Informs NRC That on 990511,Dominion Resources,Inc,Executed Amended & Restated Agreement & Plan of Merger with Consolidated Natural Gas CoML18152B440 |
Person / Time |
---|
Site: |
Surry, North Anna |
---|
Issue date: |
07/01/1999 |
---|
From: |
Irwin D, Murphy M AFFILIATION NOT ASSIGNED, HUNTON & WILLIAMS, LEBOEUF, LAMB, LEIBY & MACRAE, VIRGINIA POWER (VIRGINIA ELECTRIC & POWER CO.) |
---|
To: |
NRC OFFICE OF INFORMATION RESOURCES MANAGEMENT (IRM) |
---|
References |
---|
NUDOCS 9907070128 |
Download: ML18152B440 (6) |
|
|
---|
Category:CORRESPONDENCE-LETTERS
MONTHYEARML18152B3571999-10-22022 October 1999 Requests Relief from Temporary Repair of Through Wall Leak Discovered on 30 Inch Component Cooling Heat Exchanger Discharge Pipe Associated with Service Water Sys Common to Surry Units 1 & 2 ML20217K4391999-10-18018 October 1999 Provides Response to RAI to Support USI A-46 Program Submittal for North Anna Power Station,Units 1 & 2.Rev 10 to BNL Rept 52361,encl ML20217H3301999-10-14014 October 1999 Forwards Rev 0 to COLR for North Anna 2 Cycle 14 Pattern Su. No New Commitments Intended by Ltr ML18152B3581999-10-14014 October 1999 Submits Response to Violations Noted in Insp Repts 50-280/98-201 & 50-281/98-201.Corrective Actions:Visual Insps Were Completed on Accessible Coatings Inside Containment for Both Units 1 & 2 ML18152B3541999-10-12012 October 1999 Requests Use of Code Case N-532 & N-619,per Provisions of 10CFR50.55a(a)(3).Detailed Info Supporting Request,Encl. Attachment 2 Includes Technical White Paper That Provides Further Technical Info ML20216K1681999-10-0101 October 1999 Forwards Vols I-VIII of Rev 35 to UFSAR for Naps.Rev Also Includes Update to Chapter 17 of Ufsar,Which Contains Operational QA Program.Changes to Program Description Do Not Reduce Commitments Contained Therein ML20212J9101999-10-0101 October 1999 Forwards SE Accepting Licensee 990916 & 27 Relief Requests IWE-3 for Plant.Se Addresses Only IWE-3 Due to Util Urgent Need for Relief.Requests IWE-7 & IWE-8 Will Be Addressed at Later Date ML18152B3401999-09-27027 September 1999 Requests That Ma Walker Be Removed from List of Individuals Scheduled to Take Exam IAW Guidance Provided in NUREG-1021, Operator Licensing Exam Stds for Power Reactors ML18152B3391999-09-27027 September 1999 Forwards Revised Relief Request IWE-3,which Now Includes Addl Visual Exam Requirement After post-repair or Mod Pressure Testing Is Completed,Per Telcon with NRC ML20212G5091999-09-22022 September 1999 Forwards in Triplicate,Applications for Renewal of Licenses for Listed Individuals.Encls Withheld,Per 10CFR2.790(a)(6) ML18152B3381999-09-21021 September 1999 Forwards in Triplicate,Applications for Renewal of License for Bf Jurewicz & JW Heide.Without Encls ML18152B3331999-09-17017 September 1999 Forwards Revised 180-day Response to NRC GL 96-05, Periodic Verification of Design-Basis Capability of Safety-Related Motor-Operated Valves. ML18152B6671999-09-17017 September 1999 Forwards Two NRC Forms 536,containing Info on Proposed Site Specific Operator Licensing Exam Schedules & Estimated Number of Applicants Planning to Take Exams And/Or Gfes,In Response to NRC Administrative Ltr 99-03 ML18152B3341999-09-16016 September 1999 Requests Relief from Specific Requirements of Subsection IWE of 1992 Edition with 1992 Addenda of ASME Section XI Re Containment Liner Examination Requirements,For North Anna & Surry Power Stations ML18152B4521999-09-14014 September 1999 Forwards Comments on Review of Preliminary Accident Sequence Precursor Analysis of Operational Event That Occurred at Plant,On 980508,as Reported in LER 98-009 ML20216F1381999-09-0808 September 1999 Forwards Retake Exam Repts 50-280/99-302 & 50-281/99-302 on 990824.One SRO Applicant Who Received re-take