RA-18-0016, Response to Request for Additional Information Regarding Technical Specification Changes to Support Self-Performance of Core Reload Design and Safety Analyses

From kanterella
(Redirected from ML18156A209)
Jump to navigation Jump to search

Response to Request for Additional Information Regarding Technical Specification Changes to Support Self-Performance of Core Reload Design and Safety Analyses
ML18156A209
Person / Time
Site: Harris, Robinson  Duke energy icon.png
Issue date: 06/05/2018
From: Donahue J
Duke Energy Progress
To:
Document Control Desk, Office of Nuclear Reactor Regulation
Shared Package
ML18157A091 List:
References
RA-18-0016
Download: ML18156A209 (37)


Text

JOSEPH DONAHUE Vice President Nuclear Engineering 526 South Church Street, EC-07H Charlotte, NC 28202 980-373-1758 Joseph.Donahue@duke-energy.com PROPRIETARY INFORMATION - WITHHOLD UNDER 10 CFR 2.390 UPON REMOVAL OF ATTACHMENT 3 THIS LETTER IS UNCONTROLLED Serial: RA-18-0016 10 CFR 50.90 June 5, 2018 U.S. Nuclear Regulatory Commission ATTN: Document Control Desk Washington, DC 20555-0001 SHEARON HARRIS NUCLEAR POWER PLANT, UNIT 1 DOCKET NO. 50-400 / RENEWED LICENSE NO. NPF-63 H. B. ROBINSON STEAM ELECTRIC PLANT, UNIT NO. 2 DOCKET NO. 50-261 / RENEWED LICENSE NO. DPR-23

SUBJECT:

RESPONSE TO REQUEST FOR ADDITIONAL INFORMATION (RAI)

REGARDING TECHNICAL SPECIFICATION CHANGES TO SUPPORT SELF-PERFORMANCE OF CORE RELOAD DESIGN AND SAFETY ANALYSES

REFERENCES:

1. Duke Energy letter, Technical Specification Changes to Support Self-Performance of Core Reload Design and Safety Analyses, dated October 19, 2017 (ADAMS Accession No. ML17292A040)
2. NRC email, Harris/Robinson RAIs - Change Technical Specifications to Support Performance of Core Reload Design and Safety Analyses (L-2017-LLA-0356), dated April 25, 2018 (ADAMS Accession No. ML18116A105)

Ladies and Gentlemen:

In Reference 1, Duke Energy Progress, LLC (formerly referred to as Duke Energy Progress, Inc.), referred to henceforth as Duke Energy, submitted a request for an amendment to the Technical Specifications (TS) to support self-performance of core reload design and safety analyses at the Shearon Harris Nuclear Power Plant, Unit 1 (HNP) and H. B. Robinson Steam Electric Plant, Unit No. 2 (RNP). In Reference 2, the NRC requested additional information regarding Reference 1. provides Duke Energys response to the Reference 2 RAIs. Attachment 3 contains information that is proprietary to Duke Energy. In accordance with 10 CFR 2.390, Duke Energy requests that Attachment 3 be withheld from public disclosure. An affidavit is included (Attachment 1) attesting to the proprietary nature of Attachment 3. A non-proprietary version of Attachment 3 is included in Attachment 2.

PROPRIETARY INFORMATION - WITHHOLD UNDER 10 CFR 2.390 UPON REMOVAL OF ATTACHMENT 3 THIS LETTER IS UNCONTROLLED

PROPRIETARY INFORMATION -WITHHOLD UNDER 10 CFR 2.390 UPON REMOVAL OF ATTACHMENT 3 THIS LETTER IS UNCONTROLLED U.S . Nuclear Regulatory Commission RA-18-0016 Page 2 Attachments 4 and 5 provide updated markups of the RNP and HNP TS pages, respectively, that are affected by the RAI responses in this letter. All TS markup pages and associated inserts in Attachments 4 and 5 supersede the respective TS markup pages and inserts from Reference 1, except for RNP TS Pages 3.3-18 and 3.3-19, which are new markup pages that were not included in Reference 1.

This submittal contains no new regulatory commitments. Duke Energy is notifying the states of North Carolina and South Carolina by transmitting a copy of this letter to the designated state officials. Should you have any questions concerning this letter, or require additional information, please contact Art Zaremba , Manager - Nuclear Fleet Licensing , at 980-373-2062.

I declare under penalty of perjury that the foregoing is true and correct.

Executed on June 5, 2018.

Joseph Donahue Vice President - Nuclear Engineering JBD Attachments: 1. Affidavit of Joseph Donahue

2. Responses to the NRC Request for Additional Information (Redacted)
3. Responses to the NRC Request for Additional Information (Proprietary)
4. Robinson Proposed Technical Specification Changes (Markup)
5. Harris Proposed Technical Specification Changes (Markup) cc: (all with Attachments unless otherwise noted)

C. Haney, Regional Administrator USNRC Region II J. Zeiler, USNRC Senior Resident Inspector - HNP J. Rotton , USNRC Senior Resident Inspector - RNP M. C. Barillas, NRR Project Manager - HNP D. J. Galvin, NRR Project Manager - RNP W. L. Cox, Ill, Section Chief, NC DHSR (Without Attachment 3)

S. E. Jenkins, Manager, Radioactive and Infectious Waste Management Section (SC)

(Without Attachment 3)

A. Wilson , Attorney General (SC) (Without Attachment 3)

A. Gantt, Chief, Bureau of Radiological Health (SC) (Without Attachment 3)

PROPRIETARY INFORMATION - WITHHOLD UNDER 10 CFR 2.390 UPON REMOVAL OF ATTACHMENT 3 THIS LETTER IS UNCONTROLLED RA-18-0016 Attachment 1 Affidavit of Joseph Donahue RA-18-0016 Page 1 of 3 AFFIDAVIT of Joseph Donahue

1. I am Vice President of Nuclear Engineering, Duke Energy Corporation, and as such have the responsibility of reviewing the proprietary information sought to be withheld from public disclosure in connection with nuclear plant licensing and am authorized to apply for its withholding on behalf of Duke Energy.
2. I am making this affidavit in conformance with the provisions of 10 CFR 2.390 of the regulations of the Nuclear Regulatory Commission (NRC) and in conjunction with Duke Energys application for withholding which accompanies this affidavit.
3. I have knowledge of the criteria used by Duke Energy in designating information as proprietary or confidential. I am familiar with the Duke Energy information contained in Attachment 3 to Duke Energy RAI response letter RA-18-0016 regarding application to revise technical specifications to support self-performance of core reload design and safety analyses.
4. Pursuant to the provisions of paragraph (b) (4) of 10 CFR 2.390, the following is furnished for consideration by the NRC in determining whether the information sought to be withheld from public disclosure should be withheld.

(i) The information sought to be withheld from public disclosure is owned by Duke Energy and has been held in confidence by Duke Energy and its consultants.

(ii) The information is of a type that would customarily be held in confidence by Duke Energy. Information is held in confidence if it falls in one or more of the following categories.

(a) The information requested to be withheld reveals distinguishing aspects of a process (or component, structure, tool, method, etc.) whose use by a vendor or consultant, without a license from Duke Energy, would constitute a competitive economic advantage to that vendor or consultant.

(b) The information requested to be withheld consist of supporting data, including test data, relative to a process (or component, structure, tool, method, etc.),

and the application of the data secures a competitive economic advantage for example by requiring the vendor or consultant to perform test measurements, and process and analyze the measured test data.

(c) Use by a competitor of the information requested to be withheld would reduce the competitors expenditure of resources, or improve its competitive position, in the design, manufacture, shipment, installation assurance of quality or licensing of a similar product.

(d) The information requested to be withheld reveals cost or price information, production capacities, budget levels or commercial strategies of Duke Energy or its customers or suppliers.

RA-18-0016 Page 2 of 3 (e) The information requested to be withheld reveals aspects of the Duke Energy funded (either wholly or as part of a consortium ) development plans or programs of commercial value to Duke Energy.

(f) The information requested to be withheld consists of patentable ideas.

The information in this submittal is held in confidence for the reasons set forth in paragraphs 4(ii)(a) and 4(ii)(c) above. Rationale for this declaration is the use of this information by Duke Energy provides a competitive advantage to Duke Energy over vendors and consultants, its public disclosure would diminish the informations marketability, and its use by a vendor or consultant would reduce their expenses to duplicate similar information. The information consists of analysis methodology details, analysis results, and supporting data, relative to a method of analysis that provides a competitive advantage to Duke Energy.

(iii) The information was transmitted to the NRC in confidence and under the provisions of 10 CFR 2.390, it is to be received in confidence by the NRC.

(iv) The information sought to be protected is not available in public to the best of our knowledge and belief.

