Responds to 880523 Request for Addl Info Re Inservice Insp Program.Changes to Existing Program Resulting from Addl Info Will Be Implemented Into Inservice Insp Program Immediately, Unless Otherwise stated.W/222 Oversize Drawings
ML18150A433
Person / Time
Site: Surry  Dominion icon.png
Issue date: 09/30/1988
From: Cartwright W
VIRGINIA POWER (VIRGINIA ELECTRIC & POWER CO.)
To:
NRC OFFICE OF ADMINISTRATION & RESOURCES MANAGEMENT (ARM)
References
88-332A, TAC-65557, TAC-65558, NUDOCS 8810070165
Download: ML18150A433 (480)


Text

e e VIRGINIA ELECTRIC AND POWER COMPANY RICHMOND, VIRGINIA 23261 September 30, 1988 U. S. Nuclear Regulatory Commission Serial No. 88-332A Attn: Document Control Desk PES/ISI/DJF:Rev. 2 Washington, D. C. 20555 Docket Nos. 50-280 50-281 License Nos. DPR-32 DPR-37 Gentlemen:

VIRGINIA ELECTRIC AND POWER COMPANY SURRY POWER STATION UNITS 1 AND 2 INSERVICE INSPECTION PROGRAM REQUEST FOR ADDITIONAL INFORMATION In your letter of May 23, 1988 (TAC. NOS. 65557 and 65558) you requested additional information on our Inservice Inspection Program for Surry Power Station Units 1 and 2 based on your review of our April 16, 1987 submittals.

The enclosures to this letter provides the additional information as requested.

In addition, the entire enclosure has been forwarded to EG&G per your instructions.

Any changes to our existing programs as a result of these responses will be implemented into our Inservice Inspection Program for Surry immediately unless specifically stated otherwise in the response to the concern.

The Inservice Inspection Program submittals (revision 3 for Unit 1 and revision 1 for Unit 2) will not be revised at this time. A revision will be required by the end of the second period to incorporate the new computer aided drawings and isometrics into the program. In addition, the Inservice Testing Program Plan (IST) for Pumps and Valves has been separated from the ISI Program Plan.

Therefore, Section 4 of the ISI program submittal dated April 16, 1987 is being superceded by an IST program plan revision in response to NRC questions (Letter No. 88-024A).

If you have any further questions or require additional information, please contact us.

W. R. Cartwright.

Vice President - Nuclear


-- - ~ --- -------- ---- - - ~

r 8810070165 880930 PDR ADDCK 05000280 Q PNU

e Enclosure w/attachments

1. Unit 1 component isometrics
2. Unit 2 component isometrics
3. Unit 1 listing of welds/ components subject to examination
4. Unit 2 listing of welds/ components subject to examination
5. Units 1 and 2 listing of ultrasonic calibration standards
6. Nondestructive examination procedures
7. Unit 1 and 2 sketch of the typical nozzel-to-safe end weld
8. Unit 1 MKS drawings for integral attachments
9. Unit 2 MKS drawings for integral attachments cc: w/out Enclosure U. S. Nuclear Regulatory Commission 101 Marietta Street, N.W.

Suite 2900 Atlanta, GA 30323 Mr. W. E. Holland NRC Senior Resident Inspector Surry Power Station

DOCKEr NO. 50-280/281 SURRY 1&2 VEPCO INSERVICE INSPECTION PROGRAM NRC QUESTIONS AND COMMENTS Rec'd w/ltr 9/30/88 ... 8810070165

-NOTICE-THE ATTACHED FILES ARE OFFICIAL RE-CORDS OF THE RECORDS & REPORTS MANAGEMENT BRANCH. THEY HAVE BEEN CHARGED. TO YOU FOR A LIMITED TIME PERIOD AND MUST BE RETURNED TO THE RECORDS & ARCHIVES SERVICES SECTION P1-122 WHITE FLINT. PLEASE DO NOT SEND DOCUMENTS CHARGED OUT THROUGH THE MAIL.* REMOVAL OF ANY PAGE(S) FROM DOCUMENT FOR REPRO-DUCTION MUST BE REFERRED TO FILE PERSONNEL.

-NOTICE-

    • SURRY POWER STATION. UNITS 1 AND 2 INSERVICE INSPECTION PROGRAM NRC QUESTIONS AND COMMENTS INTRODUCTION The questions below are those questions which were asked by the NRC as a result of their review of the Surry NRC submittals and are detailed in their letter dated May 23, 1988, entitled, "REQUEST FOR ADDITIONAL INFORMATION SECOND 10-YEAR INSERVICE INSPECTION PROGRAM FOR SURRY UNITS 1 AND 2 (TAC NOS. 65557 AND 65558)." Each question applies to both Surry Unit 1 and Surry Unit 2. Responses (REP.) to the following questions are due to the NRC by September 30, 1988.
1. General Questions and Comments A. NRC. Provide isometric and/or component drawings showing the welds, components, and supports which Section XI of the ASME Code requires be examined.

REP. Virginia Electric and Power Company is currently undergoing an extensive drawing update program which is expected to be completed by the end of the second inspection period. Attached (Attachment 1 is Surry Unit 1 isometrics, Attachment 2 is Surry Unit 2 isometrics, Attachment 8 is Surry Unit 1 MKS drawings and Attachment 9 is Surry Unit 2 MKS drawings) are the existing drawings for welds and components covered under Sections IWB, IWC, and IWD of ASME Section XI. (Reference response to Item E. for information related to IWF component support drawings).

B. Provide the staff with an itemized listing of the welds/components subject to examination during the second 10-year interval. The requested listing, along with the isometric drawings, will permit the staff to determine if the extent of ISI examinations meets the applicable Code requirements.

Page 1

REP. The attached (Attachment 3 for Surry Unit 1 and Attachment 4 for Surry Unit 2) itemized listings of the welds/components subject to examination during the second 10-year interval represent those items that have been scheduled based on existing drawings and sketches. Virginia Electric and Power Company is currently undergoing an extensive drawing update program. We are in the process of issuing new controlled drawings and estimate that our revised program will be in place and utilizing these new drawings by the end of the second inspection period for Surry Units 1 and 2 respectively (reference response to Item E).

c. NRC. Provide a list of the ultrasonic calibration standards being used during the second 10-year inspection interval. This list should include calibration standard identifications, material specifications, and sizes.

REP. Reference Attachment 5.

D. Provide a list of the nondestructive examination procedures that are being used during the second inspection interval.

REP. Reference Attachment 6.

E. In Section 3 of Revision 3 of the ISI Program Plan, the Licensee added a new program for component and piping support inspection. The Licensee proposes to follow the Code requirements with the following exemptions:

(1) "Component supports that are outside the scope of the Show Cause Order regarding the I&E Bulletin 79-14 are exempt from the preservice and inservice requirements of this support program."

(2) "Component and piping supports which are buried, encased in concrete, or that portion of the supports which are made inaccessible by the normal component or piping insulation are exempt from the preservice and inservice requirements of this support program."

Page 2

With regard to the first proposed exemption, I&E Bulletin 79-14, entitled "Seismic Analyses for As-Built Safety-Related Piping Systems," requires a licensee to verify that seismic analyses were performed based on the as-built piping system configuration. This Bulletin is not intended as a guide for support inspections. Thus, the staff considers it to be inappropriate to use the scope of I&E Bulletin 79-14 in the selection of supports for examination. The proposed program would exclude from examination supports for Class 1, 2, and 3 piping 2 inch nominal pipe size and smaller. This is not consistent with Code requirements which exclude supports for Class 1 piping 1 inch nominal pipe size and smaller, and for Class 2 and 3 piping 4 inch pipe size and smaller. The Licensee would inspect fewer Class 1 component and piping supports and more Class 2 and 3 component and piping supports in the proposed program than the Code requires. Furthermore, most of the supports in the Residual Heat Removal (RHR),

Emergency Core Cooling (ECC), and Containment Heat Removal (CHR) Systems would be excluded from the proposed program due to the size exemption. However, pursuant to 10 CFR 50.55a(b) (2) (iv) (A), the RHR, ECC, and CHR systems must be inspected because of their importance in a safe plant shutdown. Thus, the staff considers the proposed adherence to the scope of I&E Bulletin 79-14 in the selection of supports for inspection not acceptable. The Licensee should follow IWF-2510 in the Code for the Selection of supports for examination.

With regard to the second proposed exemption, component and piping supports that are made inaccessible by insulation cannot be excluded from the support inspection program without consideration of the supports. Such supports should be treated on an individual basis. Paragraph IWF-1300(e) of Section XI of the ASME Code states: "Where the mechanical connection of a nonintegral -support is buried within the component insulation, the support boundary may extend from the surface of the component insulation provided the support either carries the weight of the component or serves as a structural restraint in compression." According to the reply to Question (5) of ASME Code Section XI Interpretation:

XI-1-86-11 (Interpretations Vol. 18), IWF-2510 and IWF-1300(e) require the removal of that insulation necessary to perform inspection of all component supports that cannot be shown to carry the weight of the component or serve as a structural restraint in

  • Page 3

compression. Pursuant to 10 CFR 50.55a(g) (5) (iii),

the Licensee should submit a relief request for staff evaluation for a support whose examination is determined to be impractical to perform. This provides a consistent inspection procedure for both the component and the support. Thus, the.staff considers the proposed exemption of inaccessible supports for examination not acceptable.

The Licensee should revise Section 3 of the ISI Program Plan to delete these two unacceptable exemptions from the support inspection program and establish an acceptable examination sample as stated above. (For additional information on the evaluation of the above exemptions, see NRC Memorandum, R.L.

Ballard to c. Patel, dated July 25, 1986.)

REP. (1) "Component supports that are outside the scope of the Show Cause Order regarding the I&E Bulletin 79-14 are exempt from the preservice and inservice requirements of this support program."

Virginia Electric and Power Company is currently undergoing an extensive drawing update program which will directly effect the Component Support Program. Since the current program was based on

  • I&E Bulletin 79-14, not all of the supports in the ASME Section XI boundary were included in the component support program or on the ASME Class 1, 2, and 3 drawings. The revised program will be governed by Subsection IWF of ASME Section XI and will include the supports within the ASME boundaries that require examination.

System walkdowns have been performed on those Unit 1 ASME Class 1, 2, and 3 systems which we did not have drawings for. System walkdowns are in the process of being performed on those Unit 2 ASME Class 1, 2, and 3 systems which we do not have drawings for. We are in the process of issuing new controlled drawings and estimate that our revised program will be in place and utilizing these new drawings by the end of the second inspection period for Surry Units 1 and 2 respectively.

(2) "Component and p1p1ng supports which are buried, encased in concrete, or that portion of the supports which are made inaccessible by the normal component or piping insulation are exempt

  • Page 4

from the preservice and inservice requirements of this support program."

This exemption is being withdrawn from the program plan.

F. NRC. Request for Relief SR-005 was previously denied because inadequate information was submitted. This relief request has been resubmitted in Revision 3 of the ISI Program Plan and includes drawings that show the obstructions that preclude volumetric examination of portions of pressurizer welds 7 and 15.

From review of these drawings, it appears that these welds are totally inaccessible from one side and only partially obstructed from the other side and that a significant percentage of the volumetric examination can be performed from the partially obstructed side of the welds. Estimate the percentage of the Code-required examination that can be performed for each of these welds.

REP. Virginia Electric and Power Company must perform measurements of the pressurizer weld interferences in order to accurately determine the amount of volumetric coverage. This information will be forwarded as soon as it is available.

G. Request for Relief SR-008: This relief request has not been supported by adequate descriptive and detailed technical information. Provide, as a minimum, the following additional information:

(1) Provide drawings/sketches showing the dimensions of the nozzle-to-safe end weld and the pipe-to-safe end weld with respect to each other; (2) Discuss what examination can be performed from the safe end side of the welds; (3) State whether the Code-required surface examination will be performed on both welds; and (4) Estimate the percentage of the Code-required volumetric examination that can be performed for each of the welds for which relief is requested.*

Page 5

REP. (1) Reference Attachment 7.

(2) A Volumetric examination from the pipe side of the weld will be performed in addition to a surface examination.

(3) The Code-required surface examination will be performed on both welds and the base metal on the pipe side of the welds.

(4) It is estimated that the percentage of Code-required volumetric examination that can be performed for both welds is essentially 100% in one direction only.

H. NRC. Request for Relief SR-009: Discuss the possibility of using the improved miniature linear accelerator

{Minac-6), which is reported to be almost 10 times more powerful than the original EPRI Minac, for volumetric examination of the Class 1 longitudinal electroslag piping welds in the cast austenitic elbows on the crossover leg of the reactor coolant system.

REP. Request for Relief SR-009 is being withdrawn at this time. Virginia Electric and Power Company will attempt to utilize the Minac-6 for the examination of the electroslag welds. If this method yields unacceptable results, we will resubmit this request for relief at a later date.

I. Requests for Relief SR-010 and SR-013: These are generic relief requests without a list of specific welds for which relief is requested. The regulations do not provide for granting generic relief requests.

Therefore, the staff requests the following information with regard to Requests for Relief SR-010 and SR-013:

(1) List the specific welds for which relief is requested, (2) For each of the welds listed, provide a detailed description of the obstructions or limitations which will be encountered during the course of the examination(s), and (3) Provide an estimate of the percentage of the Code-required examination(s) that can be performed for each of the welds listed.

Page 6

REP . Request for relief SR-010 and SR-013 are withdrawn at this time. These requests for relief will be submitted at a later date when extents of coverage are known. This type of information will require actual field verification in several instances of which most are outage related. As this information is compiled, subsequent relief will be made.

J. NRC. Request for Relief SR-011: Relief is requested from performing the Code-required volumetric examination of the bolting used in the reactor coolant loop stop valves. It is stated that, due to the material characteristics of both the bolting and the valve body, removal of the bolting may cause significant damage to the studs and the valve body. The bolting is ASTM A193 grade B-8M with a hex head and a 3/4-inch hole drilled completely through the stud.

An ultrasonic examination could be conducted from the center-drilled hole of the Class 1 bolts while in place under tension. Also, ASME Code case N-307-1 (listed in Regulatory Guide 1.147 as an NRC-approved Code Case) allows for a revised ultrasonic examination volume when the examinations are conducted from the center-drilled hole.

The Licensee should either withdraw Request for Relief SR-011 and use ASME Code Case N-307-1, or provide further technical justification for requesting relief from the Code requirement.

REP. Request for Relief SR-011 is being withdrawn at this time. Ultrasonic examination from the stud hole would result in an unacceptably high radiation dose due to the time required to set-up and perform the examination. Southwest Research Institute (SWRI) has been contracted to develop a cylindrically guided wave technique (CGWT) examination procedure to examine the loop stop valve studs. The CGWT procedure would greatly reduce the examination time and resulting personnel exposure. A special calibration/qualification specimen will be fabricated from a spare loop stop valve stud to qualify the technique. Virginia Electric and Power Company has in the past utilized the CGWT for Non-ASME Section XI examinations. The CGWT will be sensitive enough to detect nonaxial surface flaws specified in IWB-3515.1.

Page 7

K. NRC. Request for Relief No. 22: The section entitled "Section XI Code Requirements For Which Relief is Requested" lists the following: Class 1 System Hydrostatic Test, IWB-5222; Class 1 System Leakage Test, IWB-5221; and Visual Examination, IWA-5240.

Verify that relief is being requested for the visual examination only.

Also, provide a brief description of the proposed alternative examination method utilizing leakage identification in lieu of the Code-required visual examinations.

REP. This relief request will be clarified as follows:

Request for Relief No. 21 is asking relief only from*

the visual examination requirements of IWA-5240.

Reference to IWB-5221 and IWB-5222 will be deleted from the request for relief.

The alternative examination method utilizing leakage identification in lieu of the Code-required visual examinations is described in Technical Specification 3 .1. c.

As described in the basis of Technical Specification 3.1.C, detection of leaks from the Reactor Coolant System is by one or more of the following:

1. An increase amount of makeup water required to maintain normal level in the pressurizer.
2. A high temperature alarm in the leakoff piping provided to collect reactor head flange leakage
3. Containment sump water level indication.
4. Containment pressure, temperature, and humidity indication.

If there is significant radioactive contamination of the reactor coolant, the radiation monitoring system provides a sensitive indication of primary system l~akage. Radiation monitors which indicate primary system leakage include the containment air particulate and gas monitoring, the condenser air ejector monitor, the component cooling water monitor, and the steam generator blowdown monitor.

Page 8

L. NRC. Request for Relief No. 23: It is stated that the valve design of HCV-1310A (Unit 1) and HCV-2310A (Unit 2) prevents pressurization of the subject piping and valves when conducting the system hydrostatic pressure test per IWC-5222. The valve is required to be closed for the system hydrostatic pressure test but when the required test pressure (3419 psig) is applied, the valve lifts off its seat.

It is also stated that, in previous tests, a mechanical jack has been installed to prevent the valve seat from lifting. The hydrostatic test would be completed but valve damage was incurred (bending stem, disc, seat, etc.).

Has the damaged valve been replaced and, if so, will the replacement valve withstand the Code-required test pressure? What is the maximum test pressure that a hydrostatic test could be performed at without damaging the valve?

REP. Both valves were replaced. The new valves initiate leakage at 2000 psig. The maximum test pressure a hydrostatic test could be performed at without damaging the valve is therefore 1950 lbs (allowing for gauge accuracy) *

  • Page 9

Attachment 1.

Surry Unit 1 Component Isometrics

WESTINGHOUSE ELECTRIC CORPORATION Illustrative Only VPA-1-i 100 Rev. 1 6-18-85

- REACTOR VESSEL Flange ~igarnents 1 thru 58 (Ref. 1-llJ'.J".:;

Nozzle to Vessel Welds 10 thru 15 (Ref. 1-llJOP.)

Diai-.ieter: 157.0"I.C.

C"ircumference: 492.98" t1ateria1: Flange-f,.3Q8 Class 1_ 6 2 Carbon Steel

- 7 I (450) (22:5°)

Upper Shell: 3.125"T-SQ8 Class 2 Carbon Steel 3 ----,---~--,~------J~-,----flll Intermediate Shell: 9.0"T I A533 Carbon Steel I

8-, Lower S!1el l: 9.0"T - A533 (135°} I Carbon Steel I

I

. I 9 -

I (315°)

Botto;,1 Shell: 5.375"T - ASO Class 2 Carbon Steel Bottom Head: s:375"T - AS33 Carbon Steel Welds o,7 ,s & 9: 100" Length

WESTINGHOUSE ELECTRIC CORPORATION Illustrative Only VPA 11 OOA Rev. 1 6-18-85 REACTOR VESSEL NOZZLE VESSEL WELDS 270° 14 Loop 2 Outlet Nozzle

~ 15 Loop 2 Inlet ~ozzl 3~\ /.*

3v ~,

, 80° - - - - - - - . - - - + ---------11-+---- 0° Loco 3 Outlet tfozzl e

5) Loop 1 Outlet r*Jozzle 12 Inlet Nozzle goo Flange Ligaments I

,. . I

    • c ........
  • -* Note:

Stud hole 1 at 0°

, ... thru Stud hole 58 at

'IOT1I ~. * - - - - - - - - - - . . . . .

353.8°

  • R. V. INTERNALS VPA-1-1200 Rev. 1 6-18-85
01. Reactor Vessel Internals aa accessible (B-N-1).
02. Reactor Vessel Core Supports as accessible (B-N-3).

VPA-1-1200A INTERNALS Rev. 1 6-18-85

1. Head and Vessel Alginment Pin
2. Alignment Keyway Upper Support Plate
3. Upper Support Column
4. Control Rod Guide Tube
5. Core Barrel Outlet Nozzle/Vessel Interface Surface
6. Upper Core Plate Alignment Keyway
7. Core Barrel Mid-Plate Girth Weld
8. Upper Core Plate
9. Upper Internals Alignment Key In Core Barrel
10. Irradiation Specimen Guides
11. Guide Tube Attachment to Upper Core Plate
12. Baffle Bolting l3. Lower Core Plate
14. Lower Core Plate Fuel Assembly Alignment Pins
15. Access Plate
16. Lower Core Support Columns and Instrument Guides and Attachments
17. Core Support Column
18. Thennal Shield Flexure
19. Radial Support
20. Lower Support Column
21. Secondary Core Support Assembly
  • Items l thru 21 Ref. VPA l-1200A

Illustrative Only VPA-1-12008 INTERNALS Rev. 1 6-18-85

  • HEAD AND VESSEL ALIGNMENT PIN (l)

CONTROL ROD GUIDE TUBE (4)

UPPER SUPPORT COLUMN {3) UPPER CORE PLATE ALIGNMENT KEYWAY(6)

CORE BARREL.OUTLET NOZZLE .. CORE BARREL

. VESSEL*INTERFACE ID-PLATE GIRTH SURFACE (5) waD (7)

UPPER CORE PLATE(8)

IRRADIATION SPECIMEN GUIDES UPPER INTERNALS

( 10)

"""'11::.!;:tt-+---ALIGNMENT KEY IN

.... ....... CORE BARREL (9)

LOWER CORE PLATE GUIDE TUBE ATTACH-MENT TO UPPER FUEL ASSEMBLY ...... CORE PLATE (11)

ALIGNMENT PINS (14)

LOWER -coRE PLATE

( 13)

ACCESS PLATE

( 15)

BAFFLE BOLTING

( 12)

CORE SUPPO~~ otUMN 71 LOWER SUPPORT LOWER CORE SUPPORT COLUMN (20)

COLUMNS ANO INSTRU-MENT GU IDES AND \~~s:cJ ATTACHMENTS (16)

THERMAL SHIELD FLEXURE (18)

RADIAL ,~~)ORT

ILLUSTRATIVE ONlY Rev. 1 6-18-85 REACTOR VESSEi CLAD PATCHES

. *r,a° CP 14 1

CP 7 ACCESS SLOTS AT oO. 4&°. ssO. srl'. 90°. 1ss". 1m0 ** 23sJ: 210°. 285°. 295° I 305°

. CORE SUPPORTS AT rP

  • 90°
  • 1etf I 27o0
  • WESTINGHOUSE ELECTRIC CORPORATION Illustrative Only VPA-1-1300 Rev. 1 6-18-85 REACTOR VESSEL CLOSURE HEAD 270° 44 45 Control Rod Drive Mechanisms (Ref. 1- 13:JOA)

G7 0 OCr> I o(DS 55.

48 0 00 0 049 58 0 0 00 .57 3J (o(o0 0 00000 0 0~9 1 (Stud)

  • 000000

, 80 ° ----+-+---++-(o O O O O O O O O 5 8 --+....__..4---- 00 0 o o* o o 0

(; 5 0 00 0 0 0 0 0 0 0G2 53 e O 0 470 00 00 040

. ~~ ' qg 0~3':)***1 I-lead to Conoseal Bolting Flange ~ieldl (Marmon Clamp & (Ref. l- l 300A)

Jacking Screw) 15 goo Jacking Screw r-1armon Cl amp (S screws)

WESTINGHOUSE ELECTRIC CORPORATION Illustrative Only V PA-l-1300A i

I IC 0

IL CONTROL ROD DR.IVE MECHANISMS Rev. 1 6-18-85 t

11.25 11 ------3J4 Stainless Steel

- - Weld .655 11 T

~~ SB-167 Inconnel 112. 7511 11

-I 4.06 11 r--

CLOSURE HEAD FLANGE WELD Closure Head: 6. 187"T SA508 Class 2 Carbon Steel Diameter: 170. 875 11 Ci rcurnference: 536. 54 11 6.59 11 _..,

t

  • 28.25 11

ILLUSTRATIVE ONLY '\J PA-1-1400 Rev. 1 6-18-85 REACTOR VESSEL STUDS, NUTS & WASHERS r 8.s .. I

I

~~~~=!....JJS" NUT 11 j 9.0~ - ,

C. j  :..Jt CONVEX WASHER r-9.02 1 11 It f II¥*

STUD CONCAVE WA SHER 58 Studs: A540 Grade 824 58 Nuts: A540 Grade 824 58 Washers (concave and convex): A540 Grade 824

3 2 hOTES, I.WELD/ITEM NUMBERS ARE IIIOICAl[O WITH A No.*No.

DRAWING RffEREIICE 110. !SEE REF OWGSI IIIOIVIWAL WELOlllEH I I U M B l R - - - - - - - - - - - ~

2. ~~~ ~Ef, W~L_D C~';fAllON IALL MEASUHEMENTS TAKEN FROM 0

t OF MAN1,AY1 0 TYP I CAL Of 8 8. No. lil = 8" CCII 4 IN LINE C. Ila. 11 , 18" CW

0. No. 12 ' 12" CCW E. No. 13 , 16" cw F. Ila. 14 , lil" CCII Ii. No. 15 , 123" cw 2-5 3. ALL NOZZLES ARE CAST l<OllLES ll*IB THllU 1*231 ISEE NOlE 51 4. HANWAY IS A CASI ORlflCE 11-171
5. SAMPLE NOZ2l[S I I" SOCK[! W[LOSI 1101 ON \l[ST lht;t1lJU$f ISOMEIHIC
6. INSIRI.KNT l<OllL.E I I" SOCKET WELOI IIOT ON WfST J1<Gt10USE ISOMETRIC 4

1-18 REFEREl<CES,

"' I. OWG YPA-1*2101/l

.,. -a* ' 2. 11448-4.15* lilA ******* PRESSUllZER C TOP VIEW 'A-.A' SEE NOIE 5 SEE NOlE 5. l3 4 IN LINE l*I

!! ISEE NOlE Ill 2-,

,._ I SEE NOlE 61

"' FOR INFO:~Mi-\TION Olll Y e~,.

SEE NOTE 5

  • SH l<DlE 6 Ml1[*AC11SUJ6 JO lttl5 a . t i ~ I.Hll.L
  • CIN UI ll lZIIIIIG Ii, CAO S~llM VIRGINIA POWER WEST VIRGINIA POWER NOAH~ CAROL ~A POWER_

1---------El<lili.EERIIIG AIID C[JjSIRt.CI IDI RJCH><<HJ. VIIIOll<IA BOTTOM VIEW 'B-B' sL _jB WELD IDENTIFICATION MAP PRESSURIZER I-RC*E-002 SURRY POWER STATION* UNIT VIRG I NIA POWER A ISSUE FOR REVIEW

~~~~

L**O ,

- ~~j:~3£l:~~~R::;:~:-~:~~-j-~~

llM lN.J\_:l*

- - - - NIA

~

lH.U,!r. Dh*H*l'..L f<<Jl(U ~t I u I

WESTINGHOUSE ELECTRIC CORPORATION Illustrative Only VPA-1-3100 Rev. 1 6-18-85 STEAM GENERATORS 1,2 &3 Note: Welds 1-1, .2-1 and 3-1 replacement weld installed Outage Core V-V I 1980-81.

Class 2 Ref. 2-1100 Channel Head to Tubesheet Welds 1-1, 2-1 and 3-1.

-i-----------------t--...----

Manway f 37"

~82 t

  • Nozzle Inside Radius 29" Material: 5.2"T SA508 Class 2 Carbon Steel; Diameter: 135.88";

Circumference: 426.66" Nozzle in Vessel Welds: Not Applicable Manway Bolting: 2 manways each generator: 16 Bolts - 1.88". Diameter 8.0" Length Integrally Welded Support Attachments: Not Applicable Zero

Reference:

Top Center1ine of Hotleg Manway Inside Steam Generator Weld Radius Manway Bolting 1(1-RC-E-lA) 1-1 lA Hotleg 1-81 to l-B16 lB Coldleg 1-817 to l-B32 2{1-RC-E-18) 2-1 2A Hotleg 2-Bl to 2-B16 28 Coldleg 2-817 to 2~B32

. f(l-RC-E-lC) 3-1 3A Hotleg 3-81 to 3-816 38 Coldleg 3-817 to 3-B32

WESTINGHOUSE ELECTRIC CORPORATION VPA-1-4100 Rev. 1 6-18-85 REACTOR COOLANT PIPE R.C.

PUMP STEAM GENERATOR II ~I 1-591 2~

10 t

3 l"RC 2 Note:Welds 18 thru 21 are Longitudinal Electroslaq Welds.

Note:Welds 4,50M,6DM and 7 replaced Outage Core V-VI 1980-81. .

WESTINGHOUSE ELECTRIC CORPORATION VPA-1-4101 Rev. 1 6-18-85 RHR TAKE-OFF 14 11 SCH 140 1 .250"T SS REF. ~

1-4100 ,

3 e

--14 RH I 8

-t4'RHl8 H3 REF.

,,,.. 2-2500 9 ~~1 1-701

WESTINGHOUSE ELECTRIC CORPORATION VPA-1-4102

~

IC 0

LL ACCUMULATOR 12 11 SCH 140 1.125 11 T SS DISCHARGE Rev. 1 6-18-85 .

HI

,, 7 12 RC 12 1251.45-- H2 3

13 H3 14 ~ 2 14' l(BC)

REF "O..y 1*4100 15 19 H7 20

  • HS I- 750

WESTINGHOUSE ELECTRIC COR_PORATION VPA-1-4103 Rev. 1 6-18-85

E a:

0 IL BY- PASS 8 11 SCH 120 . 719 11 T SS 1-5 8 5 7

REF

\. 1-4 112 1/

8RCII- l(BC>

3 It', ... 3

? ..,

1..590 ""4--~REF 1-4100

WESTINGHOUSE ELECTRIC CORPORATION

. ~

VPA-1-4104

~

IC 0

6 11 SIS LOW HEAD SCH 120 .562"T SS Rev. 1 6-18-85 4

REF,..

2-2 103 .... ' I 1-87Cc 8 10 co" s,-_ 49.-/

1-874 E 8

WESTINGHOUSE ELECTRIC CORPORATION VPA-1-4105

~

a:

...0 SIS HIGH HEAD 6 11 SCH 120 .562 11 T SS Rev. 1 6-18-85 2 11 SCH 160 .344"T SS l-889A 12 REF I 2-2541 11

-~'*Re 17

~ 2

' .. ICBC)

REF ~

1-4100

WESTINGHOUSE ELECTRIC CORPORATION VPA-1-41 OG C

E cc 0

3" SCH 160 .438"T SS RTD RETURN Rev. 1 6-18-85

  • g 10 I (SW)

REF.

1-410 8 8

('c..

9 ' ,ICBC)

REF 'o._,.,

1-4100 IO

WESTINGHOUSE ELECTRIC CORPORATION VPA-1-4107

~

IC 0

2 SCH 160 .344 T SS 11 11 LETDOWN Rev. 1 6-18-85 4

I.

14"0.. . .

REF.

4100 'ay 15 8

5

-2'CH 5 1-4G>OB 1<309D 10 11

WESTINGHOUSE ELECTRIC CORPORATION

. ~

VPA-1-4108 Rev. 1 6-18-85 RTD TAKE-OFF 2" Sch 160 .344"T SS 1-54GA 4

~'


~-Z-\:--~--~}~ __ ~ REF 4

2°RC I :32 / FLA:GE \" .: l- IOl'.D 3X 2 RED.

Note: Welds 14,15 and 16 replaced 1980-81.

Welds 17,18,19,20 and 21 added 1980-81 .

WESTINGHOUSE ELECTRIC CORPORATION VPA-1-4109 Rev. 1 6-18-35 RT D TAKE-OFF 2" SCH 160 .344 11 T SS 1.5 11 SCH 160 .281 11 T SS I

12 RCl25\

4 3

~ 2 12 ' l(BC)

REF 13-oy 1-4100

'i..,20

~21 25 ,,

FLANGE A - 2 RCl29 2G 18t<a..., 27CBC>

REF. ',

I* 41 0 G 17"0.y

WESTINGHOUSE ELECTRIC CORPORATION VPA-1-4110 Rev. 1 5,..._18-85 DRAIN HEADER 2 11 SCH 160 .344 11 T SS Note: Weld 2 replaced 1980-81 Welds 3, 4, 9 and 10 added REF 2 ~ 1980-81 .

1-4100 ,,, ,,,o

~,,,, HBC>

2 3

4 5

11 HI 12 H2 13 50 49 -< I 14 REF. . . *o

  • 1-4G00

~o...

REF.

... 1-4100 18(BCf ...

2RC55\ .. 9 19 ~

20

r---------------------------------

WESTINGHOUSE ELECTRIC CORPORATION

. ~

VPA-1-4111 Rev. 1 6-18-85 FrLL HEADER 2 SCH 160 .344 T SS 11 11 9 Y'i. ,,

..,.....2CH8

~-1 SCoCi>A 1554A

  • 11

--2CHl~8 4

3 15 14 2 .,,oA.

l(BC> - ,, <3

' REF.

~o 1-4100 l7 REF

_.o--t 1*4Ci01 I

WESTINGHOUSE ELECTRIC CORPORATION VPA-1-4112 Rev. 1 6-18-85 _

PRESSURE - EQUALIZATION 2 11 SCH 160 .344 11 T SS

,, \.~FJ" 4b I 2 15 " ., .v.'15 I

I ~ REF ICBC) 14 1-4100 I

REF. i~ -2RC 45 1-4103 4 14

WESTINGHOUSE ELECTRIC CORPORATION VPA-l-4l 13 Rev. 1 6-18-85 SEAL INJECTION 11 2 11 SCH 160 .344 T SS

1. 5 11 SCH l 6 0 . 281 11 T SS 7

I 9 . ,, I

- 2 X1 I

- - T- -

1 / , R.C.

2 RED.

10

~

1 PUMPI 11

~

3 FLANGE A I 3 5 12 1

2 x4 RED. -

,, 3 R 2x 4 ED.-- I 2980 17 19 18 1, 20

~ 2 CH~7 21

  • 22

-2x 4

,, 3 ,,

RED.

WESTINGHOUSE ELECTRIC CORPORATION VPA-l-4200

IE C

0 IL REACTOR . COOLANT PIPE Rev. 1 6-18-85 R.C, PUMP STEAM GENERATQR Note:Welds 18 thru 21 are Longitudinal Electroslaq Welds.

Note:Welds 4,5DM,6DM and 7

  • replaced Outage Core V-VI 1980-81 .

WESTINGHOUSE ELECTRIC CORPORATION V PA-1-4 201 Rev. 1 6-18-85 ACCUMULATOR DISCHARGE 12" SCH 140 l. l 25 11 T SS 12 RC 23 9

)

8 7

  • *12 H2 13 3

t<o.. 2 15 ' 1(8C>

H3 REF. ',

14 1-4200 ~

14 HS I l(i 91I J..

REF.

1-4202

-12s1- 4<i 19 H7 20 HS

. _.... 1875E

WESTINGHOUSE ELECTRIC CORPORATION

. ~

VPA-1-4202 Rev~ 1 6-18-85 R HR RETURN 10 11 SCH 140 l .OO"T SS REF.

2-2512 8

.,._ 1d'RH i (o HIO H4 4

WESTINGHOUSE ELECTRIC CORPORATION

  • VPA-1-4 203 Rev. 1 6-18-85 BY- PASS 8 11 SCH 120 . 719 11 T SS 158

7 REF.

1*4212 II 8 RCl2 3'9, 8 1592 --,.. 6, 4 "'.,._REF 1-4200

WESTINGHOUSE ELECTRIC CORPORATION

'r*

.-VPA-1-4204

. Rev. 1 6-18-85

I SIS LOW HEAD IC 0 6 11 SCH 120 . 562 11 T SS IL REF.

2

"'o... 1-4 20 0 ICBCf ... 3 3 2 * ~

4

-<oRC 18 REF. t<.

2-220?> '.. 187CoC 5 I 10

~'5148~ ~

1874F 8

WESTINGHOUSE ELECTRIC CORPORATION

. ~

VPA-l-4 205 Rev. 1 6-18-85 SIS HIGH HEAD 6 11 SCH 120 .562 11 T SS 2 11 SCH 160 .344 11 T SS 18898 J

', REF.

CoSI 144 - )/ 2-2542 251 85 12CBW>

11 ,,

CoX2 RED.---

11

.-<o RC I~

2 A I <BC),,. ,,.015

~ REF 14 1-4200

WESTINGHOUSE ELECTRIC CORPORATION VPA-l-420(o Rev. 1 6-18-85 CHARGING 2

IC 0

I&. 3 11 SCH 160 .438"T SS 11

-3CHI 1312A 10

. t<

2 14 o.. , l(BC)

REF ' ,0 1-4200 15">'

WESTINGHOUSE ELECTRIC CORPORATION V PA-1-4207 Rev. 1 6-18-85 RTD RETURN 3 11 SCH 160 .438 11 T SS 4

""o 9 '

2 3 REF, JCBC>

1-4200 ~

WESTINGHOUSE ELECTRIC CORPORATION VPA-1-4208 Rev. 1 6-18-85 RTD TAKE-OFF 2 SCH 160 .344 T SS 11 11

~ ~ FLANGE A

.. ~~- 3'X i'RED.

ICo ... , "'y REF.

1-4207 Note: Welds 16, 17 and 18 replaced 1980-81 Welds 19. 20, 21. 22, 23. 24. 25 and 26 added 1980-81

WESTINGHOUSE ELECTRIC CORPORATION VPA~l-4209 Rev. 1 6-18-85 Ji RTD TAKE-OFF a: 11 2 SCH 160 .344"T SS 0

"' 1.5" SCH 160 .28l"T SS

"'a. 2 12 , llBCl

' 'o 13 REF. ">-

1-4200 ,,

/.2 RC 112 IB I 57~8 2

° FLANGE A 21 22 23 REF.

,~ ...

1*4207 24 ti, 25

WESTINGHOUSE ELECTRIC CORPORATION

. ~*

V PA-1-4210 Rev. 1 6-18-85 DRAIN HEADER 211 . SCH 160 . 344 11 T SS REF.

~ 1-4200 ICBC)' ' 5 2 'oy 3

4 5

Co Note: Weld 2 replaced 1980-81 Welds 3, 4, 9, lO, 13, and g 10 ,

14 added 1980-81 -2'RC57 II 12 9 REF. ICD

~ .... 1-4200 22<BC> , IO 17

  • 23 ~

24 21 38 42

  • ~'

REF

WESTINGHOUSE ELECTRIC CORPORATION VPA-1-421-1 Rev. 1 6-18-85 Fl LL HEADER 2 11 SCH 160 .344 11 T SS 10

-2RC 1~9 15548 II 3

2 ~

ICBC> ' I0 cf.:' REF

"'(' 9 1-42 00 -

WESTINGHOUSE ELECTRIC CORPORATION VPA-1-4212 Rev. 1 6-18-85 l1 a:

0 I&.

PRESSURE EQUALIZATION 2" SCH 160 .344"T SS 49 2 l(i)

REF. 3 1*4203 I ICBC) 15

-<a' REF.

~f

-2RC4G 1-4200 14 4

WESTINGHOUSE ELECTRIC CORPORATION

  • r.

VPA-1-4213 Rev. 1 6-18-85 SEAL INJECTION 2 11 SCH 160 .344 11 T SS 1.5 11 SCH 160 .281"T SS

,, I I0 2 Xl 2 RED.- '2.

,, oJ 9 - 2 x 4 RED.

15

' . I I C R.,

ICo 8

~~

2 0 FLANGE A

PUMP 2 18

..-2 CH95 5

G 19 7 ,. ~,;-

-1 l x4 RED, 2

21 H2 2.2 H3 23 f xf RED -

24

WESTINGHOUSE ELECTRIC CORPORATION VPA-1-4300 Rev. 1 6-18-85 REACTOR COOLANT PIPE R.C.

PUMP STEAM GENERATOR 1-594 Note:Welds 18 thru 21 are Longitudinal Electroslaq Welds.

Note:Welds 4,SOM,6DM and 7 replaced Outage Core V-VI 1980-81. .

WESTINGHOUSE ELECTRIC CORPORATION VPA-1-430 I Rev. 1 6-18-85

I ACCUMULATOR DISCHARGE E

0 IL 12 11 SCH 140 1.125 11 T SS 2

7 t"o..

15 .. .I(.BC)

H2 8 REF 1~°'>'

  • 1-4300 REF. H3

~1*4302 ~

1..0.,

, H4 10 14 H7 15 HS 1875F

  • . I I

I I

WESTINGHOUSE ELECTRIC CORPORATION V PA-1-4302 Rev. 1 6-18-85 RHR RETURN 10 11 SCH 140 1.00 11 T SS

  • 5
  • ~12 1-4301 o,

REF*, . .

I 11°""'

REF.

13 ,, .. ~ 2-2 512 17208

WESTINGHOUSE ELECTRIC CORPORATION V PA-1-4303

I BY-PASS Rev* I 6-18-85 IC 0

II, 8 11 SCH 120

  • 719 11 T SS ij 5 7

8-RCI~--.- REF

,, .... 1-4311

)

HBC>f(. .. 13. 1595

"'Q, I

--,:_a- ,4 3' .. ~........ .... REF.

1-5'4 -* ,:.:o. ~ I .. }I 1-4300 REF.

1-4300

. I

WESTINGHOUSE ELECTRIC CORPORATION VPA-1-4304 Rev. 1 6-18-85 SIS LOW HEAD 6 11 SCH 120 .562"T SS REF.