Operating Test Passed re-take Exam ML18152B4501999-09-0808 September 1999 Submits in Triplicate,Application for Renewal of License for Rd Scherer,Iaw 10CFR55.57.Requests That Certification of Medical Exam by Facility Licensee,Nrc Form 396,be Withheld from Public Disclosure,Per 10CFR2.790(a)(6) ML20211N2531999-09-0808 September 1999 Responds to Request to Exceed 60,000 Mwd/Mtu Lead Rod Burnup in Small Number of Fuel Rods in North Anna Unit 2.Informs That NRC Offers No Objection to Requested Use of Rods in Reconstituted Fuel Assembly.Se Supporting Request Encl ML20211L9151999-09-0101 September 1999 Forwards Response to NRC Request for Comments Re Closure of Review of Response to GL 92-01,Rev 1,Suppl 1, Reactor Vessel Structural Integrity ML18152B4471999-09-0101 September 1999 Requests That NRC Remove Listed Labels from Distribution ML20211J2211999-08-31031 August 1999 Approves Request to Remove Augmented ISI (Aii) Program for RCS Bypass Lines from North Anna Licensing Basis.Se Re Request to Apply LBB to Eliminate Augmented Insp Program on RCS Bypass Lines Encl ML20211H4131999-08-27027 August 1999 Informs That Util Revised Encl Bases for TS 2.2.1, Reactor Trip Sys Instrumentation Setpoints, Discussing Steam Flow/ Feed Flow Mismatch Portion of Steam Flow/Feed Flow Mismatch & Low SG Water Level Reactor Trip Setpoint ML18152B3711999-08-27027 August 1999 Forwards LER 99-005-00,per Plant TS Table 3.7.6.Rept Has Been Reviewed by Station Nuclear Safety & Operating Committee.Commitment Made by Util,Listed ML18152B3851999-08-23023 August 1999 Forwards Revised TS Basis Pages for TS 3.1.B,deleting Reactor Vessel Toughness Data Duplicated in Ufsar.Ref to Applicable UFSAR Section Included in TS Basis ML20138B3241999-08-23023 August 1999 Forwards Draft Response to Question 1 Re NAPS USI A-46 ML20211D9041999-08-20020 August 1999 Forwards Revised Pages to Third Ten Year ISI Program & Relief Requests, Replacing Pages in 990408 Submittal ML18152B3681999-08-20020 August 1999 Submits 30-day Rept Re Two Instances in Which Conditions of Approval in Coc Were Not Observed in Making Shipment.Two Type B Shipments Using Model CNS 8-120B Package Were Made After Expiration of QA Program Approval Between 990531-0628 ML18152B3661999-08-20020 August 1999 Provides Medical Status Rept for E Washington,As Required by License Conditions.Summary of E Washington Current Physical Exam & Pertinent Lab Data Attached.Encl Withheld,Per 10CFR2.790(a)(6) ML18152B3651999-08-20020 August 1999 Requests Removal of License Condition from Sh Wightman Operator License SOP-21538.Updated NRC Form 396 Is Encl.Form NRC 396 Withheld,Per 10CFR2.790(a)(6) ML18152B3801999-08-18018 August 1999 Forwards Technical Rept NE-1206,Rev 0, Surry Unit 2,Cycle 16 Startup Physics Tests Rept, Summarizing Results of Physics Testing Program Performed After Initial Criticality on 990525 ML20211B3871999-08-17017 August 1999 Requests Permission to Routinely Discharge from SW Reservior to Waste Heat Treatment Facility Under Existing Vpdes Permit Through Outfalls 108 & 103.Discharges Are Scheduled to Commence on 990907,due to High Priority Placed on Project ML20210T0671999-08-13013 August 1999 Informs of Completion of Review of Proposed Revs of Schedule for Withdrawal of Rv Surveillance Capsules Submitted by VEPCO on 981217.Approves Proposed Revs.Forwards Safety Evaluation ML18152B3781999-08-13013 August 1999 Forwards ISI Summary Rept for Surry Power Station,Unit 2 for 1999 Refueling Outage.Rept Provides Summary of Examination Performed During Outage for Third ISI Interval.No New Commitments Were Made ML18152B3751999-08-13013 August 1999 Forwards LER 99-004-00,IAW 10CFR50.73.Commitment Made by Util,Listed ML20210Q9841999-08-12012 August 1999 Forwards Rev 1 to Vepc COLR for North Anna Unit 