(v) The proprietary information sought to be withheld is that which is marked in Attachment 3 to Duke Energy RAI response letter RA-18-0016 regarding application to revise technical specifications to support self-performance of core reload design and safety analyses. This information enables Duke Energy to:

(a) Support license amendment requests for its Harris and Robinson reactors.

(b) Support reload design calculations for Harris and Robinson reactor cores.

(vi) The proprietary information sought to be withheld from public disclosure has substantial commercial value to Duke Energy.

(a) Duke Energy uses this information to reduce vendor and consultant expenses associated with supporting the operation and licensing of nuclear power plants.

(b) Duke Energy can sell the information to nuclear utilities, vendors, and consultants for the purpose of supporting the operation and licensing of nuclear power plants.

(c) The subject information could only be duplicated by competitors at similar expense to that incurred by Duke Energy.

5. Public disclosure of this information is likely to cause harm to Duke Energy because it would allow competitors in the nuclear industry to benefit from the results of a significant development program without requiring a commensurate expense or allowing Duke Energy to recoup a portion of its expenditures or benefit from the sale of the information.

RA-18-0016 Page 3 of 3 Joseph Donahue affirms that he is the person who subscribed his name to the foregoing statement, and that all the matters and facts set forth herein are true and correct to the best of his knowledge.

I declare under penalty of perjury that the foregoing is true and correct.

Executed on June 5, 2018.

~h~~

RA-18-0016 Attachment 2 Responses to the NRC Request for Additional Information (Redacted)

Note: Text that is within brackets with an a,c superscript is proprietary to Duke Energy and has been removed.

RA-18-0016 Attachment 2 Responses to the NRC Request for Additional Information (Redacted)

SRXB-RAI-1:

10 CFR 50, Appendix A, General Design Criterion (GDC) 10, Reactor Design, requires that the reactor core and associated coolant, control, and protection systems be designed with appropriate margin to assure that specified acceptable fuel design limits are not exceeded during any condition of normal operation, including the effects of anticipated operational occurrences.

Robinson was not licensed to the current 10 CFR 50, Appendix A, GDC. Per the Robinson UFSAR, it was evaluated against the proposed Appendix A to 10 CFR 50, General Design Criteria for Nuclear Power Plants, published in the Federal Register on July 11, 1967. Criterion 6, Reactor Core Design, of the July 11, 1967 proposed Appendix A requires that:

The reactor core shall be designed to function throughout its design lifetime, without exceeding acceptable fuel damage limits which have been stipulated and justified. The core design, together with reliable process and decay heat removal systems, shall provide for this capability under all expected conditions of normal operation with appropriate margins for uncertainties and for transient situations which can be anticipated, including the effects of the loss of power to recirculation pumps, tripping out of a turbine generator set, isolation of the reactor from its primary heat sink, and loss of all offsite power.

LAR Enclosure Attachments 1 and 2 describe the changes to the Robinson and Harris TSs, respectively, for the heat flux hot channel factor FQ . The proposed TSs will use the designation FQM (X, Y, Z) for the measured FQ and the designation FQL (X, Y, Z) for the limit FQ . LAR Enclosure Attachments 1 and 2 also introduce the use of a variable KSLOPE to ensure positive margin exists to the centerline fuel melt (CFM) limit during transient conditions when core peaking may be greater than the design value. The variable KSLOPE is not currently defined or used in DPC-NE-2011, the Harris or Robinson TS, or the Harris or Robinson core operating limits report (COLR). DPC-NE-2011, Section 6.4.3, describes an adjustment for the CFM limits in one sentence but does not designate this adjustment using the variable KSLOPE:

If FQM (X, Y, Z) exceeds FQL (X, Y, Z)RPS (CFM limits), then a reduction is made to the OT [over temperature] T trip setpoints, or the f1(I) or f2(I) breakpoints are adjusted.

LAR Enclosure Attachment 1 (Page 2 of 14) states that:

If the RPS margin calculation indicates negative margin, then the overpower T f2(I) breakpoints from the COLR are reduced by KLSOPE for each 1% that the measured FQ exceeds its limit. The variable KSLOPE is determined in the maneuvering analysis and is specified in the COLR.

A similar statement is also in LAR Enclosure Attachment 2.

Also, DPC-NE-2011, Section 6.1, defines the factor K(Z) as the normalized FQ as a function of core height and the factor K(BU) as representing the normalized burnup dependency of the FQ limit at rated thermal power. However, DPC-NE-2011 does not specify how these factors are determined or how whether they are sensitive to fuel types applicable to Harris and Robinson.

Page 1 of 16

RA-18-0016 Attachment 2 Responses to the NRC Request for Additional Information (Redacted)

The NRC staff has identified the following questions to ensure the appropriate considerations are made in the determination of KSLOPE and that the CFM and loss of coolant accident limits are protected.

a. Identify the steps taken and the parameters considered in determining KSLOPE.
b. Explain how the normalized FQ (X, Y, Z) as a function of core height (K(Z)) is calculated. Provide reason(s) for any assumptions in calculating this factor.
c. Explain how the normalized FQ (X, Y, Z) as a function of burnup (K(BU)) is calculated. Provide reason (s) for any assumptions in calculating this factor.
d. Address fuel type dependencies as applicable to Harris and Robinson in your response to the above questions.

SRXB-RAI-1 Response:

Part (a):

If the measured FQ exceeds the centerline fuel melt limit, FQL (X, Y, Z)RPS, the overpower T f2(I) trip reset function breakpoints from the Core Operating Limits Report (COLR) are reduced by KSLOPE for each 1% that the measured FQ exceeds its limit. The variable KSLOPE is the derivative that relates the change in centerline fuel melt peaking margin to a change in I. This derivative has the units of

%FQ/%I. The process used to calculate this variable is described below.

The initial step requires generation of three-dimensional core power distributions. These power distributions are generated with SIMULATE-3 [

]a,c An example CFM margin plot is shown in Figure RAI-1-1 at 117.5% full power (FP). Using this information, conservative [

]a,c Page 2 of 16

RA-18-0016 Attachment 2 Responses to the NRC Request for Additional Information (Redacted)

The variable KSLOPE is specified in the COLR. An illustration of its use follows. If the measured FQ exceeds the centerline fuel melt limit by 2%, then the positive and negative f2(I) trip reset function breakpoints would have to be reduced by greater than or equal to [

]a,c Figure RAI-1-1 Example 117.5% FP CFM Margins a, c Part (b) and (c):

The generation of the loss of coolant accident (LOCA) analysis limits for the fuel designs in operation in Duke Energys reactors is the responsibility of the fuel vendor performing the LOCA analysis. These limits are determined using a NRC-approved methodology, and include a reference FQ value which may be modified by axial and burnup dependent functions. The reference FQ , including any axial and burnup dependencies, limits the amount of stored energy assumed at the initiation of a LOCA and the peak location heat generation rate to acceptable levels that prevent peak clad temperatures from exceeding design limits. The LOCA FQ limits specified by the fuel vendor are verified analytically using the methodology defined in DPC-NE-2011, and by periodic power distribution measurements by satisfying the following relationship:

FQM (X, Y, Z) (FQRTP /P) x K(Z) x K(BU) (P > 0.5)

Page 3 of 16

RA-18-0016 Attachment 2 Responses to the NRC Request for Additional Information (Redacted) where, FQM (X, Y, Z) is the measured FQ FQRTP is the FQ limit at rated thermal power (RTP) conditions provided in the COLR P is the fraction of rated thermal power (Thermal Power/RTP)

K(Z) is the normalized FQRTPas a function of core height provided in the COLR K(BU) is the normalized FQRTPas a function of burnup provided in the COLR In general, the K(Z) function accounts for the lower region of the reactor core being less limiting than the top because it quenches faster. This allows for a higher FQ to be tolerated in this region of the core without impacting peak clad temperature margin. A burnup dependent function may be required to limit the initial amount of stored energy in the fuel to account for phenomena such as fuel thermal conductivity degradation (TCD). The need for either a K(Z) or K(BU) function is dependent upon the fuel design, the nuclear steam supply system (NSSS) design, the thermal output of the reactor core, and the modeling assumptions specified in the NRC-licensed LOCA methodology. Any assumptions made in the development of the K(Z) and K(BU) functions are based on the licensed method under the control of the fuel vendor performing the LOCA analysis. Configuration control is maintained by the transmittal of FQRTP, and K(Z) and K(BU), if applicable, from the fuel vendor to Duke Energy for each reload core.

Example K(Z) and K(BU) functions are presented Tables RAI-1-1 and RAI-1-2 to illustrate the calculation of each function.

