ML18166A236
ML18166A236 | |
Person / Time | |
---|---|
Site: | River Bend |
Issue date: | 06/15/2018 |
From: | Vincent Gaddy Operations Branch IV |
To: | Maguire W Entergy Operations |
References | |
IR 2018003 | |
Download: ML18166A236 (7) | |
See also: IR 05000458/2018003
Text
June 15, 2018
Mr. William F. Maguire, Site Vice President
Entergy Operations, Inc.
River Bend Station
5485 U.S. Highway 61N
St. Francisville, LA 70775
SUBJECT: NOTIFICATION OF INSPECTION (NRC INSPECTION REPORT
05000458/2018003) AND REQUEST FOR INFORMATION
Dear Mr. Maguire:
From August 27 - 31, 2018, inspectors from the Nuclear Regulatory Commissions (NRC)
Region IV office will perform the baseline biennial requalification inspection at River Bend
Station, using NRC Inspection Procedure 71111.11B, Licensed Operator Requalification
Program. Experience has shown that this inspection is a resource intensive inspection for both
the NRC inspectors and your staff. In order to minimize the impact to your onsite resources and
to ensure a productive inspection, we have enclosed a request for documents needed for this
inspection. These documents have been divided into three groups. The first group (Section A
of the enclosure) identifies information to be provided prior to the inspection to ensure that the
inspectors are adequately prepared. The second group (Section B of the enclosure) identifies
the information the inspectors will need upon arrival at the site. The third group (Section C of
the enclosure) identifies the items, which are necessary to close out the inspection and are
usually sent a few weeks after the team has left the site. It is important that all of these
documents are up to date and complete in order to minimize the number of additional
documents requested during the preparation and/or the onsite portions of the inspection.
We have discussed the schedule for these inspection activities with your staff and understand
that our regulatory contact for this inspection will be Mr. Gabe Kimich, Licensed Operator
Requalification Exam Development Lead. Our inspection dates are subject to change based on
your updated schedule of examination activities. If there are any questions about this inspection
or the material requested, please contact the lead inspector, Thomas J. Farina, at 817-200-1117
(thomas.farina@nrc.gov) or Clyde C. Osterholtz, at 817-200-1269 Clyde.Osterholtz@nrc.gov.
This letter does not contain new or amended information collection requirements subject to the
Paperwork Reduction Act of 1995 (44 U.S.C. 3501 et seq.). Existing information collection
requirements were approved by the Office of Management and Budget, control number 3150-
0018. The NRC may not conduct or sponsor, and a person is not required to respond to, a
request for information or an information collection requirement unless the requesting document
displays a currently valid Office of Management and Budget control number.
W. Maguire 2
In accordance with 10 CFR 2.390 of the NRCs "Agency Rules of Practice and Procedure," a
copy of this letter and its enclosure will be available electronically for public inspection in the
NRC Public Document Room or from the Publicly Available Records (PARS) component of
NRCs document system (ADAMS). ADAMS is accessible from the NRC web site at
http://www.nrc.gov/reading-rm/adams.html (the Public Electronic Reading Room).
Sincerely,
/RA/
Vince G. Gaddy, Chief
Operations Branch
Division of Reactor Safety
Docket: 50-458
License: NPF-47
Enclosure:
Biennial Requalification Inspection Document Request
cc: Electronic Distribution
SUNSI Review: ADAMS: Non-Publicly Available Non-Sensitive Keyword:
By: TJF Yes No Publicly Available Sensitive NRC-002
OFFICE SOE:OB C:OB
NAME TFarina VGaddy
SIGNATURE /RA/ /RA/
DATE 06/15/18 06/15/18
BIENNIAL REQUALIFICATION INSPECTION DOCUMENT REQUEST
From: Thomas J. Farina Clyde C. Osterholtz
Sr. Operations Engineer, NRC RIV Sr. Operations Engineer, NRC RIV
817-200-1117 817-200-1269
To: Gabe Kimich
Licensed Operator Requalification Exam Development Lead
225-378-3549
Subj: Information Request to Support August 27 - 31, 2018 Licensed Operator Requalification
(LOR) Program Inspection (IP 71111.11B)
A. The following information is requested in order to support inspection preparation
activities. These items are listed by section as they appear in the inspection module
(ie 2.02, 2.04, etc). Requested materials should be sent either electronically or by
CD/DVD in order to arrive at the Region IV office no later than August 16, 2018. Do
not send USB flash drives.