2,Cycle 13 Pattern Ud, Per TS 6.9.1.7.d.COLR Was Revised to Include Temp Coastdown Operation at End of Cycle 13 ML20210Q7661999-08-0606 August 1999 Requests Exception to 10CFR50.4 Requirement to Provide Total of Twelve Paper Copies When Submitting Surry & North Anna UFSAR Updates.Seek Approval to Submit Only Signed Original & One CD-ROM Version,Per Conversation with J Skoczlas ML18152B4081999-08-0606 August 1999 Forwards Response to NRC 990520 & 0525 RAIs Re North Anna & Surry Responses to GL 95-07, Pressure Locking & Thermal Binding of SR Power-Operated Gate Valves. ML18152B4091999-08-0505 August 1999 Forwards Vepc semi-annual fitness-for-duty Program Performance Data Rept for 990101-990630,IAW 10CFR26.71(d) ML20210N2921999-08-0505 August 1999 Discusses Which Submitted Proposed TSs Bases Change for Containment Leakage. Licensee Changes to Bases May Be Subj to Future Insps or Audits ML20210J8861999-08-0202 August 1999 Provides Clarification to Commitment Made in Identifying Extent by Which Existing Plant Design Complied with RG 1.97,specifically Re Variable, Radiation Exposure Rate ML18152B4001999-07-29029 July 1999 Requests Relief from Certain Impractical Requirements of ASME Section XI Code Associated with Partial Exams Conducted During 1998 Surry Unit 1 Refueling Outage.Relief Request SR-020 Encl ML18152B3981999-07-28028 July 1999 Forwards 60-day Response to GL 99-02, Lab Testing of Nuclear-Grade Activated Charcoal. Commitments Contained in Ltr,Listed ML20210F6121999-07-28028 July 1999 Forwards Supplemental Info on Proposed Irradiation of Fuel Rods Beyond Current Lead Rod Burnup Limit,Documenting Info Provided During 990624 Meeting & Suppl Original Submittal ML18152B3971999-07-26026 July 1999 Provides Estimates of Licensing Actions Expected to Be Submitted in Fys 2000 & 2001,in Response to NRC AL 99-02 ML18152B3961999-07-23023 July 1999 Forwards Preliminary,Uncertified License Application & Medical Certification for License to Operate Surry Power Station Units 1 & 2 for Ds Cobb.Encl Withheld,Per 10CFR2.790 (a)(6) ML18152B3991999-07-23023 July 1999 Requests That License for Jz Laplante Be Canceled as License Is No Longer Required ML18151A6281999-07-23023 July 1999 Forwards Revised Epips,Including Rev 19 to EPIP-4.02,rev 14 to EPIP-4.16,rev 8 to EPIP-4.21 & Rev 7 to EPIP-4.30.EP & EPIPs Continue to Meet Stds of 10CFR50.47(b) ML18152B3931999-07-16016 July 1999 Forwards Updated NRC Form 396 & Ltr,Which Documents Medical Status of Mb Gross,License SOP-20476-2.Encl Withheld from Public Disclosure,Per 10CFR2.790(a)(6) ML20209E7621999-07-0909 July 1999 Provides Addl Info to Justify Use of Less than One Gpm Detectable Leakage Rate to Establish Required Margin for Crack Stability in LBB Analysis,Per 980623 Application on Reactor Coolant Loop Bypass Lines 05000338/LER-1999-005, Forwards LER 99-005-00,IAW 10CFR50.73.Commitment Made by Util Encl1999-07-0808 July 1999 Forwards LER 99-005-00,IAW 10CFR50.73.Commitment Made by Util Encl 1999-09-08
[Table view] Category:INCOMING CORRESPONDENCE
MONTHYEARML18152B3571999-10-22022 October 1999 Requests Relief from Temporary Repair of Through Wall Leak Discovered on 30 Inch Component Cooling Heat Exchanger Discharge Pipe Associated with Service Water Sys Common to Surry Units 1 & 2 ML20217K4391999-10-18018 October 1999 Provides Response to RAI to Support USI A-46 Program Submittal for North Anna Power Station,Units 1 & 2.Rev 10 to BNL Rept 52361,encl ML20217H3301999-10-14014 October 1999 Forwards Rev 0 to COLR for North Anna 2 Cycle 14 Pattern Su. No New Commitments Intended by Ltr ML18152B3581999-10-14014 October 1999 Submits Response to Violations Noted in Insp Repts 50-280/98-201 & 50-281/98-201.Corrective Actions:Visual Insps Were Completed on Accessible Coatings Inside