Inspection Report 05000528/2023001 and 05000529/2023001 and 05000530/2023001 and 07200044/2023001 ML23128A0692023-05-0808 May 2023 Notification of Biennial Problem Dentification and Resolution Inspection and Request for Information ML23122A1822023-04-29029 April 2023 Transmittal of Technical Specification Bases Revision 76 ML23122A1912023-04-29029 April 2023 Unit 1 Core Operating Limits Report Revision 32, Unit 2 Core Operating Limits Report Revision 25, Unit 3 Core Operating Limits Report Revision 31 ML23116A2772023-04-26026 April 2023 Independent Spent Fuel Storage Installation, Annual Radioactive Effluent Release Report 2022 ML23115A4012023-04-26026 April 2023 Review of the 2022 Steam Generator Tube Inspections During Refueling Outage 23 ML23115A4982023-04-25025 April 2023 2022 Annual Environmental Operating Report IR 05000528/20230122023-04-19019 April 2023 Notification of Commercial Grade Dedication Inspection (05000528/2023012, 05000529/2023012, and 05000530/2023012) and RFI ML23108A0342023-04-18018 April 2023 NRC Initial Operator Licensing Examination Approval 05000528/2023301; 05000529/2023301; 05000530/2023301 ML23103A4642023-04-13013 April 2023 Annual Radiological Environmental Operating Report 2022 ML23103A4312023-04-13013 April 2023 Emergency Core Cooling System Performance Evaluation Models, 10 CFR 50.46(a)(3)(ii) Annual Report for 2022 IR 05000528/20224012023-04-13013 April 2023 Cyber Security Inspection Report 05000528/2022401 and 05000529/2022401 and 05000530/2022401 ML23102A3292023-04-12012 April 2023 Application for Authorized Use of Mururoa Single-Use, Supplied Air Suits, Models V4F1 and MTH2 ML23102A3242023-04-12012 April 2023 Supplement to Application to Revise Technical Specifications to Adopt TSTF-107-A, Separate Control Rods That Are Untrippable Versus Inoperable ML23089A4002023-03-30030 March 2023 Consolidated Decommissioning Funding Status Report - 2022 ML23088A4012023-03-30030 March 2023 Project Manager Assignment IR 05000528/20234022023-03-29029 March 2023 and 3 - NRC Security Inspection Report 05000528-2023402, 05000529-2023402, and 05000530-2023402, (Cover Letter Only) ML23080A3002023-03-21021 March 2023 Present Levels of Financial Protection 2024-01-19
[Table view] Category:License-Operator
MONTHYEARIR 05000528/20243012023-09-0606 September 2023 Notification of NRC Initial Operator Licensing Examination 05000528/2024301; 05000529/2024301; 05000530/2024301 ML23145A2772023-05-17017 May 2023 10-PV-2023-05 Post-Exam Comments ML23151A6492023-05-11011 May 2023 11-PV-2023-05 Public Forms ML23108A0342023-04-18018 April 2023 NRC Initial Operator Licensing Examination Approval 05000528/2023301; 05000529/2023301; 05000530/2023301 ML22196A3782022-07-15015 July 2022 Notification of NRC Initial Operator Licensing Examination 05000528/2023301; 05000529/2023301; 05000530/2023301 ML22143A9892022-05-19019 May 2022 PV-2022-05-Post Exam Comments ML22178A1772022-04-12012 April 2022 PV-2022-05-Public Forms ML23193A8502022-04-12012 April 2022 PV-2022-05-Form 2.3-1 Examination Outline Quality Checklist ML22070A1382022-03-10010 March 2022 Response to Regulatory Issue Summary (RIS) 2022-01, Preparation and Scheduling of Operator Licensing Examinations IR 05000528/20213012021-06-21021 June 2021 NRC Initial Examination Report 05000528/2021301, 05000529/2021301, and 05000530/2021301 ML21160A0832021-06-21021 June 2021 NRC Initial Examination Report 05000528/2021301, 05000529/2021301, and 05000530/2021301 ML21147A5452021-05-0606 May 2021 04 Public Forms ML21147A5442021-05-0606 May 2021 04 Post Examination Analysis ML21106A3042021-04-16016 April 2021 Response to Regulatory Issue Summary (RIS) 2021-01, Preparation and Scheduling of Operator Licensing Examinations ML21106A2842021-04-14014 April 2021 Generic Fundamentals Examination Results March 2021 ML21020A0982020-12-10010 December 2020 2020-11 Draft Operating