- Electronically: To: Thomas.Farina@nrc.gov (lead inspector);
Cc: Clyde.Osterholtz@nrc.gov (inspector)
- Physically: To: US Nuclear Regulatory Commission, Region IV
1600 E. Lamar Blvd
Arlington, TX 76011
ATTN: Thomas Farina
General Requests:
- Training and Operations Department organization charts (with qualified LOR
evaluators identified)
- Procedures that identify process for revising and maintaining LOR continuing training
program
- List of outstanding LOR program changes
- List of plant events and industry operating experience incorporated into LOR
program since last BRQ
- Audits and/or self-assessment reports addressing the LOR training program
- Last two years of simulator review committee (or equivalent) meeting minutes
- Last two years of Curriculum Review Committee (or equivalent) meeting minutes
02.03: Biennial Requalification Written Examination Quality
- The current and approved biennial written examination schedule
- The current requalification cycle written examination results to date
- All written examinations that have been approved for administration up to the date of
submittal. Include password protection if e-mailed or double envelope protection if
mailed per NUREG-1021
- The current requalification cycle examination methodology (sample plan)
02.04: Annual Requalification Operating Test Quality
- The schedule for the operating tests to be given the week of August 27, 2018
Enclosure
- All operating tests (password protected) that have been approved for administration
up to and including the week of the onsite inspection
- All 2017 NRC-required annual operating tests
- Current requalification cycle operating test results
- Current requalification cycle operating test methodology (sample plan)
- List of time critical operator actions, including USAR references
02.05: Licensee Admin of Requal Exams
- All procedures used to administer the annual operating test
- All procedures used to assess operator performance
- All procedures that describe conduct of simulator training
- All procedures used to test, operate, and maintain the simulator
02.06: Requalification Examination Security
- Tracking tools used to prevent excessive overlap on the written examinations and
ensure sampling of required topics on a periodic basis
- Tracking tools used to prevent excessive overlap on the operating tests and ensure
sampling of all required malfunctions (major events, instrument/component
malfunctions, TS calls, etc.) on a periodic basis
- All Procedures that describe examination security, including procedures used to
develop the examinations that include guidelines on overlap between examinations
in current exam cycle tests and prior year examinations
- List of all Condition Reports since the last biennial requalification inspection related
to examination security and overlap
02.07: Licensee Remedial Training Program
- List of remedial training conducted or planned since last biennial requalification
inspection (includes remedial training for exam failures and training to correct generic
or individual weaknesses observed during previous requal exam cycle)
- Remediation plans (lesson plans, reference materials, and final documentation)
02.08: Conformance with Operator License Conditions
- All Procedures and Program documentation for maintaining active operator licenses,
tracking training attendance, and ensuring medical fitness of licensed operators
- All Procedures and associated documentation that supports reactivation of any
SRO/RO license (operating or staff crew) since the last biennial inspection
02.09: Simulator Performance
- An index of the most recent operability test packages required by ANSI 3.5 2009
Appendix B, including performance and approval dates, and results
- An index of simulator baseline data sources (ANSI 3.5 2009 5.1.1) for the transient
performance tests required by ANSI 3.5 2009 Appendix B.3.2.1
- An index of most recent malfunction tests for the malfunctions listed in ANSI 3.5
2009 3.1.4, as required by section 4.1.4. If these are satisfied exclusively by SBT
packages, then include an index of relevant SBT packages
- An index of core physics testing performed in the simulator since September 5, 2016,
the plant physics data book reference used for comparison, and results
- An index of Post-Event Simulator Tests conducted since September 5, 2016
- An index of simulator modification packages that are not yet complete
2
- An index of simulator modification packages completed since September 5, 2016
- Current Simulator Differences List / Lesson plan used in training
- All Simulator Management and Configuration Procedures if not already provided for
section 02.05 above
- Simulator Discrepancy Report summary list for all open DRs, and summary list for
those Discrepancy Reports closed since September 5, 2016
02.10: Problem Identification and Resolution
- A summary report of all condition reports related to licensed operator actions/errors
in the control room since September 5, 2016
- Any revised requalification training that was based on licensed operator performance
issues since September 5, 2016
B. The following information is requested in order to support the onsite inspection
activities. Requested materials should be available to the inspection team, either
electronically or hardcopy, upon site arrival on August 27, 2018.