Containment for Both Units 1 & 2 ML18152B3541999-10-12012 October 1999 Requests Use of Code Case N-532 & N-619,per Provisions of 10CFR50.55a(a)(3).Detailed Info Supporting Request,Encl. Attachment 2 Includes Technical White Paper That Provides Further Technical Info ML20216K1681999-10-0101 October 1999 Forwards Vols I-VIII of Rev 35 to UFSAR for Naps.Rev Also Includes Update to Chapter 17 of Ufsar,Which Contains Operational QA Program.Changes to Program Description Do Not Reduce Commitments Contained Therein ML18152B3401999-09-27027 September 1999 Requests That Ma Walker Be Removed from List of Individuals Scheduled to Take Exam IAW Guidance Provided in NUREG-1021, Operator Licensing Exam Stds for Power Reactors ML18152B3391999-09-27027 September 1999 Forwards Revised Relief Request IWE-3,which Now Includes Addl Visual Exam Requirement After post-repair or Mod Pressure Testing Is Completed,Per Telcon with NRC ML20212G5091999-09-22022 September 1999 Forwards in Triplicate,Applications for Renewal of Licenses for Listed Individuals.Encls Withheld,Per 10CFR2.790(a)(6) ML18152B3381999-09-21021 September 1999 Forwards in Triplicate,Applications for Renewal of License for Bf Jurewicz & JW Heide.Without Encls ML18152B6671999-09-17017 September 1999 Forwards Two NRC Forms 536,containing Info on Proposed Site Specific Operator Licensing Exam Schedules & Estimated Number of Applicants Planning to Take Exams And/Or Gfes,In Response to NRC Administrative Ltr 99-03 ML18152B3331999-09-17017 September 1999 Forwards Revised 180-day Response to NRC GL 96-05, Periodic Verification of Design-Basis Capability of Safety-Related Motor-Operated Valves. ML18152B3341999-09-16016 September 1999 Requests Relief from Specific Requirements of Subsection IWE of 1992 Edition with 1992 Addenda of ASME Section XI Re Containment Liner Examination Requirements,For North Anna & Surry Power Stations ML18152B4521999-09-14014 September 1999 Forwards Comments on Review of Preliminary Accident Sequence Precursor Analysis of Operational Event That Occurred at Plant,On 980508,as Reported in LER 98-009 ML18152B4501999-09-0808 September 1999 Submits in Triplicate,Application for Renewal of License for Rd Scherer,Iaw 10CFR55.57.Requests That Certification of Medical Exam by Facility Licensee,Nrc Form 396,be Withheld from Public Disclosure,Per 10CFR2.790(a)(6) ML18152B4471999-09-0101 September 1999 Requests That NRC Remove Listed Labels from Distribution ML20211L9151999-09-0101 September 1999 Forwards Response to NRC Request for Comments Re Closure of Review of Response to GL 92-01,Rev 1,Suppl 1, Reactor Vessel Structural Integrity ML20211H4131999-08-27027 August 1999 Informs That Util Revised Encl Bases for TS 2.2.1, Reactor Trip Sys Instrumentation Setpoints, Discussing Steam Flow/ Feed Flow Mismatch Portion of Steam Flow/Feed Flow Mismatch & Low SG Water Level Reactor Trip Setpoint ML18152B3711999-08-27027 August 1999 Forwards LER 99-005-00,per Plant TS Table 3.7.6.Rept Has Been Reviewed by Station Nuclear Safety & Operating Committee.Commitment Made by Util,Listed ML18152B3851999-08-23023 August 1999 Forwards Revised TS Basis Pages for TS 3.1.B,deleting Reactor Vessel Toughness Data Duplicated in Ufsar.Ref to Applicable UFSAR Section Included in TS Basis ML20138B3241999-08-23023 August 1999 Forwards Draft Response to Question 1 Re NAPS USI A-46 ML20211D9041999-08-20020 August 1999 Forwards Revised Pages to Third Ten Year ISI Program & Relief Requests, Replacing Pages in 990408 Submittal ML18152B3681999-08-20020 August 1999 Submits 30-day Rept Re Two Instances in Which Conditions of Approval in Coc Were Not Observed in Making Shipment.Two Type B Shipments Using Model CNS 8-120B Package Were Made After Expiration of QA Program Approval Between 