~3 1-4300 4

~CDRC21 REF. t<

2-2303 ......... I I 87CDA 5 10

~sr-so~ g

WESTINGHOUSE ELECTRIC CORPORATION V PA-1-4305 Rev. 1 6-18-85 SIS HIGH HEAD 6" SCH 120 .562"T SS 2" SCH 160 .344"T SS 2sI 75----

11

~x 2 RED.~ 8

-Co RC20 2 ,,,,,

0 ICBC> "' "' 14

~ REF 1-4300

WESTING~OUSE ELECTRIC CORPORATION V PA- l-430Co Rev. 1 6-18-85 RTD RETURN 3 11 SCH 160 .438 11 T SS

  • 3RC 147 - -

7 10 r.:.°' ,

REF.

1-4300

WESTINGHOUSE ELECTRIC CORPORATION .

V PA-1-4307 Rev. 1 6-18-85 RTD TAKE-OFF 11 2 SCH 160 . 344 ;,T SS 8

1505C HI

~

2" I . I I ... ~ I/ ,,

l<BW) --:.:c,-3X2 RED.

Note: Welds 12, 13, 14, 19, 20 .......

and 21 replaced 1980-81.Welds 22, ~ Y REF

. 23, 24, 25 and 26 added 1980-81 1-4306

WESTINGHOUSE ELECTRIC CORPORATION V PA-1-4 308 Rev. 1 6-18-85

~

RTD TAKE-OFF I E 11 0 2 SCH 160 .344"T SS IL 1

1.5" SCH 160 .281 "T SS

  • lRCl41 Co / I2 ,,

7 i'x 11 RED.

9/ i'x~'RED 11 / 4

~ 2 12 ... l<BCl

o I~

y REF.

1-4300 20 FLANGE Ay~

25 'A'

-2*Rc 14Co 26 27CBC>,,,, ,,,, ...o15 REF.

1ro l-430G>

WESTINGHOUSE ELECTRIC CORPORATION

E a:

0 IL 2 SCH 160 .344 T SS 11 REF.

11 DRAIN HEADER Rev. 1 6-18-85

<o4 1*4~00 ICBC>' ,, 5 2 'Oy Note: Weld 2 replaced 1980-81 Welds 3, 4, 11 and 12 added 3 1980-81 4

IG 32 H4 33 31 I .

2'RC59 ~

17 37 38 3,

~ 40 IB ....... IC,

WESTINGHOUSE ELECTRIC CORPORATION Rev. 1 6-18-85

E FILL HEADER C

0 IL 2 11 SCH 160 .344"T SS 10 2 CHI0--1 3

14 II lo~ . .

20 2 l(BC) 15 ...

REF. 'o...9 r

1-4300

WESTINGHOUSE ~LECTRIC CORPORATION

. ~.

VPA-1-4311

I II:

0 II, PRESSURE 2 SCH 160 . 344"T SS EQUALIZATION Rev. 1 6-18-85 4? 2 I

IG '?JC' REF. I I CBC) :3 \1 ~ ,,Jl,"\

15 ., 15 I.

1-4~03 1 3+/- ~14 REF 1-4300

...,._ 2RC44 14 4

11

~ FE482 10

WESTINGHOUSE ELECTRIC CORPORATION

. ~

V PA-1-4312 Rev. 1 6-18-85

~

SEAL INJECTION IC 0

IL 2 11 SCH 160

  • 344 11 T SS 1.5 11 SCH 160 .281 11 T SS I . 8 2x 12 RED. -

7 I R.C.

e

... I

' ... , PUMP 3 13 V:' . . ,

I 6

x:

3 2

FLANGE A ,.

~ 2 CH93 I 3 5 1 X4 RED.-

2 14 1298C i x-3-RED.--

WESTINGHOUSE ELECTRIC CORPORATION V PA-1-4500 Rev. 1 6~18-85 PRESSURIZER SURGE 14" SCH 140 l .2SO"T SS 12" SCH 140 l. l 25"T SS

~2 REF.

9 (BC)' , 1-4~00 B ~

PRESSURIZER H5

- 12RCIO H2

WESTINGHOUSE ELECTRIC CORPORATION VPA-1-4501 Rev. 1 6-18-85 PRESSURIZER SAFETY 11 6 SCH 160 .719"T SS(Safe-end) 6 11 SCH 120 .562 11 T SS 5

. ~51A FLANGE A 8

WESTINGHOUSE ELECTRIC CORPORATION VPA-1-4502 Rev. 1 6-18-85 PRESSURIZER SAFETY 6 11 SCH 160 . 719 11 T SS(Safe-end) 6" SCH 120

  • 562 11 T SS 5

1551~

B FLANGE A

WESTINGHOUSE ELECTRIC CORPORATION VPA-1-4503 Rev. 1 6-18-85 PRESSURIZER SAFETY 6 SCH 160 . 719 T ss (.Safe-end) 11 11 6" SCH 120 .562"T SS 5

PRESSURIZER

~~RC37 l 551 C FLANGE A <fJ 8

WESTINGHOUSE ELECTRIC CORPORATION VPA-1-4504 Rev. 1 6-18-85 PRESSURIZER SPRAY 4 11 SCH 120 .438 11 T SS Sensitized Piping Piece 3 between 2 and 3 Piece 5 between 10 and ll Piece 6 between ll and 12 Piece 7 between 12 and 13 Piece 8 between 13 and 14 Piece 10 between 16 and 17 Piece 11 between 17 and 18 REF

.,.. 1*4505 1-455A ~20 2 HI - - ~ -'- -o-l er:' ,~ 20 19 ICBC>., " 15 3

--<O' REF. H2 14 1-4100 4 8 17 0

Hl7 ..

-.; 4-4 RC I 4

WESTINGHOUSE ELECTRIC CORPORATION V PA-1-4505 Rev. 1 6-18-85 PRESSURIZER SPRAY 4 11 SCH 120 .438 11 T SS Sensitized Piping Piece 12 between 2 and 3 Piece 13 between 7 and 8 Piece 14 between 8 and 9 Piece 15 between 9 and 10 Piece 16 between 10 and 11 Piece 17 between 15 and 16 Piece 18 between 16 and 17 Piece 21 between 23 and 24 PRESSURIZER*

Hl3 REF 20

-r- 1-4508 Hj

---1 HBC) 3 REF

"( . . 20 IG HI 1-4504 HII . ,,

4 2 H2 ~4RC 15 5

1~, ICBC> H3 REF. '°'r>

1-4300 14 (o 7

a 14

  • 13

WESTINGHOUSE ELECTRIC CORPORATION VPA-1-4506 Rev. 1

  • 6-18..:.85 PRESSURIZER RELIEF 4 11 SCH 160 .531 11 T SS(Safe-end) 4" SCH 120 .438"T SS .

11 3 SCH 160 .438 T SS 11 2 SCH 160 .344"T SS 11 SENSITIZED PIPI!lG Piece 22 l>etween 2 and 3 Piece 23 between 6 and 12 Piece 37 between 9 and 10 Piece 38 between 15 and 16 4 RC34 PRESSURIZER Note: Welds 11 and 17 are 2" sockets.

    • - ~7 -=-...-.,. *~- - - -

WESTINGHOUSE ELECTRIC CORPORATION VPA-1-4507 Rev. 1 6-18-85 AUXILIARY SPRAY 2" SCH 160 .344"T SS 22,.

REF. ; ICBCl 1-4505 2 21 b l.

3 HI

,. ~

  • 2CH(o8~ 7 e

15 H4

WESTINGHOUSE ELECTRIC CORPORATION VPA-1-4508 Rev. 1 6-18-85 PRESSURIZER SPRAY ORAi N 11 1.5 SCH 160 .28l"T SS

    • 3 1t'x! RED._.....

13 14 FLANGE A ~

WESTINGHOUSE ELECTRIC CORPORATION VPA-l-4GOO

! Rev. 1 6-18-85 DRAIN HEADER l!

IC 0 211 SCH 160 .344 11 T SS REF.

1-4210 I

REF.'

1*4110 43q t,o. T' I ~ _5 3 ~53 I

I (p 17 H17 REF HIS l" 1- 4 30'3 Hl9 940 18, I '(\?,,0 I~ 20 '2,.

v,-7,\ . ~~,z..'?J f i'x 43 RED.

21 27 2

23 20G13~

24 l-37(i,

WESTINGHOUSE ELECTRIC CORPORATION VPA-l-4GOI Rev. 1 6.;.18-85 FILL HEADER 2 11 SCH 160 .344 11 T SS

. 2CH8 ICo ~r>. ~1:)/ 14 1 REF I-4211 15 915 Hl2 HII II 10

  • 30 H22 24 25 REF. REF H23 1-4310 1-4111 T

I

~ 21 .

29 .

28

VPA~l~4700

  • ITEM 1

ISO 1-4106 PRESSURE RETAINING BOLTING FLANGE IDENTIFICATION FE490 TOTAL Rev. 1 STUDS AND NUTS 8S & l6N 6-18-85 STUD SIZE 2 1-4108 Flange A 8S &16N 3 1-4109 Flange A 8S & 16N 4 1-4112 FE480 8S & 16N 5 1-4113 Flange A' 4S & 8N 6 1-4207 FE491 8S & 16N 7 1-4208 Flange A 8S & 16N 8 1-4209 Flange A 8S & 16N 9 1-4212 FE481 8S &16N 10 1-4213 Flange A 4S & 8N 11 1-4306 FE492 8S & 16N 12 1-4307

  • Fla"nge A 8S & 16N 13 1-4308 Flange A 8S & 16N 14 1-4311 FE482 8S &16N
  • 15 16 17 18 1-4312 1-4501 1-4502 1-4503 Flange Flange Flange Flange A

A A

A 4S & BN 12S &24N 12S &24N 12S &24N 19 1-4508 Flange A 4S &8N

ILLUSTRATIVE ONLY V-PA-1-5100 RC. PUMPS 1,2&3 Rev. 1 6-18-85


Flywheel (Ref. l-5100B)

II __I_~

R.C.Pump 1-lRC-P-lA R.C.Pump 2-lRC-P-lB R.C.Pump 3-lRC-P-lC D D

  • No. 1 Seal Housing Bolting {Ref. 1-SlOOA)

Flange Bolting (Ref. l-5100A)

~---------Supports (Ref. l-5100B)

Casing (Ref. 1-SlOOC)

Casing Weld (Ref. 1-SlOOC)

ILLUSTRATIVE ONLY VPA-1-51 OOA Rev. 1 6-18-85

  • R.C. PUMP BOLTING NO.I SEAL HOU SI NG BOLTING 12 BOLTS 2.0 DIAMETER 11 B12 8.0 LENGTH 11 0 Reference 2" Material: SEAL INJECTION LINE B3, Etc .
  • FLANGE BOLTING 83 1 E t c . - - - - - ~ -

82 ----.,..r;.----. 24 BOLTS 4.5 11 DIAMETER 30*. 5 11 LENGTH 81*,(Typ) - - - - , , . . - - Material: SA540 Grade 0 Reference 211 B-24 Cl ass 4 SEAL INJECTION--+-----

  • Number;h preceded by (1-), (2-) or (3-) *as applicable.

ILLUSTRATIVE ONLY V~P A 510 0 8 FLYWHEEL Rev* 1 6-18-85

  • l* (Typ)

.875" Diameter 3

NOTE: During Spring 1980 Reactor Coolant Pump B Flywheel of Unit #2 was interchanged with Reactor Coolant Pump A Flywheel of Unit #1.

I I I I I

I I I

  • RC. PUMP SUPPORTS
  • Number is preceded by (1-), (2-) or (3,-) as applicable.

Illustrative Only VPA-1-5100 C Rev. 1 6-18-85

  • PUMP CASING Pump Casing
  • 4.5 11 Min. 1 T1 Material: Cast 304SST
  • Number is preceded by (1-), (2-) or (3-) as applicable .

WESTINGHOUSE ELECTRIC CORPORATION Illustrative Only V*PA-1-ColOO Rev~ 1 6-18-85

  • ~

IC 0

REACTOR COOLANT Pl PE LOOP STOP VALVE 26 Studs and 26 Nuts Each Valve Material: Studs ASTM Al93 Grade B-8M; Diameter - 3.0"; Length Nuts ASTM Al84 Grade 28; Diameter - 3.0";

  • Note: Each stud contains Hex Bolt t Bl B2 0 0 0 0 0 0 0 0 0 0 ISO VALVE STUDS AND NUTS 4100 1-590 Bl thru B26 1-4100 1-591 Bl *thru B26 1-4200 1-592 Bl thru B26 1-4200 1-593 Bl thru B26 1-4300 1-594 Bl thru 826 1-4300 1-595 Bl thru B26

VPA-I-Co200

  • ITEM VPA ISO SIZE VALVE BODIES VALVE Rev. 1 MANUFACTURER 6-18-85 l 1-4104 6" l-874E Velan 2 1-4104 6" l-876B Velan 3 1-4105 6" l-874A Velan 4 1-4105 6" l-889A Velan.

5 1-4204 611 l-874F Velan 6 1-4204 6" l-876C Velari 7 1-4205 6" l-874B Velan 8 1-4205 6" l-889B Velan 9 1-4304 6" l-874D Velan 10 1-4304 6" l-876A Velan 11 1-4305 6" l-874C Velan 12 1-4305 6" l-889C Velan 13 1-4501 6" 1-551A Crosby 14 1-4502 6" 1-5518 Crosby 15 1-4503 611 1-551 C Crosby 16 1-4103 8" 1-585 Rockwel 1 17 1-4203 8" 1-586 Rockwe 11 18 1-4303 911 1-587 Rockwel 1 19 1-4202 10 11 1-720B Darling 20 1-4302 10 11 1-720A Darling 21 1-4102 12 11 1-875A Darling 22 1-4102 12 11 1-8750 Darling 23 1-4201 12 11 1-875B Darling 24 1-4201 12 11 1-875E Darling 25 1-4301 12 11 1-875C Darling is 1-4301 12 11 1-875F Dar.1 i ng 27 1-4101 14 11 1-700 Copes Vulcan 28 1-4101 14 11 1-701 Copes Vulcan 29 1-4100 29 11 1-590 Darling 30 1-4100 27.5 11 1-591 Darling 31 1-4200 29 11 l-592

  • Darling

VPA-I-G200 Rev. 1 6-.18-85 VPA ITEM ISO SIZE VALVE MANUFACTURER 32 1~4200 27.5 11 1-593 Darling 33 1-4300 29 11 1-594 Darling 34 1-4300 27.5 11 1-595 Darling

VALVE BONNET BOLTING

.VPA G300 Rev. 1 6-18-85 VPA STUD .TOTAL ITEM ISO SIZE VALVE SIZE STUDS AND NUTS 1 1-4109 1 1/2" l-568A N/A 2 . 1-4209 l 1/2" l-568B N/A 3 1-4308 1 1/2 11 l-568C N/A 4 1-4508 1 1/2 11 l-RC105 N/A 5 1-4508 l 1/2" l-RC157. N/A 6 l-4105 2" l-S1235 N/A 7 1-4107 _ 2" 1-3090 N/A 8 1-4107 2" 1-460A 6 9 1-4107 2" 1-460B 6 10 1-4108 2" 1-505A N/A 11 1-4108 2" l-547A N/A 12 1-4108 2" l-546A N/A 13 1-4109 2" 1-575A *N/A 14 1-4109 2" 1-576A N/A 15 1-4110 2" 1-558A N/A 16 1-4110 2" 1-555A N/A 17 1-4110 2" 1-557A 6 18 1-4111 2" l-554A N/A 19 1-4111 2" 1-556A

  • 6 20 1-4112 2" l-577 N/A 21 1-4112 2" 1-581 N/A 22 1-4113 2" 1-2980 N/A 23 1-4113 2" 1-298A N/A 24 1-4205 2" 1-S1236 N/A 25 1-4208 2" 1-5058 N/A 26 1-4208 2" 1-5478 N/A 27 1-4208 2" 1-5468 N/A 28 1-4209 2" 1-5758 N/A 29 1-4209 2" 1-5768 N/A 30 1-4210 2" 1-5588 N/A 31 1-4210 2" 1-5578 6 32 1-4210 2" 1-5558 N/A

Rev. 1 5 19 95

- - VPA- I- Co 300 VPA STUD TOTAL

.ITEM ISO SIZE VALVE SIZE STUDS AND NUTS 33 1-4211 211 1-5568 6 34 1-4211 211 1-5548 N/A 35 1-4212 211 1-578 N/A 36 1-4212 211 1-582 N/A 37 1-4213 211 1-2988 N/A 38 1-4213 2" l-298E N/A 39 1-4305 211 l-SI237 N/A

-40 1-4307 2" l-505C N/A 41 1-4307 211 l-547C N/A 42 1-4307 2" l-546C N/A 43 1-4308 2" l-575C N/A 44 1-4308 2" l-576C N/A 45 1-4309 211 l-558C N/A 46 1-4309 2" l-555C N/A 47 1-4309 211* l-557C 6 48 1-4310 211 l-556C 6 49 1-4310 211 l-554C N/A 50 1-4311 211 1-583 N/A 51 1-4311 211 1..:579 N/A 52 1-4312 2" 1-298F N/A 53 1-4312 2" 1-298C N/A 54 1-4507 2" 1-313 N/A 55 1-4507 2" 1-311 N/A 56 1-4600 211 1-376 N/A 57 1-4601 211 FCV160 N/A 58 1-4106 311 l-560A 16 59

  • 1-4206 311 l-312A .12 60 1-4206 311 1-310 12 61 1-4207 311 l-560B 16 62 1-4306 . 311 l-560C 16 63 1-4506 311 1-535 12

VPA*~ G300 Rev. I 6-18-85 VPA STUD TOTAL SIZE STUDS .A.ND NUTS

-ITEM ISO SIZE VALVE 64 1-4506 311 PCVl-456 6 65 1-4506 311 1-536 12 66 1-4506 311 PCVl-455 6 67 1-4504 411 l-455A 4*

68 1-4505 411 l-455B 4 69 1-4104 511 l-874E 12 70 1-4104 611 l-876B 12 71 1-4105 611 l-874A 12 72 1-4105 611 l-889A 12 73 1-4204 , 511 l-874F 12 74 1-4204 6: 1-876C 12 75 1-4205 611 1-874B 12 76 1-4205 611 1-8898 12 77 1-4304 511 1-874D 12 78 1-4304 6: l-876A . ;12 79 1-4305 611 l-874C 12 80 1-4305 611 l-889C 12 81 1-4501. 611 l-551A 8 82 1-4502 611 1-5518 8 83 1-4503 6'i. l-551C 8 84 1-4103 an 1-585 4 85 1-4203 911 1-586 4 86 1-4303 811 1-587 4 87 1-4202 10 11 1-7208 16 88 1-4302 10 11 1-720A 16 89 1-4102 12 11 l-875A 16 90 1-4102 1211 1-8750 *16 91 1-4201 12 11 1-8758 16 92 1-4201 12 11 1-875E 16 93 1-4301 12 11 l-875C 16 94 1-4301 12 11 1-875F 16 95 1-4101 14" 1-700 16 96 1-4101 14 11 1-701

  • 16

WESTINGHOUSE ELECTRIC CORPORATION Illustrative Only V*PA-2-1100 Rev. 1 6-18-85 2

STEAM GENERATORS 1>2 &3 C

0 IL 10 _ _ _ _...,. '

(32" Diameter) Shell Welds 2 thru 8 and 11: SA 523 Grade A Class i Carbon Steel Nozzle in Vessel Welds 9 &10: SA 508 Class 2 Carbon Steel to SA 533 Grade A Mam-Jay Class l Carbon Steel 113. 50" Weld 2: Diameter: 135.88" 3.62"T Circumference: 425.66" 7 - - . - - - - - -... - - - - Welds 3,4 & 5: Diameter: 135" 113.50" Circumference: 423.9" 3.68"T Welds 6,7 & 8: Diameter: 175.75" Circumference: 551.85" 76.75" Weld 11: Diameter: 167" Circumference: 524.38" Integrally Welded Support Attachments:

138" Not Applicable 2.82"T Component Supports: As Applicable Supports - Mechanical and Hydraulic:

4- As Applicable Manway Bolting: 2 Manways each

  • Generator: 2Q Bolts - 1.25" Diameter 8.Q" Length 2.82"T 138" 3 ~

Note: Thicknesses in ~inimum inches 3.25"T 76" 27" 1 (Ref. 1-31{)0)

STEAl1 GENERATOR WELD ZERO REFERENCE 1(1-RC-E-lA) 1-2 Centerline of Feedwater Mozz.l e 2(1-RC-E-18) 2-3 Centerline of Feedwater Nozzle 2-6 Centerline of Feedwater ~lozzl e 2-9 Centerline of Feedwater Nozzle 3(1-RC-E-lC) 3-5 Centerline of Feedwater ~ozzle 3-8 Centerline of Feedv~ater rlozzl e 3-10 Centerline of Feedwater rlozz 1e Note: Welds 4, 7 & 11 not structural Discontinuities Replacement Welds 2, 3, 4, 5 and 11 installed Outage V-VI - 1;6J-8l

Illustrative Only VPA-2-1110 EXCESS LETDOWN HEAT EXCHANGER Rev. 1 6-18-85 Welds l and 2: .. 750"T SA2407P316SS Inlet Diameter: 9.5 11 ; Circumference: 29.83" Nozzle in Vessel Welds: 2 11 Diameter Integrally Welded Support Attachments: Not Applicable Component Supports: Not Applicable Supports - Mechanical and Hydraulic: Not Applicable Flange Bolting: 12 - 1.625 11 Diameter Class 3 15.5 11 Length O

Reference:

Centerline of 211 Inlet Nozz l e l-CH-E-4 Outlet

- 1 - - - -......~ - 2 211 Outlet 211 Outlet

ILLUSTRATIVE ONLY VPA-2-1120 RESIDUAL HEAT EXCHANGERS Rev. 1

  • 6-18-85 Welds l &2: .87S"T SA 240 TP304SS Diameter: 42"; CircLJTiference: 131.88 11 0 Nozzle in Vessel Welds: 10" Diameter - .875"T SA 240
  • TP 304SS (Not Accessible)

Integrally Welded Support Attactments: 2 Component Supports: 2 Welded Supports - Mechanical and Hydraulic: Not Applicable Flange Bolting: 48-1.375" Diameter 8.0" Length Class 3 1-RH-E-lA 0

Reference:

Centerline of 10" Inlet Nozzle 1-RH-E- l B

'*Note: NLJTiber is preceded by Heat Exchanger Desi gnat ion

/ ,,,.-,'

I I \\

'\ IJ

- /

/

Bolting 10" 10" Outlet Welded Supports Bl OII In 1e,.__.._._._ 10" Outlet_

From RHR PLJTip) 848

ILLUSTRATIVE ONLY VPA-2-1130 Rev. 1 SEAL WATER HEAT E XCHANG ER 6-1s-s5 Welds l and 2: .250 T SA240 TP304SS 11 Diameter:

  • 12.75 Circumference: 40.03" 11 Nozzle in Vessel Welds: 4 Diameter 11 Integrally Welded Support Attachments: 2 Class 3 Component Supports: 2 Weld~d Supports - Mechanical and Hydraulic: Not Applicabl Flange Bel ting: 12- . 75 Diameter
  • 11 10 Length 11 0

Reference:

Centerline of 4 Inlet Nozzle

  • 11 l-CH-E-1 t Outlet 4 Inlet 11 4 Outlet 11

/'Fe-===-...- - l 2WS

  • 411 Inlet 411 Outlet

ILLUSTRATIVE ONLY VPA-2-1140 NON REGENERATIVE LETO.OWN Rev. 1

  • . HEAT EXCHANGER 6-18-85 Weld l and 2: .625 11 T SA240 TP304SS Diameter: 27.0 11 ; Circumference: 84.75" Nozzle in Vessel Welds: 211 Diameter Integrally Welded Support Attachments: 2 Component Supports: 2 Welded Supports - Mechanical and Hydraulic: Not Applicable Flange Bolting: 36-1.125 11 Diameter

-CH-E-2 Length Class 3 0

Reference:

Centerline of 211 Inlet Nozzle Bolting 2 211 Inlet 1

2" Inlet 2WS

Illustrative Only VPA-2~1150 REGENERATIVE HEAT . EXCHANGER

  • Rev. 1 6-18-85

. l-CH-E-3 6

9 3 10 Welds 1 thru 12: .875"T A213TP304SS; Diameter: 9.25"; Circumference: 28.86" Nozzle in Vessel Welds: 3" Diameter Integrally Welded Support Attachments: Not Applicable Component Supports: As Applicable Supports - Mechanical and Hudraulic:

  • Not Applicable Bolti_ng: Not Applicable*

0

Reference:

Top Centerline of Weld

. Illustrative Only VPA~2-1200 VOLUME. CONTROL TA *N* KRev

  • 1 6 8 5 311 3" Welds 1 and 2: *313 T SA240 TP304SS 11 2.-...~----.. Diameter:. 84.62"i Circumference: 264.911 Nozzle in Vessel Welds: 4 and 3 Diameter 11 11 Integrally Welded Support Attachments: 4 Component Supports: 4 Welded l-CH-TK-2 Supports - Mechanical and Hydraulic:
  • Not Applicable Hanway Bolting: 16- 1.125" Diameter 5.75 Length 11 O

Reference:

Centerline of Manway l

~ * .**

Welded Supports

Illustrative Only

  • VPA-2-1300 SEAL WATER INJECTION FILTERSRev. 1

. 6-18-85 Bolting Welds 1 & 2: .875 T SA240TP304SS 11 Diameter: 10.75 11 ; Circumference: 33.7]'1 2* _ ____..,..r------r Nozzle in Vessel Welds: 2 Diameter 11 Integrally Welded Support Attachments:

3 Component Supports: 3 Welded Supports-Mechanical & Hydraulic-r~ot Applicable Flange Bolting: 16 - 1.25 11 Diameter l-CH-FL-4A Length l-CH-FL-48 0

Reference:

Centerline of 211 Inlet Nozzle

  • Note: Number is preceded by Filter Designation 211 Inlet l*

c::::::::::::~


.welded Supports 211 Outlet lWS*

2WS*

WESTINGHOUSE ELECTRIC CORPORATION ILLUSTRATIVE ONLY VPA-2-1310 Rev. 1 6-18-85 REACTOR COOLANT Fl LTER Bolting__.. Welds 1, 2 and 3: .* 188"T SA240 TP304SS 2 ..-,,r Diameter: 16.0"; Circumference: 50.24" 3" Inlet Nozzle in Vessel Welds: 3" Diameter Integrally Welded Support Attachments: 4 Component Supports: 4 Welded l-CH-FL-2 Supports - Mechani ca 1 and Hydraulic: Not Applicable Flange Bolting: 8 Bolts - . 75" Diameter 3" Outlet 0

Reference:

Centerline of 3" Outlet Nozzle

  • 1

~ Welded Support 2WS

  • 4WS 3WS

WESTINGHOUSE ELECTRIC CORPORATION ILLUSTRATIVE ONLY VPA-2-1320 Rev. I 6 85 IC 0

16, SEAL WATER RETURN FILTER Bolting~ ,...-r Welds l , 2 and 3: . l BB"T SA240 TP304SS 2 Diameter: 16.0"; Circumference: 50.24" 3" Inlet Nozzle in Vessel Welds: 3" Diameter Integrally Welded Support Attachments: 4 Component Supports: 4 Welded Supports - Mechanical and Hydraulic: Not l -CH-FL-3 Applicable Flange Bolting: 8 Bolts - .75" 'Diameter 0

Reference:

Centerline of 3" Outlet Nozzle l

  • ~ Welded Support 2WS

. 4WS 3WS

WESTINGHOUSE ELECTRIC CORPORATION VPA-2-2100 Rev. 1 6-18-85 MAINSTEAM 11 11 32 -1 . 5 T cs 30 -l .75"T CS (Tee Side Welds 11,12 & 26) 11 30"-l. l "T CS 32'X 30'*

6" SCH 80 .432"T CS I RED. EL.

Note: Welds 11, 12, 13 and 29 examined under High Energy Welds Change 13 Part A of Tech. Spec. ~

Welds 28 and 30 examined under High Energy "--),

Welds Change 13 Part A of Tech. Spec. (added I I February 1980) I ST. I Weld #1 and #2 replaced 1980-81. 1 GEN.1

I I

1.,,- - ....

--- )

10 H5

. PEN .

30 SHP-1 --

Note :4 Relief Header no exami natio 11 required.

WESTINGHOUSE ELECTRIC CORPORATION VPA-2-2101 Rev. 1 6-18-85 FEEDWATER 16 SCH 80 .844"T CS 11 14" SCH 80 .750"T CS Note: Welds 20 and 22 examined under High Energy Welds Change 13 Part A of Tech. Spec.

Welds 23, 24, 25 and 26 examined under High Energy Welds Change 13 Part B of Tech. Spec.

Welds 1, 2, 8 and 9 replaced 5 1980-81.

- - ..,' 4 8 I

I 1,

sr. ~*3 1GEN v.1\~

~ f. . : I Cg"X I 4 RE D.

I, - - ,1

' ..... - -- J.

-14WFPD-17 25 IFWIO

WESTINGHOUSE ELECTRIC CORPORATION VPA-2-2102

! Rev. 1 6-18-85 CD

~

MAINSTEAM 'BY-PASS a:

0

... 6 11 SCH 80 .432"T CS Cj HI ,.

- ( p SHP45 H2 4 IMS84 3

7 REF.

2-2100 2

,,0"'"

l(BCl0 "' 2~

.. .q 27

..: -- - 28

.,,2~ TVMS IOIA 15

WESTINGHOUSE ELECTRIC CORPORATION

. ~-

V PA 2 IO 3 SIS HOTLEG Rev. 1 6-18-85 6" SCH 120 .562"T SS Sensitized Piping Piece 27 Weld 13 to 14 Piece 28 Weld 11 to 12 Piece 29 Weld 10 to 11 Piece 30 Weld 9 to 10 Piece 31 Weld 8 to 9 Piece 32 Weld 7 to 8 3

I*, I 87~8 H2 ,,S ...

iO ', y

  • 4 REF 1**41()4 18 REF"",, I - ~"SI 4 9 2-2540 . HIS .

17 34 , ,

P' REF "( ICo 2*230~

15

. YPA-2-2104 11 Rev. 1 6-18-85.

2 .

-LOOP I 4 MA1NSTEAM RELi EE C

2 4SCH80 Sketch For Reference Only:No Examinations Required IM$10 I A

,~-4'SHP37 i

IMS8G 1"

14, ~

REF

  • 1 2*2100 : '"'HBC>

I 13'1

(

  • "I.,I

WESTINGHOUSE ELECTRIC CORPORATION V PA-2-2 200 Rev. 1 6-18-85

~

MAIN STEAM I[

0 32"-l .S"T CS II.

30"-l.75"T CS (Tee Side Welds 11.12 & 25) 30" -1 . l "T CS 6 SCH 80 . 432"T CS 11 3ix ~o" RED. EL.

Note: Welds 10, 11, 12 and 29 examined under High Energy Welds Change 13 Part A of Tech. Spec.

Welds 28 and 30 examined under High Energy Welds I

Change 13 P8rt A of Tech. Spec. (added February 1980:..s1)

Welds l and 2 replaced 1980-81.

I I I St I 1GEN. 1 I 2 I I I,.. - - ,1

. -- J 4

-,~o**sHP2 5H(o Ci NRV MS 1018 12 H7 HIO 7 1

!>0 SHP23~ 8 2>_0SHP 30 20<BC> Note: 4 Relief Header no 11

., examination required .

REF ~ ... <9 TVMS10IB 2-2202 ~

WESTINGHOUSE ELECTRIC CORPORATION

-. ~

VPA-2-2201 Rev. 1 6-18-85 FEEDWATER l 6 SCH 80 . 844 T cs 11 11 14" SCH 80 . 750"T CS Note: Welds 14, 16, 18 and 19 examined under High Energy Welds Change 13 Part A of Tech. Spec.

Welds 17, 20 and 21 examined under High Energy Welds Change 13 Part B of Tech. Spec.

Welds l, 2, 6 and 7 replaced 1980-81.

1'----I I: St 1

i GEN I 4

3 / 'I 2 :I

. ,, ,, I - - , 1 l~Xl4  :.... _... J RED.

10 H4 H5 Ho 11 18 I FW43

WESTINGHOUSE ELECTRIC CORPORATION VPA-2-2202 Rev. 1- 6-18-85 MAIN STEAM BY- PASS 6 11 SCH 80 .432 11 T CS 9

HI

-G> SHP4G 4 IMSll(D 3oi ICB~ . . ~ REF. 2-2200

... , 0 "'27 ~~

,:- :Q28

-2 9TVMSIOI B 15

WESTINGHOUSE ELECTRIC CORPORATION V PA-2-2 203 Rev. 1 6-18-85 SIS HOTLEG 6" SCH 120 . 562"T SS Sensitized Piping Piece 24 Weld 6 to 7

  • ~~SI 4 8 - -

15 H2 REF --.c ... , 1 4 2-2540 H4 14 REF 13 2-2303 H3 12

(

YPA-2-2204 Rev. 1 6-18-85 LOOP 2 4" MAIN STEAM RELIE E Sketch For Reference Only:No Examfnatfons Required lt,15119

'(

13,l I r REF-' , '2 2*22001 'l<BC>

. 12 .,~

WESTINGHOUSE ELECTRIC CORPORATION VPA-2-2300 Rev. 1 6-18-85

!., MAINSTEAM

  • E IC 0 32"-l. S"T CS i..

30"-l. 75"T cs (Tee Si de Welds 7 ,8 & 22) 30"-l.l"TCS 6 SCH 80 .432"T CS 11 Note: Welds 7, 8, 9 and 26 examined under High Energy Welds Change 13 Part A of Tech. Spec.

Welds 25 and 27 examined under High Energy Welds Change 13 Part A of Tech Spec (added February 1980)

Welds 1 and 2 replaced 1980-81.

~2**x 30**

RED/L ..

2

, \

~ - - ... I I

- 3 1 ST* 1I HI  : GEN, I

-30 SH P~ I 3 I 1

4 I H5 H2 28 30SHP 5  :

-- ... )

1 - - .... I 3o**sHP 20(BC>

REF v' Note:4 11 Relief Header no examination 2-2302 required.

WESTINGHOUSE ELECTRIC COR.PORATION VPA-2-2301 Rev. 1 6-18-85 FEEDWATER l 6 11 SCH 80 . 844 "T cs 14 11 SCH 80 . 750"T CS

~ote: Welds 23 and 24 examined under High Energy Welds Change 13 Part A of Tech. Spec.

Welds 20, 21, 22, 25, 26, 27 and 28 examined under High Energy Welds Change 13 Part B bf Tech. Spec.

Welds 1, 2, 6 and 7 replaced 1980-81 .

13 H4 14

WESTINGHOUSE ELECTRIC CORPORATION

. ~

V PA-2-2302 MAINSTEAM BY-PASS Rev. 1 6-18-85 11 6 SCH 80 .432"T CS

~

HI

- - GiSHP47

  • REF 2-2300,..

4 3

IMS155 Z?¢ 2 .).

l<BC> ,, "°23 20(8C) 1 . . .o* 0 24 18 . .- ---'25 t"2G TVMSIOIC 15

WESTINGHOUSE ELECTRIC CORPORATION V PA-2-2303 R* .

ev. 1 . 6-18-85 SIS HOTLEG 6 11 SCH 120 . 562"T SS Sensitized Piping' Piece 36 Weld 21 to 22 Piece .37 Weld 20 to 21 Piece 38 Weld 19 to 20 Piece 39 Weld 18 to 19 Piece 40 Weld 12 to 13 3 I , ,1 I- 87(pA 1

... -oJO

' y

' I REF A I-C.304 4

  • 23 11

//

-GSl-50 H2 H9 20

YPA. 2-2304 RELi EE nev. 1 6-18-85 4'scH ao Sketch For Reference Only:No Examfnatfons Requfred I MS 157 10 \f . .3

_ REF 1

'2 2*2300 1, I <BC)

- g ,2

WESTINGHOUSE ELECTRIC CORPORATION V PA-2-2 500 RHR Rev. 1 6-18-85 11 14" SCH 40 .438 T SS

  • i H3 14 I .. '

I RHR PUMP 1-RH*P-18 1701--,-,..

..,?1- ,,

"'<' I0 REF.

1-4101 25

WESTINGHOUSE ELECTRIC CORPORATION V PA-2-2510 RHR Rev. 1 6-18-85 12" SCH 40S .375"T SS 1 O" SCH 40S . 365"T SS 8" SCH 40S . 322"T SS RHE

' ;, .... 1- RH-E- I B 4G ; ,, *

. 10 RH 8\ 33 34 RHE

,, 1-RH*E-IA

-10 RH5 I RHR 35 I I I

' ... I PUMP 2 I ,' ..., I-RH-P-18 3 IRH~to"x e"RED 17 lo'RH 4

WESTINGHOUSE ELECTRIC CORPORATION VPA-2-2511.

RHR 12" SCH 40S . 375"T SS Rev. 1 6-18-85 10" SCH 405 .365"T SS ICi'RH 10 7 I H2 l ,, '

G,, RHE

, : l*RHE-18 17

- - 1o'*RH9 I(o I

' I

'~

RHE 12Xl2XIOTEE I I

',lt<!-J*E*IA 14 I REF'.

2-2 510 -' .. .... 29 23 9.. .. -12'RHl9 FCV I CoO 5 --;;- I

,, 2 12 RH 12 - 3 28 2.9

'o, I , ,

  • "r' REF 2-2512

WESTINGHOUSE ELECTRIC CORPORATION V PA-2-2512 R HR 12" SCH 40S . 375"T SS . Rev. 1 6-18-85 10" SCH 40S .365"T SS 11 6 SCH 40S . 281 "T SS REF 2-2511 T' 2<:,

,',.. 9 5 o, ,, I HI 2

~ FE1~05 e 3\ .*

_:;...- FLANGE I 5

REF.

1-4~02 "',, 7

WESTINGHOUSE ELECTRIC CORPORATION

  • r*

VPA-2-2520

~

IC o*

... 10" SCH 140 l.OO"T SS 6" SCH 120 . 562"T SS SIS Rev. 1 6-18-85 II (o51153~

3 2 HI I.

PEN.

H~ 4 GI ¢3~

I H4 J...

'1rf'x (o'"RED.

REF.

' - 1os1 1s2 2*2543

WESTINGHOUSE ELECTRIC CORPORATION V PA-2-2540

~

SIS Rev. 1 6-18-85 a:

...0 10" SCH 40S .365"T SS 6" SCH 120 .562"T SS REF.

19 .. .. ~ 2-2103

'-~

,* :*1s1229 1

PEN.CoO I ox eoRED. 4 2 " - ~,"5149

~ 5 H3 1890A

  • I !D ,, .,:>..

REF.

2-220~

,o" 7 -~ -*j SI 228 H5

- ~,'*51 48 13 H<o .

___..,_ . -,ci'x G' RED.

18908

WESTINGHOUSE ELECTRIC CORPORATION V PA-2-2541 P-ev. I 6-18-85

~

SIS H I GH H EA D CZ:

0 6" SCH 120 .562"T SS u.

REF.

1-4105 0

, I 889A 13,, \ 8 2 HI 3 H3

~s1- 145 - -

30 12 20 HS H4 21 H~

22 13

  • ' A' .

WESTINGHOUSE ELECTRIC CORPORATION

'r*

V PA-2-2542

""J SIS HIGH HEAD Rev. 1 6-18-85 It

...0 6" SCH 120 .562"T SS

. REF 1*4205 ,<1()'9, .. 188~8

' 2 I HI REF 2-2 54:)

~sr ~**s1144--

H2 25

~~51 144 'A' HG 7 16 8 17 H4 18 11 H~

12 15

\ I A

WESTINGHOUSE ELECTRIC CORPORATION VPA-2-2543 co

~

IC

...0 SIS HIGH HEAD 6" SCH 120 .562"T SS Rev. 1 6-18-85 REF REF.

"'"2-2 520 f-4305

~I '

~~ I 7 9,,,,...t 88~C I

~5 27 I

.,.. 'o.... . REF.

-.J 4 Y 2* 2542

~3 8 032

~2 ! REF HIO 2-2541 H9 H2 31 25 28 - (/SI* 153 24 22 23 21 12 H3 13 14

,~ H4

YPA-2*2550

.4* MAINSTEAM DUMPLINE Rev. 1 6-18-85 C

0 4*scH so

. Sketch For Reference Only:No Examinations Required Hey I MS 104 I MS 118

. { --4"'S0HVI04 FROM*

LOOPI '_,' ',

I FROM

-c -- 'v FROM LOOPr 3 I** LOOP2

(

f

-~-

  • V PA-2-2GOO
  • ITEM VPA LOCATION PRESSURE RETAINING BOLTING FLANGE NO.