Table RAI-1-1 Example K(Z) Function Axial Elevation (ft.) FQ Limit K(Z) Note 1 0 2.60 1.0 4 2.60 1.0

>4 2.50 0.9615 12 2.50 0.9615 Note 1: Assumes FQRTP= 2.60 Table RAI-1-2 Example K(BU) Function Burnup (MWD/MTU) FQ Limit K(BU) Note 2 0 2.60 1.0 35,000 2.60 1.0 55,000 2.34 0.9 62,000 2.08 0.8 Note 2: Assumes FQRTP= 2.60 Page 4 of 16

RA-18-0016 Attachment 2 Responses to the NRC Request for Additional Information (Redacted)

Part (d):

Fuel type dependencies applicable to the calculation of KSLOPE, and K(Z) and K(BU) are addressed separately below.

KSLOPE:

Cycle-specific CFM margin calculations are performed to confirm the acceptability of the centerline fuel melt design criteria using the methodology described in Reference RAI-1-1. These same calculations are used to confirm the acceptability of KSLOPE. CFM linear heat generation limits are generated for each unique fuel design present in the reactor core using a NRC-approved fuel rod mechanical analysis methodology and fuel performance code. The core model used to generate power distributions for CFM margin comparisons also explicitly models the characteristics of each unique fuel design in the reactor core. Because both the predictions and limits account for the characteristics of the fuel in operation, the results from the CFM margin calculations implicitly include any fuel type dependencies, thus preserving the fidelity of the analysis used to confirm the acceptability of KSLOPE, or used as the basis to calculate a new value.

K(Z) and K(BU):

LOCA limits are typically developed for each unique fuel design present in the reactor. They consist of a reference value, FQRTP, which may be modified by axial and burnup dependent functions to limit the initial amount of stored energy to preclude peak clad temperature limits from being exceeded. The need for axial and burnup dependent functions, designated as K(Z) and K(BU), is dependent upon the characteristics of fuel design, the thermal output of the reactor, and the response of the NSSS during a LOCA. For the remainder of this discussion, the term LOCA limits refers to the aggregate of the reference LOCA value and any K(Z) or K(BU) functions. Because LOCA limits are dependent on the NSSS design, the fuel design and the thermal output of the reactor core, there are separate LOCA analysis limits applicable to Harris and Robinson. If a new fuel design is introduced to one of these reactors, the acceptability of the existing LOCA limits would be determined, and if needed, new LOCA limits defined for the new fuel design. The cycle-specific confirmation of these limits would either use bounding limits that envelope all fuel designs, or limits which are mapped to the appropriate core locations of each unique fuel design in the reactor core. The core model used in reload design calculations also models each unique fuel design present in the reactor core. As a result, the power distributions used to confirm the acceptability of the LOCA limits, and the LOCA limits themselves, include the impact of the fuel designs in operation. For these reasons, the cycle-specific reload analyses performed to establish Technical Specification limits (i.e. AFD and rod insertion limits) that preserve the LOCA analysis FQ assumptions appropriately account for the impact of any fuel design present in the reactor core.

SRXB-RAI-1 References RAI-1-1. DPC-NE-2011-P-A, Nuclear Design Methodology for Core Operating Limits of Westinghouse Reactors, Revision 2 Page 5 of 16

RA-18-0016 Attachment 2 Responses to the NRC Request for Additional Information (Redacted)

SRXB-RAI-2 LAR Enclosure Attachments 1 and 3 describe the proposed revision to Robinson TS 3.2.1, Heat Flux Hot Channel Factor (FQ ). The LAR proposes a new LCO Action statement, LCO 3.2.1 Action C, that compares the measured FQM (X, Y, Z) against the centerline fuel melt limit (FQL (X, Y, Z)RPS). If FQM (X, Y, Z) exceeds FQL (X, Y, Z)RPS, the LAR proposes the following.

C.1 Reduce the OPT f2(I) breakpoints from the COLR limit by KSLOPE for each 1%

FQM (X, Y, Z) exceeds limit.

The proposed LCO 3.2.1 Action C has a proposed completion time of 72 hours8.333333e-4 days <br />0.02 hours <br />1.190476e-4 weeks <br />2.7396e-5 months <br />.

However, the technical justification in LAR Enclosure Attachment 1 for LCO 3.2.1 Action C is insufficient. Please provide a technical justification for LCO 3.2.1 Action C, including addressing the following.

a. The LAR does not address the completion time for LCO 3.2.1 Action C. Please provide a basis for the LCO 3.2.1 Action C completion time.
b. Robinson TS Table 3.3.1-1, Reactor Protection System Instrumentation, Note 2, Overpower T, includes the Overpower T (OPT) function. The Robinson OPT function includes an axial imbalance function that is designated as f(I). However, in the proposed Robinson LCO 3.2.1 Action C.1, the axial imbalance function is designated as f2(I), not f(I). Please revise the proposed Robinson LCO 3.2.1 Action C.1 to be consistent with TS Table 3.3.1-1, Note 2, including providing the appropriate TS page markup, or justify the discrepancy.

SRXB-RAI-2 Response:

Part (a):

If the measured FQ , FQM (X, Y, Z), exceeds the centerline fuel melt limit, FQL (X, Y, Z)RPS , which preserves the centerline fuel melt limit in the transient condition, LCO 3.2.1 Action C.1 requires a reduction in the OPT f2(I) breakpoints by KSLOPE for each 1% FQM (X, Y, Z) exceeds the centerline fuel melt limit. A 72 hour8.333333e-4 days <br />0.02 hours <br />1.190476e-4 weeks <br />2.7396e-5 months <br /> completion time is specified for this task. This completion time allows for an evaluation of the flux map measurement to confirm the validity of the out-of-limit condition, and if necessary, performance of confirmatory flux map prior to the implementation of the RPS setpoint change. If the out-of-limit condition is confirmed, the 72 hour8.333333e-4 days <br />0.02 hours <br />1.190476e-4 weeks <br />2.7396e-5 months <br /> completion time supports the orderly performance of the RPS setpoint modification, including the generation of a work order, work plan, job brief, rescheduling of any conflicting work, and the actual f2(I) breakpoint modification for each instrument channel. The 72 hour8.333333e-4 days <br />0.02 hours <br />1.190476e-4 weeks <br />2.7396e-5 months <br /> completion time is also consistent with completions times required to modify other RPS trip functions such as those required by TS 3.2.1 Actions B.3 and B.4. For these reasons, and because the probability of a limiting transient that would challenge the centerline fuel melt limit in this time period is highly unlikely, the 72 hour8.333333e-4 days <br />0.02 hours <br />1.190476e-4 weeks <br />2.7396e-5 months <br /> completion time is considered acceptable.

Page 6 of 16

RA-18-0016 Attachment 2 Responses to the NRC Request for Additional Information (Redacted)

Part (b):

The Table 3.3.1-1 f(I) trip reset function nomenclature specified in Note 2 is revised by adding a 2 subscript to be consistent with the nomenclature used in Action C.1. Additionally, the OTT f(I) trip reset function nomenclature specified in Note 1 is also revised by adding a 1 subscript. These revisions make the f(I) trip reset function nomenclature contained in these Notes consistent with that used at Harris, McGuire Nuclear Station and Catawba Nuclear Station. Attachment 4 contains the Table 3.3.1-1 markups identifying the proposed changes.

Page 7 of 16

RA-18-0016 Attachment 2 Responses to the NRC Request for Additional Information (Redacted)

SRXB-RAI-3:

The LAR proposes to replace the Robinson SR 3.2.1.1, and add two new SRs, SR 3.2.1.2, and SR 3.2.1.3.

The LAR does not technically justify the surveillance frequencies for the replaced SR 3.2.1.1 or for the new SRs, SR 3.2.1.2, and SR 3.2.1.3. Please discuss and provide a technical justification for the surveillance frequencies of the revised and new SRs.

SRXB-RAI-3 Response:

The proposed justifications for the replaced SR 3.2.1.1 and for the new SR 3.2.1.2 and SR 3.2.1.3 are provided below. SR 3.2.1.1, SR 3.2.1.2, and SR 3.2.1.3 are modified by the following Note:

During power escalation at the beginning of each cycle, THERMAL POWER may be increased until an equilibrium power level has been achieved, at which a power distribution map is obtained.

This note applies during the first power ascension after a refueling and allows for an increase in thermal power until an equilibrium power level has been achieved at which time a power distribution map can be obtained. This allowance, however, is modified by one of the three frequency conditions shown below.