990531-0628 ML18152B3661999-08-20020 August 1999 Provides Medical Status Rept for E Washington,As Required by License Conditions.Summary of E Washington Current Physical Exam & Pertinent Lab Data Attached.Encl Withheld,Per 10CFR2.790(a)(6) ML18152B3651999-08-20020 August 1999 Requests Removal of License Condition from Sh Wightman Operator License SOP-21538.Updated NRC Form 396 Is Encl.Form NRC 396 Withheld,Per 10CFR2.790(a)(6) ML18152B3801999-08-18018 August 1999 Forwards Technical Rept NE-1206,Rev 0, Surry Unit 2,Cycle 16 Startup Physics Tests Rept, Summarizing Results of Physics Testing Program Performed After Initial Criticality on 990525 ML18152B3781999-08-13013 August 1999 Forwards ISI Summary Rept for Surry Power Station,Unit 2 for 1999 Refueling Outage.Rept Provides Summary of Examination Performed During Outage for Third ISI Interval.No New Commitments Were Made ML18152B3751999-08-13013 August 1999 Forwards LER 99-004-00,IAW 10CFR50.73.Commitment Made by Util,Listed ML20210Q9841999-08-12012 August 1999 Forwards Rev 1 to Vepc COLR for North Anna Unit 2,Cycle 13 Pattern Ud, Per TS 6.9.1.7.d.COLR Was Revised to Include Temp Coastdown Operation at End of Cycle 13 ML20210Q7661999-08-0606 August 1999 Requests Exception to 10CFR50.4 Requirement to Provide Total of Twelve Paper Copies When Submitting Surry & North Anna UFSAR Updates.Seek Approval to Submit Only Signed Original & One CD-ROM Version,Per Conversation with J Skoczlas ML18152B4081999-08-0606 August 1999 Forwards Response to NRC 990520 & 0525 RAIs Re North Anna & Surry Responses to GL 95-07, Pressure Locking & Thermal Binding of SR Power-Operated Gate Valves. ML18152B4091999-08-0505 August 1999 Forwards Vepc semi-annual fitness-for-duty Program Performance Data Rept for 990101-990630,IAW 10CFR26.71(d) ML20210J8861999-08-0202 August 1999 Provides Clarification to Commitment Made in Identifying Extent by Which Existing Plant Design Complied with RG 1.97,specifically Re Variable, Radiation Exposure Rate ML18152B4001999-07-29029 July 1999 Requests Relief from Certain Impractical Requirements of ASME Section XI Code Associated with Partial Exams Conducted During 1998 Surry Unit 1 Refueling Outage.Relief Request SR-020 Encl ML18152B3981999-07-28028 July 1999 Forwards 60-day Response to GL 99-02, Lab Testing of Nuclear-Grade Activated Charcoal. Commitments Contained in Ltr,Listed ML20210F6121999-07-28028 July 1999 Forwards Supplemental Info on Proposed Irradiation of Fuel Rods Beyond Current Lead Rod Burnup Limit,Documenting Info Provided During 990624 Meeting & Suppl Original Submittal ML18152B3971999-07-26026 July 1999 Provides Estimates of Licensing Actions Expected to Be Submitted in Fys 2000 & 2001,in Response to NRC AL 99-02 ML18152B3991999-07-23023 July 1999 Requests That License for Jz Laplante Be Canceled as License Is No Longer Required ML18152B3961999-07-23023 July 1999 Forwards Preliminary,Uncertified License Application & Medical Certification for License to Operate Surry Power Station Units 1 & 2 for Ds Cobb.Encl Withheld,Per 10CFR2.790 (a)(6) ML18151A6281999-07-23023 July 1999 Forwards Revised Epips,Including Rev 19 to EPIP-4.02,rev 14 to EPIP-4.16,rev 8 to EPIP-4.21 & Rev 7 to EPIP-4.30.EP & EPIPs Continue to Meet Stds of 10CFR50.47(b) ML18152B3931999-07-16016 July 1999 Forwards Updated NRC Form 396 & Ltr,Which Documents Medical Status of Mb Gross,License SOP-20476-2.Encl Withheld from Public Disclosure,Per 10CFR2.790(a)(6) ML20209E7621999-07-0909 July 1999 Provides Addl Info to Justify Use of Less than One Gpm Detectable Leakage Rate to Establish Required Margin for Crack Stability in LBB Analysis,Per 980623 Application on Reactor Coolant Loop Bypass Lines 05000338/LER-1999-005, Forwards LER 99-005-00,IAW 10CFR50.73.Commitment Made by Util