TOTAL STUDS&NUTS Rev. 1 6-18-85 SIZE 1 2-2500 Flange 1 20S & 40 N 1. 25 11 2 2500. Flange 2 20S & 40 N 1

  • 25M 3 2-2500 Flange 3 20S & 40 N 1. 25 11 4 2-2500 Flange 4 20S & 40 N 1 . 25 11 5 2-2512 FE 1605 20S & 40 N 1 .125 11 6 2-2512 Flange 1 20S & 40 N 1 .125 11 7 2-2100 Flange 1 l 2S & 24N 1.375 11 8 2-2100 Flange 2 12S & 24N l.375 11 9 2-2100 Flange 3 12S & 24N 1.375 11 10 2-2100 Flange 4 12S & .24N 1. 375 11 11 2-2100 Flange 5* as &16N 1.1875 11
12. 2-2200 Flange 1 l 2S & 24N 1 . 375 11 13 2-2200 Flange 2 12S & 24N 1.375 11 14 2-2200 Flange 3 12S & 24N 1. 375 11 15 2-2200 Flange 4 l 2S & 24N 1. 375 11 16 2-2200 Flange 5*
  • as & 16N 1.1875 11 17 . 2-2300 Flange 1 l 2S & 24N 1. 375 11 18 2-2300 Flange 2 12S & 24N 1.375 11 19 2-2300 Flange 3 l 2S & 24N 1.375 11 20 2-2300 Flange 4 12S & 24N 1. 375 11 21 2-2300 Flange 5* as & 16N 1.1875 11
  • No examination required, reference only
  • WESTINGHOUSE ELECTRIC CORPORATION Illustrative Only VPA-2-3100 Rev. 1 6-18-85 RESIDUAL HEAT REMOVAL PUMP$

IC 0

"" Integrally Welded Support Attachments: ~ot Applicable Component Supports: 2 Hydraulic and Base Support Supports - Mechanical and Hydraulic: 2 Hydraulic Bolting: 20 Bo 1ts - 1. 125" Diameter; Length Casing Weld: Not Applicable 1-RH-P-l A 1-RH-P-1 B

  • D Suction -- __._ Dis.charge Hydraulic Snubber

---~Base Support

WESTINGHOUSE ELECTRIC CORPORATION Illustrative Only v*PA-2-3110 Rev. 1 6-18-85 CHARGING PUMPS Integrally Welded Support Attachments: Not Applicable Component Supports: As Applicable Supports - Mechanical and Hydraulic: Not Applicable Bolting: 32 Bolts - 2.5" Diameter; Length Casing Weld: Not Applicable

  • Note: Number is preceded by pump Designation l -CH-P-1 A l-CH-P-1B 1-CH-P-lC.

Base Support 2 Supports Each

Illustrative Only VPA-2-3120 R.C. PUMPS- 1,2&3 Rev. 2 9/16/86 Integrally Welded Support Attachments:

11 Not Applicable Component Supports: Not Applicable Supports - Mechanical and Hydraulic:

Not Applicable Bolting: 12 - 1.25 Diameter 11 4.0 Length 11 Casing Weld: Not Applicable 0

Reference:

Centerline of 2 Seal 11 Injection Line D D R.C.Pu~p 1-lRC-P-lA R.C.Pump 2-lRC-P-lB R.C.Pump 3-lRC-P-lC NOTE: Component identified by pump designator (i.e. 1-,2-, or 3-) when applicable.

V~PA-2-4100 Rev. 1 6-18-85 VALVE BONNET BOLTING VALVE VPA TOTAL ITEM NUMBER REFERENCE MANUFACTURER BOLTS SIZE 1 30 11 -TVMSlOlA 2-2100 24 l. 75 11 2 *30 11 -NRV~MS 101 A 2-2100 8 1 .125 11 3 611 -MS105A 2-2100 6 l .O" 4 611 -MS104A 2-2100 6 l .O" 5 611 -MS103A 2-2100 6 1 .O" 6 611 -MS102A 2-2100 6 1 .0 11 7 411 -MSlOlA* 2-2100 6 1 .0 II 8 14" -lFWlO 2-2101 20 .875 11 9 14 11 -1FW12 2-2101 20 .875" 10 611 -1MS84 2'.'"2102 16 .750 11 11 611 -1MS85 2-2102 10 .750 11 12 611 -ISI229 2-2103 20 .875 11 13 30 11 -TVMS1018 2-2200 24 l. 75 11 14 80 11 -NRMSlOlB 2-2200 8 l . 125 11 15

  • 611 -MS105B 2-2200 6 l *0 II 16
  • 611 -MS1048 2-2200 6- l *0 II 17 6"-MS1038 2-2200 6 l .O" 18 6"-MS102B 2-2200 6 l .0 11 19 411 -MSlOlB* 2-2200 6 l .0 11 20 14 11 -l FW41 2-2201 20 .875 11 21 14 11 -1FW43 2-2201 20 .875 11 22 6"-1MS116 2-2202 . 16 . 75 11 23 6"-1MS117 2-2202 10 . 75 11 24 611 -lSl-228 2-2203 20 .875 11 25 30 11 -TVMSlOlC 2-2300 24 1. 75 11 26 30"-NRVMS101C 2-2300 8 1.125 11 27 611 -MSlOSC 2-2300 6 1 .0 11

_28 611 -MS104C 2-2300 6 1 .0 11 29 611 -MS103C 2-2300 6 1 .0 11 30 6"-MS102C 2-2300 6 l .0 11

  • I VALVE VPA VPA-2-4100 ITEM NUMBER REFERENCE MANUFACTURER TOTAL Rev* 1 6-18-85 BOLTS SIZE 31 411-MSl 01 C* 2-2300 6 l O o II 32 14"-1FW72 2-2301 20 .875 11 33 14"-1FW74 2-2302 20 .875 11 34 6"-1MS155 2-2302 16 . 75 11 35 611 -1MS156 2-2302 10 _7511 36 14"-1RH2 2-2500 20 .875 11 37 14"-1RH8 2-2500
  • 20 .875 11 38 12"-FCV1605 2-2510 16 l .0 11 39 10"-1RH5 2-2510 24 .750 11 40 10"-1RH6 2-2510 18 .625 11 41 10"-lRHll 2-2510 24 .750 11 42 10"-1 RHl 2 2-2510 18 .625 11 43 10 11 - l RHl 5 2-2510 14 .625 11 44 10 11 -l RH20 2-2510 14 .625 11 45 12 11 -HCVl-758 2-2511 16 l. 011 46 10"-1RH9 2-2511 15 .750 11 47 10 11 - l RH24 2-2511 15 .750 11 48 611 -1RH29 2-2512 16 .50 11 49 10"-1890C 2-2520 16 1 .625 11 50 10"-1890A 2-2540 16 1 .625 11 51 10 11 -18908 2-2540 . 16 1 .625 11
  • Reference only - no examinations required

Attachment 2 Surry Unit 2 Component Isometrics

WESTINGHOUSE ELECTRIC CORPORATION Illustrative Only VIR-1-1100 Rev. 1 6-18-85 REACTOR VESSEL Flange Ligaments 1 thru 58 (Ref. 1-llCJJ.t,,)


~/

No=zle to Vessel Welds 1~ thru 15 (Ref. 1-llOOA) o~-arne-ter: 1:7 .2"1 .D.

Ci rcumfere:1ce: 432. '.j2"

~aterial: Flange - A528 2 Class 2 Carbon Steel J1J::Jer S1ell: 9.12:"T - .AS02

,_ 6 Cla3s 2 Carbon Steel Inter;,;ediate S1ell: :2.Q"T

- 7 A533 Carbon Stee1 Lm1er Shell: 8.J"T A533 Carbon Steel Bo-~tOl:i Shel 1: 5.155"T AjJD.Class 2 Carbon Steel Botto:*,1 Heaj: 5. lj0"T A533 Class 2 Carbon Steel

~ield:; 6,7,3 & S: lJO" :...enqth

WESTINGHOUSE ELECTRIC CORPORATION Illustrative Only VI R l I OOA

. Rev. 1 6-18-85 REACTOR VESSEL NOZZLE VESSEL WELDS 270° 14 Looo 2 Outlet ~ozzle

\ 15 Loop 2 Inlet ~ozzl 180-:i J~\

Jy~~o

--+-+----- I

/. 0


~---0° Looo 3 Outlet Nozzle

5) Loop 1 Outlet tlozzle 12 Inlet Nozzle goo Flange Ligaments Mote:

Stud hole 1 at 0° thru Stud hole 58 at 353.8°

  • R. V. INTERNALS VIR-1-1200 nev. I 6-18-85
01. Reactor Vessel Internals as accessible (B-N-1).
02. Reactor Vessel Cora Supports as accessible (B-N-3)
  • VIR-1-1200A INTERNALS
  • 1. Head and Vessel Alginment Pin Rev. 1 6-18-85
2. Alignment Keyway.Upper Support Plate
3. Upper Support Column
4. Control Rod Guide Tube
5. Core Barrel Outlet Nozzle/Vessel Interface Surface
6. Upper Core Plate Alignment Keyway
7. Core Barrel Mid~Plate Girth Weld
8. Upper Core Plate
9. Upper Internals Alignment Key In Core Barrel
10. Irradiation Specimen Guides
11. Guide Tube Attachment to Upper Core Plate
12. Baffle Bolting
13. Lower Core Plate
14. Lower Core Plate Fuel Assembly Alignment Pins
15. Access Plate
16. Lower Core Support Columns and Instrument Guides and Attachments
17. Core Support Column
18. Thennal Shield Flexure
19. Radial Support
20. Lower Support Column
21. Secondary Core Support Assembly
  • Items 1 thru 21 Ref. VPA 1-1200A

Illustrative Only VIR-1-12008 INTERNALS Rev. 1 6-18-85 HEAD AND VESSEL

    • ~~

-~~~~o

*

........ =*=

    • s .,.....,.
  • 0 * 'A, :,

=~:- . .

  • ALIGNMENT PIN ( l)

ALIGNMENT KEYWAY A~=*=~;.<;;>,r~*

-:~a,-~*.  :*: ~~ ~ .,......--UPPER SUPPORT PLATE

~~--- . :-:~:: *1 -~~=*= . * ( 2)

. -~~-~- l!'"A~" CONTROL ROD

  • :-: . ~~- ,e.'?'- .

. *-e:*:~-- . ~

. GUIDE TUBE (4)

UPPER SUPPORT COLUMN (3) UPPER CORE PLATE ALIGNMENT KEYWAY(6)

CORE BARREL OUTLET NOZZLE CORE BARREL VESSEL*INTERFACE ID-PLATE GIRTH SURFACE (5) WELD (7}

UPPER CORE PLATE(B)

IRRADIATION SPECIMEN GUIDES UPPER INTERNALS

( l O) ~+---ALIGNMENT KEY IN

~""~... CORE BARREL (9)

    • I LOWER CORE PLATE GUIDE TUBE ATTACH-FUEL ASSEMBLY ALIGNMENT PINS (14)

...... MENT TO UPPER CORE PLATE (11)

LOWER -CORE PLATE ACCESS PLATE (13)

( 15)

BAFFLE BOLTING

{ 12)

CORE SUPPO~~

71oLUMN LOWER SUPPORT LOWER CORE SUPPORT COLUMN (20)

COLUMNS AND INSTRU-MENT GUIDES AND ATTACHMENTS (16)

THERMAL SHIELD FLEXURE ( 18)

RADIAL l%'i°RT---' .

ILLUSTRATIVE ONLY V IR-1-1250 Rev. 1 6-18-85 REACTOR VESSEL CLAD PATCHES 210° CP 14 CP 16 iI I

1 CP 7 CP l II I

/ I I

CP 5 i

I I

. . I I

ACCESS SLOTS AT o0 , 45°, 55°, 65°, 90°, 165°, 100°, 235°, 210°, 285°, 295° & 305° j.

CORE SUPPORTS AT QO, 90°, 180° & 210° * . I

ILLUSTRATIVE ONLY VI R-1-1300 Re V

  • 1 6 8-5 REACTOR VESSEL CLOSURE HEAD I i

I CP-5 Head to flanqe weld #1 Ref 1-1300A . 1*

Control Rod Drive Housing Ref 1-1300A I

I I

I I

I I

  • 30 .'\.1 .

CP-1 I

II I

JACKING MARMON CLAMP . SCREW

WESTINGHOUSE ELECTRIC CORPORATION Il~ustrative c-ly VIR-l-1300A rev. I 6-1uO_pi::

~ ~v CONTFOL ROD DRIVE MECHANISMS 1

11.25 11

~ ~ 3 J 4 Stainless Steel

---~ SB-167 Inconnel I I 2. 75" 11

~ 4.06 11 1--

CLO SU RE HEAD FLANGE WELD Closure Head: 6. 187 11 T SA508 Class 2 Carbon Steel Diameter: 170.875 11 Circumference: 536.54" 6.59" 28.25"

  • t*

ILLUSTRATIVE ONLY VI R-1-1400 Rev. 1 6-18-85 REACTOR VESSEL STLJS, NUTS & WASHERS I i

.625--i NUT I

60 11 I* 1 I

I I

l I 2" J-5.75" _\ T STUD CONCAVE VvA SHER 58 Studs: A540 Grade 824 58 Nuts: A540 Grade 824 58 Washers (concave and convex): A540 Grade 824

3 2 I.

NOlESo I.WELO/llEH NUMBERS ARE INDICAIEO WllH A No.-t<o.

ORAWING REFEREt<CE No.lSEE REF OWGSI INOIVIOUAL WELO/llEH N U M B E R - - - - - - - - - ~

2. LONG SEAM WELO LDCAJl()tj IALL MEASUREMENTS lAJCEt< fR(),I t OF HANWAYl [)

A. t<o. 1, I IB"CW

8. No.2*6'lCW.255"CCW TYP I CAL or 8 C. No. 3*216"CW 4 IN LINE 3. ALL t<OZZLES ARE CAST NOllL[S C1- 11 Hmu 1- 151
4. MMWAY IS A CASI ORIFICE C 1-q1
5. SAMPLE NOllLES 11- SOCKET WELDS> NOi ()tj WESTINGllOUSE ISOMETRIC
6. lt<SIRlffNl NOZZLE C1" SOCKET WELOl NOi ()tj WEST lNGHOUSE 1SDM£ !RIC II

--E1--*-1 ---*----t::J-I* 12 1-11 REFERENCES, J-6 I. OWG VIR* 1-2100 C

TOP VIEW I A-A' 2. J!448:4. 15- IIA- - * - * - .PHESSURIIER 1-1 1-5

---+-----..---+---..___----i - -- -----1--,

I SEE NOi[ 5 I

~I I SEE NOTE 5 I)

I I

2-6 CSE£ NlllE 61 --L I

, I

--- *-* X:)_ ----* ---

/_.,/ I FOP. ltlfORMATION

- - . - - - , - - . S E E NOlE 5 SH NOlE 6 ONLY

"'11l*HIIIS10.-. 10 IHIS ~IJ(; ~-~

K QM" UIILlllllG lo,(" CMl h\.llJII VIRGINIA POWER 1-15 u* WEST VIRGINIA POWER M NORTH CAROLINA POWER

,__ _ _ _ _ _[l<GliiERll<G t>l;{J C1Ji51RLC1 I~

=1 s______ I _

f '* lfl' ~-

BOTTOM VIEW 'B-B' RlCHHCHl. VIRlilhlA sL WELD IDENTIFICATION MAP PRESSURIZER 2-RC-E-002 0 ISSUE FOR CONSTRUCTION. 8 coMMEN1s-1Nco-fi_P_o_R~~~-;;--~A~-1-s_s_u_E_F_o_R_R_E_v_1E_w______ ~t-c~~ --*~ -~~~ *.-*: J~~

-:.:--:-c~,;,~----,=-:~~-*:*

SURRY POWER STAT ION - UNIT 2 VIRGINIA POWER

--si,i-fr~wi" 0--:- -....

_ 11548-WMKS-RC-E-002 1 0

i)

. - -* - ----**10*Bl1'...L'-.( ~/A lhl\§. Uht~.,~ N..JIIU ~I I u- I

WESTINGHOUSE ELECTRIC CORPORATION Illustrative Only VIR-1-3100 Rev. 1 6-18-85 STEAM GENERATOR

  • WELD 3- 1 = LOOP 3 Diameter: 135.94 11 Circumference: 426.85 11 I SA508 CLASS 2 O

Reference:

Top centerline of Hotleg I

I Manway CP (Typ)

Channel Head to*

~~. Tube Sheet Weld---

(Typ)

CP (Typ)

Boltinq (Typ)

S.G. Manway Boltina CP=

(2-RC-E-lA) 1 Hotside 1-1 to 1-16 1

{2-RC-E-lA) l Coldside 1-17 to 1-32 2

{2-RC-E-1B). 2 Hotside 2-1 to 2-16 3 (2-RC-E-18} 2 Coldside 2-17 to 2-32 4 (2-RC-E-lC) 3 Hotside 3-1 to 3-16 5 (2-RC-E-lC) 3 Coldside 3-17 to 3-32 fi

  • Replacement weld installed 1979

____ NQIE:Class 1 Section Re~laced 1979

Illustrative Only

\'IR-1-3200 REGENERATIVE HEAT EXCHANGER rev. l 6-18-85 Ref. 1-4507 2-CH-E-3 17 1

19 16 I

24 Ref. 1-4507 Welds: l,2,3,4,17,18,19,20,22,23:&.24:.C75 11 T A213 TP304SS; Diameter: 9.25 11 ;

Circumference: 28. 86 11 Nozzle in Vessel Welds: 3 11 Diameter: Welds 5,6, & 15 to 3 11 Sch. 160 A312 TP304SS Welds 7,8,9,10,ll,12,13 &14 to 3 11 Sch. 80 A312 TP304SS Integrally Welded Support Attachments:. Not Applicable Component Supports: As Applicable Supports - Mechanical and Hydraulic: Not Applicable Bolting: Not Applicable 0

Reference:

Top Centerline of Weld

WESTINGHOUSE ELECTRIC CORPORATION VI R-1-4100 REACTOR COOLANT PIPE Rev. 1 6 85 R. C.

PUMP I STE.Arv~

GENFRi\TOR I

13 2-591 15 i

3 (RC*302

-27. sRC 303 4 REACTOR VESSEL NOTE: Welds 18 thru 21 are longitudinal electroslag welds.

Welds 22 & 23 installed 1979 .

. Welds 4,5(DM) ,6(DM) ,7 & 9 replaced 1979.

WESTINGHOUSE ELECTRIC CORPORATION VIR-1-4101 Rev. 1 6-18-85 RHR TAKE-OFF 14 11 SCH 140 l.25J"T*ss

  • REF 1-4100 .,,

9l(BC)

~cs ,,

2 3 ,,

--14RHl01.

7 8

H4

' ',)-' REF 2-2500

WESTINGHOUSE ELECTRIC CORPORATION VIR-1-4102 Rev. 1 6-18-85 ACCUMULATOR DISCHARGE 12" SCH 140 l .125"T SS HI 3

12 RC ::,22 1

2

/ .Pj5 I (6C)

/ REF.

1*4100

~4 7 8

11 12

WESTINGHOUSE ELECTRIC CORPORATION VI R-1-4103 Rev. 1 6-18-85 BY - PASS 8 11 SCH 120

  • 719'-'T SS G, 5 2-585 7

8 RC 311 __..,_

24(8C>o ,

REF -r 1-4109 t<',3

. . o. . . ,, \

""---\ --

2- 530 1,_,-c(4

....... r REF 1-4100

WESTINGHOUSE ELECTRIC CORPORATION VIR-1-4104 Rev. 1 6-18-85 SIS HOTLEG 6" SCH 120 . 562"T SS 5

, REF.

).I I* 4110

"'C REF 2*2103

W'ESTINGHOUSE ELECTRIC CORPORATION V I R*-1-4 I O 5 Rev. 1 6-18-85 SIS COLDLEG 6 11 SCH 120

  • 562"T' SS 4 11 SCH 120 . 438": SS 2" SCH 160 . 344"T SS REF.

2~2541 ~ ...... I 2-889A 9

8 ,,

-CoS1345 7

3 2:874A ---~- --"!eo)<G'<BVI) x ~*rE (/;'E ,, ,,

X 4 X 2 RED Co RC317 - 1011 2 2 15 A ICBC) ., .,o" REF

. .P' 1-4100 14 v 14

  • REF . "' , ,

l-4GGG 11 15

WESTINGHOUSE ELECTRIC CORPORATION VI R-1-41 OG Rev. 1 6-18,-85 RTD RETURN 3" SCH 160

  • 438"T SS REF. 9 1-4112 "j"'

I 12 H3 If

~FE490 -3 RC431 3'x2'RED. 3 0<BC) 13 8

.* .--.......... 14

""(

,,. HBW>

REF 1-4113 5

4

,<a..

9 '

REF. JC~

1-4100 10

WESTINGHOUSE ELECTRIC CORPORATION VIR-1-4107 DRAIN LI NE Rev. 1 6-18-85 2 11 SCH 160 .344"T SS Note: Welds 2 thru 15 and 17 thru 27 replaced 1979 ri- - HBC

-~> REF. 1*4 I 00 2

3

. REF 1-4100 9 10 I--<>- - l~@C) 17 18 2-555A

-2RC 355 14 20 2G 25 28 REF.

1-4208

,, 31 ,{ "'o..5 5 2 RC353-32

WESTINGHOUSE ELECTRIC CORPORATION VI R-1--4 I 08 Rev. 1 6-18-85 FILL HEADER 2 11 SCH 16 0 . 3 44 11 T SS REF.

1*4308

"'\

\ 10

\3;4 3

,. REF 2

14 11 l(BC)... .,. 10 1*4 100 Y°9 18 15 37 19

WESTINGHOUSE ELECTRIC CORPORATION VI R-1-4109 Rev. 1 6-18-85 PRESSURE EQUALIZATION 2 11 SCH 160 .344"T SS REF 1-4103. -

REF. 15 ~ 94 1-4100 ..D cf

. 'ICBC)

I I

"'('14 2 2-581 _ _2223 i3 4

I~

5 "

- 2 RC 345 18 17 FE480 ~I~ ~I 15

WESTINGHOUSE ELECTRIC CORPOltA'flON Vl*R-1-4110

  • SIS 2 11 SCH 160 .344 11 T SS HOTLEG Rev. 1 6-18-85 Sensitized Piping Piece 95 Weld 41 to 42 REF.

1-4104 8 ,,

44 .

-251-280 9

43 12 38 13 37 3~

- 2* 51-277 35 34 H7 33 re I

i i

i l_

WESTINGHOUSE ELECTRIC CORPORATION VI R-1-4111 Rev. I 6-18-85 LETDOWN 2" SCH 160 .344"T SS REF. 15 1*4100 °Y 14 o" "I CBC>

. -< 2

- 2 CH 305 10 7 11 2-309D 13 14 2-4Co0A

'y REF.

1-4~,7

wr::tESTINGHOUSE ELECTRIC CORPORATION VI R-1-4 I 12 Rev. I 6-18-8S R~D T~.KE-OFF, 2" SCH 160

  • 344" ... -~ SS 1.5" SCH 160 .28:.'"T SS 21

-2RC429 22

~ FLANGE A

. 23

>--2"RC428 24 25 2~

27 29 .:,..

30<BC) " .,IJ 13 44 REF.

- 1 r2 RC425 1-410~

.3 2~

HBC>,, 13 Y"' REF.

12 1*4100

WESTINGHOUSE ELECTRIC CORPORATION VIR-1-4113 Rev. 1 6-18-85 RTD TAKE-OFF 2 SCH 160 .344"T SS 11 Note: Welds 15 & 16 replaced 1979

-i'Xf'RED l(p 2-54(oA

"-i*RC439 2Rc 433

~%FLANGE A .

~ ~ ,,

l<BW> ,~~ X 2 RED.

14 .........

l" REF 1-4 IO(o

WESTINGHOUSE ELECTRIC CORPORATION VI R-1-4114

  • SEAL 2 11 SCH 160 .344"T SS 1.5 11 SCH 160 .28l"T SS INJECTION Rev. 1 6-18-85 19 20 21

W'ESTINGHOUSE ELECTRIC CORPORATION VI R-1-4200 Rev. 1 6-18-85 RE ACTOR COOLANT PIPE STEArv1 GENERATOR 2

11

~~I 20 ~------

10 t ~ -'18 3(RC305 I/

-27. 5 RC30(o 2

--2~'*Rc 304 REACTOR VESSEL NOTE: Welds 18 thru 21 are longitudinal electroslag welds.

Welds 22 &23 installed 1979.

Welds 4,S{DM),6{DM),7 & 9 replaced 1979.

WESTINGHOUSE ELECTRIC CORPORATION VI R-1-4201 Rev. 1 6-18-85 ACCUMULATOR DISCHARGE 12" SCH 140 1. 12 5 11 T SS HI 12 RC323~

7 3

11 12"' 51-24~- ~2 H2 14 ' ....ICBC>

REF ay 15 1-4200 12"x Ii.'x Io H3

. 15 TEE 14 /

I 13 19 I

-L REF.

1-4202

WESTINGHOUSE ELECTRIC CORPORATION VIR-1-4202 Rev. 1 6-18-85 RHR RETURN 10" SCH 140 l.OO"T SS REF

~ 1-4201

' 'oy 13 REF 2-2520 ,.t.... I 2RH7

WESTINGHOUSE ELECTRIC CORPORATION VI R-1-4203 Rev. 1 6-18-85 BY-PASS 11 8 SCH 120 .719"T SS

'° 5 7

9RC312-.

  • REF.

, ~ 1-4210 29<BC)

" '~ . e "9,,

2-592 ,.-6., 3 5 y REF 1-4200

WESTINGHOUSE ELECTRIC CORPORATION VI R-1-4204 Rev. 1 6-18-85 SIS HOTLEG 6" SCH 120

  • 562'"'"T SS 2" SCH 160
  • 34L'. ' "T ss I~ REF

~<. 1-4~00 18 t ........ 17 54(8W) '\. ~

48 53"3"x 2 RED 52 2 REF

~ 1-4200 47 51 1(8~.:. 3 3 2 'Cy REF 4 2-2203 <,, I

-c/RC-318 44 5

Co

  • HI 7

43 24 42 21 23 20 H2 I~ '<:, 22 H3 H4 I~

30 41 40

WESTINGHOUSE ELECTRIC CORPORATION VI R-1-4205 Rev. 1 6-18-85 SIS COLDLEG 11 6 SCH 120

  • 562."T SS 4" SCH 120 . 438"T SS 2" SCH 160 .344"T SS 2-889 B I

...... REF.

12 ')I 2-2543 10 CBW) 9 8

--eo'*s 1344

.:--G>"x r;*x ~-TE E 251 2 8 5 - - ,, ,,I ,, 2-874B GX4X2 RED. 3 ~eo"RC319 13 < 2 14'o, 1(8C)

REF ~

I

. ,, ,, 1-4200

~

REF.

1*4GG8

Wt:,ESTINGHOUSE ELECTRIC CORPORATION VI R-1--4 20Co Rev. 1 6-18-85 RTD RETURN 3" SCH 160 .438"-'T SS 9

REF. 12 II 1-4211 H2

~FE491 8 H3 3X2 RED,--*- -

REF. "'<

1-4212 5

.9~ ... ICBC>

REF ~

1*4200 10

WESTINGHOUSE ELECTRIC CORPORATION VIR-1-4207 Rev. 1 6-18-85 CHARGING 3" SCH 160

  • 438"T SS 2" SCH )60 .344"T SS REGEN. HEAT EXCH.

REF. 1*3200 3

2-312A HI ~,

2 7 3 CH379 l(BC) /~

1s REF H2 8 (o4 I ~eo 1-4200 ~

CoS Hl5 HICo 48 (o7 GS 85 73 Hl9 42 75 H22

  • 7G H23 H24

WESTINGHOUSE ELECTRIC CORPORATION VI R-1-4208 Rev. 1 6-18-85 DRAIN LINE 2" SCH 160 .344"T SS REF. 1'1,,

1*4200 ., 12(8C)

REF ~ .,

t<4 yd 13

"'o... .... 1-4200 ICBC> ..... ~ 14

'o""' .

2 y 2-5558 15 IG 17 ~,

- 2 RC35o 18

!2""

HI I SO .:?:'~53 49 ~ 52 54

~ REF 1-4107.,....

I 44 .

32 9.... ,0"33 24 25

--2RC353 45 RC207 2G REF.

2 RC353 30 .D' ~ 1-4307

, ',5(o

~

H4 Note: Welds 2 thru 11 and 13 thru 25 Replaced 1979.

WESTINGHOUSE ELECTRIC CORPORATION VI R-1-4209 Rev. 1 6-18-85 FILL HEADER 2" SCH 160 .344"T SS 10 H2 3

2 o?..

14 .... 10 l(SC).,.

-.f"g REF.

15 1-4200 20 21

.,~2 REF.

~I 1-4:?>08 i

I

. i

WESTINGHOUSE ELECTRIC CORPORATION VI R-1-4210 Rev. 1 6-18-35 PRESSURE EQUALIZATION 2 11 SCH 160

  • 344 11 T SS 25 24 4fI 27 28 -2"RC 34G>

l29CBC>

3i

  • REF 1-4203
  • 23 22 ~ 2 ICBC~,, IS A'

0

).

~14 REF 1-4200

WESTINGHOUSE ELECTRIC CORPORATION VIR-1-4211

  • 2" SCH 160 . 344"T SS RTD TAKE-OFF 1.5" SCH 160 .28l"T SS Rev. 1 6-18-85 2 ~ 1 1 RC 3G>O 25 2 23 2-5Co88 1~2'x 1!N RED.

2(D I~

I 2'o, 27(BC> 2-5758 REF I ~

1-4200 13 -2RC415 12 3

i<o 2

14 ' , l(BC>

REF  ;,)'

1 l-420Co

W'ESTINGHOUSE ELECTRIC CORPO~ATION VI R-1-4212 Rev. 1 6-18-85 RTD TAKE-OFF 2" SCH 160

  • 344"T SS Note: Welds 14.15 & 16 replaced 1979.

15 14 12 2-54(o8 3 ~FLANGE A

~ r 3

  • x i'RED.

15 .......

. -r REF.

1*420

WESTINGHOUSE ELECTRIC CORPORATION VIR-1-4213 Rev. 1 6-18-85 SEAL INJECTION 2" SCH 160 .344"T SS l.5"SCH 160 .28l"T SS 8

II

- - 2 CH 395 10 21 24 lx~ RED


4

WESTINGHOUSE ELECTRIC CORPORATION VI R~l-4300 Rev. 1 6-18-85 REACTOR COOLANT PIPE STt:.AM GENER.~TOR 3

13 11 2-5~5 ~~I 2 0 \ ".....______

\ 10 t ~ -'18 3 l"RC308 2

---2'3Rc 307 REACTOR VESSEL NOTE: Welds 18 thru 21 are longitudinal electroslag welds.

Welds 22 & 23 installed 1979.

Welds 4,S(DM) ,6(DM) ,7 & 9 replaced 1979.

WESTINGHOUSE ELECTRIC CORPORATION VIR-1-4301 Rev. 1 6-18-85

1i*Rc324--

~ 2 ,.

14 ' ICBC> - 1 2 SI 247

'o REF. 15y 1-4300 REF.

1-430 2 .<. 'o.l 18 H4 19

y; ESTINGHOUSE ELECTRIC CORPORATION VI R-1-4302 R ~R RETURN Rev. 1 6-18-85 10" SCH 140 1. OO"'T SS REF 1-4301 REF

,,A 2-2511

WESTINGHOUSE ELECTRIC CORPORATION VIR-1-4303 Rev. 1 6-18-85 BY-PASS 8 11 SCH 120 .719"T SS Co 5 7

28CBCl..,o

~ . . J4

"'('

REF 0,1 2-595 REF -<

'--l;~13 1-4300 ', "O,"'4 1-4309 .

I ~ REF 2-594-~1 . . ' y 1-4300

wc:.:JESTINGHOUSE ELECTRIC CORPORATION VI R-1-4304 Hev. 1 6-18-85 SIS HOTLEG 6" SCH 120

  • 562"T s: _:

. REF. 4 1-4300

- ~ RC321 5

, REF.

--r 1-4310

WESTINGHOUSE ELECTRIC .CORPORATION VIR-1-4305 Rev. 1 . 6-18-85

  • 6" SCH 120 .562"T SS 4" SCH 120 .438"T SS

. 2" SCH 160 . 344"T SS SIS COLDLEG I ',

'>-' REF. 2-2 5 4 4 12 II --~**s, 353 251275-- IO<BW> /S 'vf'.'.rEE

~XCoAID 13 8 t

ro"x4"x 2"RED.

-~'RC320 2 A ICBC>., ...015 2 SI 237 I ........ ~., REF

... 14 1-4300 "REF 1-4,,9

WESTINGHOUSE ELECTRIC CORPORATION VI R-l-430Co Rev. 1 6-18-85 RTD RETURN 3 SCH 160 .438"T SS 11 9

REF 12 H2 1-4 311 ,..I 13 ~FE492 I 8 H3

// ,, l(BC>

3X2RED -

~

REF.

1-4312 5

-~RC447 4

i<.a.. 2

~ . ' ... HBC)

REF ~

1-4300 10

'W t511NGHOU5t tlELIKIL \.UKl"UKAIIUN VI R-1-4307 DRAIN LINE Rev. 1 6-18-85 2" SCH 160 .344"T SS Note: Welds 2 thru 17 and 19 thru 31 replaced 1979.

9 10 5..,o~ II ~-o- -~-,REF

.,,, 18(BC> l9 1*4300 4 , l(BC)

REF y"' 2 1-4300 2-5 55C 3 21

-2RC359 IG 24 2RC358- 25 REF. 17

-,.. 1-4208 f32

? 31 32 HIS 33 34 35 3(D Hl7 53 37 52 Hl5 38 39

  • 2RC35\

44 ~(s).p42.

WESTINGHOUSE ELECTRIC CORPORATION VIR-1-4308 Rev. 1 6-18-85 FILL HEADER 2" SCH 160 .344"T SS 2CH310 - -2 RC500 9

3 14 II 2 ...::\

,.o 10 HBC>.,

...f)' REF 9 1-4300" 18 15 H6 24 H7 2~ y.~

23 25 REF 1-4209 19 44 I 43? ~.

1 REF 1-4108 ~

WESTINGHOUSE ELECTRIC CORPORATION VI R-1-4309 Rev. 1 6-18-85 PRESSURE EQUALIZATION 2 11 SCH 160

  • 344 "T SS REF 1-4303

~4

.. ~EF 15..,...

p 25 1*4300 24 l(BC>

23 2

4 22 5

20 21 19 ~FE482

WESTIN0'7HOUSE ELECTRIC CORPORATION VI R-l-4310 Rev. 1 6-18-85 SIS HOTLEG 2" SCH 160

,. 1" "

~oREF.1*4Co00 "12

  • 2 .!.- 3***x2RED.

5Co{8W/)

52 55 REF. 11 ;i..

1*4 304

. ,.. 1(8C)

-12 r§5~

4 H9 20 19

WESTINGHOUSE ELECTRIC CORPORATION VIR~l-4311 Rev. 1 6-18-85 RTD TAKE-OFF 2" SCH 16G .344"T SS 1.5" SCH 150 .28l"T SS 8

3 fFLANGE A "a.. lxiREO.

13 ' ....I <BC>

'a...

/

REF. 14,.. ICo 1*430f> 1415 17

~-2'RC442 IB""--+--

2*575C I I A . 2X

12 I RED .

/

21 22 _...,._

27 II I .

- 1 RC441 25 2

~ 28 12 ' 29<BC>

REF

' 'o~

1-4300

W'ESTINGHOUSE ELECTRIC CORPORATION VI R-1-4312 Rev. 1 6-18-85

  • RTD TAKE-OFF 2" SCH 160 .344"T ~:S Note: Welds 13,14,15 & 16 replaced 1979.

~2x1 RED.

16

~ FLANGE A N(BW) .. "

,, 1r ~~-3X2RED.

2RC451 2RC448 ',,

14

'>' REF l-430(o

WESTINGHOUSE ELECTRIC CORPORATION VI R-1-4 313 Rev. 1 6-18-85 SEAL INJECTION 2" SCH 160 .344"T SS 1.5" SCH 160 .28l"T SS

-l'xl'RED.

14 4 17 21

Vaa'ESTINGHOUSE ELECTRIC CORPORATION VI R-1-4500 Rev. 1 6-18-85 PRESSURIZER SURGE

. 14" SCH 140 1.2=:"T SS 12" SCH 140 l. lZ="T SS

-<o2 REF 9(8Cl' ' 1-4300 8

PRESSURIZER

--12 RC310

WESTINGHOUSE ELECTRIC CORPORATION VI R-1-4501 Rev. I 6-18-85 PRESSURIZER SAFETY 6 11 SCH 160 (Safe-end) .719"T SS 6 11 SCH 120 .562"T SS ICDM 5 PRESSURIZER CoRC338 - -

WESTINGHOUSE ELECTRIC CORPORATION VI R-1-4 502 Rev. 1 6-18-35 PRESSURIZER SAFETY 6" SCH 160 (Safe-end)

  • 719"T SS 6" SCH 120
  • 562"T SS 5

PRESSURIZER

-eoRC337 2-551C~

FLANGE A 8 HI

WESTINGHOUSE ELECTRIC CORPORATION VIR-1-4503 r..ev. 1 6-18-85 PRESSURIZER SAFETY 6 11 SCH 160 (Safe-erid) .719"T SS 6" SCH 120

  • 562"T SS PRESSURIZER 5

--~**Re 33~

2~551A ~

FLANGE A 8 HI

WESTINGHOUSE ELECTRIC CORPORATION VI R-1-4504

  • 4" 4"

SCH SCH 160 120 PRESSURIZER RELi EF (Safe-end) .531 "T SS

. 438"T SS Rev. 1 6-18-B5 3" SCH 160

  • 438"T SS 2 11 SCH 160 .344"T SS Note: Welds 17 & 23 are 2" Sockets.

~- , 3'X2RED 2

H7 HSI 22 23 2-455 C 2-535 15 H5 HG ,, ,,

-3X2RED.

WESTINGHOUSE ELECTRIC CORPORATION VIR-1-4505

  • . PRESSURIZER 4" SCH 120 .438"T SS SPRAY Rev.

Sesitized Piping I 6-18-85 Piece 49 Weld 18 to 19 Piece 53 Weld 11 to 13 Piece 55 We 1d 9 to 11 Piece 57 Weld 8 to 9 T' Piece 58 Weld 7 to 8 2 '° ~

k>- _, __ 2 2 2-455A I~

Piece 60 Weld 6 to 7

  • I A

/

REF.

25 21 20 I- 4 SOCo 4RC314--

18

  • 12 II H14 H II HIO 2 ,D" 1(8C) , 15 H9 H7 HS 14 REF. H5 HG>
  • 1-4100 H3 H4

WESTINGHOUSE ELECTRIC CORPORATION VI R-l-450G Rev. I 6-18-85 PRESSURIZER SPRAY 4 11 SCH 160 {Safe-end) .53l"T SS 4 SCH 120 .438"T SS 11 34 33 ~

Sensitized Piping  :-:13 ~

Piece 45 Weld 34 to 35 HII Piece 46 Weld 29 to 30 32 Piece 48 Weld 22 to 23 Piece 56 Weld 8 to 10 31 Piece 59 Weld 5 to 6 410 27 ~o

~ 2~

HS 1(8C) 4'RC315- 24 ---~-

')/REF.

22 1-4507

  • REF.

1-4300 /is

, '0..2 2 1-4505

)'

REF.

~--:0 1

~ 2 3

,~c" REF

- --r. 1-4508 15 4

5 7 14

WESTINGHOUSE ELECTRIC CORPORATION

  • VI R-1-4507 Rev. 1 6-18-85 AUXILIARY SPRAY 2" SCH 160 .344"T SS REF 1-4506 4 5 27?

(o REF I 2

, I <BC> 4~"'o... ,14 2 0 7 7 9 25(BC> ' 'o'Y 47 2Gf.

" 3 RED.- 8 2X 13 24 4

21

, 14 I 2-311 20

.. i'x ! RED.~ ~ 17 18 l9

-""ESTINGHOUSE ELECTRIC CORPORATION VI R-1-4508 Rev. 1 6-18-85 SPRAY LINE

1. 5" SCH 160 .:.::=- "T SS

WESTINGHOUSE ELECTRIC CORPORATION VI R-1-4 GOO

  • 438"T SS HIGH HEAD Rev. 1 6-18-25 Sensitized Piping Piece 17 Weld 17 to Weld 23

\ .,I\

/\

... ",J PEN.113

-- 2-841A 2~

PEN 23,.. ),_

...l,'1 9 10

~ ,,

- 3 SI-2>47 5

3 HI 2 REF. 1*4110

... ..).

21 19 17 48(8W) 5Co(BW>¥"--...3*x i'RED -.......... , ,a '3)( 2**RED I '*

-t. ~54(8W)

REF.