02.02: Exam Results / 02.03 and 02.04: Written Exam and Op Test Quality
- All approved operating tests to be administered subsequent to the onsite inspection
- All results up to the day the team leaves the site
02.08: Conformance with Operator License Conditions
- Access to licensed operators records
- Access to licensed operators training attendance records
- Access to licensed operators medical records
02.09: Simulator Performance
- Simulator discrepancies reports (DRs) since September 5, 2016. This should
include all open and closed DRs, with documentation / justification for closure
- Acceptance test documentation, including hardware and software model revisions at
the time of acceptance (as available)
- Documentation that validates current models, including the thermal-hydraulic and
neutronics models, to the actual plant
- All current model deficiencies, including USAR vs Design differences in the simulator
- Summary list of modifications since September 5, 2016
- Plant modifications (both hardware and software) incorporated onto the simulator
since September 5, 2016
- The complete book of all simulator annual performance test packages (either
hardcopy or electronic), complete with all transient tests, steady state tests, and
malfunction tests. This should also include the test procedures for each test, the
acceptance criteria, and results. For each transient test, the reference chart should
be included or an equivalent subject matter expert review versus the simulator
results with an analysis for any differences beyond the ANSI standard requirements
- Simulator reactor core performance test packages used to verify core physics
parameters (ANSI/ANS 3.5 sections 3.4.3.3 / 4.4.3.3), including applicable reference
graphs from the plant physics data book, test procedures, acceptance criteria, and
results
- All simulator test, configuration management, and related documents available in the
room for inspectors to review. This includes training needs analysis packages,
simulator review committee meeting minutes, etc.
3
- Current copy of ANSI 3.5 standard you are committed to for simulator testing
02.10: Problem Identification and Resolution
- All condition reports related to licensed operator actions/errors in the control room
C. River Bend Station is required to send the final results and any remaining written
exams and operating tests to the lead inspector for final review and comparison
against the Significance Determination Tools in order to communicate the exit results
for the inspection. Report results in the format below:
1. Total number of licensed operators.
2. Number of licensed operators administered a requalification examination
required by 10 CFR 55.59(a).
3. Number of individual licensed operators who failed any portion of a
requalification examination (written, JPM, or individual simulator scenario
failures).
3.a. Number of individual licensed operators who failed written exam
3.b. Number of individual licensed operators who failed JPM exam
3.c. Number of individual licensed operators who failed simulator
scenario exam individually
4. Divide line 3 by line 2 to obtain the individual requalification examination %
failure rate.
5. Number of crews administered simulator scenarios as part of a
requalification examination required by 10 CFR 55.59(a)
6. Number of crews who performed unsatisfactorily on the simulator
scenarios.
7. Divide line 6 by line 5 to obtain the crew simulator scenario failure rate. %
8. Describe the reason for each licensed operator who was not
administered an NRC-required requalification exam, or who did not pass an
administered requalification exam, and the stations plan to satisfy the
requalification exam requirement for each.
4