Encl1999-07-0808 July 1999 Forwards LER 99-005-00,IAW 10CFR50.73.Commitment Made by Util Encl ML18152B4401999-07-0101 July 1999 Informs NRC That on 990511,Dominion Resources,Inc,Executed Amended & Restated Agreement & Plan of Merger with Consolidated Natural Gas Co ML18152B4371999-06-24024 June 1999 Forwards Response to NRC Request for Clarification of Relief Requests Submitted on 990212,requesting Relief from Performing Hydrostatic Testing for Certain Small Diameter Class 1,RCS Pressure Boundary Connections ML18152B4361999-06-22022 June 1999 Forwards Response to RAI Re Surry & North Anna Power Stations,Units 1 & 2,per GL 96-06 ML20196F1151999-06-22022 June 1999 Forwards Relief Requests NDE-047 & NDE-048 for North Anna Power Station,Unit 1 Re ASME Section XI ISI Program ML20212J2951999-06-22022 June 1999 Forwards Corrected Markup & Typed Version of Affected Pages. Requests That Attached Pages for Those Previously Provided in 990506 Submittal Be Replaced & Incorporated Into NRC Review of Proposed TS ML20195J7011999-06-15015 June 1999 Forwards Revised EPIP 2.01 Which Corrects Typo That Was Found in Step 10 of Procedure.Rev Does Not Implement Actions That Decrease Effectiveness of EP ML18152B4301999-06-0303 June 1999 Informs of Util Intention to Revise Schedule for Submittal of License Renewal Applications for Surry & North Anna Power Stations to March 2002 1999-09-08
[Table view] |
Text
IC I f e e LEBOEUF, LAMB, GREENE & MACRAE L.L.P.
A LIMITED LIABILITY PARTNERSHIP INCLUDING PROFESSIONAL CORPORATIONS NEW YORK 1875 CONNECTICUT AVENUE, N.W. LOS ANGELES WASHINGTON NEWARK WASHINGTON, DC 20009-5728 PITTSBURGH ALBANY (202) 986-8000 PORTLAND. OR BOSTON SALT LAKE CITY TELEX: 440274 FACSIMILE: (202) 986-8102 DENVER SAN FRANCISCO HARRISBURG BRUSSELS PARIS HARTFORD WRITER'S DIRECT DIAL:
MOSCOW HOUSTON 986-8021 ALMATY JACKSONVILLE LONDON CA LONDON-BASED MULTINATIONAL PARTNERSHIP>
July 1, 1999 SAO PAULO 1N ASSOCIATION WITH TAVARES GUERREIRO ADVOGADOS Via Hand Delivery Nucle.ar Regulatory Commission Document Control Desk 11555 Rockville Pike Rockville, MD 20852 Re: North Anna Power Station, Unit 1 License No. NPF-4 (Docket No. 50-338), North Anna Power Station Unit 2 License No .. NPF-7 (Docket No. 50-33~), Surry Power Station Unit 1 License No. DPR-32 (Docket No. 50-280), Surry Power Station Unit 2 License No. DPR-37 (Docket No. 50-281)
Gentlemen and Ladies: j On May 11, 1999 Dominion Resources, Inc. ( 11 DRI 11 ) , the parent company of Virginia Electric and Power Company ("Virginia Power"), executed an Amended and Restated Agreement and Plan of h
Merger (the "Merger Agreement") with Consolidated Natural Gas Company ( 11 CNG 11 ) . At this time, DRI and Virginia Power wish to .\ .-. ,..., !!
inform the Nuclear Regulatory Commission ("NRC") of this merger and that this merger will have no effect upon Virginia Power, f ~1,*tll l
(j *.,I r
i I
J the NRC licens~e for North Anna Power Station Units 1 and 2 and Surry Power Station Units 1 and 2. Virginia Power has an 88.4 percent ownership interest in North Anna Power Station, Units 1 and 2 1 and a 100 percent ownership interest in Surry Power Station, Units 1 and 2.
1 Old Dominion Electric Cooperative owns the remaining 11.6 percent interest.
-9907070128- 990701 . -- -
PDR ADOCK 05000280 H PDR
- ' ( t Nuclear Regulatory Commission July 1, 1999 Page 2 DRI and Virginia Power believe that the merger will not constitute either a direct or indirect change of control, and that no change to the licenses or formal NRC approval is required, as described in the NRC's recent Final Rule regarding license transfers. 2 Nor will the merger have any impact upon the technical, financial or management qualifications upon which licensing financial decisions previously were made by the NRC.