1-4310 REF 1-4204

V \ R-1* 4700 Re V. 1 6-18-85 PRESSURE RETAINING BOLTING TOTAL ITEM LOCATION FLANGE NO. STUDS & NUTS 1 V!Rl-4106 FE490 8S&l6N 2 VIRl-4109 FE480 8S&16N 3 VIRl -4112 FLANGE A 8S&l6N 4 VIRl-4113 FLANGE A 8S&l6N 5 VIRl-4114 FLANGE A 4S&BN 6 . VIRl-4206 FE491 8S&l6N I

7 VIR1-4ll0 FE481 8S&l6N i 8 VIRl-4211 FLANGE A 8S&l6N 9 VIRl-4212 FLANGE A 8S&l6N I 10 VIRl-4213 FLANGE A 4S&8N 11 VIRl-4306 FE492 8S&l6N 12 VIRl-4306 FLANGE A 8S&l6N 13 VIRl-4309 FE482 8S&l6N 14 VIRl-4311 FLANGE A 8S&l6N 15 VIRl-4312 FLANGE A 8S&l6N 16 VIRl-4313 FLANGE A 4S&8N 17 VIRl-4501 FLI\NGE A 12S&24N 18 VIRl-4502 FLANGE A 12S&24N 19 VIRl-4503 FLANGE A l 2S&24N 20 VIRl-4508 FLANGE A 4S&8N

ILLUSTR,ATIVE ONLY VIR-1-5100

  • RC. PUMPS 1,2&3 . Rev. I 6-18-85

- - - - - - - - F l y w h e e l (Ref. 1-51008) 11 R.C.PUMP 1(2-RC-P-lA)

R.C.Pl.MP 2{2-RC-P-18)

R.C.PUMP 3(2-RC-P-lC)

D D I No._ 1 Seal *Housing Bolting {Ref. 1-SlOOA)

--* -t -- - Flange Bnlting ("Ref. 1-SlOOA)

~~--------Supports (Ref. 1-51008)

Casing {Ref. 1-SlOOC)

Casing Weld (Ref~ 1-SlOOC)

ILLUSTRATIVE ONLY R.C. PUMP BOLTING Rev. 1 6-18-85

    • NO.I SEAL HOUSING BOL-TING . .

12 BOLTS 2.o* DIAMETER a.o* LENGTH -----SEAi. INJECTION LINE 83, Etc.

FLANGE BOLTING*

83, Etc. - - - ~ - - - - -

82 ---,.i;.--

81 *, (Typ) - - ~ - -

24 BOLTS 4.s* DIAMETER 3o.s* LENGTH SEAL INJECTION LINE.--#-_...,

  • Number 1s preceded by (1-). (Z*) or (3-) as applicable.

ILLUSTRATIVE ONLY V\R-1-51008 FLYWHEEL Rev. 1 6-18-85 1 .025" DIAMETER for Loops l &3

.850" DIAMETER for Loop 2 0 0 2 3

0 Note: During Spring 1980 Reactor Coolant 0 0 Pump B Flywheel of Unit

  1. 2 was interchanged with 0 Reactor Coolant Pump A_

Flywheel of Unit #1.

I I I I I I I

I I

. RC. PUMP SUPPORTS

  • Number is preceded b~ (1-}, (2-} Or (3-) as app~icable.

ILLUSTRATIVE ONLY v R-1-s 1o~c 1

PUMP CASI-NG WELD Rev. 1 6-18-85 I

  • Number is preceded by (1-), (2-) or (3-) as applicable.

WESTINGHOUSE ELECTRIC CORPORATION Illustrative Only VIR-1-£100 Rev. 1 6-18-85 REACTOR COOLANT Pl F'E LOOP STOP VALVE 26 Studs and 26 Nuts Each Valve Material: Studs ASTM A193 Grade B-Bt1: Diameter 3.0"; Length Nuts ASTM A194 Grade 2B: Diameter 3.0" Note: Each stud contains Hex Bo 1t B26 0 -

0 0 0 0 0 0 0 0

.....L.

I 0 *:)

0 0 o* _, (.

0 i 0 iQ 0 f

ISO VALVE STUDS AND NUTS 1-4100 2-590 Bl thru 826 1-4100 2-591 Bl thru 826 1-4200 2-592 Bl thru 826 1-4200 2-593 Bl thru B26 1-4380 2-594 Bl thru 826 1-4300 2-595 Bl thru B26

V l R-l-G200 Rev. 1 6-18-85 '

VALVE BODIES. II I

VIR I ITEM ISO SIZE VALVE MANUFACTURER I

I 1 1-4104 6" 2-874E Velan i I

2 1-4104 6" 2-876B Vel an' 3 1-4105 61' 2-874A Velan 4 1-4105 511 . 2-889A Velan 5 1-4204 6" 2-874F Velan I I

6 1-4204 6" 2-876C Velan I

.i 7 l-4205 6" 2-8748 Velan  !

  • I 8 1-4205 6" 2-889B Vel an* I i

9 1-4304 511 2-874D Velan 10 1-4304 6" 2-876A Velan

,1 1-4305 6" 2-874C Velan 12 1-4305 6" 2-889C Velan i I

13 1~4501 6" 2-5518 Crosby 14 1-4502 511 2-551 C Crosby 15 1-4503 511 2-551 A Crosby*

16 1-4103 8" .2-585 Rockwel 1 17 1-4203 8" 2-586 Rockwel 1 18 1-4-303 911 2-587 Rockwel 1 19 1-4202 10 11 2-RH47 20 1-4302 10 11 2-720B Darling 21 1-4102 12 11 2-875A Darling 22 ,1.;.4102 12" 2-875D

  • Darl inn 23 1-4201 12 11 2-875B Darl fog 24 1-4201 12 11 2:...875E Darling 25
  • 1-4301 12" 2-875C Darling

V l R-1-6200 Rev. 1 6-18-.85 VALVE BODIES VIR ITEM ISO SIZE VALVE MANUFACTURER 26 1-4301 12" 2-875F Darling 27 1-410~ ,-411 2.;.700 Copes Vulcan 28 1-41 Q; 14 11 2-701 Copes Vulcan 29 1-410( 29 11 2-590 Darling-30 1-41 OC 27. 5 11 2.:.591 Darling I 31 32 1-420(

1-420[

29 27.5 11 11 2-592 2-593 Darling Darling I!

  • I 29 Darling I 11 33 l-430C 2-594 34 1-4300 27. 5 11 2-595 Darling

!I II I

I I

i I

I I

I I

I I

ii i

V IR-1-6300 VALVE BONNET BOLTING Rev. 1 6-18-85 VIR TOTAL ITEM ISO SIZE VALVE STUDS & NUTS 1 1-4113 l 1/2" 2-546A N/A 2 1-4211 l 1/2" 2-5688 tl/A 3 1-4508 l 1/2" 2-541 N/A 4 1-4105 2" 2-S1235 N/A 5 l-4107 2" 2-558A N/A 6 1-4107 I

2" N/A N/A 7 1-4107 2" 2-555A N/A

_8 1-4107 2" 2-557A 6 9 1-4108 2" 2-554A N/A 10 1-4108 2" 2-556A 6 11 1-4108 2" FCV160 N/A 12 1-4109 2" 2-581 N/A 13 1-4109 2" 2-577 N/A 14 1-4.110 2" 2-866A N/A 15 1-4111 2" 2-309D N/A 16 1-4111 2" 2-460A 6 17 1-4111 2" 2-460B 6 18 1-4112 2" 2-576A N/A 19 1-4112 2" 2-575A N/A 20 1-4112 2" 2-568A N/A 21 1-4113 2" 2-547A N/A 22 1-4114 2" 2CH324 N/A 23 1-4114 2" 2CH323 N/A 24 1-4204 2" 2-866C N/A 25 1-4205 2" 2Sl236 N/A 26 . 1-4207 2" 2-310 6 27 1-4208 . 2" 2-5558 - N/A 28 1-4208 2" 2-557B 6

VALVE BONNET BOLTING V IR-1-6300

  • ITEM VIR ISO SIZE VALVE

. Rev. 1 6-18-85 TOTAL STUDS & NUTS 29 1-4208 2" RC-207 N/A 30 1-4208 2" 2-5586 N/A 31 1-4209 211 2-5546 N/A 3? 1-4209 2" 2-5566 6 33 1-4210 2" 2-578 N/A 34 1-4210 2" 2-582 N/A 35 1-4211 2" 2-5768 N/A 36 1-4211 211 2i.J5758 N/A 37 1-4212 2" 2-5058 N/A 38 1-4212 2" 2-5478 N/A 39 1-4212 2" 2-5468 , N/A 40 1-4213 211 2CH334 N/A 41 1-4213 2" 2CH333 N/A 42 1-4305 2" 2Sl237 N/A 43 1-4307 2" 2-558C N/A 44 1-4307 211 2-555C N/A 45 1-4308 2" 2-554C N/A 46 1-4308 2" 2-556C 6 47 1-4309 211 2-583 N/A 48 1-4309 211 2-579 N/A 49 1-4310 211* 2.:.8868 N/A 50 1-4311 211 2-576C N/A 51 1-4311 211 2-575C N/A 52 1-4311 211 2-568C N/A 53 1-4312 . 211 2-505C N/A 54 1-4312 211 2-547C N/A 55 1-4312 211 2-546C N/A 56 1-4313 211 2CH35() N/A 57 1-4313 211 2CH349 N/A 58 1-4507 211 2-311 N/A 59 l-'4507 211 2-313 N/A 60 1-4106 311 2-5SOA 16

VI R-l-_6300 VALVE sm1r1n soL r~ P:-: Rev. 1 6-18-85 VIR TOTAL ITEM ISO SIZE VALVE STUDS & NUTS 61 . 1-4206 3 II 2-5608 16 1-4207 3 II 2-312A 12 62 1-4207 3 II 2-3128 12 63 64 1-4306 3 II' 2-560C 16 1-4504 3 II 2-536 12 65 66 1-4504 3" 2-455C 6 67 1-4504 3" 2-535 12 1-4504 3 II 2-456 6 68 69 1-4600 3" 2-841A 12 1-4600 3 II 2-8418 12 70 7l 1-4504 4 II 2-455A 4 1-4506 411 2-455B 4 72 73 1-4104 511 2-.874E 12

  • 74 l-4104 511 2-8768 12 75 1-4105 611 2-874A 12 76 1-4105 511 2-889A 12 77 1-4204 511 2-874F 12 78 1-4204 6" 2-876C 12 79 1-4205 6" 2-8748 12 80
  • 1-4205 511 2-8898 12 81 1-4304 6" 2-874[) 12 82 1-4304 6" 2-876A 12 83 1-4305 511 2-874C. ,2
  • l-4305 611 2-889C 12 84 85 1-4501 6" 2-551 B 8
  • 86 1-45.02 6" 2-551C 8 87 l-'4503 6" 2-551A 8 88 1-4103 . 8" 2-585 4 89 1-4203 811 2-586 4 90 1-4303 8" 2-587 4 11 91 1-4202 l0 2-RH47 16 92 1-4302 l 011 2-7208 16

VI R 6300 VALVE sn*1~1 ET BOLTING Rev: 1 6-18-85 VIR TOTAL ITEM ISO SIZE VALVE STUDS & NUTS 93 1-4102 . 12" 2-875A 16 94 1-4102 12" 2-8750 16 95 1 -:-4201 12" 2-875B 16 96 1-42()1 12" 2-875E 16 97 1-4301 12" 2-875C 16 98 1-4301 12" 2-875F 16 99 1-4101 14" 2-70() 16 100 l -4 l 01 1LI." 2-701 16 101 1-4307 2" 2-557C 6 102 1-4113 2" 2~505A N/A L_

WESTINGHOUSE ELECTRIC CORPORATION Illustrative Only VIR-2-1100

  • Rev. 1 6-18-85 STEAM GENERATORS 1,2 &3

,a (32" Oiameter) . Shell Welds 2 thru 8 and 11: SA 533

- Nozzle in Vessel Welds 9 & lQ: SA 508 Manway Class 2 Carbon Steel to SA 533 Grade A 113.50" Class 1 Carbon Steel 3.62 T11 7 -....-----~ ---- Weld 2: Diameter: 135.88" Circumference: 426.66" 113.50" Welds 3, 4 & 5: Diameter: 135" Circumference: 423.9" 76.75" Welds 6, 7 & 8: Diameter: 175.75" 3.68"T Circumference: 551 . 85" Weld 11: Diameter: 167" 138" Circumference: 524.38" 2.82"T Integrally Welded Supoort Attachments 4- Not .Applicable Component Supports: As Apolicable 138" Supports - Mechanical and Hydraulic:

  • As Applicable 2.82 T 11 Manway Bolting: 2 Man~"lays each 3-76" Generator: 20 Bolts -1.25" Diameter 3.25"T 8.0" Lengtr.

2-

,- 27 11 Note: Thicknesses in minimum inches (Ref. 1-3100)

STEAM GENERATOR WELD ZERO REFERENCE l (2-RC-E-lA) 1-2 Centerline of Feedwater ~ozzle 1-6 Centerline of Feedwater Nozzle 2 (2-RC-E-1B) 2-3 Centerline of Feedwater ~ozzle 2-9 Centerline of Feedwater Nozzle 3 (2-RC-E:-:lC) 3-5 Centerline of Feedwater Nozzle 3-8 Centerline of Feedwater Nozzle 3-10 Centerl i ne of Feedwater Nozzle Note: \~elds 4, 7 & 11 not structural discontinuity Welds Replacement \.Jelds 2, 3, 4, 5 I'. 11 installed SU1T1T1er 1979

Illustrative Only VIR-2-1110 EXCESS LETDOWN HEAT EXCHANGER Rev. 1 6-18-85 Welds l and 2: .750"T SA2407P316SS Inlet Diameter: 9.5"; Circumference: 29.83" Nozzle in Vessel Welds: 2" Diameter Integrally Welded Support Attachments: Not Applicable Component Supports: Not Applicable

  • Supports - Mechanica*l and Hydraulic: Not Applicable Flange Bolting: 12 - 1.625" Diameter Class 3 15.5" Length 2-CH-E-4 0

Reference:

Centerline of 2" Inlet Nozzle Outlet ng


'-r~----r-'

1-----+-11-- 2 2"

2 11 Outlet 2"

82

' l 2" Outlet

ILLUSTRATIVE ONLY VI R I 12 O RESIDUAL HEAT EXCHANGERS Rev. 1 6-.18-85 Welds l & 2: .875"T SA 240 TP304SS Diameter: 42"; Circumference: 131.88" 0 Nozzle in Vessel Welds: 10" Diameter - .875"T SA 240

'TP 304SS (Not ~ccessible)

Integrally Welded Support Attacrments: 2- .000' 1T Component Supports: 2 Welded Supports - Mechanical and Hydraulic: Not Applicable Flange BolUng: 48-1.375" Diameter 8.0" Length Class 3 0

Reference:

Centerline of 10 11 Inlet Nozzle *

  • 2-RH-E- lA 2-RH-E-lB '*Note: Number is preceded by Heat Exchanger Designation

/.,,.-,,-

( I \\

'\ II

' - .//

Bolting 10 11 Inlet* 10 11 Outlet Welded Supports 10" Inl e 10 11 Outlet.

(From RHR Pump) .

848

ILLUSTRATIVE ONLY VIR-2-1130 SEAL WATER HEAT EXCHANGER Rev. 1 6-18-85 Welds 1 and 2: .250"T SA240 TP304SS Diameter: 12.75 11 ; Circumference: 40.03

Nozzle in Vessel Welds: 4" .Diameter Integrally Welded Support Attachments: 2 Class 3 Component Supports: 2 Welded Supports - Mechariicar and Hydraulic: Not Applicabl Flange Bolting: 12- .75" Diameter 10 11 Length 0

Reference:

Centerline of 411 Inlet Nozzle 2-CH-E-l

  • Outlet 411 Inlet 4 11 Outlet

./F--==~.....;..._- 1 Welded Supports 2WS 4 11 Inlet 4 11 Outlet l

ILLUSTRATIVE ONLY VIR-2-1140 NON REGENERATIVE LETDOWN

. HEAT EXCHANGER Rev. 1 6-18-85 Weld 1 and 2: .625"T SA240 TP304SS Diameter: 27.0"; Circumference: 84.75" Nozzle in Vessel Welds: 2" Diameter Integr~lly Welded Support Attachments! 2 Component Supports: 2 Welded Supports - Mechanical and Hydraulic: Not Applicable Flange Bolting: 36-1.125 Diameter 11 Class 3 0

Reference:

Centerline of 2 Inlet Nozzle 11 2-CH-E-2 Bolting 2

2 .Inlet 11 l

2 Inlet 11 2 Outlet 11 2WS

Illustrative Only VIR-2-12CO VOLUME CONTROL TA.NK Rev. 1 6-18-85 Welds l and 2: .313"T SA240 TP304SS 2 ~ ~ - - - -..... Diameter: S4.62"; Circumference: 264.9 11

@) Nozzle in Vessel Welds: 4 and 3" Diameter 11 Integrally Welded Support Attachments: 4 2-CH-TK-2 Component Supports: 4 Welded Supports - Mechanical and Hydraulic:

Not.Applicable Manway Bolting: 16- 1.125" Diameter

@) 5.75" Length 0

Reference:

Centerline of Manway l

4"

Illustrative Only VIR-2-1300 SEAL WATER INJECTION Fil TE RS Rev. 1.6-18-85 Welds 1 & 2: . 875 T SA240TP304SS 11 Diameter: 10.75"; Circumference: 33.77 11 Nozzle in Vessel Welds: 2" Diameter Integrally Welded Support Att~ch~ents:

3 Component Supports: 3 Welded 2-CH-FL -4A Supports-Mechanical & Hydraulic-Not Applicable 2-CH-FL-48 Flange Bolting: 16 - 1.25 Diameter 11

. Length O

Reference:

