Cancelling Numerous Inspection Report NumbersML18173A008 |
Person / Time |
---|
Site: |
Palo Verde, Wolf Creek, Grand Gulf, Cooper, Arkansas Nuclear, Columbia, River Bend, Diablo Canyon, Callaway, Waterford, South Texas, San Onofre, Comanche Peak, Humboldt Bay, Rancho Seco, Fort Calhoun, 07200020, 07200009 |
---|
Issue date: |
06/20/2018 |
---|
From: |
Gerond George NRC Region 4 |
---|
To: |
Anton Vegel NRC Region 4 |
---|
George G |
References |
---|
Download: ML18173A008 (4) |
|
Similar Documents at Palo Verde, Wolf Creek, Grand Gulf, Cooper, Arkansas Nuclear, Columbia, River Bend, Diablo Canyon, Callaway, Waterford, South Texas, San Onofre, Comanche Peak, Humboldt Bay, Rancho Seco, Fort Calhoun, 07200020, 07200009 |
---|
Category:Memoranda
MONTHYEARML24017A2782024-01-31031 January 2024 Memorandum - Aco Conference Call Summary Jan 17, 2024 Re Phase Ii+ RAI ML24018A0852024-01-31031 January 2024 Safety Determination of a Potential Structural Failure of the Full Basket During Accident Conditions for the HI-STORM 100 and HI-STORM Flood/Wind Dry Cask Storage Systems ML24004A0472024-01-31031 January 2024 U.S. Nuclear Regulatory Commission Summary of the November 16, 2023, Observation Public Meeting to Discuss NuScales Us600 Exemption Request ML24019A0342024-01-30030 January 2024 Public Meeting Summary - 01-04-2024 - Comanche Peak LRA - Structures Monitoring Program ML23356A1242024-01-26026 January 2024 American Centrifuge Plant Fuel Facility Resident Inspector Decision ML24024A1632024-01-25025 January 2024 January 17, 2024, Summary of Meeting with Triso-X, LLC, to Align on the Triso-X Draft Environmental Impact Analysis Requests for Additional Information Part 2-2 ML23324A4332024-01-23023 January 2024 10/16-17/2023 Summary of Routine NRC Site Visit at the Oyster Creek Nuclear Generating Station to Discuss License Termination Plans and Other Technical Topics ML24023A0022024-01-22022 January 2024 Acu Audit Close Out Memo ML23356A1202024-01-19019 January 2024 December 18, 2023, Summary of Telephone Call with Centrus-American Centrifuge Operating, LLC Regarding Draft Request for Additional Information for Physical Security of Special Nuclear Material ML23362A0662024-01-16016 January 2024 12-19-23 Summary of Meeting with Triso-X, LLC, to Align on Triso-X Draft Environmental Safety Request for Additional Information ML23325A2022024-01-16016 January 2024 CFR Part 52 Construction Lessons-Learned Report ML23213A1852024-01-12012 January 2024 User Need for Rulemaking for Certificate of Compliance Renewal, Initial Issue (Amendment Number 0), Amendment Numbers 1 Through 9 to the NAC Universal Multipurpose Canister System ML24011A1562024-01-11011 January 2024 Document Request for Uusa OPS1 Inspection 2024-001 ML24010A1672024-01-10010 January 2024 Environmental Impact Statement Scoping Process, Summary Report for the TRISO-X, LLC, Public Scoping Period January February 2023 ML24008A0802024-01-0808 January 2024 Kairos Power LLC, Summary of 11/2/2023, Public Meeting to Discuss Material Control and Accounting ML24010A1662024-01-0808 January 2024 Scoping Summary Report Related to the Environmental Scoping Process for the Triso-X Special Nuclear Material License Application ML23349A1222024-01-0808 January 2024 November 15, 2023, Summary of Telephone Call with Centrus - American Centrifuge Operating, LLC Regarding Physical Security of Special Nuclear Material at the American Centrifuge Plant in Piketon, Ohio ML24004A2192024-01-0808 January 2024 Construction Reactor Oversight Process Performance Metric Report for Calendar Year 2023 ML23354A0912024-01-0808 January 2024 December 4, 2023, Summary of Telephone Call with Centrus-American Centrifuge Operating, LLC, Regarding Its Chief Executive Officer'S Security Clearance ML23355A2452024-01-0505 January 2024 TRISO-X Fuel Facility Resident Inspector Decision ML23353A1832023-12-27027 December 2023 Summary of Meeting on December 4, 2023, with TRISO-X LLC, to Align on TRISO-X Draft Responses to the Requests for Additional Information for the Chemical Safety Analysis ML23346A2532023-12-20020 December 2023 Summary of Site Visit to the Department of Commerce National Institute of Standards and Technology in Gaithersburg, Maryland ML23123A1032023-12-20020 December 2023 User Need for Rulemaking for the Holtec HI-STORM 100 Cask System, Amendment No. 16 ML23345A0792023-12-16016 