Test Comments ML21020A0942020-12-10010 December 2020 11 Draft Written Examination ML21020A1032020-12-10010 December 2020 11 Post Examination Analysis ML21020A1042020-12-10010 December 2020 11 Public Forms ML21020A0932020-12-10010 December 2020 11 Draft Written Examination Comments ML21020A0962020-12-10010 December 2020 11 Final Outlines ML21020A0952020-12-10010 December 2020 11 Final Operating Test ML21020A0902020-12-10010 December 2020 11 Draft Operating Test ML21020A0972020-12-10010 December 2020 11 Final Written Examination ML21020A0912020-12-10010 December 2020 11 Draft Outline Comments ML21020A0922020-12-10010 December 2020 11 Draft Outlines ML20325A3682020-11-20020 November 2020 NRC Initial Operator Licensing Examination Approval 05000528/2020301; 05000529/2020301; 05000530/2020301 ML20199M3832020-07-17017 July 2020 Response to Regulatory Issue Summary (RIS) 2020-01, Preparation and Scheduling of Operator Licensing Examinations ML20003E2762019-10-11011 October 2019 PV-2019-10 Post Exam Comments and Analysis ML19273C8072019-09-30030 September 2019 NRC Initial Operator Licensing Exam Approval Letter 05000528/529/530/2019301 ML19135A3352019-05-15015 May 2019 Response to Regulatory Issue Summary (RIS) 2019-02, Preparation and Scheduling of Operator Licensing Examinations ML20042C1192019-03-12012 March 2019 PV-2019-10 Public Forms ML19045A3732019-02-12012 February 2019 March 2019 GFE Cover Letter Riv ML19011A3712019-01-10010 January 2019 Announcement of Generic Fundamentals Examination Section of the Written Operator Licensing Examination for 2019 ML18284A4942018-09-25025 September 2018 NRC Retake Initial Operator Licensing Examination Approval 05000528/2018302, 05000529/2018302 and 05000530/2018302 ML18184A3552018-06-29029 June 2018 Response to Regulatory Issue Summary (RIS) 2018-02, Preparation and Scheduling of Operator Licensing Examinations - Update ML18122A3722018-05-0101 May 2018 Response to Regulatory Issue Summary (RIS) 2018-02, Preparation and Scheduling of Operator Licensing Examinations ML18086B0842018-02-16016 February 2018 Facility Cover Letter - Riv - March 2018 - GFE ML18009A9852018-01-0808 January 2018 Announcement of Generic Fundamentals Examination Section of the Written Operator Licensing Examination for 2018 ML17124A2082017-05-0404 May 2017 Response to Regulatory Issue Summary (RIS) 2017-03, Preparation and Scheduling of Operator Licensing Examinations ML17013A5482017-01-13013 January 2017 Generic Fundamentals Section of the Written Operator Licensing Examination Scheduled for 2017 ML16321A4722016-11-0303 November 2016 10 Draft Written Exam Pedigree ML16321A4632016-11-0303 November 2016 Palo VERDE-2016-10 Final Written Exam ML16321A4682016-11-0303 November 2016 2016-10 Draft Outlines ML16321A4662016-11-0303 November 2016 Palo VERDE-2016-10 Post-Exam Comments ML16321A4652016-11-0303 November 2016 Palo VERDE-2016-10 Final Operating Test ML16321A4692016-11-0303 November 2016 2016-10-DRAFT Outline Comments Rev 2 with PVNGS Response ML16321A4832016-11-0303 November 2016 Palo VERDE-2016-10 Draft Operating Test ML16321A4862016-11-0303 November 2016 Palo VERDE-2016-10 Draft Operating Test Comments ML16321A4882016-11-0303 November 2016 Palo VERDE-2016-10 Final Outlines 2023-09-06
[Table view] Category:Part 55 Examination Related Material