Centerline of 2 Inlet Nozzle 11

  • Note: Number is preceded by Filter Designation 2 Inlet 11 l*

~~~-~~. Welded Supports 2 Outlet 11 lWS*

B2 etc.

11 2 Inlet----- + ---+--

2WS*

'f++'ESTINGHOUSE ELECTRIC CORPORATION ILLUSTRATIVE ONLY VIR-2-1310 Rev. 1 6-18-85 RFACTOR COOLANT FILTER Bolting--- We 1ds 1 , 2 and 3: . 188 11 T SA240 TP304SS 2 ___...., Diameter: 16.0"; Circumference: 50.2.'..

3 11 Inlet Nozzle in Vessel t~elds: 3" Diameter

]ntegrally Welded Support Attachments: 4 Component Supports: 4 Welded Supports - Mechanical and Hydraulic: Not Applicable 2-Cr-FL-2 Flange Bolting: 8 Bolts - .75 11 Diameter 3 11 Outlet 0

Reference:

Centerline of 3 11 Outlet Nozzle

~-

Welded Support 2WS

+

4WS 3WS

WESTINGHOUSE ELECTRIC CORPORATION ILLUSTRATIVE ONLY VI R-2-1320 Rev. I 6-18-35 SEAL WATER RETURN FILTER Bolting--.. Welds l , 2 and 3:

  • 188"T SA240 TP304SS

' ...-,r 2 Diameter: 16.0"; Circumference: 50.24" 3" Inlet Nozzle in Vessel Welds: 3" Diameter Integrally Welded Support Attachments: 4 Component Supports:. 4 Welded Supports - Mechanical and Hydraulic: Not Applicable

  • Flange Bolting: 8 Bolts - *.75" Diameter 2-CH-FL-3 3" Outlet 0

Reference:

Centerline of 3" Outlet Nozzle

  • l

~ Welded Support 2WS

+

4WS 3WS

WESTINGHOUSE ELECTRIC CORPORATION VIR-2-2100 Rev. 1 6-18-85 MAIN STEAM 32 11 - l.5"T C.S.

30 11

- l.75"T C.S. (Tee Side Welds 15,16 & 30) 30 11

- 1 . 1"T C. S.

6 Sch. 80 .432"T C.S.

11 Note: Welds 15,16, 17,32,3l(added Feb. 1980) 33(added Feb. 1980) examined under High Energy Welds Change 13 Part A of Tech. Spec.

Welds 1 ,2 & 3 replaced SlJTITler 1979.

4 32'x 3c**

RED. EL.

I I

\" )

0 I - - - I H5 ST I I I I 10 ,GEN.I I I

I 1,-,- -,.

-:,osHP 101 I

' --- I 11 M~Z'04A REF. .. . JGL 2-2102 T

I YREF I H7 2-2104

~-~~

1°'"' 31 ~HBC>

~1,.,1, -3cfsHP122 37L ~ . I~

  • Note: 4 11 30~

Re 1i ef Header no examinations requi re?Oj l5

WESTINGHOUSE ELECTRIC CORPORATION VIR-2-2101 Rev. 1 18-85 FEEDWATER 16"-4. 75"T C.S. (Weld 1) .

16" SCH 80 .844"T C.S.(Weld 2) 14" SCH 80 .750"T C.S.

Note:Welds 21 ,23,26 & 27 examined under High Energy Welds Change 13 Part A of Tech Spec.

Welds 24,25,28 & 29 examined under High Energy Welds Change 13 Part B of Tech Spec.

Welds 1,2,3,4,5,9 & 10 replaced 1979. -

r: \

,,- - - ..... \

7 w 1'--'1 I I HI 5 2 11 ST, :

4 .

3 *~GEN. I 1 I

1 t<ox I 4 RED. J I .

~- - - --..~

I

-14WFPD-117-GOI 12 15 H5 I Co H~

H7 17

WESTINGHOUSE ELECTRIC CORPORATION VIR-2-2102 Rev. 1 6-18-85 MAINSTEAM BY-PASS 6 11 Sch. 80 .432"T C.S.

~

HI

--.:(o***sHP 145 _

8 4

13 2MS84 H2 3 REF T.2-2100 2 ,o>...

Y33 ,,' 30 I ,

~19(8Cl ,, l(BC)

  • I

°31 1 ,o', T VMS 201A I" 32 14

WESTINGHOUSE ELECTRIC CORPORATION VIR-2-2103

  • 6" SCH 120 .562 T SS 11 SIS HOTLEG Rev. 1 6-18-85 Sensitized Piping Piece 54 Weld 24 to 26 (2 bends)

Piece 55 Weld 23 to 24 Piece 56 Weld 22 to 23 Piece 57 Weld 21 to 22 Piece 58 Weld 19 to 21 (2 bends)*

Piece 59 Weld 16 to 18 (2 bends)

Piece 60 Weld 14 to 16 (2 bends)

Piece 61 Weld 11 to 13 (2 bends)

Piece 62 Weld 10 to 11 Piece 63 Weld 9 to 10 Piece 64 Weld 8 to 9 ftSl-249 22 / H22 REF.

  • H23 1-4104~ ...

H28 H29 25

WESTINGHOUSE ELECTRIC CORPORATION VIR~2-2104

  • Rev. 1 6-18-85 MAINSTEAM RELIEF 4" SCH 80 .337"T C.S.

Sketch for Reference only:No examination required .

  • REF.

l17

l(BC>

2MS BG

  • 2-2100-3

WESTINGHOUSE ELECTRIC CORPORATION VI R-2-2200

  • 32" - l.5"T C.S.

MAINSTEAM 30" - 1.75" C.S. (Tee side of welds 11,12 & 26) 30" - l. l "T C. S.

Rev. 1 6-:18-85 6 Sch. 80 .432"T C.S.

11 Note: Welds 11,12,13,28,27 (added Feb. 1980), 29(added Feb. 1980) examined under High Energy Welds change 13 Part A of Tech. Spec.

Welds l ,2, & 3 replaced Sl1T111er 1979.

5 35L 29 1g(BC) ., '()_\ rt, 2~ .l"~ REF.

REF y H4 -rJ 2"-.f202 I ST I 2-2202 HI :GEN.2 I I 7 I I

\.,

- - .._I

- - -- /

IO PEN.75 -3o*sHP-102 2

8 Note: 4 Relief Header no examinations required.

11

WESTINGHOU~E ELECTRIC CORPORATION VIR-2-2201 Rev. 1 6-18-85 FEEDWATER 16" "."4.75"T C.S. (l~eld 1) 16" SCH 80 .844"T C.S. (Weld 2) 14" SCH 80 . 750 "T C. S.

Note:Welds 25 & 26 examined under High Energy Welds Change 13 Part A of Tech Spec.

Welds 22,23,24,27,28,29&30 examined under High Energy Welds Change 13 Part B of Tech Spec.

Welds 1 ,2,3,4,7&8 replaced 1979.

. I I

,....---,t.

I

\

14 WFP0-113-CoOI-

. 24

  • WESTINGHOUSE ELECTRIC CORPORATION VI R-2-2202 Rev. 1 6-18-85 MAIN STEAM BY- PASS 6 SCH 80 .432"T C.S.

11 9

HI

-~'SHP14~

2MS117

--12 13 4 H2 29f 2 n(s*c, 1 JJ::>.. REF. 2-2200 l -;; I HBC>, " 2Co 18 I .. .P27 I . . - --~

I .., o ',

,.., . . 28 TVMS2018 14

WESTINGHOUSE ELECTRIC CORPORATION VIR-2-2203 Rev. 1 6-18-85

  • 6 11 SCH 120
  • 562"T SS SIS HOTLEG REF S~nsitized Piping
  • 1-4204

., ;'\.

Piece 45 Weld 19 to 20 11 , ,

Piece 46 Weld 18 to 19 .... __....

-- ',a' Piece 47 Weld 17 to 18 287G>C Piece 48 Weld 16 to 17 Piece 49 Weld 15 to 16 4

17 29 28 ;30 1

2~ REF

., 27  : 2-2103 REF. "'t __ ., I / 25 t29.

01 ,, ,, 24 2-2540 6 X fD X (g Hl3 TEE 21

\ 20

~/'s1 248

WESTINGHOUSE ELECTRIC CORPORATION VI R-2-2204 Rev. 1 6-18-85 MAINSTEAM RELIEF 4" SCH 80 .337"T C.S.

Sketch for Reference only:No examination required.

MS201B

~ FLANGE Co 5

- 2MS 119 13 ~ 14 1

REF. ~ ICBC) 2-2200 I o3 121 . 2

WESTINGHOUSE ELECTRIC CORPORATION VIR-2-2300 Rev. 1 6-18-85 MAINSTEAM 32" - 1.S"T C.S.

30" - l.75"T C.S. (Tee side of welds 13.14 & 28) 30" - 1 . 1 "T C. S.

6 11 Sch. 80 .432"T C.S.

Note: Welds 13.14.15.30.29(added Feb. 1980). 31(added Feb. 1980) examined under High Energy Welds Change 13 Part A of Tech. Spec.

Welds 1.2 & 3 replaced Sl.lT'lller 1979 3i'x30

/RED ..

EL .

I I I' - - -'I I I 7 I ST. I H2 :GEN.3:

8 I ___ I H3 ,, - 'l

-:,0SHP 103

'3

\.. - - ....

10 Nl(V- MS 201 C 31 19(89, YREF HS 2-2304 i4-3o**sHP 124 Note: 4" ReHef Header no examfoatfons required. 28 ~ IO A 3

VIR-2-2301 Rev. 1 6-18-85 l QQP :; JG"+ 14 FEED WATER I

0 1ro*scH8Q ;14 SCHBO

}....---__.,.,,

IG:x 14"RED *

  • . I 2
ST, I.

I

--~

GEN. 1.

I* C  :

II *I I *** .. I

r. . - _.,'

-14\'IFPD-109*601 H2

-14 19 H'f ... :..* A

-IS ~Ill'

-24 20 PEN.

l

- - 2 f:'.,Y72

'21 23- , f

..r*

  • 22 A- 14~WFP0* 109*601 Iota, Valda 1.2.3,,.7, I **placed 1979 Valda 19, Zl examined under Biah rcara, Valda Chana* 13 Pare A of Tech Spec.

Valda 22, 23, 24, 25 examined under B11h Enar17 Valda Change Jc3il*f.\~7ffr Tedi Spec.

I J§o

WESTINGHOUSE ELECTRIC CORPORATION VIR-2-2302

  • MAINSTEAM 6" SCH 80 .432"T C.S.

BY- PASS. Rev. I 6-18-85 9

-<o " SHPl47

  • f3 2 MSI 55 H2 14

WESTINGHOUSE ELECTRIC CORPORATION VI R 2303 Rev. 1 6-18-85 SIS HOTLEG 6 11 SCH 120 . 562"T SS Sensitized Piping Piece 40 Weld 8 to 10 (2 Bends)

REF 1-4304 r ' ' ~--. 2-87(oA

',, HI H2 32f 2 REF 2-2103 31 ~ -(g Sl-250 15 14 4

HCo 11 10 H7

WESTINGHOUSE ELECTRIC CORPORATION.

VI R-2-2304 Rev. I 6-18-85 MAINSTEAM RELi EF 4" SCH 80 .337"T C.S.

Sketch for Reference only:No examination required.

MS201C Dr>

Co FLANGE I 15 f 4 I

REF. I l<BC) 2-2300 :

3 141

WESTINGHOUSE ELECTRIC CORPORATION VI R-2-2500 Rev. 1 6-18-85 RHR 14" SCH 40 .438"T SS RH.R I

I,:;.._"'~

12

, 'I PUMP 1 15 1

2-RH-P*l 8

  • 11 2-701 ..

""'( " I0 .

REF. -14 RH 118 1-4101 17 23 FLANGE 2>  ?~9 FLANGE 4 ~

20

WESTINGHOUSE ELECTRIC CORPORATION VI R-2-2510

  • Rev. 1 6-18-85 RHR 12" SCH 405 .375"T.SS 10" SCH 405 .365"T SS 8" SCH 40S .322"T SS 35

-t<fRHI08 3Gi 37.

45 RHE  : RHE 2-RHE- 2RHl5 ........ : 2*RHE-IA -

18 I

I ,'

39 41: .....

H7 40 I 49 HII FCV2G>O 50 GO

-12RH 119

~

~"j y:ei..J.\r>.

GS 51

  • 01 .

... ' y REF.

2-2511

WESTINGHOUSE ELECTRIC CORPORATION VIR-2-2511 Rev. 1 6-18-85 RHR 12" SCH 40S

  • 375"T SS lO"_SCH 40S .365"T SS 6" SCH 40S . 281 "T SS .

REF 2-2510

('- -0..

r~(p I

53 '.. I 1£>,, RH 114

,, " RED.--

12X(o 2 RH29 H3 7 10 REF. i:a-.. II ,, ,,

2-2520 y

-12X 10 RED.

12 H4

-- t _, 17

,..o- . : 27208

  • REI:~ 8 1-4302

WESTINGHOUSE ELECTRIC CORPORATION VI R-2-2520 Rev. 1 6-18-85 RHR 10" SCH 140 1. OO"T SS Sensitized Piping Piece 41 Weld 5 to 6 Piece 42 Weld 4 to 5 Piece 43 Weld 3 to 4 Piece 44 Weld 2 to 3 Piece ~5 Weld 1 to 2 REF.

1-4202 7

-S-10 2720A . REF 15 IO"RH 11 Co -  ! 2-2511 111..

9

WESTINGHOUSE ELECTRIC CORPORATION VI R-2-2521 Rev. 1 6-18-85 RHR 10" SCH 40S .365"T SS I RHE 2RH24 ' 2 RH-E-18 10 H2

  • H3 H4 0

7 17 :-0.,.54 ..-:

55 \ ,,

10 RH 109 I

"i, I '

I RHE 2 RH-E-IA REF.~5(o 2-2510

WESTINGHOUSE ELECTRIC CORPORATION VI R-2-252*2 Rev. 1 6-18-85 SIS 10" SCH 140 l.OO"T SS 3 "

--10 SI 352 I 4 HI

~3 ,:,

5

-c " "' " IoX Cg"RED.

REF.

2-2542

WESTINGHOUSE ELECTRIC CORPORATION VI R-2-2540

  • 10" SCH 40S .365"T SS 6" SCH 120 . 562"T SS SIS Rev. 1 6-18-85 3 ,,

-Co SI 248 REF. .

,,,i. 2-2203 30., ...

. ~ ...

2 --:- -2 SI 228

.,._ REF

~5 .," 2-2103

.. -- '4J' 2Sl229 13 G'*s I 249 l8

~

WESTINGHOUSE ELECTRIC CORPORATION VI R-2-2541

  • 6 11 SCH 120
  • 562"T SS SIS COLDLEG Rev. 1 6-18-BS HI 2 2889A

, . . \ -_.,,9 1..-0,

' 'r' REF

. 1*4105 7

8 It

-G/S1345 H2 12 I~

17 REF. ""C 2-2542

WESTINGHOUSE ELECTRIC CORPORATION.

VIR-2-2542 Rev .. 1 6-18-85.

SIS COLDLEG 6" SCH 120

  • 562"T SS REF i<

2-2s22 , I - iox~;"RED.

33 REF 30 2-2541 REF 29

~17 28 p;.. 2-2544

2G, 27 REF.

2G,

,\ 2-2543 Jr

' 2CD 3 25 HI ,, 24

- G Sl-345 23 21 H9 22

\ '

4 A

' I A

~

17

. 18 10 II HCo

WESTINGHOUSE ELECTRIC CORPORATION VI R-2-2543

  • 6 11 SCH 120
  • 562"T SS SIS COLDLEG Rev. 1 6-18-85 REF 7 .,

rl.. ... '9,. 2 8898 1-4205 '

I 5 2G 9 2~

REF.  :

2-2542 I 25 I

25f 24 Hl2 23

...... 22 9 ~

17 IG> H8 18 10 HS HG 11 12

WESTINGHOUSE ELECTRIC CORPORATION VI R-2-2544

  • 6" SCH 120 .562"T SS SIS COLDLEG Rev. 1 6-18-85 2889<;_ .... ~--- I

,,D'.

"Y..... 7 REF.

1-4305 (p 7

8 11 H2 12 28 f 2G REF. ; 25 2*2542 I H7 I

15 29i_ 24 23 I~

WESTINGHOUSE ELECTRIC CORPORATION VIR-2-2550 Rev. 1 6-18-85 MAINSTEAM DUMP LINE 4" SCH 80 .337"T C.S.

Sketch for Reference only.No examination required.

MS204 7 .,

2MS118

  • --4**s0Hv 104

\

\

\

  • ~;'-\ ,.

/

\

\

, \

3 ~.,' ........

')-' .

VIR-2-2Co00 Rev. 1 6-18-85 PRESSIIRE RETAINrnr, BOLTING VIR TOTAL ITEM LOCAt!ON FLAN(,E IDENTITY STUDS & 'NUTS SIZE 1 2-250() Flange 1 2()S Pt 40N 1. 25 11 2 2-2500 Flange 2 20S & 40N 1. 25 11 3 2-2500 Flanqe 3 20S & 40N 1. 25 11 4 2-2500 Flange 4 2rJS & 4ml l. 25 11 5 2-2511 Flange l 20S &. 4rJN 1 .125 11 6' 2-2511 FE2605 2ns & 40N l .125 11 7 2-2100 Flange 1 l 2S & 24N l .375 11 8 2-2100 Flange 2 l 2S & 24N l .375 11 9 , 2-2100 Fl a_nge 3 . l 2S & 24N l. 375 11 10 2-2100 Flange 4 l 2S & 24N l .375 11 11 2-2100 Flange 5* 8S & 16N 1.1875 11 12 2-2200" Flange 1 l 2S & 24N 1.375 11 13 2-2200 Flange 2 l 2S & 24N l .375 11 14 2-2200 Flange 3 l 2S & 24N l. 375 11 15 2-2200 Flange 4 l 2S & 24N l. 375 11 16 2"'."2200 Flange 5* 8S & 16N 1.1875 11 17 2-2300 Flange l l 2S & 24N l. 375 11 18 2-2300 Flange 2 l 2S & 24N l . 375 11 19 2-2300 Flange 3 l 2S & 24N l. 375 11 20 2-.2300 .Flange 4 l 2S & 24N l. 375 11 21 2-2300 Flange 5* as &16N 1.1875 11

  • Reference only - no examination required .

WESTINGHOUSE ELECTRIC CORPORATION Illustrative Only VI R-2-3100 Rev. 1 6-18-85 RESIDUAL HEAT REMOVAL PUMPS Integrally Welded Support Attachments: 1fot Applicable Component 'Supports: 2 Hydraulic and Base Support Supports - Mechanical and Hydraulic: 2 Hydraulic Bolting: 20 Bolts - 1.125 Diameter 11 Casing Weld: Not Applicable

  • D 2-RH-P-lA 2-RH-P-lB Suction - ~ Discharge Hydraulic Snubber

Base Support

WESTINGHOUSE ELECTRIC CORPORATION Illustrative Only VI R 3110 Rev*. 1 6-18-85 CHARGING PUMPS Integrally Welded Support Attacrrnents: Not Applicable Component Supports: As Applicable Supports - Mechanical and Hydraulic:. Not Applicable Bolting: 32 Bolts - 2.5" Diameter Casing Weld: Not Applicable

  • Note: Number is preceded by pump Designation 2-CH-P-lA 2-CH-P-lB 2-CH-P-lC Base Support 2 Supports Each

Illustrative Only VI R-2-3120 R.(. P LJ MPS I, 2 & 3 Rev. 2 9 / 17 / 86

  • Integ_ra_lly Welded Support Attachments:

II Not Applicable Component Supports: Not Applicable Supports - Mechanical and Hydraulic:

Not Applicable Bolting: 12 - 1.25" Diameter 7.0" Length Casing Weld: Not Applicable 0

Reference:

Centerline of 2" Seal Injection Line D D R.C. PlJ!lp 1 (2-RC-P-lA)

R.C. PlJ!lp 2 (2-RC-P-18)

R.C. Pump 3 (2-RC-P-lC)

NOTE: Component identified by p~mp designator (i.-e. 1--,2-, or 3-) when applicable

VIR-2-4100 Rev. 1 6-18-85 VALVE BONNET BOLTING TOTAL ITEM VALVE NUMBER VIR REFERENCE STUDS & NUTS SIZE 1 30 -TVMS 201A 11 2-2100 24 1 . 75 11 2 30 -NRVMS201A 11 2-2100 8 1 *125 II 3 6 11

- MS205A 2-2100 6 1 .0 II 4- 11 6 - MS202A 2-2100 6 1 .0 11 5 6" - MS203A 2..:2100 6 1 .0 11

-6 611 - MS204A 2-2100 6 1 *0 II 7 4 11 - MS201A* 2-21 no 6 l .0 11 8 14 -2FW10 11 2-2101 20 -.875 11 9 14 11 -2FW12 2-2101 20 .875 11 10 611 - 2MS84 2-2102 16 .750 11 11 611 - 2MS85 2-2102 10 .750 11 12 6." - 2SI 229 2-2103 - 2n .875 11 13 30 11 -TVMS201B 2-2200 24 1. 75 11 14 30 11 -NRVMS2013 2-2200 8 l *125 II 15 611 . -MS2058 2-2200 6 l .0 11 16 611 -MS202B  ?-2200 6 1 . 0 11 17 611 -MS203B 2-2200 6 l .0 II 18 611 -MS2048 2-2200 6 l. Q II 19 4 11 -MS 2'118* 2-2200 6 l .0 II 20 14 11 -2FW41 2-2201 20 .875 11 21 14 11 -2FW43 2-2201 20 .875 11 22 611 -2MS116 2-2202 16 .750 11 23 611 -2MS117 2-2202 10 . 750 11 24 611- 2SI228 2-2203 20 .875 11 25 ,30 11 -TVMS201C 2-2300 24 1. 75 11 26 30 11 -NRVMS201C 2-230() 8 1 . 125 11 27 611 -MS205C 2-2300 6 1. 0 11 28 611 -MS202C 2-2300 6 1 .o II 29 611 -MS203C 2-2300 6 1 .0 II 30 611 -MS204C 2-,.2300 6 1 .0 II 31 4 11

.'..MS201C* 2-2300 6 1 .0 II

VIR-2-4100

. }-"'\

ITEM VALVE NUMBER VALVE BONNET BOLTING VIR REFERENCE Rev. 1 TOTAL 6-18-85 STUDS & NUTS SIZE 32 14" -2FW74 2-2301 20 .875" 33 14 11 -2FW72 2-2301 20 .875" I 34 611 -2MS155 2-2302 16 .750" I

i 35 611 -2MS156 2-2302. 10 .750" I

I j

36 14 11 -2RH2 2-2500 20 .875" 37 14" -2RH8 2-2500 20 .875 11 38 10 11 -2RH20 2-2510

  • 14 - . 625 11 39 10"--2RH15 2-2510 14 .625 11 40 10 11 -2RH5 2-2510 24 .750 11 41 10" -2RH6
  • 2-2510 18 .625 11 42 1O" -2RH12 2-2510 18 .625 11 43 10" -2RH11 2-2510 24 .750 11 44 12" -FCV2605 2-2510 H 1 . O" 45 12 11 -HCV2758 2-2510 16 l *0 II 46 6 -2RH29 11 2-2511 16 . 5" 47 10" 720A 2-2520 16 l . 625 11 48 10" -2RH19 2-2521 14 . 75" 49 10"- 2RH24 2-2521 14 . 75 11 50 l 011 890C 2-2522 16 1 .625 11 51 l O" 890A 2-2540 16 1 .625 11 52 10 11 8908 2""2540 16 l .625"
  • Reference only - No Examinations Required

Attachment 3 Surry Unit 1 Listing of Welds/Components Subject to Examination

Surry Unit 1 First Period Inspection Plan

SURRY UNIT 1 PERIOD 1 ITEM 1 VPA-1-1100 01 Examine from UT-AUT/Bl.30 40.35 Degrees through 65.17 Degrees and from 139.66 Degrees through 195.52 Degrees and from 238.97 Degrees through 313.45 Degrees and from 344.49 Degrees through 9.30 Degrees.

2 VPA-1-llOOA 10 UT-AUT/B3.90 3 VPA-1-llOOA lONIR UT-AUT/B3.100 4 VPA-1-llOOA 12 UT-AUT/B3.90 5 VPA-1-llOOA 12NIR UT-AUT/B3.100 6 VPA-1-llOOA 14 UT-AUT/B3.90 7 VPA-1-llOOA 14NIR UT-AUT/B3.100 8 VPA-1-llOOA Threads in Flange UT-AUT/136.40 Examine around stud holes 8 throug~ 11 and around stud holes 24 through 32 and around stud holes 40 through 51 and around stud holes 57 through 2.

9 VPA-1-1200 01 VT-3/Bl3.10 RV Interior, all accessible areas, Examine all areas maqe accessible du~ing normal refueling.

10 VPA-1-1300A 01 UT, MT/Bl. 4-0 Examine from 0 11 through 179 11 11 VPA-1-1400 CCW21-CCW40 VT-1/B6.50 12 *vPA-1-1400 CVW21-CVW40 VT-1/B6.50 13 VPA-1-1400 N21-N40 MT/B6.10 14 VPA-1-1400 S21-S40 UT,MT/B6.30 15 VPA-1-2100 07 Examine 0 11 to 97 11 U_T/B2 .11 16 VPA-1-2100 08 Examine 276" to 83" UT/B2 .11 17 VPA-1-2100 09 Examine 0 11 to 4 11 UT/B2.12 18 VPA-1-2100 15 Examine 24 11 to 36" UT/B2.12

  • Page 1 Revision O September 15, 1988

SURRY UNIT 1 PERIOD *1

  • ITEM 19 20 VPA-1-2100 VPA-1-2100 16 Examine O" to 97" 21NIR (RELIEF REQUEST)

MT/BS.20 VT-1/B3.120 21 VPA-1-2100 22NIR (RELIEF REQUEST). VT-1/B3.120 22 VPA-1-2100 BOLTING (Manway Bolting) VT-1/B7. 20 23 VPA-1-3100 1-01 UT/B2. 40 24 VPA-1-3100 lANIR (RELIEF REQUEST) VT-1/B3.140 25 VPA-1-3100 lBNIR (RELIEF RE9UEST) VT-1/B3.140 26 VPA-1-3100 A-BOLTS (Manway Bolting) VT-1/B7.30 27 VPA-1-4100 01DM (Relief Request) UT-AUT/B5.10 28 VPA-1-4100 04 UT,PT/B9.11 29 VPA-1-4100 05DM UT,PT/B5.30 30 VPA-1-4100 *11 UT,PT/B9.11 31 VPA-1-4100 12 UT,PT/B9.11 32 VPA-1-4100 14 UT,PT/B9.11 33 VPA-1-4101 10 UT,PT/B9.11 34 VPA-1._4102 10 UT,PT/B9.11 35 VPA-1-4103 05 UT,PT/B9.11 36 VPA-1-4105 13 UT,PT/B9.11 37 VPA-1-4106 10 PT/B9.21 38 VPA-1-4106 11 PT/B9. 21 39 VPA-1-4107 09 PT/B9. 40 40 VPA-1-4109 02 PT/B9.40 41 VPA-1-4109 03 PT/B9. 40 42 VPA-1-4109 16 PT/B9. 40 Page 2 - Revision O September 15, 1988

SURRY UNIT 1 PERIOD 1 ITEM 43 VPA-1-4109 17 PT/B9. 40 44 VPA-1-4110 22 PT/B9. 40 45 VPA-1-4110 23 PT/B9.40 46 VPA-1-4110 24 PT/B9. 40 47 VPA-1-4110 25 PT/B9. 40 48 VPA-1-4110 26 PT/B9.40 49 VPA-1-4111 08 PT/B9.40 50 VPA-1-4112 12 PT/B9.40 51 VPA-1-4112 13 PT/B9. 40 52 VPA-1-4113 14 PT/B9. 40 53 VPA-1-4113 24 PT/B9.40 54 VPA-1-4200 01DM (Relief Request)* UT-AUT/B5.10 55 VPA-1-4201 10 UT,PT/B9.11 56 VPA-1-4203 05 UT,PT/B9.11 57 VPA-1-4204 10 UT,PT/B9.11 58 VPA-1-4205 05 UT,PT/B9.11 59

  • VPA-1-4206 07 PT/B9.21 60 VPA-1-4206 08 PT/B9.21 61 VPA-1-4206 12 PT/B9.21 62 VPA-1-4207 08 PT/B9. 21 63 VPA-1-4207 09 PT/B9. 21 64 VPA-1-4208 *23 PT/B9 .40 65 VPA-1-4208 -24 PT/B9. 40 66 VPA-1-4209 14 PT/B9. 40 Page 3 Revision O September 15, 1988

SURRY UNIT 1 PERIOD 1 ITEM 67 VPA-1-4209 15 PT/139. 40 68 VPA-1-4210 21 PT/B9. 40 69 VPA-l;..4210 23 PT/B9.40 70 VPA-1-4210 24 PT/B9.40 71 VPA-1-4210 25 PT/B9 ~ 40 72 VPA-1-4212 12 PT/B9.40 73 VPA-1-4212 13 PT/B9. 40 74 VPA-1-4213 12 PT/B9. 40 75 VPA-1-4213 13 PT/B9. 40 76 VPA-1-4300 01DM (Relief Request) UT-AUT/B5.10 77 VPA-1-4300 04 UT,PT/B9.11 78 VPA-1-4300 06DM UT,PT/B5.30 79 VPA-1-4300 11 UT,PT/B9.11 80 VPA-1-4300 12 UT,PT/B9.11 81 VPA-1-4301 05 UT,PT/B9.11 82 VPA-1-4301 16 UT, PT/B9 .11 83 VPA-1-4303 05 UT,PT/B9.11 84 VPA-1-4304 10 UT,PT/B9.ll 85 VPA-1-4305 03 UT,PT/B9.ll 86 .VPA-1-4305 10 PT/B9. 40 87 VPA-1-4306 09 PT/B9. 21 88 VPA-1-4307 24 PT/B9 .40 89 VPA-1-4307 25 PT/B9. 40 90 VPA-1-4307 26 PT/B9. 40

  • Page 4 *Revision 0 September 15, 1988

SURRY UNIT 1 PERIOD 1

  • ITEM 91 92 VPA-1-4309 VPA-1-4309 09 10 PT/B9. 40 PT/B9.40 93 VPA-1-4309 11 PT/B9.40 94 VPA-1-4309 12 PT/B9.40 95 VPA ... 1-4309 13 PT/B9.40 96 VPA-1-4309 14 PT/B9.40 97 VPA-1-4310 08 .PT/B9.40 98 VPA-1-4312 10 PT/B9. 40 99 VPA-1-4312 11 PT/B9. 40 100 VPA-1-4312 23 PT/B9. 40 101 VPA-1-4500 01DM UT,PT/B5.20 102 VPA-1-4501 01DM UT,PT/B5.20 103 VPA-1-4501 08 UT,PT/B9.11 104 VPA-1-4503 08 UT,PT/B9.11 105 VPA-1-4506 08 PT/B9. 21 106 VPA-1-4507 04 PT/B9.40 107 VPA-1-4507 05 PT/B9.40 108 VPA-1-4650 07 PT/CS.11 109 VPA-1-4652 11 PT/C5.1.1 I

I 110 VPA-1-4700 01 VT-1/B7.50 '

111 VPA-1-4700 02 VT-1/B7.50 112 VPA-1-4700 11 VT-1/B7.50 113 VPA-1-4700 13 VT-1/B7.50 114 VPA-1-4700 14 VT-1/B7.50 Page 5 Revision O September 15., 1988

SURRY UNIT 1 PERIOD 1 ITEM 115 VPA-1-4700 18 VT-1/B7.50 116 VPA-1-5100A FLGBLTS (Loop 2 Main Flange UT/B6.180 Bolting) 117 VPA-1-5100B 1-SCOl PT/Bl0.20 118 VPA-1-5100B 3-SC02 PT/BlO. 20 119 VPA-1-5100B 3-SC03 PT/BlO. 20 120 VPA-1-6100 05 (MOV-1594 Bolting)

  • UT/B6. 210 121 VPA-1-6100 06 (MOV-1595 Bolting) UT/B6. 210 122 VPA-1-6300 55 VT-1/B7.70 123 VPA-1-6300 57 VT-1/B7.70 124 VPA-1-6300 59 VT-1/B7.70 125 VPA-1-6300 73 VT-1/B7.70 126 VPA-1-6300 81 VT-1/B7.70
  • 127 128 129 VPA-1-6300 VPA-1-6300 VPA-1-6300 82 83 85 VT-1/B7. 70 VT-1/B7. 70 VT-1/B7.70 130 VPA-1-6300 91 VT-l/B7.70 131 VPA-2-1100 3-02 Examine O" to 142 11 UT/Cl. 30 132 VPA-2-1100 3-03 Examine O" to 142 11 UT/Cl.10 133 VPA-2-1100 3-05 Examine O" to 142 11 UT/Cl.10 134 VPA-2-1100 3-06 Examine O" to 185 11 UT/Cl.10 135 VPA-2-1100 3-08 Examine O" to 185 11 UT/Cl. 20 136 VPA;...2-1100 3-09* UT,MT/C2.21 137 VPA-2-1100 3-09NIR (RELIEF REQUEST) VT-l/C2.22 138 VPA-2-1100 3-10 Examine 56 11 to 104" UT,MT/C2.21
  • Page 6 Revision 0 September 15, 1988

SURRY UNIT 1 PERIOD 1 ITEM 139 VPA-2-1110 01 Examine Q II to 10 11 UT/Cl.20 140 VPA-2-1110 02 Examine Q II to 10 11 UT/Cl.10 141 VPA-2-1120 A-02 Examine 0 11 to 22 11 UT/Cl.10 142 VPA-2-1120 B-WS01 PT/C3.10 143 VPA-2-1120 .* B-01 Examine 0 11 to 44 11 UT/Cl.10 144 VPA-2-1120 B-02 Examine 22 11 to 44 11 UT/Cl.10 145 VPA-2-1150 04 Examine 19 11 to 24 11 UT/Cl.20 146 VPA-2-1150 10 Examine 19 11 to 24 11 UT/Cl. 20 147 VPA-2-1150 11 Examine 19 11 to 24 II UT/Cl.JO 148 VPA-2-1150 12 Examine 19" to 24 11 UT/Cl. 30 149 VPA-2-1300 4A-Ol Examine 111 to 12 11 UT/Cl.10 150 VPA-2-1300 4B-02 Examine 111 to 12 11 UT/Cl.20 151 VPA-2-2100 16 PT/C5.ll 152 VPA-2-2100 31 UT,PT/C5.21 153 VPA-2-2100 H06 MT/CJ.40 154 VPA-2-2100 H02 MT/C3.40 155 VPA-2-2101 21 UT,PT/C5.21 156 VPA-.2-2102 08 PT/C5.ll 157 VPA-2-2200 13 UT,PT/C5.21 158 VPA-2-2200 31 UT,PT/C5.21 159 VPA-2-2202 07 PT/C5.11 160 VPA-2-2202 HOl MT/C3.40 161 VPA-2-2202 H02 MT/C3~40 162 VPA-2-2203 05 UT,PT/C5.21

  • Page 7 Revision 0 September 15, 1988

SURRY UNIT 1 PERIOD 1

  • ITEM 163 164 VPA-2-2203 VPA-2-2500 06 27 UT,PT/C5.21 PT/C5.11 165 VPA-2-2510 02 PT/C5.11 166 VPA-2-2510 11 PT/C5.ll 167 VPA-2-2510 20 PT/C5.11 168 VPA-2-2510 21 PT/C5.11 169 VPA-2-2510 22 PT/CS.11 170 VPA-2-2511 15 PT/CS.11 171 VPA-2-2520 10 UT,PT/CS.21 172 VPA-2-2540 06 PT/CS.11 173 VPA-2-2542 01 UT, PT/CS. 21 174 VPA-2-2542 02 UT,PT/CS.21 175 VPA-2-2542 03 UT,PT/CS.21
  • Page 8 Revision O September 15, 1988

Surry Unit 1 First Period Integral Attachment Inspection Plan

SURRY UNIT 1 PERIOD 1 INTEGRAL ATTACHMENTS

  • Item 1

2

~KS-0100Dl, H-03, SHPl-601, FP-202AD~ PSSK-100D13 MKS-0100Dl, H-04, SHPl-601, FP-202AE, PSSK-100D SURF .. /B-K-1 VT-3/IWF SURF./B-K-1 VT-3/IWF 3 MKS-0100Dl, H-05, SHPl-601, SURF./B-K-1 FP-202AE, PSSK-100D15 VT-3/IWF 4 MKS-0100Dl, H-06, SHPl-601, SURF./B-K-1 FP-202AE, PSSK-100D VT-3/IWF 5 MKS-0100Dl, H-07, SHPl-601, SURF./B-K-1 FP-202AE, PSSK-100D17 VT-3/IWF 6 MKS-0100Dl, H-08, SHPl-601, SURF./B-K-1 FP-202AB, PSSK-100D VT-3/IWF 7 MKS-0100Dl, H-09, SHPl-601, SURF./B-K..;.1 FP-202AB, PSSK-100D19 VT-3/IWF 8 MKS-OlOOGl, H-03, WFPD17-601, SURF./B-K-1 FP-202AA, PSSK-100G13 VT-3/IWF 9 MKS-OlOOGl, H-04, WFPD17-601, SURF./B-K-1 FP-202AA, PSSK-lOOG VT-3/IWF 10 MKS-OlOOGl, H-05, WFPD17-601, SURF./B-K-1 FP-202AB, PSSK-lOOG VT-3/IWF 11 MKS:-OlOOGl, H-06, WFPD17-601, SURF./B-K-1 FP-202AB, PSSK-100G16 VT-3/IWF 12 MKS-OlOOGl, H-07, WFPD17-601, SURF./B-K-1 FP-202AB, PSSK-lOOG VT-3/IWF 13 MKS-OlOOGl, H-08 ' WFPD17-601, SURF./B-K-1 FP-202AB, PSSK-100G18 VT-3/IWF 14 MKS-OlOOGl, H-11, WFPD17-601, SURF./B-K-1 FP-202AB, PSSK-lOOGlll VT-3/IWF 15 MKS-0101Dl, H-03, SHP2-601, SURF./B-K-1 FP-202AC, PSSK-101D VT-3/IWF Page 1 Revision.a September 15, 1988

SURRY UNIT 1 PERIOD 1 INTEGRAL ATTACHMENTS (CONT'D)

  • Item 16 MKS-0101Dl, H-04, SHP2-601, FP-2002AC, PSSK-101D14 SURF./B-K-1 VT-3/IWF 17 MKS-0101Gl, H-02, WFPD13-601, SURF./B-K-1 PSSK-101G12 VT-3/IWF 18 MKS-0101Gl, H-03, WFPD13-601, SURF./B:...K.;....1 FP-202AC, PSSK-101G13 VT-3/IWF 19 MKS-0101Gl, H-05, WFPD13-601, SURF./B-K-1 FP-202AC, PSSK-101G15 VT-3/IWF 20 MKS-0102Dl, H-01, SHP3-601, SURF./B-K-1 FP-202AB, PSSK-102Dll VT-3/IWF 21 MKS-0102Dl, H-02, SHP3-601, SURF./B-K-1 FP-202AB, PSSK-102D12 VT-3/IWF 22 MKS--0102Gl, H-03, WFPD9-601, SURF./B-K-1 FP-202AB, PSSK-102G13 VT-3/IWF 23 MKS-0102Gl, H-05, WFPD9-601, SURF./B-K-1 FP-202AB, PSSK-102G15 VT-3/IWF
  • 24 25 MKS-0102Gl, H-06, WFPD9-601 FP-202AB, PSSK-102G MKS-0103Al, H-01, SHP24-601, FP-247F, PSSK-103All SURF./B-K-1 VT-3/IWF SURF./B-K-1 VT-3/IWF 26 MKS-0103Al, H-02, SHP24-601, SURF./B-K-1 PSSK-103A12 VT-3/IWF 27 MKS-0103Al, H-03, SHPl-601, SURF./B-K-1 FP-247F, PSSK-103A13 VT-3/IWF 28 MKS-0103Al, H-04, SHPJ-601, SURF./B-K-1 FP-247F, PSSK-103A14 VT-3/IWF 29 MKS-OlOJAl, H-05, SHP2-601, SURF./B-K-1 FP-247F, PSSK-103A15 VT-3/IWF 30 MKS-0103A2, H-01, SHP24-601, SURF./B-K-1 FP247F, PSSK-103A21 VT-3/IWF 31 MKS-0103A2, H-02, SHP24-601, SURF./B-K-1 FP247G, PSSK-103A22 VT-3/IWF Page 2 Revision O September 15, 1988.

SURRY UNIT 1 PERIOD 1 INTEGRAL ATTACHMENTS (CONT'D)

Item 32 MKS'""'.0103A2, H38, SHP22-601, SURF./B-K-1 FP-247G, PSSK-103A238 VT-3/IWF 33 MKS-0103A2, H39, SHP22-601, SURF./B-K-1 FP-247F, PSSK-103A239 VT-3/IWF 34 MKS-'0103A2, H40, SHP23-601, SURF./B-K-1 FP-247G, PSSK-103A240 VT-3/IWF 35 MKS-0103A2, H41, SHP23-601, SURF./B-K-1 FP-247F, PSSK-103A241 VT-3/IWF 36 MKS-0103A2, H42, SHP45-601, SURF./B-K-1 FP-247G, PSSK-103A242 VT-3/IWF 37 MKS-0103A2, H43, SHP45-601, SURF./B-K-1 PSSK-103A243 VT-3/IWF 38 . MKS.-0103A2, H44, SHP47-601, SURF./B-K-1 PSSK-103A244 VT-3/IWF 39 MKS-0103A2, H45, SHP47-601, SURF./B-K-1 FP-247G, PSSK-103A245 VT-3/IWF

  • 40 41 MKS-0103A2, H46, SHP46-601,.

FP-247G, PSSK-103A246 MKS-0103A2, H47, SHP46-601, PSSK-103A247 SURF./B-K-1 VT-3/IWF SURF./B-K-1 VT-3/IWF 42 MKS-0103A2, H75, SAEl-121, SURF./B-K-1 FP-247G, PSSK-103A275 VT-3/IWF 43 MKS-0103A2, H76, SAE2-121, SURF./B-K-1 FP-247G, PSSK-103A276 VT-3/IWF 44 MKS-0103A2, H77, SAE3-121, SURF./B-K-1 FP-247G, PSSK-103A277

  • VT-3/IWF 45 MKS-0103A2, H79, SAE38-121, SURF./B-K-1 FP-247G, PSSK-103A279 VT-3/IWF 46 MKS-Ol03A2, H81, SAE39:-.121

. I SURF./B-K:...1 FP-247G, PSSK-103A281 VT-3/IWF Page 3 Revision o September 15, 1988

SURRY UNIT 1 PERIOD 1 INTEGRAL ATTACHMENTS (CONT'D)

  • Item 47 MKS-0103A2, H83, SAE37-121, FP-247G, PSSK-103A283 SURF./B-K-1 VT-3/IWF 48 MKS-0103A2, H84, SHP45-601, SURF./B-K-1 FP".'"247G, PSSK-103A VT-3/IWF 49 MKS-0103A2, H85, SHP47-601, SURF./B-K-1 PSSK-103A VT-3/IWF 50 MKS-0103A2, H86, SHP46-601, SURF./B-K-1 FP-247G, PSSK-103A VT-3/IWF 51 MKS-0112AA1, H02, CCl0-121, SURF./C-C FP-202Q, PSSK-112A VT-3/IWF 52 MKS-0112AA1, HOG, CCl0-121, SURF./C-C FP-202A, PSSK-112AA16 VT-3/IWF 53 MKS-0112AA1,- HlO, CCl0-121, SURF./C-C FP-202R, PSSK-112AA10 VT-3/IWF 54 MKS-0112AA1, H12, CCl0-121, SURF./C".'"C FP-202A, PSSK-112AA12 VT-3/IWF 55 MKS-0112AA1, H14, CC17-121, SURF./C-C FP-202A, PSSK-112AA114 VT-3/IWF 56 MKS-0112AA1, H16, CC17-121, SURF./C-C PSSK-112AA116 VT-3/IWF 57 MKS-0112AA1, H20, CC17-121, SURF./C-C FP-202R, PSSK-112AA120 VT-3/IWF 58 MKS-0112AA1, H21, CCl0-121, SURF./C-C FP-202G, PSSK-112AA121 VT-3/IWF 59 MKS-0112AB1, H04, CC17-121, SURF./C-C PSSK-112AB14 VT-3/IWF 60 MKS-0112AB1, HOS, CClS-121, SURF./C".'"C PSSK-112AB15 VT-3/IWF 61 MKS-0112AE1, HOl_, CC7-121, - SURF./C-C FP-206N, PSSK-112AE11 VT-3/IWF Page 4 Revision O September 15, 1988_

SURRY UNIT 1 PERIOD 1 INTEGRAL ATTACHMENTS (CONT'D)

Item 62 MKS-0112AE1, H-06, CC226-121,* SURF./C-C PSSK-112AE16 VT-3/IWF 63 MKS-0112AE2, H-01, CC7-121, SURF./C-C PSSK-112AE21 VT-3/IWF 64 MKS-0112AE2, H16, CC169-121, SURF./C-C FP-206P, PSSK-112AE216 VT-3/IWF 65 MKS-0112AE2, H17, CC169-121, SURF./C-C FP-206D, PSSK-112AE217 VT-3/IWF 66 MKS-0112AE2, _H18, CC177-151, SURF./C-C FP206D, PSSK-112AE218 VT-3/IWF 67 MKS-0112AE2, H19, CC177-151, SURF./C-C FP-206D, PSSK-112AE219 VT-3/IWF 68 MKS-0_112AH1, H03, CC7-121, SURF./C-C PSSK-112AH13 VT-3/IWF 69 MKS-0112AH2, HOB, CC153-151, SURF./C-C FP-206D, PSSK-112A VT-3/IWF

  • 70 71 MKS-0112AH2, H09, CC153-151, FP-206D, PSSK-112AH29 MKS-0112AH2, HlO, CC153-151, FP-206P, PSSK-112AH210 SURF./C-C VT-3/IWF SURF./C-C VT-3/IWF 72 MKS-0112AH2, H14, CC161-121, SURF./C-C FP-206D, PSSK-112AH214 VT-3/IWF 7,3
  • MKS-0112AH2, Hl6, CC158-151, SURF./C-C FP-206D, PSSK-112AH216 VT-3/IWF 74 MKS-0112AH2, H17, CC158-151, SURF./C-C FP-206P, PSSK-112AH217 VT-3/IWF 75 MKS-0112AJ1, HOl, CC14-121, SURF./C-C FP-206N, PSSK-112A VT-3/IWF 76 MKS-0112AJ1, H02, CC14-121, SURF./C-C FP-206C, PSSK-112AJ12 VT-3/IWF 77 MKS-0112AJ1, H04, CC14-121, SURF./C-C*

FP-206C, PSSK-112AJ14

  • VT-3/IWF Page 5_ Revision O September 15, 1988