December 2023 Memorandum - NuScale Standard Design Approval Application Review Interim Lessons Learned Report ML23331A7912023-12-0606 December 2023 Nov. 2023 Enviro Scoping Meetings Related to the V.C. Summer Subsequent License Renewal Application Meeting Summary Memo ML23318A3922023-12-0404 December 2023 NRC Observational Site Visit at the Burrell, Pennsylvania Disposal Site ML23356A0212023-12-0101 December 2023 American Nuclear Insurers, Secondary Financial Protection (SFP) Program ML23318A5162023-11-30030 November 2023 Implementation of Provisions from Consultations Under Section 106 of the National Historic Preservation Act on the Kairos Hermes Test Reactor CP Review ML23332A1652023-11-30030 November 2023 Second Limited Aging Management Audit Plan Regarding the Subsequent License Renewal Application Review ML23319A3532023-11-29029 November 2023 NRC Observational Site Visit at the Canonsburg, Pennsylvania Disposal Site Dated November 29, 2023 ML23297A0532023-11-27027 November 2023 Restart Panel Charter ML23313A1172023-11-21021 November 2023 October 26, 2023 Summary of Holtec International Pre-decisional Enforcement Conference ML23313A2062023-11-21021 November 2023 Summary of Meeting with Framatome, Inc., to Discuss Framatome'S Response to NRC Staff'S Request for Additional Information for License Amendment Request Submittal ML23320A0322023-11-16016 November 2023 Meeting Summary - NuScale Sdaa - NuScale NRC Management Public Meeting November 7, 2023 (Non-prop) ML23311A3642023-11-14014 November 2023 Summary of September 28, 2023, Meeting with NAC International, Inc. to Discuss Submittal of the Application for Magnastor Amendments 15 and 16 ML23279A0812023-11-13013 November 2023 Abilene Christian University, Report on the Pre-Submittal Regulatory Audit Related to Physical Security for the Molten Salt Research Reactor ML23289A2222023-11-13013 November 2023 Summary of Call with the U.S. Department of Commerce, National Institute of Standards and Technology: Special Nuclear Material License Number-362 Renewal Application ML23313A1592023-11-0909 November 2023 U.S. Nuclear Regulatory Commission Summary of the October 10, 2023, Public Meeting to Discuss Monticello'S Condensate Backwash Receiving Tank Fatigue Evaluation ML23303A0662023-11-0606 November 2023 October 2023 Environmental Scoping Meetings Re Perry Nuclear Power Plant License Renewal Application Meeting Summary Memo ML23303A2032023-11-0101 November 2023 October 24, 2023, Summary of Comment Gathering Public Meeting on Lessons Learned from the ITAAC Hearing Process for Vogtle Units 3 and 4 2024-01-08 The following query condition could not be considered due to this wiki's restrictions on query size or depth: <code> [[:Palo Verde]] OR [[:Wolf Creek]] OR [[:Grand Gulf]] OR [[:Cooper]] OR [[:Arkansas Nuclear]] OR [[:Columbia]] OR [[:River Bend]] OR [[:Diablo Canyon]] OR [[:Callaway]] OR [[:Waterford]] OR [[:South Texas]] OR [[:San Onofre]] OR [[:Comanche Peak]] OR [[:Humboldt Bay]] OR [[:Rancho Seco]] OR [[:Fort Calhoun]] OR [[:07200020]] OR [[:07200009]] </code>.
[Table view]The following query condition could not be considered due to this wiki's restrictions on query size or depth: <code> [[:Palo Verde]] OR [[:Wolf Creek]] OR [[:Grand Gulf]] OR [[:Cooper]] OR [[:Arkansas Nuclear]] OR [[:Columbia]] OR [[:River Bend]] OR [[:Diablo Canyon]] OR [[:Callaway]] OR [[:Waterford]] OR [[:South Texas]] OR [[:San Onofre]] OR [[:Comanche Peak]] OR [[:Humboldt Bay]] OR [[:Rancho Seco]] OR [[:Fort Calhoun]] OR [[:07200020]] OR [[:07200009]] </code>. |
Text
June 20, 2018 MEMORANDUM TO: Anton Vegel, Director Division of Reactor Projects Region IV Mark Shaffer, Director Division of Reactor Safety Region IV FROM: Gerond George, Team Leader /RA/
Inspection Programs and Assessment Team Division of Reactor Safety Region IV
SUBJECT:
CANCELLING NUMEROUS INSPECTION REPORT NUMBERS This memorandum documents Region IVs cancellation of inspection report numbers that were assigned from the 2012 timeframe until 2017. Numerous report numbers were created and assigned, but not used and not closed. The Region IV office has verified that inspection efforts were not expended nor were any licensees charged for inspection time under those report numbers. To see the complete list of cancelled inspection report numbers please refer to the enclosure listed below.