  • Once after each refueling prior to THERMAL POWER exceeding 75% RTP, and
  • Once within 12 hours1.388889e-4 days <br />0.00333 hours <br />1.984127e-5 weeks <br />4.566e-6 months <br /> after achieving equilibrium conditions after exceeding, by > 10% RTP, the THERMAL POWER at which FQM (X, Y, Z) was last verified, and
  • 31 EFPD [effective full power days] thereafter All three frequency conditions are applicable to SR 3.2.1.1, SR 3.2.1.2, and SR 3.2.1.3. The first condition requires a FQ measurement following a refueling outage prior to thermal power exceeding 75%

RTP. The second condition requires verification that the measured FQ , FQM (X, Y, Z), is within specified limits after a power rise of > 10% RTP over the thermal power at which it was last verified to be within specified limits. Because FQM (X, Y, Z) could not have previously been measured in this reload core, power may be increased to RTP prior to an equilibrium verification of FQM (X, Y, Z) provided a measurement of FQM (X, Y, Z) is performed at one or more power levels during startup physics testing. As required by the first condition, these measurements are performed prior to reaching 75% RTP. This ensures that a determination of FQM (X, Y, Z) is made at a lower power level at which adequate margin is available before power is increased to 100% RTP. Without the first and second frequency conditions, reactor power could be increased to the RTP condition and operated for 31 EFPD prior to verification that FQM (X, Y, Z) is within limits. The second frequency condition is not intended to require verification of the surveillance parameters after every 10% increase in power level above the last verification. It only requires verification after a power level is achieved for extended operation that is at least 10% higher than that power at which FQ was last measured.

The 12 hour1.388889e-4 days <br />0.00333 hours <br />1.984127e-5 weeks <br />4.566e-6 months <br /> completion time after achieving equilibrium conditions allows for the orderly setup and performance of a flux map and the associated processing and review of the results used to verify each limit.

Page 8 of 16

RA-18-0016 Attachment 2 Responses to the NRC Request for Additional Information (Redacted)

The 31 EFPD frequency is acceptable for verifying that FQM (X, Y, Z) is within limits because of the slow and predictable behavior of the core power distribution with increasing burnup and burnable absorber depletion. Provisions of SR 3.2.1.2 and SR 3.2.1.3 also extrapolate the measured power distribution for 31 EFPD beyond the most recent measurement and repeats the margin calculations at this future state to ensure FQ (X, Y, Z) remains within applicable limits.

Page 9 of 16

RA-18-0016 Attachment 2 Responses to the NRC Request for Additional Information (Redacted)

SRXB-RAI-4:

For Robinson TS 3.2.3, Axial Flux Difference (AFD), SR 3.2.3.1, SR 3.2.3.2, and SR 3.2.3.3 are proposed to be replaced with SR 3.2.3.1.

a. While the surveillance portion of SR 3.2.3.1 was retained, the frequency portion of SR 3.2.3.1 was revised. However, the LAR does not address this change.
b. The existing SR 3.2.3.2 includes the following note in the frequency portion of the SR Only required to be performed if AFD monitor is inoperable The existing SR 3.2.3.2 was partially included in the frequency column of SR 3.2.3.1, however, the following was not included: (1) the need to log the AFD for each operable channel, (2) the note in the surveillance portion of the SR, and (3) the condition to perform the SR on 15 minutes intervals. The LAR does not address this change. The staff notes that the LAR proposed to retain the logging provision and the equivalent of the note in the surveillance portion of the Harris AFD TS but the LAR does not describe the reason the provisions are deleted for Robinson but retained for Harris.

Please provide a discussion of and a technical justification for the proposed revision to the Robinson SR 3.2.3.1 and the elimination of SR 3.2.3.2 SRXB-RAI-4 Response:

A single response is provided to answer parts (a) and (b).

Current SR 3.2.3.1 and the SR 3.2.3.2 specify the requirement to monitor AFD for the condition where each excore channel is operable (SR 3.2.3.1) and for the condition where the AFD monitor alarm is inoperable (SR 3.2.3.2). To accommodate the proposed deletion of SR 3.2.3.2, the frequency portion of SR 3.2.3.1 is being revised to add the requirement to monitor AFD more frequently when the AFD monitor alarm is inoperable. The AFD logging requirements and variable monitoring frequency requirements that depend upon power level for SR 3.2.3.2 were removed. Justifications for each of these changes are presented below.

Current SR 3.2.3.2 requires an AFD log to be established to monitor the accumulation of penalty minutes for the time AFD was outside of the target band. This requirement is a carryover from the AREVA PDC-3 Axial Offset Control Methodology and is not required in the Duke Energy methodology. Therefore, the note that states, Assume logged values of AFD exist during the previous time interval is no longer required. For the same reason, the requirement to log AFD for each operable excore channel if the AFD monitor alarm monitor is inoperable is also removed.

The proposed revision to SR.3.2.3.1 adds the requirement to monitor AFD more frequently if the AFD monitor alarm is inoperable. The monitoring frequency is 7 days when the alarm monitor is operable, and is reduced to 1 hour1.157407e-5 days <br />2.777778e-4 hours <br />1.653439e-6 weeks <br />3.805e-7 months <br /> if it is not. The variable frequency requirement when the AFD alarm monitor is inoperable in the current SR 3.2.3.2 is removed because there is no basis for the increased monitoring frequency depending upon the operating power level (15 minutes with thermal power > 90% RTP and 1 Page 10 of 16

RA-18-0016 Attachment 2 Responses to the NRC Request for Additional Information (Redacted) hour when thermal power is < 90% FTP). This multi-tiered requirement adds administrative burden to the operations staff and is replaced in the proposed SR 3.2.3.1 with the requirement to monitor AFD within 1 hour1.157407e-5 days <br />2.777778e-4 hours <br />1.653439e-6 weeks <br />3.805e-7 months <br /> of the AFD monitor alarm being inoperable, and every 1 hour1.157407e-5 days <br />2.777778e-4 hours <br />1.653439e-6 weeks <br />3.805e-7 months <br /> thereafter. This singular surveillance frequency is acceptable during normal operation because AFD changes slowly over time.

During a transient condition where AFD may change at a faster rate, the indicated AFD on the control board would be monitored by the operations staff as part of normal practice. A 1 hour1.157407e-5 days <br />2.777778e-4 hours <br />1.653439e-6 weeks <br />3.805e-7 months <br /> surveillance frequency is also consistent with the McGuire and Catawba Technical Specifications.

To maintain fleet consistency, a change to Harris SR 4.2.1.1 is proposed. The proposed change encompasses removing the logging provision when the AFD Monitor Alarm is inoperable. This is justified because there are no requirements in the Duke Energy methodology requiring the logging of AFD.

The proposed revision to Harris SR 4.2.1.1 is shown below. Attachment 5 contains the updated Technical Specification markup that includes this proposed revision.

4.2.1.1 The indicated AFD shall be determined to be within its limits during POWER OPERATION above 50% of RATED THERMAL POWER by:

a. Monitoring the indicated AFD for each OPERABLE excore channel at the frequency specified in the Surveillance Frequency Control Program when the AFD Monitor Alarm is OPERABLE, and
b. Monitoring and logging the indicated AFD for each OPERABLE excore channel at least once within 1 hour1.157407e-5 days <br />2.777778e-4 hours <br />1.653439e-6 weeks <br />3.805e-7 months <br /> and every 1 hour1.157407e-5 days <br />2.777778e-4 hours <br />1.653439e-6 weeks <br />3.805e-7 months <br /> per hour for the first 24 hours2.777778e-4 days <br />0.00667 hours <br />3.968254e-5 weeks <br />9.132e-6 months <br /> and at least once per 30 minutes thereafter, when the AFD Monitor Alarm is inoperable. The logged values of the indicated AFD shall be assumed to exist during the interval preceding each logging.

Page 11 of 16

RA-18-0016 Attachment 2 Responses to the NRC Request for Additional Information (Redacted)

SRXB-RAI-5 Robinson TS 5.6.5.a lists TSs with parameters to be documented in the core operating limits report (COLR). The LAR proposes to revise the names of TS of 3.2.1 and 3.2.2 but does not propose corresponding changes in TS 5.6.5.a.5 and TS 5.6.5.a.6. The effect is that the COLR will have parameters not applicable to the TS. Please clarify TS 5.6.5.a to be consistent with the proposed changes to TS of 3.2.1 and 3.2.2 and provide corresponding TS markups as applicable.

SRXB-RAI-5 Response:

Robinson Technical Specification 5.6.5.a is revised to maintain consistency in the naming convention used in the revised TS 3.2.1 and TS 3.2.2 and TS 5.6.5.a items 5 and 6. The revised TS 5.6.5.a is shown below. The updated Technical Specification markup that includes this proposed revision is presented in .

5.6.5 CORE OPERATING LIMITS REPORT (COLR)

a. Core operating limits shall be established prior to each reload cycle, or prior to any remaining portion of a reload cycle, and shall be documented in the COLR for the following:
1. Shutdown Margin (SDM) for Specification 3.1.1;
2. Moderator Temperature Coefficient limits for Specification 3.1.3;
3. Shutdown Bank Insertion Limits for Specification 3.1.5;
4. Control Bank Insertion Limits for Specification 3.1.6;
5. Heat Flux Hot Channel Factor (FQ(Z)) limit (, , ) Limits for Specification 3.2.1; N
6. Nuclear Enthalpy Rise Hot Channel Factor (FH ) limit (, ) Limits for Specification 3.2.2; Harris TS 6.9.1.6.1 is also revised to maintain consistency between TS 3/4.2.2 and TS 3/4.2.3, and TS 6.9.1.6.1 items f and g. This proposed revision to TS 6.9.1.6.1 is shown on the next page. The updated Technical Specification markup that includes this proposed revision is presented in Attachment 5.