SURRY UNIT 1 PERIOD 1 INTEGRAL ATTACHMENTS (CONT'D)

Item 78 MKS-0112AJ1, H05, CC156-151, SURF./C-C FP-206C, PSSK-112AJ15 VT-3/IWF 79 MKS-0112AJ1, H06, CC156-151, SURF./C-C FP-206D, PSSK-112AJ16 VT-3/IWF 80 MKS-0112AJ1, H22, CC156-151, SURF./C-C FP-206D, PSSK-112AJ122 VT-3/IWF 81 MKS-0112AJ1, H24, CC160-151, SURF./C-C FP-206D, PSSK-112AJ124 VT-3/IWF 82 MKS-0112AJ1, H26, CC159-151, SURF./C-C PSSK-112AJ126 VT-3/IWF 83 MKS-Oll2AJ1, H27, CC149-151, SURF./C-C FP-206D, PSSK-112AJ127 VT-3/IWF 84 MKS-0112AJ1, H29, CC149-151, SURF./C-C FP-206N, PSSK-112AJ129 VT-3/IWF 85 MKS-0112AJ2, "H07, CC14-151, s*uRF./C-C FP-206N, PSSK-112AJ27 VT-3/IWF

  • 86 87 MKS-0112AJ2, Hll, CClSl-151, FP-206D, PSSK-112AJ211 MKS-0112AJ2, H12~ CClSl-151, FP-206D, PSSK-112AJ212 SURF./C-C VT-3/IWF SURF./C-C VT-3/IWF 88 MKS-0112AJ2, H13, CC173-151, SURF./C-C FP-206D, PSSK-112AJ213 VT-3/IWF 89 MKS-0112AJ2, H14, CC173-151, SURF./C-C FP-206D, PSSK...:112AJ214 VT-3/IWF 90 MKS-0112AJ2, H16, CC165-151, SURF./C-C FP-206D, PSSK-112AJ216 VT-3/IWF 91 MKS-0112AJ2

- I H17, CC165-151, SURF./C-C FP-206D, PSSK-112AJ217 VT-3/IWF 92 MKS-0112AJ2, H26, CC159-151, SURF./C-C FP-206T, PSSK..:112AJ226 VT-3/IWF 93 MKS-0112AJ2, H30, CC159-151, SURF./C-C FP-206D, PSSK-112AJ230 VT-3/IWF Page 6 Revision O. September 15, 1988

SURRY UNIT 1 PERIOD 1 INTEGRAL ATTACHMENTS (CONT ID)

  • Item

.94 MKS-0112AJ2, H31, CC159-151, FP-206D, PSSK-112AJ231 SURF./C-C VT-3/IWF 95 MKS-0112AK1, H-01, CC14-121, SURF./C-C PSSK-112AK11 VT~3/IWF 96 MKS-0112AK1, H-03, CC14-121, SURF./C-C PSSK-112AK13 VT-3/IWF 97 MKS-0112AK1, H-04, CC72-121, SURF./C-C FP-206C, PSSK-112AK14 VT-3/IWF 98 MKS-0112AK1, H-05, CC72-121, SURF./c~c FP-206C, PSSK-112AK15 VT-3/IWF 99 MKS-0112AK1, H-06, CC72-121, SURF./C-C FP-206J, PSSK-112AK16 VT-3/IWF 100 MKS-0112AK1, H-09, CC72-121, SURF./C-C PSSK-112AK19 VT-3/IWF 101 MKS-0112AK1, Hl2, CC148-151, SURF./C-C FP-206V, PSSK-112AK112 VT-3/IWF 102 MKS-0112AK1, H16, CC146-151, SURF./C-C FP-206V, PSSK-112AK116 VT-3/IW;F 103 MKS-0112AL1, H-01, CC143-151, SURF./C-C PSSK-112AL11 VT-3/IWF 104 MKS-0112AL1, H-04, CC143-151, SURF./C-C FP-206J, PSSK:...112AL14 VT-3/IWF 105 MKS-0112AN1, H-01, CClS-121, SURF./C-C FP-206D, PSSK-112AN11 VT-3/IWF 106 MKS-0112AN1, H-02, CC15-121, .SURF./C-C PSSK-112AN12 VT-3/IWF 107 MKS-0112AN1, H-05, CClS-121, SURF./C-C FP-206N, PSSK-112AN15 VT-3/IWF 108 MKS-0112AN1, H-07., CClS-121, SURF./C-C FP-206Q, PSSK-112AN17 VT-3/IWF 109 MKS-0112AN1, H-08, CClS:-121, SURF./C-C PSSK-112AN18 VT-3/IWF Page 7 Revision o September 15, 1988

SURRY UNIT 1 PERIOD 1 INTEGRAL ATTACHMENTS (CONT'D)

Item 110 MK:S-0112AR1, H-01, CC69-151, SURF./C-C FP-207A, PSSK-112AR11 VT-3/IWF 111 MKS-0112AR1, H-04, CC67-121, SURF./C-C FP-207A, PSSK-112AR14 VT-3/IWF 112 MKS-0112AR1, Hll, CC473-151, SURF./C-C FP-206Y, *PSSK-112A VT-3/IWF 113 MKS-0112AR2, H13, CC67-121, SURF./C-C FP-206H, PSSK-112AR213 VT-3/IWF 114 MKS-0112AR2, H16, CC143-121, SURF./C-C FP-206H, PSSK-112AR216 VT-3/IWF 115 MKS-0112Bl, H-04, CC225-121, SURF./C-C FP-203C, PSSK-112Bl4 VT-3/IWF 116 MKS-0112Cl, H-02, CC227-121, SURF./C-C FP-203C PSSK-112C VT-3/IWF 117 MKS-0112Cl, H-03, .* cc221~121, SURF./C-C FP-203C PSSK-112Cl3 VT-3/IWF 118 MKS-0112Cl, H-04, cc221-121., SURF./C-C FP-203C PSSK-112C14 VT-3/IWF 119 MKS-0112Cl, H-07, CC227-121, SURF./C-C FP-203C PSSK-112C VT-3/IWF 120 MKS-0112Cl, H-08, CC227-121, SURF./C-C FP-203C PSSK-112C18 . VT-3/IWF 121 MKS-0112Cl, H-09, CC228-121, SURF./C-C FP-203C PSSK-112C19 VT-3/IWF 122 MKS-0112Cl, HlO, CC228-121, SURF./C-C FP-203C, PSSK-112Cll0 VT-3/IWF 123 MKS-0112Cl, Hll, cc22s~121, SURF./C-C FP-203C PSSK~l12Clll VT-3/IWF 124 MKS-0112Cl, H15, CC229-121, SURF./C-C FP-203C, PSSK-112C115 VT-3/IWF 125 MKS-0117Al, H-01, RHl-1502, SURF./B-K-1 FP-202Q, PSSK-117All VT-3/IWF Pages* Revision O September 15, 1988

SURRY UNIT 1 PERIOD 1 INTEGRAL ATTACHMENTS {CONT'D)

Item 126 MKS-0117A1, H-02, RHl-1502, SURF./B-K-1 FP-202Q, PSSK-117A12 VT-3/IWF 127 MKS-0117A1, H-03, RHl-1502, SURF./B-K-1 FP-202A, PSSK-117A12 VT-3/IWF 128 MKS-0117A1, H-04, RH18-602, SURF./B-K-1 FP-202L, PSSK-117A14 VT-3/IWF 129 MKS-0117Al, H-07, RH18-602, SURF./C-C FP-202A, PSSK-117A17 VT-3/IWF 130 MKS-0117Al, H-08, RH18-602, SURF./C-C FP-202A-, PSSK-117A18 VT-3/IWF 131 MKS-0117Al, Hll, RH18-602, SURF./C-C FP-202G, PSSK-117A VT-3/IWF 132 MKS-0117Al, H12, RH4.:...6Q2, SURF./C-C FP-202G, PSSK-117A112 VT-3/IWF 133 MKS-0117Al, H15, RHS-602, SURF./C-C

_FP-202Q, PSSK-117A115 VT-3/IWF 134 MKS-0117Al, H16, RHS-602, - SURF~/C-C FP-202Q, PSSK-117A116 VT-3/IWF 135 MKS-0117Al, H17, RH5-602, SURF./C-C FP-202G, PSSK-117All7 VT-3/IWF 136 MKS-0117Al, Hl8, RH2-602, SURF./C-C FP-202G, PSSK-117All8 VT ... 3/IWF 137 MKS-0117Al, Hl9, RH2-603, SURF./C-C FP-202G, PSSK-117All9 VT-3/IWF 138 MKS-0117A2, H22, RH19-602, SURF./C-C FP-202B, PSSK-117A222 VT-3/IWF 139 MKS-0117A2, H26, RHl0-602, SURF./C-C FP-202G, PSSK-117A226 VT-3/IWF 140 MKS-0117A2, H27, RHl0-602, SURF./C-C FP-202G, PSSK-117A VT-3/IWF 141 MKS-0117A2, H28, RH7-602, SURF./C-C

-FP-202Q, PSSK-117A228 VT-3/IWF Page 9 Revision o September 15, 1988

SURRY UNIT 1 PERIOD 1 INTEGRAL ATTACHMENTS (CONT'D)

Item 142 MKS-0117A2, H31, RH12-602, SURF./C-C pp:..202Q, PSSK-117A231 VT-3/IWF 143 MKS-Oi17A2, H32, RH12-602, SURF./C-C FP-202G, PSSK-117A232 VT-3/IWF 144 MKS-0117A2, H33, RH9-602, SURF./C-C FP-202G, PSSK-117A233 VT-3/IWF 145 MKS-0117A2, H34, RH8-602, SURF./C-C FP-202G, PSSK-117A234 VT-3/IWF 146 MKS-0122Al, H-06, RH16-1502, SURF./B-K-1 FP-202B, PSSK-122A16 VT-3/IWF 147 MKS-0122Al, H12, RH16-1502, SURF./B-K-1 PSSK-122A112 VT-3/IWF 148 MKS-0122A2, H33, SI47-1502, SURF./B-K-1

  • FP-202B, PSSK-122A VT-3/IWF 149 MKS-0122A2, H34, SI47-1502, ~URF./B-K-1 FP-202B, PSSK-122A234 VT-3/IWF
    • 150 151 MKS-0122A2, H35, SI47-1502, FP-202B, PSSK-122A235 MKS-0122A2, H36, SI47-l502, FP-202B, PSSK-122A236 SURF./B-K-1 VT-3/IWF SURF./C-C VT-3/IWF 152 MKS-012201, H02, SI46-1502, SURF./B-K-1 FP-202W, PSSK-1220 VT-3/IWF 153 MKS-012201, H03, SI46-1502, SURF./B-K-1 FP-202S, PSSK-122013 VT-3/IWF 154 MKS-012201, H05, 5!46-:-1502, SURF./B-K-1 FP-202P-, PSSK-122015 VT-3/IWF 155 MKS-012201, HOG, SI46-1502, SURF./B-K-1 FP-202C, PSSK-1220 VT-3/IWF 156 MKS-012201, H07, 5!46-1502, SURF./B-K-1 FP-202C, PSSK-122017* VT-3/IWF 157 MKS-012201, HOS, 5!46-1502, SURF./B-K-1 FP-202C, PSSK-122018 VT-3/IWF Page 10 Revision o September 15, 1988

SURRY UNIT 1 PERIOD 1 INTEGRAL ATTACHMENTS (CONT'D)

Item 158 MKS-0122Dl, H09, SI46-1502, SURF./C-C FP-202C, PSSK-122D19 VT-3/IWF 159 'MKS-0122Dl, H14, RH16-1502, SURF./B-K-1 FP-202C, PSSK-122D114 VT-3/IWF 160 MKS-0122Li, HOG, SI45-1502, SURF./B-K-1 FP-202A, PSSK-122L16 VT-3/IWF 161 MKS-0122Ll, H07, SI45-1502, *suRF./B-K-1 FP-202A, PSSK-122L17 VT-3/IWF 162 MKS-0122Ll, HOS, SI45-1502, SURF./B-K-1 FP-202A, PSSK-117L18 VT-3/IWF 163 VPA-1-4107, HOl, 2"-CH-5 SURF./B-K-1 VT-3/IWF 164 VPA-1-4110, HOl, 2 1-'-RC-53 *sURF./B-K-1 VT-3/IWF 165 VPA-1-4211, H02, 2 11 -CH-9 SURF./B-K-1 VT-3/IWF

  • 166 167 VPA-1-4309, HOl, 2 11 -RC-59 VPA-1-4309, H02, 2 11 -RC-59 SURF./B-K-1 VT-3/IWF SURF./B-K-1 VT-3/IWF

.168 VPA~l-4600, HOl, 2"-RC-53 SURF./B-K-1 VT-3/IWF 169 VPA-1-4600, H02, 2"-RC-53 SURF./B-K-1 VT-3/IWF 170 VPA-1-4600, H03, 2 11 -RC-53 SURF./B-K-1 VT-3/IWF 171 VPA-1-4600, H04, 2"-RC-53 SURF./B-K-1 VT-3/IWF 172 VPA-1-4600, HOS, 2"-RC-53 SURF./B-K-1 VT-3/IWF 173 VPA-1-4105, HOl, 6".-SI-145 SURF./B-K-1 VT-3/IWF Page 11 Revision o September 15, 1988

SURRY UNIT 1 PERIOD 1 INTEGRAL ATTACHMENTS (CONT'D)

  • Item 174 175 VPA-1-4500, HOl, 12 11 -RC-10 VPA-1-4500, H02, 12 11 -RC,...10 SURF./B-K-1 VT-3/IWF SURF./B-K-1 VT-3/IWF 176 VPA-1-4500, H03, 12 11 -RC-10 SURF./B-K-1 VT-3/IWF 177 VPA-1-2100, 16 SURF./B-K-1 Pressurizer Skirt weld VT-3/IWF Examine from O" thru 97".

178 VPA-1-5100B, 1SC SURF./B-K-1 A Reactor Coolant Pump VT-3/IWF 179 VPA-1-5100B, 2SC. SURF./B-K-1 C Reactor Coolant Pump VT-3/IWF 180 VPA-1-5100B, 3SC SURF./B-K-:-1 c Reactor Coolant Pump VT-3/IWF 181 VPA-2-1120, WS01 SURF./C-C Residual Heat Exchanger lB VT-3/IWF 182 VPA-2-:-2100, H-02 SURF./C-C 30 11 -SHP-1 VT-3/IWF 183 VPA-2-2100, H-06 SURF./C-C 30 11 -SHP-1 VT-3/IWF 184 VPA-2-2202, H-01 SURF./C-C 6"-SHP-46 VT-3/IWF 185 VPA-2-2202, H-02 SURF./C-C 6 11 -SHP-46 VT-3/IWF Page 12 Revision o September 15, 1988

Surry Unit 1 Second Period Inspection Plan

SURRY UNIT 1 PERIOD 2 REACTOR VESSEL COMPONENTS Item 1 Closure head nuts, N41-Nl*, Examine 100% MT/B6 .10 VPA-1-1400 2 Closure head studs, S41-Sl, Examine 100% UT,MT/B6.30 VPA-1-1400 3 Closure washers, CCW41-CCW1, CVW41-CVW1, VT-1/B6.50 Examine 100%, VPA-1-1400 4 Remaining bolting, all outages, VT-1/Aug.

Examine 100%, VPA-1-1400 5 Reactor vessel interior, VT-3/B13.10 accessible areas, VPA-1-1200A.

6 Reactor vessel head-to-flange weld, MT,UT/Bl.40 Examine 179-358 in. clockwise (o' ref. centerline of stud hole #1)

VPA-1-1300A Page 1 Revision 2 September 15, 1988

SURRY UNIT 1 PERIOD 2 PRESSURIZER (47 1 )

Item 7 3 11 -RC-161, weld 17, Examine 100%, PT/B9. 40 VPA-1-4506 8 B pressurizer safety nozzle-to safe end UT,PT/B5.20 weld 1DM, Examine 100%, VPA-1-4502 UT,PT/B5.50 9 C pressurizer safety nozzle-to~safe end UT,PT/B5.20 weld 1DM, Examine 100%, VPA-1-4503 UT,PT/B5.50 10 Pressurizer manway, bolts, studs, nuts, VT-1/B7. 20

. Examine 100%, Each refueling (VPA-1-2100) 11 SV-1551B, flange A (12S & 24N) VT-1/B7.50 Examine 100%, VPA-1-4502

  • (Item 17, VPA-1-4700) 12 MOV-RC-1535, bonnet bolts (12S & N) VT-1/B7. 70 Examine 100%, VPA-1-4506 (Item 63, VPA-1-6300) 13 PCV-RC-1456, bonnet bolts (6S & N) VT-1/B7.70 Examine 100%, VPA-1-4506 (Item 64, VPA-1-6300) 14 MOV-RC-1536, bonnet bolts (12S & N) VT-1/B7.70 Examine 100%, VPA-1-4506 (Item 65, VPA-1-6300) 15 PCV-1455, bonnet boits (6S & N) VT-1/B7.70 Examine 100%, VPA~l-4506 (Item 66, VPA-1-6300)
  • Page 2 Revision 2 September 15, 1988

SURRY UNIT 1 PERIOD 2 PRESSURIZER (LOWER LEVEL)

Item 16 PCV-RC-1455A, bonnet bolts (4S & N) VT-1/B7.70 Examine 100%, VPA-1-4504 (Item 67, VPA-1-6300) 17 PCV-RC-1455B, bonnet bolts (4S & N) VT-1/B7.70 Examine 100%, VPA-1-4505 (Item 68, VPA-1-6300) 18 Pressurizer shell-to-head weld 8 UT/B2 .11 Examine 83 thru 180 in. clockwise (o' ref. centerline of manway)

VPA-1-2100 19 -pressurizer longitudinal weld 9 UT/B2 .12 Examine 4 in. to 8 in.

( o.' ref. intersection of weld 8 and 9)

VPA-1-2100

/

j Page 3 Revision 2 September 15, 1988

SURRY UNIT 1 PERIOD 2 A STEAM GENERATOR (CUBICLE & LOOP ROOM}

Item 20 1-SI-109, bonnet bolts (16S & N) VT-1/B7.70 Examine 100%, VPA-1-4102 (Item 89, VPA-1~6300) 21 MOV-RH-1700, bonnet bolts (16S & N) VT-1/B7.70 Examine 100%, VPA-1-4101 (Item 95, VPA-1-6300) 22 6"-SI-49, weld #3, Examine 100%, UT,PT/CS.21 VPA-2-2103 23 6"-SI-49, weld #1, Examine 100%, UT, PT/CS. 21 VPA-2-2103 -

24 A RCP main flange bolts 1-24, UT/B6.180 Examine 100%, VPA-1-SlOOA 24.1 A RCP No. 1 Seal House Bolts (12) VT-1/B7.60 Examine 100%, VPA-1-SlOOA 25 2"-RC-45, weld 11, Examirte 100%, PT/B9 .40 VPA-1-4112 26 2"-CH-97, weld 23, Examine 100%, PT/B9. 40 VPA-1-4113 27 2"-CH-97, .weld 13, Examine 100%, PT/B9. 40 VPA-1-4113 28 2"-RC-129, flange A (8S & 16N), VT-1/B7.50 Examine 100%, VPA-1-4109 (Item 3, VPA-1-4700) 29 2"-RC-45, FE 480 (8S & 16N), VT-1/B7.50 Examine 100%~ VPA-1-4112 (Item 4, VPA-1-4700) 30 LCV-1460A, bonnet bolts (6S & N), VT-1/B7.70 Examine 100%, VPA-1-4107 (Item a, VPA-1-6300) 31 LCV-1460B, bonnet bolts (6S & N), VT-1/B7 ~ 70.

Examine 100%, VPA-1-4107 (Item 9, VPA-1-6300) 32 HCV-1557A, bonnet bolts (6S & N), VT-1/B7.70 Examine 100%, VPA-1-4110 (Item 17, VPA-1-6300)

  • Page 4 Revision 2 September 15, 1988

SURRY UNIT 1 PERIOD 2 A STEAM GENERATOR {CUBICLE/LOOP ROOM CONT-' D)

Item 33 1-SI-91, bonnet bolts (12S & N), VT-1/B7.70 Examine 100%, VPA-1-4104 (Item 69, VPA-1-6300) 34 3"-RC-131, weld 13, Examine 100%, PT/B9.21 VPA-1-4106 35 2"-CH-5, weld 10, Examine 100%, PT/B9.40 VPA-1-4107 36 2"-CH-5, weld 11, Examine 100%, PT/B9. 40 VPA-1-4107 37 2"-RC-129, weld 22, Examine 100%, PT/B9. 40 VPA-1-4109 38 2"-RC-129, weld 21, Examine 100%, PT/B9.40 VPA-1-4109 39 2"-RC-129, weld 20, Examine 100%, PT/B9.40 VPA-1-4109 40 2 11 -RC-53, weld l(BC), Examine 100%, PT/B9.32 VPA-1..:.4110 41 2"-CH-8, weld 9, Examine 100%, PT/B9.40 VPA-1-4111 41.1 6 studs and 6 nuts. Examine 100% VT-1/B7.70

{Item 19. VPA-1-6300) VPA-1-4111 1-42 2"""."RC-45, weld 10, Examine 100%, PT/B9. 40 VPA-1,..4112 43 31"-RC-2, weld 20, Examine 100%, PT/B9.12 VPA-1-4100 Relief Request 44 31 11 -RC-2, weld 21, Examine 100%, PT/B9.12 VPA-1-4100 Relief Request 45 6"-RC-16, weld 3, Examine 100%, UT,PT/B9.ll VPA-1-4104 46 6"-RC-16, weld 4, Examine 100%, UT,PT/B9.ll VPA-1-4104 47 6"-RC-16, weld 7, Examine 100%, UT,PT/B9.ll VPA-1-4104

  • Page 5 Revision 2 September 15, 1988

SURRY UNIT 1 PERIOD 2 A STEAM GENERATOR (CUBICLE/LOOP ROOM CONT'D)

Item 48 6 11 -RC-49, weld 10, Examine 100%, UT,PT/B9.11 VPA-1-4104 49 6"-SI-145, weld 12, Examine 100%, UT,PT/B9.11 VPA-1-4105 50 6"-SI-145, weld 10, Examine 100%, UT,PT/B9.11 VPA-1-4105 51 3 11 -RC-131, weld 12, Examine 100%, PT/B9. 21 VPA-1-4106

  • Page 6 Revision 2 September 15, 1988

SURRY UNIT 1 PERIOD 2.

B STEAM GENERATOR . ( CUBICLE AND LOOP ROOMS).

Item 52 B S/G tubesheet-to-head weld 2-1, UT/B2. 40 Examine 100% (426.66")

(o' ref. centerline top of hotleg manway)

VPA-1-3100 53 B inlet nozzle-to-safe end weld 5DM, UT,PT/B5.30 Examine 100%, VPA-1-4200 UT,PT/B5.50 54 B outlet nozzle-to-safe end weld 6DM, UT,PT/B5.30 Examine 100%, VPA-1-4200 UT,PT/B5.50 55 B S/G primary manway bolting, hotleg and VT-1/B7.30 cold leg VPA-1-3100, (32 bolts) 56 3 11 -RC-16, FE 491 (8S & 16N), VT-1/B7.50 Examine 100%, VPA-1-4207 (Item 6, VPA-1-4700)

.57 1-RC-63, bonnet bolts (16S & N), VT-1/B7. 70 Examine 100%, VPA-1-4207, (Item 61, VPA-1-6300) 58 1-SI-238, bonnet bolts (12S & N), VT-1/B7.70 Examine 100%, VPA-1-4204, (Item 74, VPA-1-6300) 59 B S/G weld #3, Examine 142 11 -284 11 clockwise UT/Cl.10 (o' ref. centerline feed nozzle)

VPA-2-1100 60 B S/G weld #2, Examine 142 11 -284" clockwise UT/Cl.30 (o' ref. centerline of feedwater nozzle).

VPA-2-1100 Page 7* Revision 2 September 15, 1988

SURRY UNIT 1 PERIOD 2 B STEAM GENERATOR (CUBICLE/LOOP ROOM CONT'D)

Item 61 12"-SI-46, weld 17, Examine 100%, PT,UT/B9~11 VPA-1-4201 62 12""-SI-46, weld 16, Examine 100%, PT,UT/B9.11 VPA-1-4201 63 6"-SI-155, weld 6, Examine 100%, PT,UT/B9.11 VPA-1-4205 64 1 l/2"-RC-60, weld l(BC), Examine 100%, PT/B9.32 VPA-1-4209 65 2"-RC-112, weld 16, Examine 100%, VPA-1-4209 PT/B9 .40 66 2"-RC-112, weld 17, Examine 100%, V~A-1-4209 PT/B9. 40 67 2 11 .:..cH-9, weld 8, Examine 100%, VPA-1-4211 PT/B9 .40 68 1 l/2"-CH-95, weld 3, Examine 100%, PT/B9. 40 VPA-1-4213 69 1 l/2"-CH-95, weld 2, Examine 100%, PT/B9. 40 VPA-i-4213 69.1 6"-RC-18, weld l(BC), Examine 100%, UT,PT/B9.31 VPA-1-4204

. " 69.2 6"-RC-19, weld l(BC), Examine 100%, UT,PT/B9.31 VPA-1-4205

  • Page 8 Revision 2 September 15, 1988

SURRY UNIT 1 PERIOD 2 B STEAM GENERATOR (47 1 AND ABOVE)

Item 70 B S/G weld 9NIR OD and ID 100%, VT-1/C2.22 VPA-2-1100 Relief Request 71 B S/G weld 10 NIR OD and ID 100%, VT-1/C2.22 VPA-2-1100 Relief Request 72 B S/G weld #5, Examine 142 11 to UT/Cl.10 284 11 clockwise (o' ref. centerline feed nozzle)

VPA-2-1100 73 B S/G weld #6, Examine 185 11 to UT/Cl.10 370" clockwise _

(o' ref. centerline feed nozzle)

VPA-2-1100 74 B S/G weld #8, Examine 185 11 to UT/Cl.20 370 11 clockwise (o' ref. centerline of feed nozzle)

VPA ... 2-1100 75 B S/G weld #9, Examine 16-33 in. MT,UT/C2.21 clockwise (o' ref. centerline top of feed nozzle)

VPA-2-1100 76- B S/G weld #10, Examine 0-33 in., MT,UT/C2.21 clockwise (o' ref. centerline top of feed nozzle)

VPA-2-1100 77 30 SHP 2, weld 2, Examine 100%, .MT,UT/C5.21 VPA-2-2200

  • Page 9 ~evision 2 September 15, 1988

SURRY UNIT 1 PERIOD 2 CONTAINMENT CRANE WALL

  • Item 78 14"-WFPD-13, weld 8, Examine 100%,

VPA-2-2201 MT,UT/C5.21

  • Page 10 Revision 2 September 15, 1988

SURRY UNIT 1 PERIOD 2 C STEAM GENERATOR (CUBICLE AND LOOP ROOMS)

  • Item 79 1-SI-147, bonnet bolts (16S Examine 100%, VPA-1-4301, (Item 93, VPA-1-6300)

& N), VT-1/B7.70 80 6"-SI-153, weld 8 Examine 100%, UT,PT/C5.21 VPA-2-2543 81 6 11 -SI-153, weld 9, Examine 100%, UT,PT/C5.21 VPA-2-2543 82 6"-SI-153; weld 10, Examine 100%, UT,PT/CS.21 VPA-2-2543 83 No. 1 seal house bolts (12) C RCP, VT-1/B7. 60 Examine 100%, VPA-1-5100A 84 2"-RC-148, Flange A (8S & 16N), VT-1/B7.50 Examine 100%, VPA-1-4307, (Item 12, VPA-1-4700) 85 2 11 -CH-93, Flange A (4S & SN), VT-1/B7.50 Examine 100%, VPA-1-4312, (Item 15 1 VPA-1-4700) 86 1-RC-95, bonnet bolts (16S & N), VT--1/B7.70 Examine 100%, VPA-1-4306, (Item 62, VPA-1-6300) 87 1-SI-240, bonnet bolts (12S & N), VT-1/B7. 70 Examine 100%, VPA-1-4304, (Item 78, VPA-1-6300) 88 2"-RC-44, weld 5, Examine 100%, PT/B9. 40 VPA-1-4311 89 2"-RC-44, weld 6, Examine 100%, PT/B9. 40 VPA-1-4311 90 2 11 -RC-44, weld 7, Examine 100%, PT/B9. 40 VPA-1-4311

91. 2 11 -cH-93, weld 22, Examine 100%, PT/B9 .40 VPA-1-431~

92 1 l/2"-RC-93, weld 1, Examine 100%, PT/B9. 40 VPA-1-4312 Page 11 Revision 2 September 15, 1988

SURRY UNIT 1 PERIOD 2 C STEAM GENERATOR (CUBICLE AND LOOP ROOMS CONT'D)

Item 93 1 1/2 11 -RC-105, weld 7, Examine 100%, PT/B9. 40 VPA-1-4508 94 1 1/2"-RC-105, weld 8, Examine 100%, PT/B9. 40 VPA-1-4508 95 1 1/2 11 -RC-105, weld 9, Examine 100%, . PT/B9.40 VPA-1-4508 96 1 1/2 11 -RC-105, weld 10, Examine 100%, PT/B9.40 VPA-1-4508 97 3 11 -RC-147, weld 11, Examine 100%, PT/B9. 21 VPA-1-4306 98 2 11 -RC-59, weld 22, Examine 100%, PT/B9 .40 VPA-1-4309 99 2"-RC-59, weld 23, *Examine 100%, PT/B9 .40 VPA-1-4309 100 2 11 -RC-59, weld 24, Examine 100%, PT/B9.40 VPA-1-4309 101 2 11 -RC-59, weld 25, Examine 100%, PT/B9. 40 VPA-1-4309 102 2 11 -CH-10, weld 9, Examine 100%, . PT/B9. 40 VPA-1-4310*

103. 2"-RC-200, weld 7, Examine 100%, PT/B9.40 VPA-1-4310 104 2 11 -RC""".200, weld 4, Examine 100%, PT/B9.40 VPA-1-4310 105 2"-RC-200, weld 3, Examine 100%, PT/B9. 40 VPA-1-4310 106 27.5 11 -RC-9, weld 14, Examine 100%, UT,PT/B9.ll VPA-1-4300 107 31 11 -RC-8, weld 10, Examine 100%, UT,PT/B9.11 VPA-1-4300

  • Page 12 Revision 2 September 15, 1988

SURRY.UNIT 1 PERIOD 2 C STEAM GENERATOR (CUBICLE AND LOOP ROOM CONT'D)

Item 108 31"-RC-8, weld.9, Examine 100%, UT,PT/B9.11 VPA-1-4300 109 12 11 -SI-47, weld 12, Examine 100%, UT,PT/B9.11 VPA-1-4301 110 8 11 -RC-13, weld 8, Examine 100%, UT,PT/B9.11 VPA-1-4303 111 8"-RC-13, weld 7, Examine 100%, UT,PT/B9.11 VPA-1-4303 112 8 11 -RC-13, weld 4, Examine 100%, UT,PT/B9.11 VPA-1-4303 113 6 11 -RC-20, weld 2, Examine 100%, UT,PT/B9.11 VPA-1-4305 114 3 11 -RC-147, weld 10, Examine 100%, PT/B9. 21 VPA-1-4306

  • Page 13 Revision 2 September 15, 1988 .

SURRY UNIT 1 PERIOD 2 RHR FLATS

  • Item 115 A RHR heat exchanger 10 in. inlet nozzle fillet weld pad.

VPA-2-1120 (1-RH-E-lA)

PT/C2. 21 Relief Request 116 A RHR heat exchanger welg #2, UT/Cl .10 Examine 44 11 -66 11 clockwise (o' ref. centerline of 10 11 inlet nozzle)

VPA-2-1120 (1-RH-E-lA) 117 B RHR heat exchanger weld #2, UT/Cl.10 Examine 66 11 -88" clockwise (o' ref. centerline of 10 11 inlet nozzle)

VPA-2-1120 (1-RH-E-1B) 118 Excess letdown heat exchanger weld #2, UT/Cl.10 Examine 10 11 -20 11 clockwise (o' ref. centerline of 2 11 inlet nozzle)

VPA-2-1110 (l-CH-E-4) 119 Residual heat exchanger weld #1, UT/Cl.20 Examine 44 11 -88 11 clockwise (o' ref. centerline of 10 11 inlet riozzle)

VPA-2-1120 (1-RH-E-lA) 120 Excess letdown heat exchanger weld #1, UT/Cl.20 Examine 10 11 ..:20 11 clockwise (o' ref. centerline of 2 11 inlet nozzle)

VPA-2-1110 (1-CH-E~4) i21 14 11 -RH-1, weld 1, Examine 100%, VPA-2-2500 PT/C5.11 122 14 11 -RH-1, weld 2, Examine 100%, VPA-2-2500 PT/C5.11 123 B pump suction piping weld 5, Examine 100% PT/C5.11 VPA-2-2500 124 B pump suction piping weld 6, Examine 100% PT/CS.11 VPA-2-2500 125 10"-RH-4, weld 14, Examine 100%, VPA-2-2510 PT/CS.11 126 12 11 -RH-12, weld 29, Examine 100%, VPA-2-2510 PT/C5.11 127 12 11 -RH-12, weld 28, Examine 100%, VPA-2-2510 PT/C5.ll

  • Page 14 Revision 2 September 15, 1988

SURRY UNIT 1 PERIOD 2 RHR FLATS (CONT'D)

Item 128 12 11 -RH-12, weld 25, Examine 100%, PT/C5.11 VPA-2-2510 129 10 11 -RH-10, weld 13, Examine 100%, VPA-2-2511 PT/C5.11 Page 15 Revision 2 September 15, 1988

SURRY UNIT 1 PERIOD 2 CONTAINMENT PENETRATION Item 130 2 11 -CH-8, weld 37, Examine 100%, VPA-1-4601 PT/B9. 40 131 2 11 -CH-8, weld 36, Examine 100%, VPA-1-4601 PT/B9. 40

  • Page 16 Revision 2 September 15, 1988

SURRY UNIT 1 PERIOD 2 CONTAINMENT BASEMENT

  • Item 132 2"-RC-57, weld 43, Examine 100%,

VPA-1-4210 PT/B9. 40 133 12"-SI-47, weld 15, Examine 100%, PT,UT/B9.11 VPA-1-4301 134 2"-RC-53, weld 5, Examine 100%, PT/B9. 40 VPA-1-4600 135 2 11 -RC-53, weld 6, Examine 100%, PT/B9. 40 VPA-1-4600 136 2"-RC-53, weld 7, Examine -100%, PT/B9.40 VPA-1-4600 137 2"-CH-8, weld 14, Examine 100%, PT/B9.40 VPA-1-4601 138 2"-CH-8, weld 15, Examine 100%, PT/B9.40 VPA-1-4601 139 10"-RS-9, weld 10, Examine 100%, PT/C5.11 VPA-1-4~51 140 10 11 -Rs-2, - weld 12, Examine 100%, PT/C5.ll VPA-1-4652 141 10"-RS-l, weld 16, Examine 100%, PT/C5.ll VPA-1-4653 142 MOV-RH-1701, bonnet bolts (16S & N), VT-l/B7.70 Examine 100%, VPA-1-4101, (Item 96, VPA-1-6300)

Page 17 Revision 2 September 15, 1988

SURRY UNIT 1 PERIOD 2 AUX BASEMENT

.Item 143 DELETED 144 Regenerative heat exchanger weld 10, UT/Cl. 20 Examine 6 11 -19 11 VPA-2-1150 (l-CH-E-3) 145 Regenerative heat exchanger weld 4, UT/Cl. 20 Examine 6 11 -19" VPA-2-1150 (l-CH-E-3) 146 Regenerative heat exchanger weld 11, UT/Cl. 30 Examine 6 11 -19 11 VPA-2-1150 (l-CH-E-3) 147 Regenerative heat exchanger, weld 12, UT/Cl. 30 Examine 6 11 -19 11 VPA-2-1150 (l-CH-E-3) 148 DELETED 149 Seal *water Injection filter weld #1, UT/Cl. 20 Examine 12 11 -23 11 clockwise (o' ref. centerline of 2 11 inlet nozzle)

VPA-2-1300 (l-CH-FL-4B) 150 DELETED 151 DELETED 152 Non-Regenerative Hx weld 1, UT/Cl.20 Examine Q"-56" clockwise (o' ref. centerline of 2 11 inlet nozzle)

  • VPA-2-1140 (l-CH-E-2)
  • Page 18 Revision 2 September 15, 1988

SURRY UNIT 1 PERIOD 2 AUX BASEMENT (CONT'D)

ITEM 153 2"-CH-8, weld 38, Examine 100%, PT/B9.40 VPA-1-4601 154 DELETED 155 DELETED 156 Seal water injection filter, weld 2, UT/Cl.10 Examine*12"-23" clockwise (o' ref. centerline of 2" inlet nozzle)

VPA-2-1300 (l-CH-FL-4A) 157 Nonregenerative letdown heat exchanger _UT/Cl.10 weld #2, Examine Q"-57" clockwise (o' ref. centerline of 2" Inlet no~zle)

I VPA-2-1140, (l-CH-E-2) 158 DELETED _

  • Page 19 Revision 2 *september 15, 1988

SURRY UNIT 1 PERIOD 2 SAFEGUARDS/MSVH

  • Item 159 160 6"-SHP-45, weld 20(BC), Examine 100%,

VPA-2-2102 6"-SHP-46, weld 7, Examine 100%,

MT/C5.31 MT/C5.ll VPA-2-2202 161 10 11 -Rs-10, weld 15, Examine 100%, PT/C5.11 VPA-1-4654 162 ~"-SI-49, weld 3, Examine 100%, PT,UT/C5.21 VPA-2-2540 163 10"-SI-152, weld 9, Examine 100%, PT,UT/C5.21 VPA-2-2520 164 10"-SI-152, weld 8, Examine 100%, PT, UT/C5. 21 VPA-2-2520 Page 20 Revision 2 September 15, 1988

Surry Unit 1 Second Period Integral Attachment Inspection Plan

SURRY UNTT 1 PERIOD 2 INTEGRAL ATTACHMENTS Item 1 MKS-0112Cl, H-16, CC229-121, VT-3/IWD FP-203C, PSSK-112C VT-3/IWF

-2 MKS-0112Cl, H-17, CC229-121, VT-3/IWD FP-203C, PSSK-112C VT-3/IWF 3 MKS-0112Cl, H-19, CC229_-121, VT-3/IWD FP-203C, PSSK-112C119 VT-3/IWF 4 MKS-0112Dl, H-1, CC227-121, VT-3/IWD FP-206F, PSSK-112Dll VT-3/IWF 5 MKS-0112Dl, H-2, CCl-121, VT-3/IWD FP-206Q, PSSK-112D12 VT-3/IWF 6 MKS-0112Dl, H-3, CC2-121, VT-3/IWD FP,;,..206R, PSSK-112D VT-3/IWF 7 MKS-0112Dl, H-4, cc2-121, VT-3/IWD FP-206E, PSSK-112014- VT-3/IWF 8 . MKS-0112Dl, H-5, cc2-121, VT-3/IWD FP-206E, PSSK-112D15 VT-3/IWF 9 MKS-0112Dl, H-6, CCl-121, VT-3/IWD FP-206F, PSSK-112016 VT-3/IWF 10 MKS-0112Dl, H7, CCl-121, VT-3/IWD FP-206F, PSSK-112D17 VT-3/IWF 11 MKS-0112Dl, HS, CC228-121, VT-3/IWD FP-206F, PSSK-112D18 VT-3/IWF 12 MKS-0112Dl, HlO, CC229-121, VT-3/IWD FP-206F, PSSK-112D110 VT-3/IWF 13 MKS-0112Dl, Hl2, CC4-121, VT-3/IWD FP-206Q,. PSSK-112Dll2 VT-3/IWF 14 MKS-011201, H13, CC4-121, VT-3/IWD FP-206E, PSSK-1120113 VT-3/IWF 15 MKS-011201, H14, CC4-121, VT_-3/IWD FP-206E, PSSK-112D114 .VT-3/IWF

  • Page 1 Revision 1
  • July 2~, 1988

SURRY UNIT 1 PERIOD 2 INTEGRAL ATTACHMENTS (CONT'D)

Item 16 MKS-0112Dl, H15, CC3-121, VT-3/IWD FP-206E, PSSK-112Dl15 VT-3/IWF 17 MKS-0112Dl, H16, CC3-121, VT-3/IWD FP-206E, PSSK-112D116 VT-3/IWF 18 MKS-0112Dl, H23, CC227-121, VT-3/IWD FP-206F, PSSK-112D123 VT-3/IWF 19 MKS-0112El, H2, CC19-121, VT-3/IWD FP-206E, PSSK-112E12 VT-3/IWF 20 MKS-0112El, HJ, CC15-121, VT-3/IWD FP-206Q, PSSK-112E VT-3/IWF 21 MKS-0112El, H4, CC19-121, VT-3/IWD FP-206E, PSSK-112El4 VT-3/IWF 22 MKS-0112El, H6, CC15-121, VT-3/IWD FP-206Q, PSSK-112E VT-3/IWF 23 MKS-0112El, HlO, CC16-121, VT-3/IWD PSSK-112Ell0 VT-3/IWF 24 MKS-0112El, Hl5, CC17..;.121,. VT-3/IWD FP-206R, PSSK-112Ell5 VT-3/IWF 25- MKS-0112El, Hl6, CC19-121, VT-3/IWD FP-206F, PSSK-112Ell6 VT-3/IWF 26 MKS-0112El, Hl7, CC19-121, VT-3/IWD FP-206Q, PSSK-112Ell7 VT-3/IWF 27 MKS-0112El, Hl8, CC19-121, VT-3/IWD FP-206E, PSSK-112Ell8 VT-3/IWF 28 MKS-0112El, Hl9, CC14-121, VT-3/IWD FP-206Q, PSSK-112Ell9 . VT-3/IWF 29 MKS~0112E2, H20, CC287-151, VT-3/IWD FP-206W, PSSK-112E VT-3/IWF 30 MKS-0112E3, H6, CClS-121, VT-3/IWD PSSK-112E36 VT-3/IWF 31 MKS-0112E3, H15, CC17-121, VT-3/IWD PSSK-112E315 VT-3/IWF Page 2 Revision 1 July 22, 1988

SURRY UNIT 1 PERIOD 2 INTEGRAL ATTACHMENTS (CONT ID)

Item 32 MKS~0112E3, H24, CC20-151, VT-3/IWD FP-206W, PSSK-112E VT-3/IWF 33 MKS-0112E3, H28, CC20-151, VT-3/IWD FP-206AA, PSSK-112E VT-3/IWF 34 MKS-0112E3, H3l, WCMU-14-301, VT-3/IWD FP-206W, PSSK-112E331 VT-3/IWF 35 MKS-0112Fl, H3, CC235-121, VT-3/IWD FP-203C~ PSSK-112F13 VT-3/IWF 36 MKS-0112Fl, H4, CC235-121, VT-3/IWD FP~203C, PSSK-112F VT-3/IWF 37 MKS-0112Fl, H12, CC236-121, VT-3/IWD PSSK-112F112 VT-3/IWF 38 MKS-Oll2Fl, Hl3, CC236-121, VT-3/IWD PSSK-112F113 VT-3/IWF 39 MKS-0112Fl; HlS, CC237-121, VT-3/IWD FP-203C, PSSK-112F115 VT-3/IWF 40 MKS-0112Fl, H16, CC237-121, VT-3/IWD FP-203C, PSSK-112F116 VT-3/IWF 41 MKS-0112Fl, H18, cc237:.121, VT-3/IWD PSSK-112F118 VT-3/IWF 42 MKS-0112Gl, Hl, CC27-121, VT-3/IWD FP-206Q, PSSK-112G VT-3/IWF 43 MKS-0112Gl, HJ, CC235-121, VT-3/IWD FP-206F, PSSK-112G VT-3/IWF 44 MKS-0112Gl, H6, CC235-121, VT-3/IWD FP-206F, PSSK-112Gl6 VT-3/IWF 45 MKS-0112Gl, H9, CCl0-121, VT-3/IWD FP-206M, PSSK-112G19 VT-3/IWF 46 MKS-0112Gl, H12, ccs-121, VT-3/IWD FP-206M, PSSK-112G112 VT-3/I'WF Page 3 Revision 1 July 22, 1988

SURRY UNTT 1 PERIOD 2 INTEGRAL ATTACHMENTS (CONT'D)

Item 47 MKS-Oll2Gl, H13, cca-121, VT-3/IWD FP-206M, PSSK-112Gll3 VT-3/IWF 48 MKS-0112Gl, Hl6, cca-121, VT-3/IWD.

FP-206F, PSSK-112G116 VT-3/IWF 49 MKS-0112Gl, H17, CC226-121~ VT-3/IWD PSSK-112Gll7 VT-3/IWF 50 MKS-0112G1, H18, CC226-121, VT-3/IWD FP-206R, PSSK-112G VT-3/IWF 51 MKS-0112Gl, H19, CC226-121, VT-3/]WD FP-206R, PSSK-112G119 VT-3/IWF 52 MKS-0112Gl, H21, CC237-121, VT-3/IWD FP-206F, PSSK-112G121 VT-3/IWF 53 MKS-0112Gl, H23, CC236-121, VT-3/IWD FP-206F, PSSK-112G123 VT-3/IWF 54 MKS-0112Gl, H25, CC236-121, VT-3/IWD FP-206F, PSSK-112G125 VT-3/IWF 55 MKS-0112Gl, H25, CC236-121, VT-3/IWD FP-206F, PSSK~112Gl25 VT-3/IWF 56 MKS-0112G3, H9, CCl0-151, VT*-3/IWD PSSK-112G39 VT-3/IWF 57 MKS-0112G3, H38, CC89-151, VT-3/IWD FP-206A, PSSK-112G338 VT-3/IWF.

58 MKS-0112G3, H39, CCSS-151, VT-3/IWD FP-206A, PSSK-112G339 VT-3/IWF

  • 59 . MKS-0112G3, H40, CC97-151, VT-3/IWD FP-206A, PSSK-112G340 VT-3/IWF

.60 MKS-0112G3, H41, CC97-151, VT-3/IWD FP-206A, PSSK-112G341 VT-3/IWF 61 MKS-0112Jl, H2, CC16-121, VT-3/IWD FP-206B, PSSK~ll2Jl2 YT-3/IWF Page 4 Revision 1 July 22, 1988

SURRY UNIT 1 PERIOD 2 INTEGRAL ATTACHMENTS (CONT'D)