MONTHYEARIR 05000528/20243012023-09-0606 September 2023 Notification of NRC Initial Operator Licensing Examination 05000528/2024301; 05000529/2024301; 05000530/2024301 ML23145A2772023-05-17017 May 2023 10-PV-2023-05 Post-Exam Comments ML23151A6492023-05-11011 May 2023 11-PV-2023-05 Public Forms ML23108A0342023-04-18018 April 2023 NRC Initial Operator Licensing Examination Approval 05000528/2023301; 05000529/2023301; 05000530/2023301 ML22196A3782022-07-15015 July 2022 Notification of NRC Initial Operator Licensing Examination 05000528/2023301; 05000529/2023301; 05000530/2023301 ML22143A9892022-05-19019 May 2022 PV-2022-05-Post Exam Comments ML23193A8502022-04-12012 April 2022 PV-2022-05-Form 2.3-1 Examination Outline Quality Checklist ML22178A1772022-04-12012 April 2022 PV-2022-05-Public Forms ML22070A1382022-03-10010 March 2022 Response to Regulatory Issue Summary (RIS) 2022-01, Preparation and Scheduling of Operator Licensing Examinations IR 05000528/20213012021-06-21021 June 2021 NRC Initial Examination Report 05000528/2021301, 05000529/2021301, and 05000530/2021301 ML21160A0832021-06-21021 June 2021 NRC Initial Examination Report 05000528/2021301, 05000529/2021301, and 05000530/2021301 ML21147A5452021-05-0606 May 2021 04 Public Forms ML21147A5442021-05-0606 May 2021 04 Post Examination Analysis ML21106A3042021-04-16016 April 2021 Response to Regulatory Issue Summary (RIS) 2021-01, Preparation and Scheduling of Operator Licensing Examinations ML21020A1032020-12-10010 December 2020 11 Post Examination Analysis ML21020A1042020-12-10010 December 2020 11 Public Forms ML21020A0972020-12-10010 December 2020 11 Final Written Examination ML21020A0952020-12-10010 December 2020 11 Final Operating Test ML21020A0942020-12-10010 December 2020 11 Draft Written Examination ML21020A0932020-12-10010 December 2020 11 Draft Written Examination Comments ML21020A0912020-12-10010 December 2020 11 Draft Outline Comments ML21020A0982020-12-10010 December 2020 2020-11 Draft Operating Test Comments ML21020A0962020-12-10010 December 2020 11 Final Outlines ML21020A0922020-12-10010 December 2020 11 Draft Outlines ML21020A0902020-12-10010 December 2020 11 Draft Operating Test ML20325A3682020-11-20020 November 2020 NRC Initial Operator Licensing Examination Approval 05000528/2020301; 05000529/2020301; 05000530/2020301 ML20199M3832020-07-17017 July 2020 Response to Regulatory Issue Summary (RIS) 2020-01, Preparation and Scheduling of Operator Licensing Examinations ML20003E2762019-10-11011 October 2019 PV-2019-10 Post Exam Comments and Analysis ML19273C8072019-09-30030 September 2019 NRC Initial Operator Licensing Exam Approval Letter 05000528/529/530/2019301 ML19135A3352019-05-15015 May 2019 Response to Regulatory Issue Summary (RIS) 2019-02, Preparation and Scheduling of Operator Licensing Examinations ML20042C1192019-03-12012 March 2019 PV-2019-10 Public Forms ML18284A4942018-09-25025 September 2018 NRC Retake Initial Operator Licensing Examination Approval 05000528/2018302, 05000529/2018302 and 05000530/2018302 ML18184A3552018-06-29029 June 2018 Response to Regulatory Issue Summary (RIS) 2018-02, Preparation and Scheduling of Operator Licensing Examinations - Update ML18122A3722018-05-0101 May 2018 Response to Regulatory Issue Summary (RIS) 2018-02, Preparation and Scheduling of Operator Licensing Examinations ML18009A9852018-01-0808 January 2018 Announcement of Generic Fundamentals Examination Section of the Written Operator Licensing Examination for 2018 ML17124A2082017-05-0404 May 2017 Response to Regulatory Issue Summary (RIS) 2017-03, Preparation and Scheduling of Operator Licensing Examinations ML16321A4652016-11-0303 November 2016 Palo VERDE-2016-10 Final Operating Test ML16321A4632016-11-0303 November 2016 Palo VERDE-2016-10 Final Written Exam ML16321A4832016-11-0303 November 2016 Palo VERDE-2016-10 Draft Operating Test ML16321A4682016-11-0303 November 2016 2016-10 Draft Outlines ML16321A4722016-11-0303 November 2016 10 Draft Written Exam Pedigree ML16321A4792016-11-0303 November 2016 2016-10 Draft Written Exam Comments ML16321A4862016-11-0303 November 2016 Palo VERDE-2016-10 Draft Operating Test Comments ML16340B6372016-11-0303 November 2016 Palo VERDE-2016-10 Public Forms ML16321A4662016-11-0303 November 2016 Palo VERDE-2016-10 Post-Exam Comments ML16321A4692016-11-0303 November 2016 2016-10-DRAFT Outline Comments Rev 2 with PVNGS Response ML16321A4882016-11-0303 November 2016 Palo VERDE-2016-10 Final Outlines ML16293A1212016-10-18018 October 2016 2016-11-Examination Approval ML16203A1502016-07-15015 July 2016 Response to Regulatory Issue Summary (RIS) 2016-09, Preparation and Scheduling of Operator Licensing Examinations ML16089A0712016-03-29029 March 2016 Generic Fundamentals Examination Results for March 9, 2016 2023-09-06