Page 12 of 16

RA-18-0016 Attachment 2 Responses to the NRC Request for Additional Information (Redacted) 6.9.1.6 CORE OPERATING LIMITS REPORT 6.9.1.6.1 Core operating limits shall be established and documented in the CORE OPERATING LIMITS REPORT (COLR) prior to each reload cycle, or prior to any remaining portion of a reload cycle, for the following:

a. SHUTDOWN MARGIN limits for Specification 3/4.1.1.2.
b. Moderator Temperature Coefficient Positive and Negative Limits and 300 ppm surveillance limit for Specification 3/4.1.1.3.
c. Shutdown Bank Insertion Limits for Specification 3/4.1.3.5.
d. Control Bank Insertion Limits for Specification 3/4.1.3.6.
e. Axial Flux Difference Limits for Specification 3/4.2.1.
f. Heat Flux Hot Channel Factor, FQRTP, K(Z), and V(Z) (, , ) Limits for Specification 3/4.2.2.

RTP

g. Enthalpy Rise Hot Channel Factor, FH , and Power Factor Multiplier, PFH

(, ) Limits for Specification 3/4.2.3.

h. Boron Concentration for Specification 3/4.9.1.
i. Reactor Core Safety Limits Figure for Specification 2.1.1.
j. Overtemperature T and Overpower T setpoint parameters and time constant values for Specification 2.2.1.
k. Reactor Coolant System pressure, temperature, and flow Departure from Nucleate Boiling (DNB) limits for Specification 3/4.2.5.

Page 13 of 16

RA-18-0016 Attachment 2 Responses to the NRC Request for Additional Information (Redacted)

SRXB-RAI-6:

In LAR Enclosure Attachments 2 and 4, the LAR describes the proposed revision to Harris TS 3/4.2.2, Heat Flux Hot Channel Factor - FQ (Z). The LAR proposes a new TS 3/4.2.2 LCO Action a.1 (from Insert #2b) that states:

1. Reduce Overpower T f2(I) breakpoints from the COLR limit by KSLOPE for each 1%

FQM (X, Y, Z) exceeds the limit within 72 hours8.333333e-4 days <br />0.02 hours <br />1.190476e-4 weeks <br />2.7396e-5 months <br />.

However, Harris TS 3/4.2.2 LCO Action a.1 (from insert 2b) is not fully discussed in the corresponding technical justification section. Please provide a technical justification for Harris TS 3/4.2.2 LCO Action a.1, including addressing the following.

a. The LAR proposes 72 hours8.333333e-4 days <br />0.02 hours <br />1.190476e-4 weeks <br />2.7396e-5 months <br /> to complete the action for LCO 3.2.2 Action a.1 (from insert 2b).

The LAR does not discuss the time period. Please provide a justification for the time period.

b. DPC-NE-2011, in the section designated as Technical Justification of Changes for Revision 2 (Redacted), for Change 6-10, Heat Flux Hot Channel Factor - FQ (X, Y, Z) (Section 6.4.3, third paragraph, page 6-10), states The option to adjust the breakpoints of the OTT f1(I) trip reset penalty function is added because the OPT f2(I) trip reset penalty function at Harris is not active. As a result, the OTT f1(I) trip reset function breakpoints must be adjusted to compensate for the condition where FQM (X, Y, Z) exceeds FQL (X, Y, Z)RPS limit.

The OPT f2(I) trip reset penalty function at Harris being not active means f2(I) is defined as 0.0 for all I and thus f2(I) has no breakpoints or slopes defined. Prior to f2(I) being moved to the COLR by Harris Amendment 161 (ADAMS Accession No. ML17250A202) f2(I) was defined as 0.0 for all I for Harris. In the Harris Cycle 21 Core Operating Limits Report, Revision 1, submitted February 14, 2018 (ADAMS Accession No. ML18045A648), f2(I) was also defined as 0.0 for all I.

Please describe how the proposed action statement addresses the condition of the measured FQM (X, Y, Z) exceeds FQL (X, Y, Z)RPS if the OPT f2(I) trip reset penalty function at Harris is not active. In particular, please describe what it means to adjust the breakpoints for OPT f2(I) when no breakpoints and slopes are defined.

c. Two actions a. are being proposed for TS 3/4.2.2 LCO Action a., one each in inserts 2a and 2b.

Please clarify the designation of the actions for Harris TS 3/4.2.2 LCO Actions.

Page 14 of 16

RA-18-0016 Attachment 2 Responses to the NRC Request for Additional Information (Redacted)

SRXB-RAI-6 Response:

Part (a):

Refer to the response for SRXB-RAI-2 part a.

Part (b):

At the time Revision 2 to the DPC-NE-2011 methodology report was written, the Harris OPT trip function lacked the hardware for the f2(I) trip reset function. Accordingly, a method change was made to allow for the adjustment of the OTT f1(I) trip reset function to regain CFM margin for the condition where FQM (X, Y, Z) exceeds the centerline fuel melt limit, FQL (X, Y, Z)RPS. An option to install the OPT f2(I) trip reset function was being pursued at the time Revision 2 to DPC-NE-2011 was submitted on May 4, 2016 (ADAMS Accession No. ML16125A420), however, the plant modification to install this trip reset penalty function had not been approved. Since the DPC-NE-2011 submittal, the plant modification to install the f2(I) functionality to the OPT trip function has been completed (performed during the spring 2018 refueling outage). Because the full functionality of the OPT trip function, including the f2(I) trip reset function, will be available prior the implementation of Duke Energy reload methods, the action associated with specification 4.2.2.2.c.3 to reduce the overpower T f2(I) breakpoints if the measured FQ is not within limits is acceptable. Breakpoints and slopes assumed in reload analyses for this function will be specified in the Core Operating Limits Report.

Part (c):

Insert 2b should specify action c, not action a. The corrected insert is shown below. Attachment 5 contains the updated Technical Specification markup for TS 3/4.2.2 including the corrected insert.

c. With specification 4.2.2.2.c.3 not being satisfied (FQM (X, Y, Z) exceeding its transient Reactor Protection System limit, FQL (X, Y, Z)RPS ):
1. Reduce Overpower T f2(I) breakpoints by KSLOPE for each 1% FQM (X, Y, Z) exceeds the limit within 72 hours8.333333e-4 days <br />0.02 hours <br />1.190476e-4 weeks <br />2.7396e-5 months <br />.
2. If the required Actions and associated completion times are not met, be in MODE 2 within 6 hours6.944444e-5 days <br />0.00167 hours <br />9.920635e-6 weeks <br />2.283e-6 months <br />.

Page 15 of 16

RA-18-0016 Attachment 2 Responses to the NRC Request for Additional Information (Redacted)

SRXB-RAI-7:

Harris TS 6.9.1.6.1 lists the core operating limits that shall be established and documented in the COLR.

Harris TS 6.9.1.6.2 lists the analytical methods to be used to determine the core operating limits and the TS each analytical method is being used to determine. The LAR proposes to add to Harris TS 6.9.1.6.1 core operating limits in TSs 3/4.1.1.1, 3/4.1.2.5, 3/4.1.2.6, 3/4.5.1, and 3/4.5.4; however, no corresponding changes were proposed to TS 6.9.1.6.2 to identify the analytical methods applicable to the proposed added TS. LAR Enclosure Section 3.0 states that or each proposed TS relocation described in LAR Enclosure Sections 2.2 and 2.4, DPC-NF-2010 is the NRC-approved methodology used to calculate the appropriate acceptance criteria to ensure applicable plant safety analysis limits are met. Please provide a markup of TS 6.9.1.6.2 to reflect the additional TS DPC-NF-2010 is being used to determine.

SRXB-RAI-7 Response:

DPC-NF-2010-A was added to the list of analytical methods used to determine core operating limits as part of the NRC approval of the license amendment request for this report (ADAMS Accession No. ML17102A923). The citation for DPC-NF-2010-A in Technical Specification 6.9.1.6.2 (item r) is modified to add the core operating limits associated with Technical Specifications 3/4.1.1.1, 3/4.1.2.5, 3/4.1.2.6, 3/4.5.1 and 3/4.5.4. The modified citation is shown below. Attachment 5 contains the updated Technical Specification markup that includes this proposed revision to TS 6.9.1.6.2.

r. DPC-NF-2010-A, Nuclear Physics Methodology for Reload Design, as approved by NRC Safety Evaluation dated May 18, 2017.