Item 62 MKS-0112Jl, H4, CC16-121, VT-3/IWD FP-206M, PSSK-112J VT-3/IWF 63 MKS-0112Jl, HS, CC16-121, VT-3/IWD FP-206R, PSSK-112Jl8 VT-3/IWF 64 MKS-0112Ll, Hl5, CClOl-151, VT-3/IWD

  • FP-206A, PSSK-112Ll15 VT-3/IWF 65 MKS-0112Ll, H16, CClOl-151, VT-3/IWD FP-206A, PSSK-112L116 VT-3/IWF 66 MKS-0112Ll, H18, CC93-151, VT-3/IWD B268, PSSK-112L118 VT-3/IWF 67 MKS-0112Ll, H33, CC79-151, VT-3/IWD FP-206A, PSSK-112L133 VT-3/IWF 68 MKS-0112Ll, H34, CC79-151, VT-3/IWD FP-206A, PSSK-112L134 VT-3/IWF 69 MKS-0112Ll, H35, CC79-151, VT-3/IWD FP-206A, PSSK-112Ll VT-3/IWF 70 MKS-0112L2, H4, CC17-121, VT-3/IWD FP-206M, PSSK-112L24 VT-3/IWF 71 MKS-0112L2, HS, CC17-121, VT-3/IWD FP-206A, PSSK-112L25 VT-3/IWF 72 MKS-0112L2, H13, CCSS-151, VT-3/IWD FP-206A, PSSK-112L213 VT-3/IWF 73 MKS-0112L3, Hl, CC17-121, VT-3/IWD FP-206A, PSSK-112L31 VT-3/IWF 74 MKS-0112L3, HJ, CC17-121, VT-3/IWD FP-206B, PSSK-112L33 VT-3/IWF 75 MKS-0112L3, HG, CC78-151, VT..:..3/IWD FP-206A, PSSK-112L VT-3/IWF 76 MKS-0112L3, H7, CC78-151, VT-3/IWD PSSK-112L37 VT-3/IWF 77 MKS-0117Cl, Hl, RH20-152, SURF./C-C FP-202W, .PSSK-117Cll VT-3/IWF
  • Page 5 Revision 1 July 22, 1988

SURRY UNIT 1 PERIOD 2 INTEGRAL ATTACHMENTS (CONT'D)

Item

.78 MKS-0117Cl, HJ, RH 20-152, SURF./C-C FP-202C, PSSK-117C VT-3/IWF 79 MKS-0117Cl, H9, RH 20-152, SURF./C-C FP-202C, PSSK-117Cl9 VT-3/IWF 80 MKS-Oll8Al, Hl, WAPD2-601, SURF./C-C FP-202Z, PSSK-118All VT-3/IWF 81 MKS-0118Al, HJ, WAPD2-601, SURF./C-C FP-202AC, PSSK-118Al3 VT-3/IWF 82 MKS-Oll8Al, H4, WAPD2-601, SURF./C-C

  • FP-202AC, PSSK-118A14 VT-3/IWF 83 MKs~o11aA2, HlO, WAPDl-601, SURF./C-C FP-202Y, PSSK-118A 210 VT-3/IWF 84 MKS-0118A2, H31, WAPD 51-601, SURF./C-C FP-202Y, PSSK-118A231 VT-3/IWF 85 MKS-0118A2, H32, WAPD 50-601, SURF./C-C FP-202N, PSSK-118A232 VT-3/IWF 86 MKS-0122Al, Hl, RH19-602, SURF./C-C PSSK-112'All VT-3/IWF 87 MKS-0122Al, H3,RH19-602, SURF./C-C FP202B, PSSK-122A13 VT-3/IWF 88 MKS-0122Al, H14, RH20-152, SURF./C-C FP-202B, PSSK-122A114 VT-3/IWF 89 MKS-0122Al, H21, RH20-152, SURF./C-C PSSK-122A121 VT-3/IWF 90 MKS-0122Al, H27, RH17-502, SURF./B-K-1 FP-202L, PSSK-122A VT-3/IWF 91 MKS-0122A2, HJO, SI47-1502, SURF./B-K-1 FP-202R, PSSK-122A VT-3/IWF 92 MKS-0122A2, H32, SI-47-1502, SURF./B-K-1 FP-202N, PSSK-122A232 VT-3/IWF
  • Page 6 Revision 1 July 22, 1988

SURRY UNIT 1 PERIOD 2 INTEGRAL ATTACHMENTS (CONT'D)

Item 93 MKS-0122Dl, Hl, RC-23-1502, SUR,F. /B-K-i FP-202W, PSSK-122Dll VT-3/IWF 94 MKS-0122Hl, H5, SI-49-1502, SURF./C-C FP-202Q, PSSK-122Hl5 VT-3/IWF 95 MKS-0122Jl, H4, SI-50-1502, SURF./C-C FP-202R, PSSK-122J14 VT-3/IWF 96 MKS-0122Jl, HlO, SI-50-1502, SURF./C-C PSSK-122J110 VT-3/IWF 97 MKS-0122Kl, H4, SI-48-1502, SURF./C-C FP202S, PSSK-122K VT-3/IWF 98 MKS-0122Kl, HS, SI-48-1502, SURF./C-C FP202P, PSSK-122K15 VT-3/IWF 99 MKS-0122Kl, Hll, SI-50-1502, SURF./C-C FP202M, PSSK-122Klll VT-3/IWF 100 MKS-0122Kl, H12, SI-49-1502, SURF./C-C FP202P, PSSK-122K112 VT-3/IWF 101 MKS-0122Kl, H13, SI-49-1502, SURF .*;c-c FP.,.202M, PSSK-122K VT-3/IWF 102 MKS-0122Ll, Hl, RC-22-1502, SURF./B-K-1 FP-202X,. PSSK-122L VT-3/IWF 103 MKS-0122Ll, H2, SI-45-1502, SURF./B-K-1 FP-202X, PSSK-122L VT-3/IWF 104 MKS-0122Ll, HJ, SI-45-1502, SURF./B-K-1 i

I FP-202T, PSSK-122Ll3 VT-3/IWF I.

105 MKS-0122Ll, HS, SI-45-1502, SURF./B-K-1 FP-202G, PSSK-122Ll5 VT;..3/IWF 106 MKS-0122Ll, H9, SI-45-1502, SURF./C-C PSSK-122Ll9 VT-3/IWF 107 MKS-0123Al, Hl, CS4-153, SURF./C-C PSSK-123All VT-3/IWF Page 7 Revision 1 July 22, 1988

SURRY UNIT 1 PERIOD 2 INTEGRAL ATTACHMENTS (CONT'D)

Item 108 MKS-0123Al, H3, CS4-153, SURF./C-C FP-202AD, PSSK-123A VT-3/IWF 109 MKS-0123Al, H4, CS4,-153, SURF./C-C FP-202AD, PSSK-123A VT-3/IWF 110 MKS-0123Al, H8, CS4-153, SURF./C-C FP202AG, PSSK-123Al8 VT-3/IWF 111 MKS-0123Al, Hll, CS4-:-153, SURF./C-C FP202AD, PSSK-123A VT-3/IWF 112 MKS-0123Al, H14, CS4-153, SURF./C-C FP202W, PSSK-123A VT-3/IWF 113 MKS-0123A2, H3, CS3-153, SURF./C-C FP-202AF, PSSK-123A VT-3/IWF 114 MKS-0123A2, H4, CS3-153, SURF./C-C FP-202W, PSSK-123A VT-3/IWF 115 MKS-0123A2, HS, CS3-153, SURF./C-C FP-202W, PSSK-123A VT-3/IWF

  • 116 117 MKS-0123A2, HS, CS22-153, FP-202AG, PSSK-123A210 MKS-0123A2, Hll, CS22-153, FP-202AD, PSSK-123A211 SURF./C-C VT-3/IWF SURF./C-C VT-3/IWF 118 MKS-0123A2, H14, cs2i-1sJ, SURF./C-C-FP-202AE, PSSK-123A214 VT-3/IWF 119 MKS-0123Bl, Hl, CSJ-153', SURF./C-C FP-202AC, PSSK-123Bll VT-3/IWF 120 MKS-0123Cl, H2, CS4-153, SURF./C-C FP-202W, PSSK-123Cl2 VT-3/IWF 121 MKS-0123Cl, H4, CS4-153, SURF./C-C FP-202X, PSSK-123C VT-3/IWF 122 MKS-0123Cl, H6, CS4-153, SURF./C-C FP-202X, PSSK-123Cl6 VT-3/IWF 123
  • MKS-0123Cl, Hl3, CS4-153, SURF./C-C FP-202AA, PSSK-123Cll3 VT-3/IWF Page 8 Revision 1 July 22, 1988

SURRY UNIT 1 PERIOD 2 INTEGRAL ATTACHMENTS (CONT'D)

  • Item 124 125 MKS-0123Dl, Hl, RS21-153, FP-202AG, PSSK-123Dll MKS-0123Dl, H6, RS21-153, SURF./C-C VT-3/IWF SURF./C-C FP-202AF, PSSK-123D16 VT-3/IWF 126 MKS-0123Dl, HlO, RS21-153, SURF./C-C FP-202AE, PSSK-123D110 VT-3/IWF 127 MKS-0123El, H4, RS4-153, SURF./C-C FP-202Z, PSSK-123E VT-3/IWF 128 MKS-0123El, HS, RS4-153, SURF./C-C FP-202AC, PSSK-123E15 VT-3/IWF 129 MKS-0123El H7, RS21-153, SURF./C-C PSSK-123E17 VT-3/IWF 130 MKS-0123El, *H9, RS4-153, SURF./C-C FP-202AF, PSSK-123El9 V'r-3/IWF 131 MKS-123Fl, Hl, RS23-153, SURF./C-C

. FP-202AG, PSSK-123Fll _VT-3/IWF 132 MKS-Ol23Fl, H6, RS23-153, SURF./C-C

.. PSSK-123Fl6 VT-3/IWF 133 MKS-0123Fl, HiO, RS12-153, . SURF./C-C PSSK-123F110 VT-3/IWF 134 MKS-0123Fl, Hll, RS12-153, SURF./C-C FP-202AC, PSSK-123Flll VT-3/IWF 135 MKS-0123Fl, Hl2, RS12-153, SURF./C-C FP-202AC, PSSK-123Fll2 VT-3/IWF 136' MKS-0123Fl, Hl3, RS12-153, SURF./C-C FP-202AU, PSSK-123Fll3 VT-3/IWF 137 MKS-0123F2, Hl, RS22-153, SURF./C-C FP-202AG, PSSK-123F21 VT-3/IWF 138 MKS~Ol23F2, H6, RS22-153, SURF./C-C FP-202AD, PSSK-123F26 VT-3/IWF 139 MKS-0123F2, HlO, RS22-153, SURF./C-C FP-202AE, PSSK-123F210 , VT-3/IWF Page 9 Revision 1 July 22, 1988

SURRY UNIT 1 PERIOD 2 INTEGRAL ATTACHMENTS (CONT'D}

Item 140 MKS-0123F3, Hl, RS20-153, SURF./C-C FP-202AG, PSSK-123F31 VT-3/IWF 141 MKS-0123F3, H6, RS20-153, SURF./C-C FP-202AD, PSSK-123F36 VT-3/IWF 142 MKS-0123F3, HlO, RS20-153, SURF./C-C FP-202AE, PSSK-123F310 VT-3/IWF 143 MKS-0123F3, H12, RS3-153, SURF./C-C PSSK-123F312 . VT-3/IWF 144 MKS-0123G2, H2, RSl0-153, SURF./C-C FP202W, PSSK-123G22 VT-3/IWF 145 MKS-0123Hl, Hl2, RS3-153, SURF./C-C FP202D, PSSK-123Hll2 VT-3/IWF 146 MKS-0123Hl, H22, RS3-153, SURF./C-C FP-202T, PSSK-123Hl22 VT-3/IWF 147 MKS-0123H2, Hl5, RSll-153, SURF./C-C FP-202D, PSSK-123H215 VT-3/IWF

  • 148 149 MKS-0123Jl, Hl, CS34-153, FP-236B, PSSK-123Jll MKS-0123Jl, H3, CS34-153, FP-236B, PSSK-123Jl3 SURF./C-C VT-3/IWF SURF./C-.C VT~3/IWF 150 MKS-012 3Jl, H9_, CS34-153, SURF./C-C FP-230, PSSK-123Jl9 VT-3/IWF 151 MKS-0123Kl, Hl, CS33-153, SURF./C-C FP-236B, PSSK-123Kll VT-3/IWF 152 MKS-0123Kl, HJ, CS33-153,
  • VT-3/IWF 153 MKS-0125Al, Hl, RC15-1502, SURF./B-K-1 FP-202AB, PSSK-125All VT-3/IWF 154 MKS~0125Al, H2, RC15-1502, SURF./B-K-1 FP-202AB, PSSK-125Al2 VT-3/IWF 155 MKS-0125Al, HJ, RC15-1502, SURF./B-K-1 FP-202AB, PSSK-125Al3 VT-3/IW,F Page 10 Revision 1 July 22, 1988

SURRY UNIT 1 PERIOD 2 INTEGRAL ATTACHMENTS (CONT'D)

Item 156 MKS-0125Al, H4, RC-15-1502, SURF./B-K-1 FP-202Y, PSSK-125A14 VT-3/IWF 157 MKS-0125Al, H5, RC15-1502, SURF./B-K-1 FP-202Z, PSSK-125A15 VT-3/IWF 158 MKS-0125Al, H6, RC15-1502, SURF./B-K-1 FP-202Y, PSSK-125A16 VT-3/IWF 159 MKS-0125Al, H7, RC15-1502, SURF./B-K-1 FP-202R, PSSK-125A VT-3/IWF 160 MKS-0125Al, HS, RC15-i502, SURF./B-K-1 FP-202N, PSSK-125Al8 VT-3/IWF 161 MKS-0124Al, H20, RC34-1502, SURF./B-K-1 FP-202AC, PSSK-124A VT-3/IWF 162 MKS-0125Al, H9, RC15-1502, SURF./B-K-1 FP-202N, PSSK~l25Al9 VT-3/IWF 163 MKS-0125Al, HlO, RClS-1502, SURF./B-K-1 FP-202N, PSSK-125A110 VT-3/IWF

  • 164 165 MKS-0125Al, Hll, RClS-1502, FP-202N, PSSK-125A VPA-1-4210, Hl, 2 11 -RC-57 SURF./B-K-1 VT-3/IWF SURF./B-K-1 VT-3/IWF 166 VPA-1-4210, H2, 2 11 -RC-57 SURF./B-K-1 VT-3/IWF*

167 VPA-1-4507, H4, 2"-CH-68 SURF./B-K VT-3/IWF 168 VPA-1-4507, H5, 2 11 -CH-68 SURF./B-K-1 VT-3/IWF 169 VPA-1-4600, HlO, 2 11 -RC-53 SURF./B-K-1 VT-3/IWF 170 VPA-1-4600, H12, 2H-RC-53. SURF./B-K-1

'VT-3/IWF 171 VPA-1-4600, Hl4, 2"-RC-53 SURF./B-K-1 VT-3/IWF Page 11 Revision 1 July 22, 1988

SURRY UNIT 1 PERIOD 2 INTEGRAL ATTACHMENTS (CONT'D)

Item 172 VPA-1-4600, H15, 2"-RC-53 SURF./B-K-1 VT-3/IWF 173 VPA-1-4600, H17, 2"-RC-53 SURF./B-K-1 VT-3/IWF 174 VPA-1-4600, H19, 2"-RC-53 SURF./B-K-1 VT-3/IWF 175 VPA-1-,4600, H20, 2"-RC-53 SURF./B-K-1 VT-3/IWF 176 VPA-1-4600, H21, 2 11 -RC-53 SURF./B-K-1 VT-3/IWF 177 VPA-1-4306, H2 SURF./B-K-1 VT-3/IWF 178 VPA-1-4504, H2 SURF./B-K-1 VT-3/IWF 179 VPA-1-4504, HJ SURF./B-K-1 VT-3/IWF 180 VPA-1-4505, Hl SURF./B-K-1 VT-3/IWF 181 VPA-2-2201, H5 SURF./C-C VT-3/IWF 182 VPA-2-2201, H7 SURF./C-C VT-3/IWF 183 VPA-2-2300, HJ SURF./C-C VT-3/IWF 184 VPA-2-2301, H6 SURF./C-C VT-3/IWF 185 VPA-2-2303, H6 SURF./C-C VT-3/IWF 186 VPA-2-2303, HS SURF./C=C VT-3/IWF Page 12 Revision 1 July 22, 1988

SURRY UNIT 1 PERIOD 2 INTEGRAL ATTACHMENTS (CONT'D)

Item 187 VPA-%-%3%8,-%WS-------------------------------SHRFTf3T%8 Reae~er-eeeia"~-£ii~er---------------------------V!p-3f%WF f%-H-F%:l-%t 188 VPA-2-1300, lWS, SURF./C3.10 Seal water injection filter (4A) . VT-3/IWF (1-CH-FL-4A) 189 VPA-%-%%88,-%WS----------------------~--------SHRFTf3T%9 Veittme-ee"~rei-!pa"k-----~------------------------V!p-3f%WF f%-H_;IPH-%t 190 VPA-2-1140, lWS SURF./C3.10 Non-regenerative Letdown Hx VT-3/IWF (l-CH-E-2) 191 VPA-1-5100B, 3SC SURF./B-K-1 B Reactor Coolant Pump* VT-3/IWF (1-RC-P-lB)

.192 VPA-1-5100B, 1SC SURF./B-K-1 a Reactor Coolant Pump VT-3/IWF (1-RC-P-lb) 193 VPA-1-5100B, 2SC SURF./B-K-1 B Reactor Coolant Pump VT-3/IWF (1-RC-P-lB) 194 .VPA-1-5100B, 4SC SURF./B-K-1 B Reactor Coolant Pump VT-3/IWF (1-RC-P-lB) 195 VPA-1-2100, W16. SURF./B-H Pressurizer Skirt weld VT-3/IWF-Examine 96 11 to 193 11 clockwise Page 13 Revision 1 July 22, 198

Surry Unit 1 Third Period Inspection Plan

SURRY UNIT 1 FERIOD-3 REACTOR VESSEL COMPONENTS Item 1 Closure head nuts, N2-N20 MT/B6.10 Examine 100%, VPA-1-1400 2 Closure head studs, S2-S20 MT/UT/B6.30 Examine 100%, VPA-1-1400 Remaining closure studs VT-1/Each Refuel 3 threads in fla~ge, 3-7,12-23,33-39, UT/B6 .40 52-56 Examine 100%, VPA-1-1400 (Tool) 4 Closure washers, CCW2-CCW20 VT-1/B6.50 CVW2-CVW20, Examipe 100%,

VPA-1-1400 5 Reactor vessel interior, each refueling VT-3/B13.10 accessible areas, VPA-l-1200A 6 Reactor Vessel Core. Support Structure, VT-3/B13.30 accessible welds and surfaces, removed from RV for exam, VPA-l-1200A 7 Rx Vessel weld #2 UT/Bl.11 Examine 100% VPA-1-1100 (Tool) 8 Rx Vessel weld #7 UT/Bl.11 Examine 100% VPA-1-1100 (Tool) 9 Inlet nozzle to vessel weld 11 UT/B3. 90 Examine 100%, VPA-1-llOOA (Tool) 10 Inlet nozzle to vessel weld 13 UT/B3. 90 Examine 100%, VPA-1-llOOA * (Tool) 11 Inlet nozzle to vessel weld 15 UT/B3. 90 Examine 100%, VPA-1-llOOA (Tool) 12 Inlet nozzle inside radius llNIR UT/B3.100 Examine 100%, VPA-1-llOOA (Tool) 13 Inlet nozzle inside radius 13NIR UT/B3.100 Examine 100%, VPA-1-llOOA (Tool)

  • Page 1 Revision 2 September 15, 1988

SURRY UNIT 1 PERIOD 3 REACTOR VESSEL COMPONENTS (CONT'D)

  • Item 14 Inlet nozzle inside radius 15NIR Examine 100%, VPA-1-llOOA UT/BJ.100 (Tool) 15 A loop nozzle-to-safe end weld 17DM UT,PT/B5.10 Examine 100%, VPA-1-4100 UT,PT/B5.50 (Tool)

(Relief Request) 16 Bloop nozzle-to-safe end weld 17DM UT,PT/B5.10 Examine 100%, VPA-1-4200 UT,PT/B5.50 (Tool)

(Relief Request) 17 c loop nozzle-to-safe end weld 17DM UT,PT/B5.10 Examine 100%, VPA-1-4300 UT,PT/B5.50 (Tool)

(Relief Request) 18 Rx Vessel head weld #5 UT/Bl. 21 Examine 100%*accessible (Tool)

VPA-1-1100 19 Rx Vessel shell-to-flange weld #1 UT/Bl.JO Examine 65.170-139.660, 195.520- (Tool) 238.970, 313.450-344.490, and 9.300~40.350 Degrees.

20 Rx Vessel head-to-flange weld UT,MT/Bl.40 Examine 358 in t6 536.54" (VPA-l-1300A)

. 21 Rx Vessel welds in CRD UT or PT/B14.10 Housing, Examine 10% peripheral CRD housings, VPA-1-lJOOA.

21.1 Rx Vessel head marmon clamps VT-l/B7.10 VPA-1-1300, Examine all 4 100%

21.2 Rx vessel welds in CRD VT-2/B4.12 Housing, Examine 25% of total CRD housings, VPA-1-lJOOA .

  • Page 2 Revision 2 September 15, 1988

SURRY UNIT 1 PERIOD 3 PRESSURIZER (47')

Item 22 6"-RC-39, Weld 2 UT,PT/B9.11 Examine 100%, VPA-1-4501 23 6"-RC-39, Weld 3 UT,PT/B9.11 Examine 100%, VPA-1-4501 24 6"-RC-38, Weld 2 UT,PT/B9.11 Examine 100%, VPA-1-4502 25 6"-RC-38, Weld 3 UT,PT/B9.ll Examine 100%, VPA-1-4502 26 Pressurizer manway, Bolts VT-1/B7.20 studs, nuts.

Examine 100%, each refueling.

(VPA-1-2100) 27 SV-1551A, flange A (12S & 24N) VT-1/B7.50 Examine 100%, VPA-1-4501, (Item 16, VPA-1-4700) 28 SV-1551A, valve internal VT-3,B12.40 Examine 100%, VPA-1-4503 (VPA-1-6200, Item 13) 29 6"-RC-37, Weld 3 UT,PT/B9.11 Examine 100%, VPA-1-4503 30 6"-RC-37, Weld 2 UT,PT/B9.11 Examine 100%, VPA-1-4503 31 3 11 -RC-:35, Weld 11 PT/B9. 40 Examine 100%, VPA-1-4506 32 DELETED.

33 Nozzle inside radius 18NIR VT-1/B3.120 Examine 100%, VPA-1-2100 Relief Request 34 Nozzle inside radius 19NIR VT-1/B3.120 Examine 100%, VPA-1-2100 Relief Request 35 Nozzle inside radius 20NIR VT-1/B3.120 Examine 100%, VPA-1-2100 Relief Request

  • Page 3 Revision 2 September 15, 1988

SURRY UNIT 1 PERIOD 3 PRESSURIZER (47 1 CONT'D) 3 5. 1 NeHHie-::i:i,s::i:ele-r"a~H:1:iS-r3:N:ER-----------------Vlil-3:f B:h*3:%9 Exam::i:i,e-3:99%,--VPA-3:-r3:99---------------Rei::i:e£-Regl:les~

35.2 NeHHie-::i:i,s::i:ele-r"ael::i:1:is-rrN:ER-----~-----------Vlil-3:fB3T3:r9 Exam::i:i,e-3:99%,--VPA-3:-r3:99---------~-----Rei::i:e£-Regl:les~

35~3 Shell-to-head weld #7 VT-2/B2.11 Examine 100%, VPA-1-2100 Relief Request 35~4 Shell-to-head longitudinal weld #15 VT-2/B2.11 Examine 100%, VPA-1-2100 Relief Request 35.5 Nozzle inside radius 23NIR VT-1/B3.120 Examine 100%. VPA-1-2100 Relief Request 36 Pressurizer Spray nozzle-to-safe UT,PT/B5.20 end weld 25DM, Examine 100%, UT,PT/B5.50 VPA-1-4505 37 Pressurizer Relief nozzle-to-safe end UT,PT/B5.20 weld lDM, Examine 100%, VPA-1-4506 UT,PT/B5.50

  • Page 4 Revision 2 September 15, 1988

SURRY UNIT 1 PERIOD 3 PRESSURIZER {LOWER LEVEL)

Item 38 12"-RC-10, Weld 2 UT,PT/B9.ll Examine 100%, VPA-1-4500

  • 39 Shell-to-head weld #8 UT/B2.11 Examine 180 in. to 276 in. clockwise VPA-1-2100 (o' ref. centerline of manway) 40 Shell-to-head longitudinal weld #9 UT/B2.12 Examine 8 11 to 12" (o' ref. intersection of weld 8 and 9)

VPA-1-2100 Page 5 Revision 2 September 15, 1988

SURRY UNIT 1 PERIOD 3 A STEAM GENERATOR (CUBICLE & LOOP ROOMS)

Item 41 1-SI-241, bonn~t bolts (12S & N) VT-1/B7.70 Examine 100%, VPA-1-4105, (Item 72, VPA-1-6300) 42 MOV-RC-1585, Clamp bolts (4S & N) VT-1/B7.70 Examine 100%, VPA-1-4103, (Item 84, VPA-1-6300) 43 MOV-RC-1587, Clamp bolts (4S & N) VT-1/B7. 70 Examine 100%, VPA-1-4303, (Item 86, VPA-1-6300) 44 1-SI-239, Valve thickness UT/B12.40 Examine per Relief, VPA-1-4104 Relief Request 45 1-RC-P-lA, Pump casing weld RT/B12.40 E;xamine per Relief VPA-1-5100 Relief Request 46 A S/G weld #3 Examine 284 in*. to 423. 9 in. clockwise UT/Cl.10 (o' ref._ centerline of feedwater nozzle)

VPA-2-1100

47. 6"-SI-145, weld 5 UT,PT/C5.21 Examine 100%, VPA-2-2541 48 6"-SI-145, weld 6 UT,PT/C5.21 Examine 100%, VPA-2-2541 49 6"-SI-145, weld 7 UT;PT/C5.21 Examine 100%, VPA-2-2541 50 A S/G primary manway bolting, hotleg VT-1/B7. 30 coldleg.

Examine 100%, VPA-1-3100 (32 bolts) 51 2"-CH-97, flange A (4S & SN) VT-1/B7.50 Examine 100%, VPA-1-4113, (Item 5, VPA-1-4700) 52 1-RC-24, bonnet bolts (16S & N) VT-1/B7.70 Examine 100%, VPA-1-4106, (Item 58, VPA-1-6300) 53 1-SI-239, bonnet bolts (12S & N) VT-1/B7.70 Examine 100%, VPA-1-4104, (Item 70, VPA-1-6300)

Page 6 Revision 2 September 15, 1988

SURRY UNIT 1 PERIOD 3 A STEAM GENERATOR (CUBICLE/LOOP ROOM CONT'D)

  • Item 54 1-SI-79, bonnet bolts (12S & N)

Examine 100%, VPA-1-4105, (Item 71, VPA-1~6300)

VT-1/B7.70 55 1-RC-P-lA, Pump internal surface, VT-3/B1'2. 20 VPA-1-5100 56 2-CH-198, weld 5 PT/B9.40 Examine 100%, VPA-1-4111 57 2 11 -CH-198, weld 4 PT/B9.40 Examine 100%, VPA-1-4111 58 2"-CH-198, weld 3 PT/B9.40 Examine 100%, VPA-1-4111 59 2 11 -CH-198, weld 2 PT/B9. 40 Examine 100%, VPA-1-4111 60 2"-RC-45, weld 14 PT/B9.40 Examine 100%, VPA-1-4112 61 2 11 ...;RC-45, weld 15 PT/B9. 40 Examine 100%, VPA-1-4112 62 .2"-RC-45, weld 16 PT/B9.40 Examine 100%, VPA-1-4112 63 2 11 -RC-45, weld 17(BC) PT/B9.32 Examine 100%, VPA-1-4112 64 6"-SI-145, weld 4 UT,PT/C5.21 Examine 100%, VPA-2-2541 65 2"-RC-53, weld 11 PT/B9.40

  • Examine 100%, VPA-1-4110 66 2"-RC-53, weld 12 PT/B9. 40 Examine 100%, VPA-1-4110 67 2 11 -RC-53, weld 13 PT/B9.40 Examine 100%, VPA-1-4110 68 2"-RC-53, weld 14 PT/B9.40 Examine 100%, VPA-1-4110 Page 7 Revision 2 September 15, 1988.

SURRY UNIT 1 PERIOD 3 A STEAM GENERATOR (CUBICLE/LOOP ROOM CONT'D)

Item 69 2 11 -RC-53, weld 15 PT/B9 .40 Examine 100%., VPA-1-4110 70 2 11 -~C-53, weld 16 PT/B9. 40 Examine 100%, VPA-1-4110 71 2 11 -RC-55, weld 19 PT/B9. 40 Examine 100%, VPA-1-4110 72 2 11 -RC-55, weld 20 PT/B9.40 Examine 100%, VPA.-1-4110 73 *2 11 -RC-55, weld 21 PT/B9.40 Examine 100%, VPA-1-4110 74 2"-CH-5, weld 2 PT/B9.40 Examine 100%, VPA-1-4107 75 2 11 -CH-5, weld l(BC) PT/B9.32 Examine 100%, VPA-1-4107 76 2"-RC-129, weld 27(BC) PT/B9.32 Examine 100%, VPA-1-4109

  • 77 78 2 "-Rc-*129, weld 26 Examine 100%, VPA-1-4109 2 11 -RC-129, weld 25 Examine 100%, VPA-1-4109 PT/B9.40

. PT/B9. 40 79 2"-RC-129, weld 24 PT/B9. 40 Examine 100%, VPA-1-4109 80 2"-RC-129, weld 23 PT/B9.40.

Examine 100%, VPA-1-4109 81 2 11 -RC-53, weld 7 PT/B9. 40 Examine 100%, VPA-1-4110 82 2"-RC;..53, weld 8 PT/B9.40 Examine 100%, VPA-1;_4110

-I 83 14 -RH-1, weld 1 (BC) 00 UT,PT/B9.31 Examine 100%, VPA-1-4101 Page 8 Revision 2 September 15, 1988

SURRY UNIT 1 PERIOD 3 A STEAM GENERATOR (CUBICLE/LOOP ROOM CONT'D)

Item 84 , 14 11 -RH-1, weld 8 UT,PT/B9.11 Examine 100%, VPA-1-4101 85 12 11 -SI-45, weld 12 UT,PT/B9.11 Examine 100%, VPA-1-4102 86 12 11 -SI-45, weld 11 UT,PT/B9.11 Examine 100%, VPA-1-4102 87 2"-SI-74, weld 9 PT/B9. 40 Examine 100%, VPA-1-4105 88 2"-CH-5, weld 6 PT/B9.40 Examine 100%, VPA-1-4107 89 2"-CH-5, weld 5 PT/B9.40 Examine 100%, VPA-1-4107 90 2"-CH-5, weld 4 PT/B9.40 Examine 100%, VPA-1-410'7 91 2 11 -CH-5, weld 3 PT/B9. 40 Examine 100%, VPA-1-4107 91.1 .29 11 -RC-1 weld 06DM UT,PT/BS.30 Examine 100%, VPA-1.:..4100 .UT,PT/BS.50 Page 9 Revision 2 September 15, 1988

SURRY UNIT 1 PERIOD 3 A STEAM GENERATOR (47 1 AND ABOVE)

Item 92 A' S/G weld #6 UT/Cl.10 Examine 370 in. to 551.9 in.

(o' ref. centerline of feed nozzle)

VPA-2-1100 93 A' S/G weld #8 UT/Cl.20 Examine 370 to 551.85 in. clockwise (o' ref. centerline of feed nozzle)

VPA-2-1100 94 A S/G weld #9 MT,UT/C2.21 Examine 33 to 50.265 in. clockwise (o' ref. centerline of feed nozzle top)

VPA-2-1100 95 A S/G weld #10 MT,UT/C2.21 Examine 33 to 67 in. clockwise (o' ref. centerline of feed nozzle top) 96 A S/G weld #9NIR VT-1/C2.22 Examine ID and OD 100% (Reli,ef Request)

VPA-2-1100

  • 97 98 A S/G weld lONIR Examine ID and OD 100%

VPA-2-1100 A S/G weld #5 Examine 284 in. to 423.9 in. clockwise VT-1/C2.22 (Relief Request)

UT/Cl.10 (o' ref. centerline of feed nozzle)

(VPA-2-1100) 98.1 A S/G weld #2 UT/Cl.30 Examine 284 in. to 423.9 in. clockwise Co' ref. centerline of feed nozzle)

(VPA-2-1100)

Page 10 Revision 2 September 15, 1988

SURRY UNIT 1 PERIOD 3 B STEAM GENERATOR (CUBICLE/LOOP ROOMS)

Item 99 1-CH-312, bonnet bolts (128 &*N) VT-1/B7.70 Examine 100%, VPA-1-4206 (Item 60, VPA-1-6300) 100 l-SI-82, bonnet bolts (128 & N) VT-1/B7.70 Examine 100%, VPA-1-4205 (Item 75, VPA-1-6300) 101 1-SI-242, bonnet bolts (128 & N) VT-1/B7.70 Examine 100%, VPA-1-4205 (Item 76, VPA-1-6300)

  • 102 S/G Nozzle inside radius 2B VT-1/B3.140 Examine 100%, VPA-1-3100 Relief Request 103 No. 1 seal house bolts (12) VT-1/B7.60 B RCP Examine 100%,

VPA-1-5100A 104 2"-RC-117, Flange A (8S & 16N) VT-1/B7.50 Examine 100%, VPA-1-4208, (Item 7, VPA-1-4700) 105 2"-RC-112, Flange A (8S & 16N) VT-1/B7. 50 Examine 100%, VPA-1-4209, (Item 8, VPA-1-4700) 106 2 11 -RC-46, FE 481 (8S & 16N) VT-1/B7.50 Examine 100%, VPA-1-4212, (Item 9, VPA-1-4700) 107 2"-CH-95, Flange A (4S & SN) VT-1/B7.50 Examine 100%, VPA-1-4213, (Item 10, VPA-1-4700) 108 HCV-1557B, bonnet bolts (6S & N) VT-1/B7.70 Examine 100%, VPA-1-4210, (Item 31, VPA-1-6300) 109 HCV-1556B, bonnet bolts (6S & N) VT-1/B7. 70 Examine 100%, VPA-1-4211, (Item 33, VPA-1-6300) 110 2 11 -Rc-112, weld 20 PT/B9. 40 Examine 100%, VPA-1-4209 111 2"-RC-112, weld 21 PT/B9.40 Examine 100%, VPA-1-4209 112 2"-RC-112, weld 23 PT/B9.40 Examine 100%, VPA-1-4209 Page 11 Revision 2 September 15, 1988

SURRY UNIT 1 PERIOD 3 B STEAM GENERATOR (CUBICLE/LOOP ROOMS CONT'D)

Item 113 2"-RC-112, weld 22, PT/B9.40 Examine 100%, VPA-1-4209 114 2"-RC-112, weld 24 PT/B9. 40 Examine 100%, VPA-1-4209 115 2"-RC-112, weld _25 PT/B9.40 Examine 100%, VPA-1-4209 116 2"-RC-112, weld 26 PT/B9.40 Examine 100%, VPA-1-4209 117

  • 2 "-RC-112, weld 27(BC) PT/B9.32 Examine 100%, VPA-1-4209 118 S/G nozzle inside radius 2A VT-1/B3.140 Examine 100%, VPA-1-3100 Relief Request 119 6"-RC-18, weld 4 UT,PT/B9.ll Examine 100%, VPA-1-4204 120 6"-RC-18, weld 3 UT,PT/B9.11 Examine 100%, VPA-1-4204 121 6"-RC-19

. I weld 3 UT,PT/B9.11 Examine 100%, VPA-1-4205 122 6"-RC-19, weld 2 UT,PT/B9.11 Examine 100%, VPA-1-4205 123 3*r-cH-l, weld l(BC) PT/B9 ;32 Examine 100%, VPA-1-4206 124 3 11 :-CH-1, weld 9

  • PT/B9. 21 Examine 100%, VPA-1-4206 125 3 11 -CH-l, weld 10 PT/B9. 21 Examine. 1 oO%, VPA-1-4206 126 2"-RC-112, weld 18 PT/B9.40 Examine 100%, VPA-1-4209
  • Page 12 Revision 2 September 15, 1988

SURRY UNIT 1 PERIOD 3 B STEAM GENERATOR (CUBICLE/LOOP ROOMS)

Item 127 2 11 -RC-112, weld 19 PT/B9. 40 Examine 100%, VPA-1-4209 128 27.5 11 -RC-6, weld 16 PT,UT/B9.11 Examine 100%, VPA-1-4200 129 27.5 11 -RC-6, weld 15 PT,UT/B9.11 Examine 100%, VPA-1-4200 130 31 11 -RC-5, weld 11 PT,UT/B9.11 Examine 100%, VPA-1-4200 131 31 11 -RC-5, weld 20 PT/B9.12 Examine 100%, VPA-1-4200 Relief Request 132 12 11 -SI-46, weld 21 PT/B9.12 Examine 100%, VPA-1-4200 Relief Request 133 12"-SI-46, weld 12* PT,UT/B9:11 Examine 100%, VPA-1-4201 134 12 11 -SI--46, weld 11 PT,UT/B9.11 Examine 100%, VPA-1-4201 135 8"-RC-12, weld 3 PT,UT/B9.11 Examine 100%, VPA-1-4203 136 8 11 -RC-12, weld 2 PT, UT/B9 .* 11 Examine 100%, VPA-1-4203 Page 13 Revision 2 September 15, 1988

SURRY UNIT 1 PERIOD 3 C STEAM GENERATOR (CUBICLE & LOOP ROOMS)

Item 137 1-SI-243, bonnet bolts (12S & N) VT-1/B7. 70 Examine 100%, VPA-1-4305 (Item 80, VPA-1-6300) 138 c RCP main flange bolts, 1-24 UT/B6.180 Examine 100%, VPA-1-SlOOA 139 Tubesheet-to-head weld 3-1 UT/B2.40 Examine 1 oO% ( 4 2 6 .* 6 6" )

(o' ref. centerline top of hotleg manway)

VPA-1-3100 140 S/G nozzle inside radius 3A VT-1/B3 .140 Examine 100%, VPA-1-3100 Relief Request 141 S/G nozzle inside radius 3B VT-1/B3.140 Examine 100%, VPA-1-3100 Relief Request 142 C inlet nozzle-to-safe end weld SOM UT,PT/BS.30 Examine 100%, VPA-1-4300 UT,PT/BS.50 143 DELETED 144 1 1/2"-RC-105, Flange A (4S & SN) VT-1/B7.50 Examine 100%, VPA-1-4508 (Item 19, VPA-1-4700) 145 HCV-1557C, bonnet bolts {6S & N) VT-1/B7.70 Examine 100%, VPA-1-4309, (Item 47, VPA-1-6300) 146

  • HCV-1556C, bonnet bolts (6S & N) VT-1/B7.70 Examine 100%, VPA-1-4310 (Item 48, VPA-1-6300) 147 1-SI-94, bonnet bolts (12S & N) VT-1/B7.70 Examine 100%, VPA-1-4304 (Item 77, VPA-1-6300) 148 l-SI-85, bonnet bolts (12S & N)' VT-l/B7.70 Examine 100%, VPA-1-4305 (Item 79, VPA-1-6300) 149 12 11 -SI-47, weld 10 UT,PT/B9.11 Examine 100%, VPA-1-4301
  • Page 14 Revision 2 September 15, 1988

SURRY UNIT 1 PERIOD 3 C STEAM GENERATOR (CUBICLE & LOOP ROOMS CONT'D)

  • Item 150 12 11 -SI-47, weld 9 Examine 100%, VPA-1-4301 UT,PT/B9.11 151 8"-RC-13, weld 3 UT,PT/B9.11 Examine 100%, VPA-1-4303 I

152 8 11 -RC.-13, weld 2 UT,PT/B9.11 Examine 100%, VPA-1-4303 153 6"-RC-21, weld 6 .UT, PT/B9 .11 Examine 100%, VPA-1-4304 154 3 11 -RC-147, weld 13 PT/B9.21 Examine 100%, VPA-1-4306 155 3"-RC-147, weld 14 PT/B9.21 Examine 100%, VPA-1-4306 156 12 11 -RC-10, weld 8 UT,PT/B9.11 Examine 100%, VPA-1-4500 157 6"-RC~21, weld 5, UT,PT/B9.11 Examine 100%, VPA-1-4304

  • Page 15 Revision 2 September 15, 1988 )

SURRY UNIT 1 PERIOD 3 RHR FLATS

  • Item 158 Excess letdown heat exchanger weld #1 Examine 20 in to 29.83 in. clockwise (o' ref. centerline of 2" Inlet nozzle)

UT/Cl.20 (VPA-2-1110) i-CH-E-4 159 B RHR Heat Exchanger PT/C2.21 10"-outlet nozzle fillet weld Relief Request Examine 100%

(VPA-2-1120) 1-RH-E-lB 160 A RHR Heat exchanger weld #2 UT/Cl.10 Examine 88" to 110" clockwise (o' ref. centerline of 10" inlet nozzle)

(VPA-2-1120) 1-RH-E-lA 161 B RHR Heat exchanger weld #2 UT/Cl.10 Examine 110 11 -to 131. 88" clockwise (o' ref. centerline of 10" inlet nozzle)

(VPA-2-1120) 1-RH-E-lB 162 Excess letdown heat exchanger weld #2 UT/Cl.10 Examine 20 in. to 29.38 in. clockwise (o' ref. centerline of 2" inlet nozzle)

(VPA-2-1110) 1-CH-E-4 163 B RHR heat exch~nger weld #1 UT/Cl.20 Examine 88 in. to 131.88 in. clockwise (o' ref. centerline of 10" inlet nozzle)

(VPA-2-1120) 1-RH-E-lB 164 14"-RH-18, weld 28 PT/C5.11 Examine 1~0%, VPA-2-2500 165 10"-RH-5, weld 1 PT/C5.11 Examine 100%, VPA-2-2510 166 12"-RH-12, weld 24 PT/C5.11 Examine 100%, VPA-2-2510 167 12 11 -RH-12, weld 30 PT/C5.ll.

Examine 100%, VPA-2-2510 168 12 11 -RH-12, weld 31 PT/C5.11 Examine 100%, VPA-2-2510 169 12"-RH-12, weld 38 PT/C5.11 Examine 100%, VPA-2-2510 Page 16 Revision 2 September 15, 1988

SURRY UNIT 1 PERIOD 3 RHR FLATS (CONT'D)

Item 170 12 11 -RH-6, weld 23 PT/C5.ll Examine 100%, VPA-2-2510 171 10 11 -RH-9, weld 14 PT/C5.11 Examine 100%, VPA-2-2511

  • Page 17 Revision 2 September 15, 1988

SURRY UNIT 1 PERIOD 3 CONTAINMENT CRANE WALL

  • Item 172 14"-WFPD-9 , weld 12 Examine 100%, VPA-2-2301 UT,MT/C5.21 Page 18 Revision 2 September 15, 1988

SURRY UNIT 1 PERIOD 3 PRT/REGEN AREA Item 173 Regenerative heat exchanger weld #10 UT/Cl.20 Examine 24.65 in. to 6 in.

(o' ref. top centerline of weld)

(VPA-2-1150) 1-CH-E~3 174 Regenerative heat exchanger weld #4 UT/Cl. 20 Examine 24.65 in. to 6 in.

(o' ref. top centerline of weld)

(VPA-2-1150) l~CH-E-3 175 Regenerative heat exchanger weld #11 UT/Cl. 30 Examine 24.65 in. to 6 in.

(o' ref. top centerline of weld)

(VPA-2-1150) 1-CH-E-3 176 Regenerative heat exchanger weld #12 UT/Cl.JO Examine 24.65 in. to 6 in.

(o' ref. top centerline of weld)

(VPA-2-1150) 1-CH-E-3 Page 19 Revision 2 September 15, 1988

SURRY UNIT 1 PERIOD 3

  • coNTAINMENT BASEMENT Iteni 177 MOV-RH-1701, valve thickness UT/B12 .40 Examine per relief, VPA-1-4101 178 6 11 -SI-50, weld #10 UT,PT/C5.21 Examine 100%, VPA-2-2303 179 6"-SI-50, weld #22 UT,PT/C5.21 Examine 100%, VPA-2-2303 180 10 11 -Rs-1 , weld 13 PT/C5.11 Examine 100%, VPA-1-4653 181 *10"-RS-1, weld 14 PT/C5.11 Examine 100%, VPA-1-4653 182 MOV-RH-1720B, bonnet bolts (16S & N) VT-1/B7.70 Examine 100%, VPA-1-4202, (Item 87, VPA-1-6300) 183 MOV-RH-1720A, bonnet bolts (16S & N) VT-1/B7.70 Examine 100%, VPA-1-4302, (Item 88, VPA-1-6300) 184 1-SI-107, bonnet bolts (16S & N) VT-1/B7.70 Examine 100%, VPA-1-4102, (Item 90, VPA-1-6300) 185 1-SI-'128, bonnet bolts (16S & N) VT-1/B7.70 Examine 100%, VPA-1-4201, (Item 92, VPA-1-6300) 186 1-SI-145, bonnet bolts (16S & N) VT-1/B7.70 Examine 100%, VPA-1-4301, (Item 94, VPA-1-6300) 187 MOV-RH-1720B, Valve thickness UT/B12. 40 Examine per relief, VPA-1-4302 188 1-SI-107, valve -thickness UT/B12 .40

_Examine per relief, VPA-1-4102 189 2 11 -CH-8, weld 24 . PT/B9. 40 Exami~e 100%, VPA-1-4601 190 2"-CH-8, weld 23 PT/B9.40 Examine 100%, VPA-1-4601 191 2"-CH-8, weld 22 PT/B9. 40 Examine 100%, VPA-1-4601 Page 20 Revision 2 September 15, 1988