[Table view] |
Text
RIS 2018-02
-.) aps Palo Verde Nuclear Generating Station 102-07738-TNW/DJH P.O. Box 52034 June 29, 2018 Phoe ni x, AZ 850 72 Mail Station 7636 Tel: 6 23 - 363-5 764 ATTN: Document Control Desk U. S. Nuclear Regulatory Commission Washington, DC 20555-0001
Reference:
Arizona Public Service Company (APS) Letter No. 102-07686, dated May 1, 2018, Response to Regulatory Issue Summary (RIS) 2018-02, Preparation and Scheduling of Operator Licensing Examinations
Dear Sir:
Subject:
Palo Verde Nuclear Generating Station (PVNGS)
Units 1, 2, and 3 Docket Nos. STN 50-528/529/530 Response to Regulatory Issue Summary (RIS) 2018-02, Preparation and Scheduling of Operator Licensing Examinations - Update This letter provides the PVNGS updated voluntary response to RIS 2018-02, Preparation and Scheduling of Operator Licensing Examinations. The enclosed NRC Form 536 provides the PVNGS proposed schedule of operator licensing examinations for calendar years 2020 through 2023 and includes an Examination on November 16, 2020 that was not in the initial response.
There are no commitments made to the NRC by this letter.
If you have any questions or require additional information, please contact Matt Kura, Regulatory Affairs Department Leader, at (623) 393-5379.
Sincerely, Thomas N. Weber Director, Regulatory Affairs TNW/DJH
Enclosure:
NRC Form 536, Operator Licensing Examination Data A member of STARS Alliance LLC Callaway
102-07738-TNW/DJH U. S. Nuclear Regulatory Commission Response to RIS 2018-02 Page 2 cc: w/enclosure V. G. Gaddy NRC Region IV, Chief, Operations Branch J. A. Bridges NRC Region IV, Licensing Assistant C. A. Peabody NRC Senior Resident Inspector PVNGS G. B. Miller NRC Region IV, Chief, Branch D
Enclosure NRC Form 536 Operator Licensing Examination Data
NRC FORM 536 U.S. NUCLEAR REGULATORY COMMISSION APPROVED BY 0MB: NO. 3150-0131 EXPIRES: 11/30/2020 (11-2017)
~fl,REGlJ<
.;," 'f)! Estimated burden per response to comply with this voluntary information collection request: 1 hour1.157407e-5 days <br />2.777778e-4 hours <br />1.653439e-6 weeks <br />3.805e-7 months <br />. This
.41
~
\;
.. <?,,
~
n 0
~
OPERATOR LICENSING EXAMINATION DATA information collection is used to plan budgets and resources for operator examinations. Send comments regarding burden estimate to the Information Services Branch (T-2 F43), U.S. Nuclear Regulatory Commission, Washington, DC20555-0001, or by e-mail to lnfocollects.Resource@nrc.gov, i :
v;,.4-1) +O~ and to the Desk Officer, Office of Information and Regulatory Affairs, NEOB-10202, (3150-0131), Office of Management and Budget, Washington, DC 20503. If a means used to impose an information
- "' collection does not display a currently valid 0MB control number, the NRC may not conduct or sponsor, and a person is not required to respond to, the information collection.
FACILITY NRC REGION Palo Verde Nuclear Generating Station 50-528, 50-529, 50-530 l1v I A. PROPOSED EXAMINATION PREPARATION SCHEDULE PROPOSED NUMBER CY 20 CY 21 CY 22 CY 23 ESTIMATED NUMBER OF LICENSEE-PREPARED 1 1 1 0 EXAMINATIONS ESTIMATED NUMBER OF NRG-PREPARED EXAMINATIONS B. INITIAL OPERATOR LICENSE EXAMINATIONS PROPOSED NUMBER CY 20 CY 21 CY 22 CY 23 NUMBER OF REACTOR OPERATORS 12 12 NUMBER OF SENIOR REACTOR OPERATORS- INSTANT 16 6 6 NUMBER OF SENIOR REACTOR OPERATORS-UPGRADE 6 6 NUMBER OF SENIOR REACTOR OPERATORS - LIMITED PROPOSED DA TES PRIMARY DATE 11/16/2020 04/26/2021 10/17/2022 ALTERNATE DATE 11/30/2020 05/24/2021 10/24/2022 NRC FORM 536 (11-2017)