(Methodology for Specifications 3.1.1.1 - SHUTDOWN MARGIN - MODES 1 and 2, 3.1.1.2

- SHUTDOWN MARGIN - MODES 3, 4, and 5, 3.1.1.3 - Moderator Temperature Coefficient, 3.1.2.5 - Borated Water Source - Shutdown, 3.1.2.6 - Borated Water Sources - Operating, 3.1.3.5 - Shutdown Bank Insertion Limits, 3.1.3.6 - Control Bank Insertion Limits, 3.5.1 -

ECCS Accumulators - Cold Leg Injection, 3.5.4 - ECCS Refueling Water Storage Tank, and 3.9.1 - Boron Concentration).

Page 16 of 16 RA-18-0016 Attachment 3 Responses to the NRC Request for Additional Information (Proprietary)

Note: Text that is within brackets with an a,c superscript is proprietary to Duke Energy.

RA-18-0016 Attachment 4 Robinson Proposed Technical Specification Changes (Markup)

 536,QVWUXPHQWDWLRQ

 





 7DEOH SDJHRI 

 5HDFWRU3URWHFWLRQ6\VWHP,QVWUXPHQWDWLRQ





1RWH2YHUWHPSHUDWXUH7



7KH2YHUWHPSHUDWXUH7)XQFWLRQ$OORZDEOH9DOXHVKDOOQRWH[FHHGWKHIROORZLQJ1RPLQDO7ULS

6HWSRLQWE\PRUHWKDQRI7VSDQ



 7VHWSRLQW7^..> 6  6 @ 77 . 33 +/-I , `



KHUH 7LVWKHLQGLFDWHG7DW573)

 VLVWKH/DSODFHWUDQVIRUPRSHUDWRUVHF 

 f1(I)

 7LVWKHPHDVXUHG5&6DYHUDJHWHPSHUDWXUH)

 7 LVWKHUHIHUHQFH7DYJDW573> @)



 3LVWKHPHDVXUHGSUHVVXUL]HUSUHVVXUHSVLJ

 3 LVWKHQRPLQDO5&6RSHUDWLQJSUHVVXUH> @SVLJ



 .> @ . > @) . > @SVLJ

 > @VHF > @VHF 



 I ,   > @^ TETW > @` ZKHQTWTE> @573

  RI573 ZKHQ> @573TWTE> @573

  > @^ TWTE > @` ZKHQTWTE!> @573

 f1(I)

  :KHUHTWDQGTEDUHSHUFHQW573LQWKHXSSHUDQGORZHUKDOYHVRIWKHFRUH

UHVSHFWLYHO\DQGTWTELVWKHWRWDO7+(50$/32:(5LQSHUFHQW573





7KHYDOXHVGHQRWHGZLWK> @DUHVSHFLILHGLQWKH&2/5



+%56(38QLW1R     $PHQGPHQW1R

 536,QVWUXPHQWDWLRQ

 





 7DEOH SDJHRI 

 5HDFWRU3URWHFWLRQ6\VWHP,QVWUXPHQWDWLRQ





1RWH2YHUSRZHU7



7KH2YHUSRZHU7)XQFWLRQ$OORZDEOH9DOXHVKDOOQRWH[FHHGWKHIROORZLQJ1RPLQDO7ULS6HWSRLQWE\

PRUHWKDQRI7VSDQ





 7VHWSRLQW7^.+/-.>6 6 @7+/-. 77 +/-I , `





KHUH 7LVWKHLQGLFDWHG7DW573) f2(I)



 VLVWKH/DSODFHWUDQVIRUPRSHUDWRUVHF 

 7LVWKHPHDVXUHG5&6DYHUDJHWHPSHUDWXUH)

 7 LVWKHUHIHUHQFH7DYJDW573> @)



 .> @ .> @)IRULQFUHDVLQJ7DYJ .> @)ZKHQ7!7 

  > @)IRUGHFUHDVLQJ7DYJ > @)ZKHQ77 

     W> @VHF



 I ,   > @^ TETW > @` ZKHQTWTE> @573

  RI573 ZKHQ> @573TWTE> @573

  > @^ TWTE > @` ZKHQTWTE!> @573

 f2(I)

  :KHUHTWDQGTEDUHSHUFHQW573LQWKHXSSHUDQGORZHUKDOYHVRIWKHFRUH

UHVSHFWLYHO\DQGTWTELVWKHWRWDO7+(50$/32:(5LQSHUFHQW573





7KHYDOXHVGHQRWHGZLWK> @DUHVSHFLILHGLQWKH&2/5











+%56(38QLW1R     $PHQGPHQW1R

5HSRUWLQJ5HTXLUHPHQWV



5HSRUWLQJ5HTXLUHPHQWV

 $QQXDO5DGLRORJLFDO(QYLURQPHQWDO2SHUDWLQJ5HSRUW FRQWLQXHG 

,QWKHHYHQWWKDWVRPHLQGLYLGXDOUHVXOWVDUHQRWDYDLODEOHIRULQFOXVLRQZLWKWKH

UHSRUWWKHUHSRUWVKDOOEHVXEPLWWHGQRWLQJDQGH[SODLQLQJWKHUHDVRQVIRUWKH

PLVVLQJUHVXOWV7KHPLVVLQJGDWDVKDOOEHVXEPLWWHGLQDVXSSOHPHQWDU\UHSRUW

DVVRRQDVSRVVLEOH

 5DGLRDFWLYH(IIOXHQW5HOHDVH5HSRUW

7KH5DGLRDFWLYH(IIOXHQW5HOHDVH5HSRUWFRYHULQJWKHRSHUDWLRQRIWKHXQLWVKDOO

EHVXEPLWWHGLQDFFRUGDQFHZLWK&)5D7KHUHSRUWVKDOOLQFOXGHD

VXPPDU\RIWKHTXDQWLWLHVRIUDGLRDFWLYHOLTXLGDQGJDVHRXVHIIOXHQWVDQGVROLG

ZDVWHUHOHDVHGIURPWKHXQLW7KHPDWHULDOSURYLGHGVKDOOEHFRQVLVWHQWZLWKWKH

REMHFWLYHVRXWOLQHGLQWKH2'&0DQG3URFHVV&RQWURO3URJUDPDQGLQ

FRQIRUPDQFHZLWK&)5DDQG&)5$SSHQGL[,6HFWLRQ,9%

 '(/(7('

 &25(23(5$7,1*/,0,765(3257 &2/5 

D &RUHRSHUDWLQJOLPLWVVKDOOEHHVWDEOLVKHGSULRUWRHDFKUHORDGF\FOHRU SULRUWRDQ\UHPDLQLQJSRUWLRQRIDUHORDGF\FOHDQGVKDOOEHGRFXPHQWHG LQWKH&2/5IRUWKHIROORZLQJ

 6KXWGRZQ0DUJLQ 6'0 IRU6SHFLILFDWLRQ

 0RGHUDWRU7HPSHUDWXUH&RHIILFLHQWOLPLWVIRU6SHFLILFDWLRQ

 6KXWGRZQ%DQN,QVHUWLRQ/LPLWVIRU6SHFLILFDWLRQ

 &RQWURO%DQN,QVHUWLRQ/LPLWVIRU6SHFLILFDWLRQ 

)4 ;<= Limits

 +HDW)OX[+RW&KDQQHO)DFWRU ) 4 = OLPLWIRU6SHFLILFDWLRQ

 1XFOHDU(QWKDOS\5LVH+RW&KDQQHO)DFWRU )1 + OLPLWIRU 6SHFLILFDWLRQ

FH(X,Y) Limits FRQWLQXHG 

+%56(38QLW1R  $PHQGPHQW1R

RA-18-0016 Attachment 5 Harris Proposed Technical Specification Changes (Markup)

32:(5',675,%87,21/,0,76

6859(,//$1&(5(48,5(0(176

 7KHLQGLFDWHG$)'VKDOOEHGHWHUPLQHGWREHZLWKLQLWVOLPLWVGXULQJ32:(5

23(5$7,21DERYHRI5$7('7+(50$/32:(5E\

D 0RQLWRULQJWKHLQGLFDWHG$)'IRUHDFK23(5$%/(H[FRUHFKDQQHODWWKH IUHTXHQF\VSHFLILHGLQWKH6XUYHLOODQFH)UHTXHQF\&RQWURO3URJUDPZKHQWKH

$)'0RQLWRU$ODUPLV23(5$%/(DQG within 1 hour1.157407e-5 days <br />2.777778e-4 hours <br />1.653439e-6 weeks <br />3.805e-7 months <br /> and every 1 hour1.157407e-5 days <br />2.777778e-4 hours <br />1.653439e-6 weeks <br />3.805e-7 months <br /> E 0RQLWRULQJDQGORJJLQJWKHLQGLFDWHG$)'IRUHDFK23(5$%/(H[FRUHFKDQQHODW OHDVWRQFHSHUKRXUIRUWKHILUVWKRXUVDQGDWOHDVWRQFHSHUPLQXWHV WKHUHDIWHUZKHQWKH$)'0RQLWRU$ODUPLVLQRSHUDEOH  7KHORJJHGYDOXHVRIWKH LQGLFDWHG$)'VKDOOEHDVVXPHGWRH[LVWGXULQJWKHLQWHUYDOSUHFHGLQJHDFK ORJJLQJ