DRI is a diversified utility holding company, and its common stock is listed on the New York Stock Exchange. DRI primarily is involved in the electric business and its principal subsidiary is Virginia Power, a regulated public utility engaged in the generation, transmission, distribution and sale of electric energy. DRI had assets of $17,517 million and operating revenues of $6,086 million for the year ended December 31, 1998.
The primary service area of Virginia Power is in Virginia and northeastern North Carolina. DRI's other major subsidiaries are Dominion Energy, Inc., an independent power and natural gas subsidiary, and Dominion Capital, Inc., a diversified financial services company.
CNG is a Delaware corporation, and a public utility holding company registered under the 1935 Act. CNG is engaged solely in the business of owning and holding all of the outstanding equity securities of nineteen directly owned subsidiary companies. CNG had assets of $6,362 million and operating revenues of $12,760 million for the year ended December 31, 1998. CNG and its subsidiaries are engaged in all phases of the natural gas business: distribution, transmission, storage and exploration and production. The company's principal subsidiaries include: Virginia Natural Gas, Inc., Hope Gas, Inc., The Peoples Natural Gas Company and The East Ohio Gas Company, all of which are public utility subsidiaries. CNG Transmission Corporation, also a subsidiary, operates a regional interstate pipeline system and provides gas transportation and storage services to each of CNG's public utility subsidiaries and to non-affiliated utilities, end-users and others in the Midwest, the Mid-Atlantic states and the Northeast. Through its wholly-owned subsidiary, CNG Iroquois, Inc., CNG Transmission Corporation holds a 16 2
Streamlined Hearing Process for NRC Approval of License Transfers, 63 Fed. Reg. 66721, 99727 (1998) (to be codified at 10 C.F.R. Parts 2 and 51).
e Nuclear Regulatory Commission July 1, 1999 Page 3 percent general partnership interest in the Iroquois Gas Transmission System, L.P., that owns and operates an interstate natural gas pipeline extending from the Canada-United States border near Iroquois, Ontario, to Long Island, New York. The Iroquois pipeline transports Canadian gas to utility and power generation customers in metropolitan New York and New England.
The Merger will result in the combined company having proforma 1998 assets of $28.0 billion as of March 31, 1999 and revenues of $8.8 billion for the year ended December 31, 1998.
The Merger will create a combined electric and natural gas system with the ability to compete effectively for the nearly four million retail customers in five states presently served by the combined company as well as by other retail customers in the region. The combined company will have an energy portfolio of more than 20,000 megawatts of domestic power generation, 2.9 trillion cubic feet equivalent in natural gas and oil reserves producing nearly 300 billion cubic feet equivalent annually. It will have more than 5,000 miles of electric transmission lines, which are located to transmit power from low-cost producers in the Southeast, including Virginia Power, into higher-cost markets in the Northeast and Midwest, including CNG's service territory.
It will operate a major interstate gas pipeline system and the largest natural gas storage system in North America with almost 900 Bcf of storage.
Following completion of the Merger, the Board of Directors of DRI will have 17 members, 10 of whom will be designated by DRI and 7 of whom will be designated by CNG.
Thomas E. Capps, the current CEO of DRI, will be the President and Chief Executive Officer of DRI after the Merger, and George A. Davidson, Jr., the current CEO of CNG, will serve as Chairman of the Board of 'Directors until his previously announced retirement on August 1, 2000, at which time Mr. Capps will reassume his position as Chairman. All officers and directors of the combined company will be United States citizens. Current DRI shareholders will own approximately 65 percent of the combined company and current CNG shareholders will own approximately 35 percent of the combined company. However, no single shareholder will hold a 5 percent or greater interest in DRI after the merger. DRI will continue to use the name Dominion Resources and be headquartered in Richmond, Virginia.
e Nuclear Regulatory Commission July 1, 1999 Page 4 The Merger Agreement contemplates a two-step merger transaction. In the first step, a wholly-owned subsidiary of DRI
("SPV 11 ) will merge (the "First Merger") with and into DRI in a transaction in which DRI will be the surviving corporation. In the second step, CNG will either merge (the "Second Merger") (i) with and into another wholly-owned subsidiary of DRI ("CNG Acquisition 11 ) in a transaction in which CNG Acquisition will be the surviving corporation, which will result in all of CNG's current rights, obligations, duties and liabilities being assumed by CNG Acquisition as a matter of law or (ii) with and into DRI in a transaction in which DRI will be the surviving corporation.