CONTACT: Eduardo D. Uribe, IPAT/DRS 817-200-1534
Enclosure:
List of Cancelled Inspection Report Numbers
LIST OF CANCELLED INSPECTION REPORT NUMBERS - JUNE 20, 2018 Site Docket Docket Docket Report Number Number Number Number Arkansas Nuclear 1 05000313 05000368 2012502 and 2 Callaway 05000483 2012502 Columbia Generating 05000397 2012504 Station Comanche Peak 1 05000445 05000446 2012502 and 2 Cooper 05000298 2012502 Diablo Canyon 1 and 2 05000275 05000323 2012502 Diablo Canyon 1 and 2 05000275 05000323 2012504 Fort Calhoun 05000285 2012502 Grand Gulf 05000416 2012502 Palo Verde 1, 2, and 3 05000528 05000529 05000530 2012502 River Bend 05000458 2012502 San Onofre 1, 2, and 3 05000206 05000361 05000362 2012502 South Texas 1 and 2 05000498 05000499 2012502 Waterford 3 05000382 2012502 Wolf Creek 1 05000482 2012502 Fort Calhoun 05000285 2013001 Arkansas Nuclear 1 05000313 05000368 2013504 and 2 Fort Calhoun 05000285 2013006 San Onofre 1, 2, and 3 05000206 05000361 05000362 2013001 San Onofre 1, 2, and 3 05000206 05000361 05000362 2013401 San Onofre 1, 2, and 3 05000206 05000361 05000362 2013502 Fort Calhoun 05000285 2014402 San Onofre 1, 2, and 3 05000206 05000361 05000362 2014402 San Onofre 1, 2, and 3 05000206 05000361 05000362 2014403 Palo Verde 1, 2, and 3 05000528 05000529 05000530 2014008 Enclosure
San Onofre 1, 2, and 3 05000206 05000361 05000362 2014401 San Onofre 1, 2, and 3 05000206 05000361 05000362 2014403 San Onofre 1, 2, and 3 05000206 05000361 05000362 2014404 San Onofre 1, 2, and 3 05000206 05000361 05000362 2014501 South Texas 1 and 2 05000498 05000499 2014503 San Onofre 1, 2, and 3 05000206 05000361 05000362 2015001 San Onofre 1, 2, and 3 05000206 05000361 05000362 2015401 San Onofre 1, 2, and 3 05000206 05000361 05000362 2015405 San Onofre 1, 2, and 3 05000206 05000361 05000362 2015402 San Onofre 1, 2, and 3 05000206 05000361 05000362 2015501 Rancho Seco 05000312 2016401 Columbia Generating 07200035 2012401 Station (ISFSI)
Comanche Peak (ISFSI) 07200074 2013401 Cooper Nuclear Station 07200066 2012401 (ISFSI)
Diablo Canyon (ISFSI) 07200026 2013401 DOE Idaho - FSV 07200009 2012402 DOE Idaho - TMI 07200020 2012401 DOE Idaho - TMI 07200020 2016401 Fort Calhoun (ISFSI) 07200054 2012401 Grand Gulf (ISFSI) 07200050 2012401 Humboldt Bay (ISFSI) 07200027 2012401 Palo Verde (ISFSI) 07200044 2012401 River Bend (ISFSI) 07200049 2012401 SONGS 1 (ISFSI) 07200041 2012401 GE Vallecitos Nuclear 07000754 2015401 Center GE Vallecitos Nuclear 07000754 2016401 Center 2
ML18173A008 SUNSI Review ADAMS: Non-Publicly Available Non-Sensitive Keyword:
By: EDU Yes No Publicly Available Sensitive NRC-002 OFFICE PE:IPAT TL:IPAT D:DRS D:DRP NAME EUribe GGeorge MShaffer AVegel SIGNATURE /RA/ /RA/ /RA/ /RA/
DATE 06/19/2018 06/20/2018 06/21/2018 06/19/2018