 7KHLQGLFDWHG$)'VKDOOEHFRQVLGHUHGRXWVLGHRILWVOLPLWVZKHQWZRRUPRUH

23(5$%/(H[FRUHFKDQQHOVDUHLQGLFDWLQJWKH$)'WREHRXWVLGHWKHOLPLWV

 7KHWDUJHW$)'RIHDFK23(5$%/(H[FRUHFKDQQHOVKDOOEHGHWHUPLQHGE\H[FRUH

PHDVXUHPHQWDWWKHIUHTXHQF\VSHFLILHGLQWKH6XUYHLOODQFH)UHTXHQF\&RQWURO

3URJUDPLQFRQMXQFWLRQZLWKWKHUHTXLUHPHQWVRI6SHFLILFDWLRQ  7KHWDUJHW

$)'PD\EHXSGDWHGEHWZHHQPHDVXUHPHQWVE\DGGLQJWKHPRVWUHFHQWO\PHDVXUHG

YDOXHDQGWKHFKDQJHLQWKHSUHGLFWHGYDOXHVLQFHWKHPHDVXUHPHQW  7KHSURYLVLRQV

RI6SHFLILFDWLRQDUHQRWDSSOLFDEOH

Delete 6+($521+$55,681,7  $PHQGPHQW1R  

Replace "Z" with "X,Y,Z" Replace with: )04 ;<= 

Replace with Inserts #2a and 2b

D :LWKVSHFLILFDWLRQFQRWEHLQJVDWLVILHG ( , , )H[FHHGLQJLWVVWHDG\VWDWH

OLPLW 



 5HGXFH7+(50$/32:(5IRUHDFK ( , , )H[FHHGVWKHOLPLWZLWKLQ

PLQXWHV



 5HGXFHWKH3RZHU5DQJH1HXWURQ)OX[+LJK7ULSVHWSRLQWVE\IRUHDFK

( , , )H[FHHGVWKHOLPLWZLWKLQKRXUV



 5HGXFHWKH2YHUSRZHU'7WULSVHWSRLQWVE\IRUHDFK ( , , )H[FHHGV

WKHOLPLWZLWKLQKRXUV



 3ULRUWRLQFUHDVLQJ7+(50$/32:(5DERYHWKHPD[LPXPDOORZDEOHSRZHUOHYHO

IURPDFWLRQDGHPRQVWUDWHWKURXJKLQFRUHIOX[PDSSLQJWKDW ( , , )LV

ZLWKLQLWVVWHDG\VWDWHOLPLW



 ,IWKHUHTXLUHG$FWLRQVDQGDVVRFLDWHGFRPSOHWLRQWLPHVDUHQRWPHWEHLQ02'(

ZLWKLQKRXUV





E :LWKVSHFLILFDWLRQFQRWEHLQJVDWLVILHG ( , , )H[FHHGLQJLWVWUDQVLHQW

2SHUDWLRQDOOLPLW ( , , ) 



 5HGXFH$)'OLPLWVE\WKHDPRXQWVSHFLILHGLQWKH&2/5WRUHVWRUH ( , , )WR

ZLWKLQLWVOLPLWVZLWKLQKRXUV



 5HGXFH7+(50$/32:(5E\WKHDPRXQWVSHFLILHGLQWKH&2/5WRUHVWRUH

( , , )WRZLWKLQLWVOLPLWVZLWKLQKRXUV



 5HGXFH3RZHU5DQJH1HXWURQ)OX[+/-+LJKWULSVHWSRLQWVIRUHDFKWKDWWKH

7+(50$/32:(5OHYHOLVUHGXFHGZLWKLQKRXUV



 5HGXFHWKH2YHUSRZHU'7WULSVHWSRLQWVE\IRUHDFKWKDWWKH7+(50$/

32:(5OHYHOLVUHGXFHGZLWKLQKRXUV



 3ULRUWRLQFUHDVLQJ7+(50$/32:(5DERYHWKHPD[LPXPDOORZDEOHSRZHUOHYHO

IURPDFWLRQEGHPRQVWUDWHWKURXJKLQFRUHIOX[PDSSLQJWKDW ( , , )LV

ZLWKLQLWVWUDQVLHQWRSHUDWLRQDOOLPLW ( , , ) 



 ,IWKHUHTXLUHG$FWLRQVDQGDVVRFLDWHGFRPSOHWLRQWLPHVDUHQRWPHWEHLQ02'(

ZLWKLQKRXUV

Insert #2a

F :LWKVSHFLILFDWLRQFQRWEHLQJVDWLVILHG ( , , )H[FHHGLQJLWVWUDQVLHQW5HDFWRU

3URWHFWLRQ6\VWHPOLPLW ( , , ) 



 5HGXFH2YHUSRZHU'7I ', EUHDNSRLQWVE\.6/23(IRUHDFK ( , , )

H[FHHGVWKHOLPLWZLWKLQKRXUV



 ,IWKHUHTXLUHG$FWLRQVDQGDVVRFLDWHGFRPSOHWLRQWLPHVDUHQRWPHWEHLQ02'(

ZLWKLQKRXUV

Insert #2b

$'0,1,675$7,9(&21752/6

  &25(23(5$7,1*/,0,765(3257

Insert "3/4.1.1.1 and"

&RUHRSHUDWLQJOLPLWVVKDOOEHHVWDEOLVKHGDQGGRFXPHQWHGLQWKH&25(23(5$7,1*

/,0,765(3257 &2/5 SULRUWRHDFKUHORDGF\FOHRUSULRUWRDQ\UHPDLQLQJSRUWLRQRI

DUHORDGF\FOHIRUWKHIROORZLQJ

D 6+87'2:10$5*,1OLPLWVIRU6SHFLILFDWLRQ

E 0RGHUDWRU7HPSHUDWXUH&RHIILFLHQW3RVLWLYHDQG1HJDWLYH/LPLWVDQGSSP VXUYHLOODQFHOLPLWIRU6SHFLILFDWLRQ

F 6KXWGRZQ%DQN,QVHUWLRQ/LPLWVIRU6SHFLILFDWLRQ

G &RQWURO%DQN,QVHUWLRQ/LPLWVIRU6SHFLILFDWLRQ



H $[LDO)OX['LIIHUHQFH/LPLWVIRU6SHFLILFDWLRQ )4 ;<=  Limits I +HDW)OX[+RW&KDQQHO)DFWRU)

. = DQG9 = IRU6SHFLILFDWLRQ

J (QWKDOS\5LVH+RW&KDQQHO)DFWRU)