Thus DRI will acquire, through the Second Merger (including, indirectly, through CNG Acquisition or otherwise), all of the issued and outstanding common stock of CNG and, indirectly, all of the common stock of each of the four public utility subsidiaries of CNG. As a result of the Merger and the other transactions contemplated by the Merger Agreement, CNG will cease to exist and either CNG Acquisition, as the successor in interest to CNG, will become a direct subsidiary of DRI or each of CNG's four public utility subsidiaries will become direct subsidiaries of DRI. As a result of the Merger, CNG's non-utility subsidiaries will each become direct or indirect subsidiaries of CNG Acquisition or DRI, as the case may be. In the Merger, shareholders of both DRI and CNG will have the option to elect to receive either cash or DRI common stock in return for each of their DRI or CNG shares, as the case may be, subject to allocation and also subject to certain limitations in order to ensure the desired tax treatment for the Second Merger.
Shareholders of both DRI and CNG may elect to exchange some of their shares for cash and some for stock. The First and the Second Merger are each conditioned on the other occurring.
As to Virginia Power, the merger will not constitute a direct or indirect change of control and no change to the NRC licenses is required. Virginia Power, which is currently a subsidiary of DRI, will remain a subsidiary of DRI. As stated above, the CEO of DRI will remain the CEO of the combined company, and become President and Chairman of the combined company on August 1, 2000. Furthermore, a majority of the board of directors will be designated by DRI. Clearly, the merger will not affect the relationship between DRI and Virginia Power, and there will be no change in the upstream economic ownership of Virginia Power as a result of the merger. Nor will there be any change in the identity of the licensee. Virginia Power will
Nuclear Regulatory Commission July 1, 1999 Page 5 continue to be the licensee for North Anna Power Station, Units 1 and 2 and Surry Power Station Units 1 and 2.
DRI and Virginia Power submit that the merger will not change the basis upon which licensing decisions have been made by the NRC. Virginia Power's technical and financial qualifications will not be changed in any respect by the merger. The identity, organization and management of its nuclear operations will be unchanged, both in Richmond and at Surry and North Anna. None of the financial resources available for the nuclear department and for operation of the plants will be affected. Similarly, the decommissioning trust funds for Surry and North Anna, and Virginia Power's continuing obligation to fund them, will be unaffected by the merger.
As shown above, the merger between DRI and CNG will not result in a transfer of the NRC licenses, directly or indirectly.
Moreover, as Virginia Power will remain the licensee, the merger will not necessitate an amendment to the license. Thus, DRI and Virginia Power submit that no prior NRC consent is required by this transaction, and request NRC confirmation that this is correct.
Respectfully submitted, fJ<5hM?I P. ~frv't'YV Donald P. Irwin Samuel Behrends Hunton & Williams Mary A. Murphy 951 East Byrd Street LeBoeuf, Lamb, Greene Richmond, VA 23219 & MacRae, L.L.P.
1875 Connecticut Avenue, NW Attorney for Virginia Washington, DC 20009 Electric and Power Co.
Attorneys for Dominion Resources, Inc.
e Nuclear Regulatory Commission July 1, 1999 Page 6 cc: Luis A. Reyes Regional Administrator U.S. Nuclear Regulatory Commission Region II Sam Nunn Atlanta Federal Center, 23 TBS 61 Forsyth Street, SW Atlanta, Georgia 30303-8931 Michael J. Morgan Chief Resident Inspector North Anna Power Station 1022 Haley Road Mineral, Virginia 23117-0402 Randall A. Musser Chief Resident Inspector Surry Power Station 5570 Hog Island Road Surry, Virginia 23883-0315 Robert S. Wood Senior Level Licensee Financial Policy Advisor Office of Nuclear Reactor Regulation U.S. Nuclear Regulatory Commission 11555 Rockville Pike Rockville, Maryland 20852 Lawrence J. Chandler, Esq.
Associate General Counsel U.S. Nuclear Regulatory Commission 11555 Rockville Pike Rockville, Maryland 20852 Steven Hom Office of General Counsel U.S. Nuclear Regulatory Commission 11555 Rockville Pike Rockville, Maryland 20852