DQG3RZHU)DFWRU0XOWLSOLHU3)¨+IRU

6SHFLILFDWLRQ FH(X,Y) Limits K %RURQ&RQFHQWUDWLRQIRU6SHFLILFDWLRQ

L 5HDFWRU&RUH6DIHW\/LPLWV)LJXUHIRU6SHFLILFDWLRQ

Add Insert #7 M 2YHUWHPSHUDWXUH¨7DQG2YHUSRZHU¨7VHWSRLQWSDUDPHWHUVDQGWLPHFRQVWDQW YDOXHVIRU6SHFLILFDWLRQ

N 5HDFWRU&RRODQW6\VWHPSUHVVXUHWHPSHUDWXUHDQGIORZ'HSDUWXUHIURP 1XFOHDWH%RLOLQJ '1% OLPLWVIRU6SHFLILFDWLRQ

7KHDQDO\WLFDOPHWKRGVXVHGWRGHWHUPLQHWKHFRUHRSHUDWLQJOLPLWVVKDOOEHWKRVH

SUHYLRXVO\UHYLHZHGDQGDSSURYHGE\WKH15&DWWKHWLPHWKHUHORDGDQDO\VHVDUH

SHUIRUPHGDQGWKHDSSURYHGUHYLVLRQQXPEHUVKDOOEHLGHQWLILHGLQWKH&2/5

D ;1 3 $ (((RQ1XFOHDU1HXWURQLFV'HVLJQ0HWKRGVIRU3UHVVXUL]HG

DWHU5HDFWRUVDSSURYHGYHUVLRQDVVSHFLILHGLQWKH&2/5

0HWKRGRORJ\IRU6SHFLILFDWLRQ6+87'2:10$5*,102'(6DQG

0RGHUDWRU7HPSHUDWXUH&RHIILFLHQW6KXWGRZQ%DQN,QVHUWLRQ

/LPLWV&RQWURO%DQN,QVHUWLRQ/LPLWV$[LDO)OX['LIIHUHQFH

+HDW)OX[+RW&KDQQHO)DFWRU1XFOHDU(QWKDOS\5LVH+RW&KDQQHO)DFWRU

DQG%RURQ&RQFHQWUDWLRQ 

E $1) 3 $ $1)5(/$30HWKRGRORJ\IRU3UHVVXUL]HG:DWHU5HDFWRUV

$QDO\VLVRI1RQ/2&$&KDSWHU(YHQWVDSSURYHGYHUVLRQDVVSHFLILHGLQWKH

&2/5

0HWKRGRORJ\IRU6SHFLILFDWLRQ+/-5HDFWRU7ULS6\VWHP,QVWUXPHQWDWLRQ 6HWSRLQWV0RGHUDWRU7HPSHUDWXUH&RHIILFLHQW6KXWGRZQ%DQN

,QVHUWLRQ/LPLWV&RQWURO%DQN,QVHUWLRQ/LPLWV$[LDO)OX[

'LIIHUHQFH+HDW)OX[+RW&KDQQHO)DFWRU1XFOHDU(QWKDOS\5LVH

+RW&KDQQHO)DFWRUDQG+/-'1%3DUDPHWHUV 

F ;11) 3 $ $SSOLFDWLRQRI(((RQ1XFOHDU&RPSDQ\3:57KHUPDO 0DUJLQ0HWKRGRORJ\WR0L[HG&RUH&RQILJXUDWLRQVDSSURYHGYHUVLRQDVVSHFLILHG LQWKH&2/5

0HWKRGRORJ\IRU6SHFLILFDWLRQ+/-5HDFWRU&RUH6DIHW\/LPLWV+/-5HDFWRU 7ULS6\VWHP,QVWUXPHQWDWLRQ6HWSRLQWV+/-1XFOHDU(QWKDOS\5LVH+RW

&KDQQHO)DFWRUDQG+/-'1%3DUDPHWHUV 

6+($521+$55,681,7  $PHQGPHQW1R

O 6KXWGRZQDQG2SHUDWLQJ%RULF$FLG7DQNDQG5HIXHOLQJ:DWHU6WRUDJH7DQNERURQ

FRQFHQWUDWLRQOLPLWVIRU6SHFLILFDWLRQDQG



P(&&6$FFXPXODWRUVDQG5HIXHOLQJ:DWHU6WRUDJH7DQNERURQFRQFHQWUDWLRQOLPLWVIRU

6SHFLILFDWLRQDQG

Insert #7

$'0,1,675$7,9(&21752/6

  &25(23(5$7,1*/,0,765(3257 &RQWLQXHG 

0HWKRGRORJ\IRU6SHFLILFDWLRQ+/-5HDFWRU7ULS6\VWHP,QVWUXPHQWDWLRQ

6HWSRLQWV+/-0RGHUDWRU7HPSHUDWXUH&RHIILFLHQW+/-6KXWGRZQ%DQN

,QVHUWLRQ/LPLWV+/-&RQWURO%DQN,QVHUWLRQ/LPLWV+/-$[LDO)OX[

'LIIHUHQFH+/-+HDW)OX[+RW&KDQQHO)DFWRU+/-1XFOHDU(QWKDOS\5LVH

+RW&KDQQHO)DFWRUDQG+/-'1%3DUDPHWHUV 

R 0HFKDQLFDO'HVLJQ0HWKRGRORJLHV

11) 3 $ 52'(;)XHO5RG7KHUPDO0HFKDQLFDO5HVSRQVH (YDOXDWLRQ0RGHODSSURYHGYHUVLRQDVVSHFLILHGLQWKH&2/5

$1) 3 $ 52'(;)XHO5RG7KHUPDO0HFKDQLFDO5HVSRQVH(YDOXDWLRQ 0RGHODSSURYHGYHUVLRQDVVSHFLILHGLQWKH&2/5

11) 3 $ 4XDOLILFDWLRQRI(((RQ1XFOHDU)XHOIRU([WHQGHG%XUQXS

DSSURYHGYHUVLRQDVVSHFLILHGLQWKH&2/5

$1) 3 $ 4XDOLILFDWLRQRI$GYDQFHG1XFOHDU)XHOV 3:5'HVLJQ 0HWKRGRORJ\IRU5RG%XUQXSVRI*:G078DSSURYHGYHUVLRQDVVSHFLILHGLQ WKH&2/5

11) 3 $ (((RQ1XFOHDU8UDQLXP'LR[LGH*DGROLQLD,UUDGLDWLRQ

([DPLQDWLRQDQG7KHUPDO&RQGXFWLYLW\5HVXOWVDSSURYHGYHUVLRQDVVSHFLILHGLQ WKH&2/5

(0) 3 $ *HQHULF0HFKDQLFDO'HVLJQ&ULWHULDIRU3:5)XHO'HVLJQV

DSSURYHGYHUVLRQDVVSHFLILHGLQWKH&2/5

Add Insert #8 0HWKRGRORJLHVIRU6SHFLILFDWLRQ$[LDO)OX['LIIHUHQFH+HDW)OX[+RW

&KDQQHO)DFWRUDQG1XFOHDU(QWKDOS\5LVH+RW&KDQQHO)DFWRU 

S '3&1(3$³7KHUPDO+\GUDXOLF6WDWLVWLFDO&RUH'HVLJQ0HWKRGRORJ\'

DSSURYHGYHUVLRQDVVSHFLILHGLQWKH&2/5

0HWKRGRORJ\IRU6SHFLILFDWLRQ+/-1XFOHDU(QWKDOS\5LVH+RW&KDQQHO)DFWRU T '3&1(3$³1XFOHDU'HVLJQ0HWKRGRORJ\8VLQJ&$6026,08/$7(

IRU:HVWLQJKRXVH5HDFWRUV'DVDSSURYHGE\15&6DIHW\(YDOXDWLRQGDWHG0D\



0HWKRGRORJ\IRU6SHFLILFDWLRQ+/-6+87'2:10$5*,1+/-02'(6

DQG+/-0RGHUDWRU7HPSHUDWXUH&RHIILFLHQW+/-6KXWGRZQ%DQN Replace with ,QVHUWLRQ/LPLWV+/-&RQWURO%DQN,QVHUWLRQ/LPLWV+/-$[LDO)OX[

Insert #9 'LIIHUHQFH+/-+HDW)OX[+RW&KDQQHO)DFWRU+/-1XFOHDU(QWKDOS\5LVH

+RW&KDQQHO)DFWRUDQG+/-%RURQ&RQFHQWUDWLRQ 

U '3&1)$³1XFOHDU3K\VLFV0HWKRGRORJ\IRU5HORDG'HVLJQ'DVDSSURYHG E\15&6DIHW\(YDOXDWLRQGDWHG0D\

0HWKRGRORJ\IRU6SHFLILFDWLRQ+/-6+87'2:10$5*,1+/-02'(6

DQG+/-0RGHUDWRU7HPSHUDWXUH&RHIILFLHQW+/-6KXWGRZQ%DQN

,QVHUWLRQ/LPLWV+/-&RQWURO%DQN,QVHUWLRQ/LPLWVDQG+/-%RURQ

&RQFHQWUDWLRQ 

V '3&1(3$³1XFOHDU'HVLJQ0HWKRGRORJ\5HSRUWIRU&RUH2SHUDWLQJ

/LPLWVRI:HVWLQJKRXVH5HDFWRUV'DVDSSURYHGE\15&6DIHW\(YDOXDWLRQGDWHG 0D\

0HWKRGRORJ\IRU6SHFLILFDWLRQ+/-6KXWGRZQ%DQN,QVHUWLRQ/LPLWV+/-

&RQWURO%DQN,QVHUWLRQ/LPLWV+/-$[LDO)OX['LIIHUHQFH+/-+HDW)OX[+RW

&KDQQHO)DFWRUDQG+/-1XFOHDU(QWKDOS\5LVH+RW&KDQQHO)DFWRU 

6+($521+$55,681,7 F $PHQGPHQW1R

%$:3$³&23(51,&)XHO5RG'HVLJQ&RPSXWHU&RGH'DSSURYHGYHUVLRQDV

VSHFLILHGLQWKH&2/5

Insert #8 (Methodology for Specifications 3.1.1.1 - SHUTDOWN MARGIN - MODES 1 and 2, 3.1.1.2 -

SHUTDOWN MARGIN - MODES 3, 4, and 5, 3.1.1.3 - Moderator Temperature Coefficient, 3.1.2.5 - Borated Water Source - Shutdown, 3.1.2.6 - Borated Water Sources - Operating, 3.1.3.5 - Shutdown Bank Insertion Limits, 3.1.3.6 - Control Bank Insertion Limits, 3.5.1 -

ECCS Accumulators - Cold Leg Injection, 3.5.4 - ECCS Refueling Water Storage Tank, and 3.9.1 - Boron Concentration).

Insert #9