SURRY UNIT 1 PERIOD 3-CONTAINMENT BASEMENT (CONT ID)

  • Item 192 2 11 -CH-8, weld 21 Examine 100%, VPA-1-4601 PT/B9. 40 193 2 11 -CH-8, weld 20 PT/B9.40 Examine 100%, VPA-1-4601 194 2 11 -CH-8, weld 19 PT/B9.40 Examine 100%, VPA-1-4601 195 2 11 -CH-8, weld 18 PT/B9. 40 Examine 100%, VPA-1-4601 196 2"-CH-8, weld 17 PT/B9.40 Examine 100%, VPA-1-4601 197 2"-CH-8, weld 16 PT/B9.40 Examine 100%, VPA-1-4601 198 2"-RC-53, weld 12 PT/B9.40 Examine 100%, VPA-1-4600 199 2"-RC-53, weld 13 PT/B9. 40 Examine 100%, VPA-1-4600 200 2"-RC-53, weld 14 PT/B9.40 Examine 100%, VPA-1-4600 201 2"-RC-53, weld 15 PT/B9.40 Examine* 100%, VPA-1-4600 202 2"-RC-53, weld 16 PT/B9. 40 Examine 100%, VPA-1-4600 203 2"-RC-53 weld 17 PT/B9.40

' - VPA-1-4600 Examine 100%,

204 2"-CH-8, weld 31 PT/B9.40 Examine 100%, VPA-1-4601 205 2 11 -CH-8, weld 30 PT/B9. 40

-Examine 100%, VPA-1-4601 206 2"-CH-8, weld 25 PT/B9. 40 Examine 100%, VPA-1-4601

  • Page 21 Revision 2 -September 15, 1988.

SURRY UNIT 1 PERIOD 3 CONTAINMENT BASEMENT (CONT'D)

Item 207 10 11 -RH-16, weld 12 PT,UT/B9.11 Examine 100%, VPA-1-4202 208 10 11 -RH-16, weld 10 PT,UT/B9.11 Examine 100%, VPA-1-4202 209 10"-RH-16, weld 9 PT,UT/B9.11 Examine 100%, VPA-1-4202 210 10"-RH-16, weld 2 PT,UT/B9.11 Examine 100% ,* VPA-1-4202 211 10 11 -RH-23, weld 5 PT,UT/B9.11 Examine 100%, VPA-1-4302 212 2 11 -RC-53, weld 8 PT/B9. 40 Examine 100%, VPA-1-4600 213 2"-RC-53, weld 9 PT/B9. 40 Ex.amine 100%, VPA-1-4600 214 2"-RC-53, weld 10 PT/B9.40 Examine 100%, VPA-1-4600

  • 215 2 11 -RC-53, weld 11 Examine 100%, VPA-1-4600 PT/B9. 40
  • Page 22 Revision 2 September 15, 1988

SURRY UNIT 1 PERIOD 3 SAFEGUARDS/MSVH Item 216 10"-RS-9, weld 1 PT/C5.11 Examine 100%, VPA-1-4651 217 10 11 -Rs-10, weld 16 PT/C5.11 Examine 100%, VPA-1-4654 218 A branch line, weld 23BC, MT/C5.31 Examine 100%, VPA-2-2100 219 6"-SI-48, weld 12 PT,UT/C5.21 Examine 100%, VPA-2-2540 220 30 11 -SHP-1, weld 34L MT, UT/C5. 22 Examine 100%, VPA-2-2100 221 A satety header, weld 32L MT/C5.22 Examine 100%, VPA-2-2100 222 10"-SI-152, weld 7, UT,PT/CS.21 Examine 100%, VPA-2-2520 Page 23 Revision 2 September 15, 1988

SURRY UNIT 1 PERIOD 3 AUX BUILDING Item 223 DELETED 224 DELETED 225 Seal water injection filter weld #1 UT/Cl. 20 Examine 23 in. to 33.77 in. clockwise (o' ref. centerline of 2 in. inlet nozzle)

(VPA-2-1300) 1-CH-FL-4A 226 DELETED 227 DELETED 228 Non-regenerative letdown heat exchanger UT/Cl. 20 weld #1 Examine 56 in. to 84.75 in. clockwise (0 1 ref. centerline of 2" inlet nozzle)

(VPA-2-1140) 1-CH-E-2 229 DELETED 230 DELETED 231 Seal water Injection Filters weld #2 UT/Cl.10 Examine 23 in. to 33.77 in. clockwise (o' ref. centerline of 2"-inlet nozzle)

(VPA-2-1300) 1-CH-FL-4B Page 24 Revision 2 September 15, 1988

SURRY UNIT 1 PERIOD 3 AUX BUILDING Item 232 Non-regenerative letdown heat exchanger UT/Cl.10 weld #2

  • Examine 57 in. to 84.75 in. clockwise (o' ref. centerline of 2" inlet nozzle)

(VPA-2-1140) 1-CH-E-2 233 DELETED Page 25 Revision 2 September 15, -1988

Surry Unit 1 Third Period Integral Attachment Inspection Plan

SURRY UNIT 1 .

PERIOD 3 INTEGRAL ATTACHMENTS Item*

1 MKS-0103A1, H1, SHP-24-601, SURF./C-C FP-247F, PSSK-103A11 VT-3/IWF 2 MKS-0103A2, H39, SHP-22-601, SURF./C-C FP-247F, PSSK-103A239 VT-3/IWF 3 MKS-0103A2, H75, SAE-1-121, SURF./C-C FP-247G, PSSK-103A275 VT-3/IWF 4 MKS-0103A2, H76, SAE-2-121, *SURF./C-C FP-247G, PSSK-103A276 VT-3/IWF

  • 5 MKS-0103A2 ,_ H77, SAE-3-121, SURF./C-C FP-247F, PSSK-103A277 VT-3/IWF 6 MKS-0103A2, H79, SAE-38-121, SURF./C-C FP-247G, PSSK-103A279. VT-3/IWF 7 MKS-0103A2, H81, SAE-39-121, SURF./C-C FP-247G, PSSK-103A281 VT-3/IWF 8 MKS-0103A2, H83, SAE-37-121, SURF./C-C FP-247G, PSSK-103A283 VT-3/IWF 9 MKS-0112AA1, H14, cc-10-121, VT-3/IWD*

FP-202A, PSSK-112AA114 VT-3/IWF 10 MKS-0112AE1, Hl, CC-7-121, VT-3/IWD FP-206N, PSSK-112AE11 VT-3/IWF 11 MKS-0112AE1, H6, CC-226~121, VT-3/IWD PSSK-112AE16 VT-3/IWF 12 MKS-0112AE2, Hl; CC-7-121, VT-3/IWD PSSK-112AE21 VT-3/IWF 13 MKS-0112AE2, H18, CC-177-121, VT-3/IWD FP-206D, PSSK-112AE2_18 VT-3/IWF 14 MKS-0112AE2, H19, .CC-177-121, VT-3/IWD FP-206D, PSSK-112AE219 VT-3/IWF 15 MKS-0112AH1, H3, CC-7-121, - VT~3/IWD PSSK-112.AHlJ VT-3/IWF Page 1 Revision 2 September 15, 1988

SURRY UNIT 1 PERIOD 3 INTEGRAL ATTACHMENTS {CONT'D)

Item 16 MKS-0112AH2, HS, CC-153-151, VT-3/IWD FP-206D, PSSK-112A VT-3/IWF 17 MKS-0112AH2, H17, CC-158-151, VT-3/IWD FP-206D, PSSK-112AH217 VT-3/IWF 18 MKS-0112AJ2, H26, CC-159-151, VT-3/IWD FP-206T, PSSK-112AJ226 VT-3/IWF 19 MKS-0112AK1, H9, CC-72-121, VT-3/IWD PSSK-112AK19 VT-3/IWF 20 MKS-0112AK1, H12, CC-148-151, VT-3/IWD FP-206V, PSSK-112AK112 VT-3/IWF 21 MKS-0112AK1, H16, CC-146-151, VT-3/IWD FP-206V, PSSK-112AK116 VT-3/IWF 22 MKS-0112AL1, Hl, CC-143-121, VT-3/IWD PSSK-112AL11 VT-3/IWF 23 MKS-0112AN1, H7, CC-15-121, VT-3/IWD FP-206Q, PSSK-112AN17 VT-3/IWF 24 MKS-Ol.12AN1, HS, CC-15-121, VT-3/IWD PSSK-112AN18 VT-3/IWF 25 MKS-0112AR1, H1, CC-69-151, VT-3/IWD FP-207A, PSSK-112AR11 VT-3/IWF 26 MKS-0112AR1, H4, CC-67-121, VT-3/IWD FP-207A, PSSK-112AR14 VT-3/IWF 27 MKS-0112AR1, Hll, CC-473-151, VT~3/IWD FP-206Y, PSSK-112A VT-3/IWF 28 MKS-0112AR2, H13, CC-67-121, VT-3/IWD FP-206H, PSSK-112AR213 VT-3/IWF 29 MKS-0112AR2, H16, CC-143-121, VT-3/IWD FP-206H, PSSK-112AR216 VT-3/IWF 30 MKS-0112Cl, H2, CC-227-121, VT-3/IWD FP-203C, PSSK-112C VT-3/IWF 31 MKS-0112Cl, H3, *CC-227-121, VT-3/IWD FP-203C, PSSK-112C13 VT-3/IWF Page 2 Revision 2 September 15, 1988

SURRY UNIT 1 PERIOD 3 INTEGRAL ATTACHMENTS (CONT'D)

Item 32 MKS-0112Cl, HS, CC-227-121, VT-3/IWD PSSK-112C18 VT-3/IWF 33 MKS-0112Cl, H9, CC-228-121~ VT-3/IWD PSSK-112C19 VT-3/IWF 34 MKS-0112Cl, HlO, CC-228-121, VT-3/IWD FP-203C, PSSK-112Cl10 VT-3/IWF 35 MKS-0112Cl, Hll, CC-228-121, VT-3/IWD FP-203C, PSSK-112Clll VT-3/IWF 36 MKS-0112Cl, H15, CC-229-121, VT-3/IWD

. PSSK-112Cll5 VT-3/IWF 37 MKS-0117Al, Hl, RH-1-1502, SURF./B-K-1 FP-202Q, PSSK-117All. VT-3/IWF 38 MKS-0117Al, H2, RH-1-1502, SURF./B-K-1 FP-202Q, PSSK-117A12 VT-3/IWF 39 MKS-0117Al, H3, RH-1-1502, SURF./B-K-1 FP-202A, PSSK-117A12 VT-3/IWF 40 MKS-0117Al, Hll, RH-18-602, SURF./C-C FP-202G, PSSK-117A *vT-3/IWF 41 MKS-0117A2, H22, RH-19-602, SURF./C-C FP-202B, PSSK-117A222 VT-3/IWF 42 MKS-0122Al, H6, RH-16-1502, -SURF./B-K-1 FP-202B, PSSK-122A16 VT-3/IWF 43 MKS-0122Al, H12,.RH-16-1502, SURF./B-K-1 PSSK-122All2 VT-3/IWF 44 MKS-0122A2, H33, SI-47-1502, SURF./B-K-1 FP-202B, PSSK-122A VT-3/IWF 45 MKS-0122Dl, H2, SI-46-1502, SURF./B-K-1 FP-202W, PSSK-122D VT-3/IWF 46 MKS-0122Dl, HJ, SI-46-1502, SURF./B-K-1 FP-202S, PSSK-122Dl3 VT-3/IWF

  • Page 3 Revision 2 September 15, *1988

SURRY UNIT 1 PERIOD 3 INTEGRAL ATTACHMENTS (CONT'D)

Item 47 MKS-0122Dl, H6, SI-46-1502, SURF./B-K-1 FP-202C, PSSK-1220 VT;,_3/IWF 48 MKS-0112Ll, H6, SI-45-1502, SURF./B-K-1 FP-202A, PSSK-122L16 VT-3/IWF 49 VPA-1-4107, Hl, 2 11 -CH-5 SURF./B-K-1 VT-3/IWF 50 VPA-1-4110, Hl, 2 11 -RC-53 SURF./B:-K-1

.VT-3/IWF 51 VPA-1-4211, H2, 2"-CH-9 SURF./B-K-1 VT-3/IWF 52 VPA-1-4600, Hl, 2 11 -RC-53 SURF./B-K-1 VT-3/IWF.

53

  • VPA-1-4600, H2, 2 11 -RC-53 SURF./B-K-1 VT-3/IWF 54 VPA-1-4600, H3, 2"-RC-53 SURF./B-K-1 VT-3/IWF 55 VPA-1-4600, H4, 2"-RC-53 SURF./B-K-1 VT-3/IWF 56 VPA-1-4600, HS, 2 11 -RC-53 SURF./B-K-1 VT-3/IWF 57 VPA-2-2100, HS, 30 11 -SHP-1 SURF./C-C VT-3/IWF 58 VPA-2-2101, HS, 14 11 -WFPD-17 SURF./C-C VT-3/IWF 59 VPA-2-2200, H4, 30 11 -SHP-2 SURF./C-C*

VT-3/IWF 60 VPA'."'"2-2200, HS, 30"-SHP-2 SURF./C-C VT-3/IWF 61 VPA-2-2200, HS, 30 11 -SHP-2 SURF./C-C

  • VT-3/IWF
  • Page 4
  • Revision 2 September 15, 1988

SURRY UNIT 1 PERIOD 3 INTEGRAL ATTACHMENTS (CONT'D)

  • Item 62 MKS-0112L3, H20, CC-78-151, FP-206A, PSSK-112L320 MKS-0112L3, H22, CC-80-151, VT-3/IWD VT-3/IWF VT-3/IWD 63 FP-206A, PSSK-112L322 VT-3/IWF 64 MKS-0112L3, H24, CC-115-151, VT-3/IWD FP-206A, PSSK-112L324 VT-3/IWF 65 MKS-0112L3, H25, CC-115-151, VT-3/IWD FP-206S, PSSK-112L325 VT-3/IWF 66 MKS-0112Ml, Hll, CC-72-121, VT-3/IWD FP-206H, PSSK-112Mlll VT-3/IWF 67 MKS-0112Ml, H14, CC-70-121_, VT-:-3/IWD FP-206H, PSSK-112M114 VT-3/IWF 68 MKS-0112Ml, H15, CC-70-151, VT-3/IWD FP-206B, PSSK-112Ml15 VT-3/IWF 69 MKS-0112Ml, H16, CC-70-121, VT-3/IWD FP-206H, PSSK-112M VT-3/IWF 70 MKS-0112Ml, H19, CC-66-151, VT-3/IWD FP-206U, PSSK-112M119 VT-3/IWF 71 MKS-0112Ml, H23, CC-364-151, VT-3/IWD PSSK-112Ml23 VT-3/IWF 72 MKS-0112M2 ,. Hl, CC-17-121, VT-3/IWD PSSK-112M21 VT-3/IWF 73 MKS-0112M2, HS, CC-17-121, VT-3/IWD FP-206R, PSSK-112M25 VT-3/IWF 74 MKS-0112M2, H6, CC-17-121, VT-3/IWD PSSK-112M26 VT-3/IWF 75 MKS;..0112M2, H26, CC-17-121, VT-3/IWD FP-206R, PSSK-112M226 VT-3/IWF 76 MKS-0112M3, H26, CC-70~151, VT-3/IWD FP-207A, PSSK-112M326 VT..;.3/IWF
  • Page 5 Revision 2 September 15, 1988

SURRY UNIT 1 PERIOD 3 INTEGRAL ATTACHMENTS (CONT'D)

  • Item 77 MKS-0112M3, H27, CC-70-151, FP-207A, PSSK-112M327 VT-3/IWD

. VT-3/IWF 78 - MKS-0,112M3, H28, CC-70-151, VT-3/IWD FP-207A, PSSK-112M328 VT-3/IWF 79 MKS-0112M3, H29, CC-70-151, VT-3/IWD FP-207A, PSSK-112M329 VT-3/IWF 80 MKS-0112M3, H35, cc-_71-121, VT-3/IWD FP-207.A, PSSK-112M. VT-3/IWF 81 MKS-0112M3, H37, CC-474-151, VT-3/IWD FP,-206Y, PSSK-112M VT-3/IWF 82 MKS".""0112Sl, H2, CC-8-121, VT-3/IWD FP-202Q, PSSK-112S12 VT-3/IWF 83 MKS-0112Sl, H4, CC-8-121, VT-3/IWD FP-202G, PSSK-.112S VT-3/IWF 84 MKS-0112Sl, HS, CC-8-121, VT-3/IWD PSSK-112Sl8 VT-3/IWF 85 MKS-0112Sl, Hl4, CC-16-121, VT-3/IWD FP-202R, PSSK-112Sll4 VT-3/IWF 86 MKS-0112Sl, Hl5, CC-8.-121, VT-3/IWD FP-202V, PSSK-112Sll5 VT.-3/IWF 87 MKS-0112Tl, HS, CC-67-151, VT-3/IWD PSSK-112Tl5 VT-3/IWF 88 MKS-Oil2T2, HS, CC-67-121, VT-3/IWD PSSK-112T25 VT-3/IWF 89 MKS-0112T2, H6, CC-67-121, VT-3/IWD FP-206M, PSSK-112T26 VT-3/IWF 90 MKS-0112T2, H7, cc-10-121, VT-3/IWD PSSK-112T27 VT-3/IWF 91 MKS-0112T2, Hl8, CC-81-121, VT-3/IWD FP-206A, PSSK-112T218 VT-3/IWF Page 6 Revision 2 September 15, 1988

SURRY UNIT 1 PERIOD 3 INTEGRAL ATTACHMENTS (CONT'D)

Item 92 MKS-0112T2, Hl9, cc-10-121, VT-3/IWD FP-206M, PSSK-i12T219 VT-3/IWF 93 MKS-0112T3, Hl2, CC-75-151, VT-3/IWD FP-206A, PSSK-112T VT-3/IWF 94 MKS-0118Gl, Hl, WAPD-1-601, VT-3/IWD FP-247E, PSSK-118Gll VT-3/IWF 95 MKS-0118Gl, H4, WAPD-1-601, VT-3/IWD FP-247E, PSSK-118G14 VT-3/IWF 96 MKS-0118G1, H7, WAPD-150=601, VT-3/IWD FP-247C, PSSK-118G17 VT-3/IWF 97 MKS-0118G1, H11, WAPD-15-601, VT-3/IWD FP-247C, PSSK-118Gl11 VT-3/IWF 98 MKS-0118G2, HlO, WAPD-2-601, VT-3/IWD FP-247E, PSSK-118G210 VT-3/IWF 99 MKS-0118G2, Hll, WAPD-2-601, VT-3/IWD FP-247E, PSSK-118G211 VT-3/IWF 100 MKS-0118G2, H14, WAPD-2-601, VT-3/IWD FP-247E, PSSK-118G214 VT-3/IWF 101 MKS-0118G2, H17, WAPD-152-601, VT-3/IWD FP-247C, PSSK-118G217 VT-3/IWF 102 MKS-0118L1, H6, WCMU-5-151, VT-3/IWD FP-247C, PSSK-118L16 VT-3/IWF 103 MKS-0118Ll, HlO, WCMU-8-151, VT-3/IWD FP-247C, PSSK-118Lll0 VT-3/IWF 104

  • MKS-0118Ll, H15, WCMU-6=151, VT-3/IWD FP-247C, PSSK-118L115 VT-3/IWF 105 MKS-0118Ll, H16, WCMU-6-151, VT-3/IWD FP-247C, PSSK-118L116 VT-3/IWF 106 MKS-0118Ll, H20, WCMU-7-151, VT-3/IWD FP-247C, PSSK-118Ll20 VT-3/IWF 107 MKS-0118Ll, H~l, WCMU-7-151, VT-3/IWD FP-247C, PSSK-118Li21 VT-3/IWF Page 7 Revision 2 September 15, 1988

SURRY UNIT 1 PERIOD 3 INTEGRAL ATTACHMENTS (CONT'D)

  • Item 108 MKS-0119Al, Hl, WS-26-10, FP-202S, PSSK-119All VT-3/IWD VT-3/IWF 109 MKS-0119A2, Hl, WS-28-10, VT.-3/IWD FP-202S, PSSK-119A VT-3/IWF 110 MKS-0119A3, Hl, WS-30-10, VT-3/IWD FP-202W, PSSK-119A VT-3/IWF 111 MKS-0119A4, Hl, WS-32-10, VT-3/IWD FP-202V, PSSK-119A41 VT-3/IWF 112 MKS-0123Kl, H6, CS-33-153, SURF./C-C FP-247C, PSSK-123K16 VT-3/IWF 113 MKS-0123Kl,.H10, CS-36-153, SURF./C-C FP-247C, PSSK-123Kll0 VT~3/IWF 114 MKS-0123Nl, H2, RS-9-153, SURF./C-C FP-236A, PSSK-123N12 VT-3/IWF 115 MKS-0123Nl, H3, RS-14-153, SURF./C-C FP-236A, PSSK-123N13 VT-3/IWF 116 MKS-0123N2, HS, RS-10-153, SURF./C-C FP-236A, PSSK-123N25 VT-3/IWF 117 MKS-0123Pl, Hl, CS-1-153, SURF./C-C FP-247C, PSSK-123Pll VT-3/IWF 118 MKS-0123Pl, H2, CS-1-153, SURF./C-C FP-247C, PSSK-123P12 VT-3/IWF 119 MKS-0123Ql, H2, CS-2-153, SURF./C-C FP-247C, PSSK-123Q12 VT-3/IWF 120 MKS-0123Ql, HJ, CS-2-153, SURF./C-C FP-247C, PSSK-123Q13 VT-3/IWF 121 MKS-0123Rl, H2, RS-1-153, SURF./C-C FP-202S, PSSK-12.3R12 VT-3/IWF 122 MKS-0123Rl, H4, RS-1-153, SURF./C-C FP-202P, PSSK-123R14 VT-3/IWF
  • Page 8 Revisiqn 2 September 15, 1988

SURRY UNIT 1 PERIOD 3 INTEGRAL ATTACHMENTS (CONT ID)

  • Item 123 124 MKS-0123R2, H2, RS-2-153, FP-202S, PSSK-123R22 MK_S-0123R2, H4, RS-2-153, SURF./C-C VT-3/IWF SURF./C-C FP-202S, PSSK-123R24 VT-3/IWF 125 MKS-0124Al, H6, RC-62-602, VT-3/IWD FP-202AB, PSSK-124A VT-3/IWF 126 MKS-0124Al, H7, RC-62-602, VT-3/IWD FP-202AB, PSSK-124Al7 VT-3/IWF 127 MKS-0124Al, Hll, RC-20-1502, VT-3/IWD PSSK-124A VT-3/IWF 128 MKS-0124Al, H18, RC-41-602, VT-3/IWD FP-202Z, PSSK-124All8 VT-3/IWF 129 MKS-0124A2, H23, RC-40-602, VT-3/IWD

.FP-202AB, PSSK-124A223 VT-3/IWF 130 MKS-0124A2, H25, _RC-36-602, VT-3/IWD FP-202AC, PSSK-124A225 VT-3/IWF 131 MKS-0124A2, H26, RC-36-602, VT-3/IWD FP-202Z, PSSK-124A226 VT-3/IWF 132 MKS-0124A2, H27, RC-36-602, VT-3/IWD FP-202W, PSSK-124A227 VT-3/IWF 133 MKS-0124A2, H28, RC-36-602, VT-3/IWD FP-202W, PSSK-124A VT-3/IWF_

134 MKS-0125Al, H13, RC-15-1502, SURF./B-K-1 FP-202H, PSSK-125All3 VT-3/IWF 135 MKS-0125Al, Hl4, RC-15-1502, SURF./B-K-1 FP-202H, PSSK-125All4 VT-3/IWF 136 MKS-0125Al, Hl7, RC-15-1502, SURF./B-K-1 FP-202V, PSSK-125All7 VT-3/IWF 137 MKS-0125Al, Hl8, RC-14-1502, SURF./B-K-1 B268, PSSK-125All8 VT-3/IWF Page 9 Revision 2 September 15, 1988

SURRY UNIT 1 PERIOD 3 INTEGRAL ATTACHMENTS (CONT'D)

  • Item 138 MKS-0125Al, H20, RC-14-15.02, FP-202N, PSSK-125Al20 MKS-0125Al, H21, RC-14-1502, SURF./B-K-1 VT-3/IWF SURF./B-K-1

. I I

139 FP-202N~ PSSK-125Al21 VT-3/IWF 140 MKS-0125Al, H22, RC'.'"'14-1502, SURF./B-K-1 FP-202N, PSSK-125Al22 VT-3/IWF 141 MKS-0125Al, H23, RC-14-1502, SURF./B-K-1 FP-202N, PSSK-125A VT-3/IWF 142 MKS-0125Al,H25, RC-14-1502, SURF./B-K...;l FP-202J, PSSK-125A125 VT-3/IWF 143 MKS-0125Al, H28, RC-14-1502, SURF./B-K-1 FP-202J, PSSK-125A128 VT-3/IWF 144 MKS-0125Al, H30, RC-14-1502, SURF ./B-K-1 FP-202K, PSS.K-125A VT-3/IWF 145 MKS-0125Al, H33, RC-14-1502, SURF./B-K-1 FP-202X, PSSK-125A133 VT-3/IWF

  • 146 147 MKS-0127Cl, Hl, SI-84-152, FP-236A, PSSK-127Cll MKS-0127Cl, HS, SI-92-153, PSSK-127C18 SURF./C-C VT-3/IWF SURF./C-C VT-3/IWF 148 MKS-0127Cl, H9, SI-49-1502, SURF./C-C PSSK-127C19 VT-3/IWF 149 MKS-0127C2, H9, SI-52-1502, SURF./C-C B268, PSSK-127C29 VT-3/IWF 150 MKS-0127C2, Hll, SI-150-153, SURF./C-C FP-236A, PSSK-127C211 VT-3/IWF 151 MKS-0127C2, H13, SI-83-152, SURF./C-C FP-236A, PSSK-127C213 VT-3/IWF 152 MKS-0127C2, H14, SI-48-1502, SURF./C-C FP-236A, PSSK-127C214 VT-3/IWF
  • Page 10 Revision 2 September 15, 1988

SURRY UNIT 1 PERIOD 3 INTEGRAL ATTACHMENTS (CONT'D)

  • Item 153 154 MKS-0127El, H3, SI-92-153, FP...;247B, PSSK-127E13 MKS-0127El, H5; SI-92-153, SURF./C-C VT-3/IWF SURF./C-C FP-247B, PSSK-127E15 VT-3/IWF 155 MKS-0127El, H9, SI-92-153, SURF./C-C PSSK-127E19 VT-3/IWF 156 MKS-0127E2, H3, SI-14-153, SURF./C-C FP...;247B, PSSK-127E23 VT-3/IWF 157 MKS-0127E2, HS, SI-14~153, SURF./C-C FP-247B, PSSK-127E25 VT-3/IWF

. 158 MKS-0127E2, HS, SI-14-153, SURF./C-C FP-247A, PSSK-127E28 VT-3/IWF 159 MKS-0127E2, H9, SI-14-153, SURF./C-C PSSK-127E29 VT-3/IWF 160 MKS-0127Fl, H6, SI-6-153, SURF./C-C PSSK-127F16 VT-3/IWF 161 MKS-0127Gl, Hl, SI-92-153, SURF./C-C FP-206G, PSSK-127Gll VT-3/IWF 162 MKS-0127Gl, H17, CH-17-152, SURF./C-C FP-206B, PSSK-127Gl17 VT-3/IWF 163 MKS-0127G2, H17, CH-17-152, SURF./C-C PSSK-127G217 VT-3/IWF*

164 MKS-0127G2, H19, SI-14-153, SURF./C-C FP-206U, PSSK-127G219 VT-3/IWF.

165 MKS-0127G2, H26, SI-14-153, SURF./C-C FP-206G, PSSK-127G VT-3/IWF 166 MKS-0127G2, H27, SI-14-153, SURF./C-C FP-206G, PSSK-127G VT-3/IWF 167 MKS-0127G2, H28, SI-170-153, SURF./C-C PSSK-127G228 VT-3/IWF

  • Page 11 Revision 2 September 1.5, 1988

SURRY UNIT l*

PERIOD 3 INTEGRAL ATTACHMENTS (CONT'D)

  • Item 168 169 MKS-0127G2, H30, SI-170-153, PSSK-127G230 MKS-0127G2, H31, SI-170-153, SURF./C-C VT-3/IWF SURF./C-C FP-206B, PSSK-127G231 VT-3/IWF 170 MKS-0127G2, H32, CH-206-152, SURF./C-C FP-206U, PSSK-127G232 VT-3/IWF 171 MKS-0127G2, H33, CH-206-152, SURF./C-C FP-206U, PSSK-127G233 VT-3/IWF 172 MKS-0127G2, H34, SI-102-152, SURF./C-C FP-206U, PSSK-127G234 VT-3/IWF 173 MKS-0127Jl, H5, SI-145-1502, SURF./C-C FP-202AK, PSSK-127Jl5 VT-3/IWF 174 MKS-0127J2, H3, SI-144-1502, SURF./C-C PSSK-127J23 VT-3/IWF 175 MKS-0127J3, Hl, SI-153-1502, SURF./C-C FP-202Y, PSSK-127J31 VT-3/IWF
  • 176 177 MKS-0127J3, H4, SI-153-1502, FP-202R, PSSK-127J34 MKS-0127J4, Hl, SI-153-1502, PSSK-127J41 SURF./C-C VT-3/IWF SURF./C-C VT-3/IWF 178 MKS-0127J4, HS, SI-153-1502, SURF./C-C FP-202S, PSSK-127J48 VT-3/IWF 179 MKS-0127J5, Hl, SI-145-1502, SURF./C-C FP-202T, PSSK-127J VT-3/IWF

-180 MKS-0127J'5, HJ, SI-145-1502, SURF./C-C

. FP-202K, PSSK-127J53 VT-3/IWF 181 MKS-0127J5, HS, SI-145-1502, SURF./C-C FP-202J, PSSK-127J55 VT-3/IWF 182 MKS-0127J5, H6, SI-145-1502, SURF./C-C FP-202J, PSSK-127J56 VT-3/IWF

  • Page 12 Revision 2 Septeinber 15, 1988

SURRY UNIT 1 PERIOD 3 INTEGRAL ATTACHMENTS (CONT'D)

  • Item 183 184 MKS-OL27J5, H9, SI-144-1502, FP-202S, PSSK-127J59 MKS-0127J5, H13, SI-153-1502, SURF./C-C VT-3/IWF SURF./C-C PSSK-127J513 VT-3/IWF 185 MKS-0131Al, HlO, SHP-31-601, SURF./C-C FP.-247E, PSSK-131A VT-3/IWF 186 MKS-0137Al, H2, CV8-151, SURF./C-C FP-206A, PSSK-137A12 VT-3/IWF 187 MKS-0137Al, H3, CV8-151, VT-3/IWD FP-206A, PSSK-137A13 VT-3/IWF 188
  • MKS-1018Al, H3, WAPD-50-601, VT-3/IWD PSSK-1018Al3 VT-3/IWF 189 MKS-1018A3, H22, WFPD-12-601, VT-3/IWD FP-203B, PSSK-1018 VT-3/IWF 190 MKS-1018B2, Hl, WCMU-52-151, VT-3/IWD FP-247C, PSSK-1018 VT-3/IWF 191 MKS-1018B2, H2, WCMU-53-151, VT-3/IWD FP-247C, PSSK-1018 VT-3/IWF 192 MKS-1018B2, H2, WCMU-53-151 VT-3/IWD FP-247C, PSSK-1018 VT-3/IWF 193 MKS-1018B2, H7, WCMU-52-151, VT-3/IWD FP-247A, *pssK-1018B27 VT-3/IWF 194 MKS-1022Al, Hl, CC,-97-151, VT-3/IWD FP-202R, PSSK-1022All VT-3/IWF 195 MKS-1022A10, H9, CC-85-151, VT-3/IWD FP-202R, PSSK-1022Al09 VT-3/IWF 196 MKS-1022A10, H12, CC-85-151, VT-3/IWD FP-202Y, PSSK-1022A101 VT-3/IWF 197 MKS-1022A3, Hl, CC-101-151, SURF./C-C FP-202Q,_ PSSK-1022 VT-3/IWF Page 13 Revision 2 September 15, 1988

SURRY UNIT 1 PERIOD 3 INTEGRAL ATTACHMENTS (CONT'D)

  • Item 198
  • 199 MKS-1022A5, Hl, CC-93-151, FP-202R, PSSK-1022A51 MKS-1022A5, H15, CC-93-151, SURF./C-C VT-3/IWF SURF./C-C FP-202S, PSSK-1022A515 VT-3/IWF 200 MKS-1022A5, H18, CC-!:)3-151, SURF./C-C FP-2022, PSSK-1022A518 VT-3/IWF 201 MKS-1022A7,
  • Hl, CC-89-151, VT-3/IWD FP-202V, PSSK-1022A71 VT-3/IWF 202 MKS-1022A9, Hl, CC-81-151, VT-3/IWD FP-202V, PSSK-1022A91 VT-3/IWF 203 MKS-1022A9, H5, CC-81-151, VT-3/IWD FP-202V, PSSK-1022A95 VT-3/IWF 204 MKS-1022B3, Hl, CC-76-151, VT-3/IWD FP-202Y, PSSK-1022B31 VT-3/IWF 205 MKS-1022B4, Hl, CC-77-151, VT-3/IWD FP-202Y, PSSK-1022B41 VT-3/IWF 206 MKS-1022B5, Hl, CC-80-151, SURF./C-C FP-202E, PSSK-1022B51 VT-3/IWF 207 MKS-102_2B5, H3, CC-78-151, SURF./C-C 211, PSSK-1022B53 VT-3/IWF 208 MKS-1022B5, H5, CC-79-151, VT-3/IWD 211, PSSK-1022B55 VT-3/IWF 209 MKS-1101A4, H2, CS-14-152, SURF./C-C FP-214A, PSSK-1101 VT-3/IWF 210 MKS-1101A7, H5, CS-88-153, SURF./C-C FP-202AF, PSSK-1101A75 VT-3/IWF 211
  • MKS-1101A7, HS, CS-88-153, SURF./C-C FP-202AE, PSSK-1101A78 VT-3/IWF 212 MKS-1101A7, Hll, CS-88-153, SURF./C-C FP-202AE, PSSK-1101A711 VT-3/IWF Page 14 Revision 2 September 15, 1988

SURRY UNIT 1 PERIOD 3 INTEGRAL ATTACHMENTS (CONT'D)

Item 213 MKS-1101A7, H14, CS-88-153, SURF./C-C FP~202AD, PSSK-1101A714 VT-3/IWF 214 MKS-1101A7, H17, CS-88-153, SURF./C-C FP-202AG, PSSK-1101A717 VT-3/IWF 215 MKS-1101A7, H20, CS-88-153, SURF./C-C FP-202AG, PSSK-1101A720 VT-3/IWF 216 MKS-1101A8, H2, CS-98-153, SURF./C-C FP-247B, PSSK-1101 ' VT-3/IWF 217 MKS-1103A4, H2, RC-116-1502, SURF./B-K-1 FP-202S, PSSK~l103A42 VT-3/IWF 218 MKS-1103A4, HJ, RC-116-1502, SURF./B-K-1 FP-202S, PSSK-1103A43 VT-3/IWF 219 MKS-1103A5, Hl, RC-131-1502, SURF./B-K-1 FP-202Q, PSSK-1103A51 VT-3/IWF 220 MKS-1103A5, H2,.RC-131-1502, SURF./B-K-1 FP-202Q, PSSK-1103A52 VT-3/IWF 221 MKS-1103A6, Hl, RC-147-1502, SURF./B-K-1 FP-202R, PSSK-1103A61 VT-3/IWF 222 MKS-1103A6, H2, RC~l47-1502, SURF./B-K-1 FP-202R, PSSK-1103A62 VT-3/IWF 223 MKS-1103A6, HS, RC-146-1502, SURF./B-K-1 FP-202R, PSSK-1103 . VT-3/IWF 224 MKS-1103A6, H6, RC-147-1502, SURF./B-K-1 FP-202R, PSSK-1103 VT-3/IWF 225 MKS-1106A7, Hf, SI-5-153, . SURF./C-C FP-236B, PSSK-1106 VT-3/IWF 226 MKS-1106A7, H2, SI-10.5-153, SURF./C-C B268, PSSK-1106A72 VT-3/IWF 227 MKS-1106A7, Hl3, SI-106-153, SURF./C-C FP-~36B, PSSK-1106A713

  • VT-3/IWF Page.IS Revision 2 September 15,

SURRY UNIT 1 PERIOD 3 INTEGRAL ATTACHMENTS (CONT'D)

  • Item 228 229 MKS-1106A7, H15, SI-5-153, FP-236B, PSSK-1106 VPA-2-2520, Hl, SURF./C-C VT-3/IWF SURF./C-C VT-3/IWF 230 VPA-2-2520, H2, SURF./C-C VT-3/IWF 231 VPA-2-2540, Hl, SURF./C-C VT-3/IWF 232 VPA-2-2540, H2, SURF./C-C VT-3/IWF 233 VPA-2-2540, H4, SURF./C-C VT-3/IWF 234 VPA-2-2540, HS, SURF./C-C VT-3/IWF 235 DELETED 236 DELETED 237 VPA-2-1300, 3WS, SURF./C-C Seal Water Injection Filter, VT-3/IWF ii (1-CH-FL-4A) 238 DELETED 239 DELETED 240 DELETED

_Page 16 Revision 2 September 15, 1988

SURRY UNIT 1 PERIOD 3 INTEGRAL ATTACHMENTS (CONT'D)

  • Item 241 VPA-2-1120, 2WS, Residual Heat Exchanger, (1-RH-E-lA)

SURF./C-C VT-3/IWF 242 VPA-1-4110, H2, 2H-RC-53, SURF./B-K-1 VT-3/IWF 243 VPA-1-4110, H3, 2 11 -RC-53, SURF./B-K-1 VT-3/IWF 244 VPA-1-4111, H3, 2"-CH-8 SURF./B-K-1 VT-3/IWF 245 VPA-1-4309, H3,. 2"-RC-59 SURF./B-K-1 VT-3/IWF 246 VPA-1-4309, H4, 2 11 -RC-59 SURF./B-K=l VT-3/IWF 247 VPA-1-4310, H4, 2"-CH-10 SURF./B-K-1 VT-3/IWF 248 VPA-1-4507, Hl, 2"-CH-68 SURF./B-K-1 VT-3/IWF 249 VPA-1-4507, H2, 2 11 -CH-68 SURF./B-K-1 VT-3/IWF 250 VPA-1-4507, H3, 2"-CH-68 SURF./B-K-1 VT-3/IWF 251 VPA-1-4600, H6, 2"-RC-53 SURF./B-K-1 VT-3/IWF 252 VPA-1-4600, H7, 2"-RC-53 SURF./B-K-1 VT-3/IWF 253 VPA-1-4600, HS, 2"-RC-53 SURF./B-K-1 VT-3/IWF 254 -VPA-1-4205, Hl, 6"-RC-19 SURF./B-K-1 VT-3/IWF Page 17 Revision 2 September 15, 1988

SURRY UNIT 1 PERIOD 3 INTEGRAL ATTACHMENTS (CONT'D)

Item 255 VPA-1-4301, Hl SURF./B-K-1 VT-3/IWF 256 VPA-1-4500, HS SURF./B-K-1 VT-3/IWF 257 VPA-1-4500, H6 SURF./B-K-1 VT-3/IWF 258 VPA-1-5100B, 2SC, SURF./B-K-1 A RCP (1-RC-P-lA) VT-3/IWF 259 VPA-1-SlOOB, 3SC, SURF./B-K-1 A RCP (1-RC-P-lA) VT-3/IWF 260 VPA-1-SlOOB, 4SC, SURF./B-K-1 A RCP (1-RC-P-lA) VT-3/IWF 261 VPA-1-SlOOB, lSC, SURF./B-K-1 C RCP (1-RC-P-lC) VT-3/IWF 262 VPA-1-5100B, 4SC, SURF./B-K-1 C RCP (1-RC-P-lC) VT-3/IWF 263 VPA-1-2100, W16 SURF./B-H Pressurizer Skirt Weld VT-3/IWF Examine 193" to 290 11 clockwise 264 VPA-2-1300, WS02, l-CH-FL-4B SURF./C-C Seal Water Injection Fiiter 4B VT-3/IWF 265 VPA-2-1140, WS02, 1-CH-E-2 SURF./C-C Non Regenerative Letdown Heat Exchanger VT-3/IWF Page 18 Revision 2 September 15, 1988

Attachment 4 Surry Unit 2 Listing of Welds/Components Subject to Examination

Surry Unit 2 First Period Inspection Plan

SURRY UNIT 2 PERIOD 1

  • ITEM 1 VIR-1-1100 01 Examine from 43.4 Degrees through 105.5 Degrees and from 161.4 Degrees through 204.8 Degrees and from 291.7 Degrees through 360 Degrees.

UT-AUT/Bl.30 2 VIR-1-1100 10 . UT-AUT/B3 . 9 0 3 VIR-1-1100 lONIR UT-AUT/B3.100 4 VIR-1-1100 12 UT-AUT/B3.90 5 VIR-1-1100 12NIR UT-AUT/B3.100 6 VIR-1-1100 14 UT-AUT/B3.90 7 VIR-1-1100 14NIR UT-AUT/B3.100 8 VIR-1-llOOA THRD08 through THRD18 UT-AUT/B6.40 and THRD22 through THRD34 and THRD47 through THRD51.

9 VIR-1-1200 01 VT-3/B13.10 RV interior, all accessible areas, Examine all areas made accessible during normal refueling *

  • 10 11 VIR-1-1300A 01 Examine from O" through 179" VIR-1-1400 SOl through S20 UT,MT/Bl.40 UT,MT/B6.30 12 VIR-1-1400 NOl through N20 MT/B6 .10 13 VIR-1-1400 CCWOl through CCW20 VT-1/B6.50 14 VIR-1-1400 CVWOl through CVW20 VT-1/B6.50 15 VIR-1-2100 BOLTING (Manway Bolting) VT-1/B7.20 16 VIR-1-2100 03 UT/B2.12 Examine from O" through 4" 17 VIR-1-2100 04 UT/B2.11 Examine from O" through 96 11 18 VIR-1-2100 lONIR (RELIEF REQUEST) VT-l/BJ.120 19 VIR-1-2100 llNIR (RELIEF REQUEST) VT-l/BJ.120
  • Page 1 Revision O September 15, 1988

SURRY UNIT 2 PERIOD 1 ITEM 20 VIR-1-2100 12NIR (RELIEF REQUEST)_ VT-1/B3.120 21 DELETED 22 DELETED 23 VIR-1-3100 C-BOLTS (Manway) VT-1/B7. 30 24 VIR-1-3100 2-01 UT/B2. 40 25 VIR-1-3100 3ANIR (RELIEF REQUEST) VT-1/B3.140 26 VIR-1-3100 3BNIR (RELIEF REQUEST) VT-1/B3.140 27 VIR-1-3200 04 UT/Cl. 20 Examine 0 11 through 611 28 VIR-1-3200 22 UT/Cl. 20 Examine 0 11 through 6 II 29 VIR-1-3200 23 UT/Cl. 20 Examine 0 11 through 6 II 30 VIR-1-3200* 24 UT/Cl. 20 Examine 0 11 th.rough 611 31 VIR-1-4100 01DM UT,PT/B5.10 32 VIR-1-4100 050M UT,PT/B5.30 33 VIR-1-4100 08 UT,PT/B9.11 34 VIR-1-4100 18 PT/B9.12 (RELIEF REQUEST) 35 VIR-1-4101 02 UT,PT/B9.11 36 VIR-1-4101 06 UT,PT/B9.11 37 VIR-1-4102 OlBC UT,PT/B9.31 38 VIR-1-4102 02 UT,PT/B9.11 39 VIR-1-4102 03 UT,PT/B9.11 40 VIR-1-4103 01 UT,PT/B9.11 41 VIR-1-4103 02 UT,PT/B9.11

  • Page 2 Revision 0 September 15, 1988

SURRY UNIT 2 PERIOD 1 ITEM 42 VIR-1-4103 05 UT,PT/B9.ll 43 VIR-1-4104 11 UT,PT/B9.ll 44 VIR-1-4105 02 UT,PT/B9.ll 45 VIR-1-4105 13 PT/B9. 40 46 VIR-1-4105 14 PT/B9. 40 47 VIR-1-4106 OlBC PT/B9.32 48 VIR-1-4106 02 PT/B9. 21 49 VIR-1-4106 03 PT/B9. 21 50 VIR-1-4107 OlBC PT/B9. 32 51 VIR-1-4108 02 PT/B9.40 52 VIR-1-4108 03 PT/B9. 40 53 VIR-1-4108 04 PT/B9. 40 54 VIR-1-4108 05 PT/B9. 40 55 VIR-1-4108 06 PT/B9. 40 56 VIR-1-4108 08 PT/B9. 40 57 VIR-1-4108 09 PT/B9. 40 58 VIR-1~4108 10 PT/B9. 40 59 VIR-1-4108 11 PT/B9.40 60 VIR-1-4108 41 PT/B9. 40 61 VIR-1-4109 03 PT/B9. 40 62 VIR-1-4109 04 PT/B9.40 63 VIR-1-4109 05 PT/B9.40 64 VI:R-1-4110 OlBC PT/B9.32 65 VIR-1-4110 02BW PT/B9. 21 Page 3 Revision O September 15, 1988

SURRY UNIT 2 PERIOD 1

  • ITEM 66 67 68 VIR-1-4110 VIR-1-4110 VIR-1-4110 03 04 05 PT/B9. 40 PT/B9. 40 PT/B9. 40 69 VIR-1-4110 06 PT/B9. 40 70 VIR-1-4110 07 PT/B9. 40
  • 71 VIR-1-4110 08 PT/B9. 40 72 VIR-1-4110 27 PT/B9. 40 73 DELETED 74 VIR-1-4111 02 PT/B9. 40 75 VIR-1-4111 03 PT/B9. 40 76 VIR-1-4111 04 PT/B9. 40 77 VIR-1-4111 05 PT/B9. 40 78 VIR-1-4112 02 PT/B9.40 79 VIR-1-4112 03 PT/B9. 40 80 VIR-1-4112 04 PT/B9. 40 81 VIR-1-4114 07 PT/B9. 40
  • 82 VIR-1-4114 21 PT/B9. 40 83 VIR-1-4114 22 PT/B9. 40 84 VIR-1-4200 01DM UT,PT/B5.10 85 VIR-1-4200 04 UT,PT/B9.11 86 VIR-1-4201 02 UT,PT/B9.11 87 VIR-1-4201 03 UT,PT/B9.il 88 VIR-1-4202 03 UT,PT/B9.11 89 VIR-1-4203 02
  • UT, PT/B9. 11 Page 4 Revision O September 15 ,* 1988

SURRY UNIT 2 PERIOD 1

  • ITEM 90 91 92 VIR-1-4204 VIR-1-4204 VIR-1-4204 02 03 44 UT,PT/B9.11 UT,PT/B9.ll PT/B9.40 93 VIR-1-4204 45 PT/B9. 40 94 VIR-1-4204 46 PT/B9.40 95 VIR-1-4204 47 PT/B9.40 96 VIR-1-4204 48 PT/B9. 40 97 VIR-1-4204 49 PT/B9. 40 98 VIR-1-4204 50 PT/B9.40 99 VIR-1-4204 51 PT/B9. 40 100 VIR-1-4204 52 PT/B9. 40 101 -vrR-1-4204 53 PT/B9 .40 102 VIR-1-4204 54BW PT/B9. 21 103 VIR-1-4205 02
  • UT, PT/B9. 11 104 VIR-1-4206 02 PT/B9. 21 105 VIR-1-4206 06 PT/B9. 21 106 VIR-1-4207 02 PT/B9.21 107 VIR-1-4207 03 PT/B9. 21 108 VIR-1-4207 04 PT/B9. 21 109 VIR-1-4207 07 PT/B9. 21 110 VIR-1-4207 08 PT/B9. 21 111 VIR-1-4207 09 PT/B9. 21 112 VIR-1-4207 10 PT/B9. 21 113 VIR-1-4207 13 PT/B9.21
  • Page 5 Revision O September 15, 1988

SURRY UNIT 2 PERIOD 1

  • ITEM 114 115 116 VIR-1-4208 VIR-1-4209 VIR-1-4209
  • 05 08 19 PT/B9. 40 PT/B9.40 PT/B9.40 117 DELETED 118 VIR-1-4213 22 PT/B9. 40 119 VIR-1-4300 01DM UT,PT/B5.10 120 VIR-1-4300 06DM UT,PT/B5.30 121 VIR-1-4301 02 UT,PT/B9.11 122 VIR-1-4301 03 UT,PT/B9.ll 123 VIR-1-4302 06 UT,PT/B9.ll 124 VIR~l-4303 01 UT,PT/B9.ll 125 VIR-1-4304 02 U:T,PT/B9.11 VIR-1-4306 HOl 126 PT/Bl0.10 127 VIR-1-4310 05 PT/B9. 40 128 VIR-1-4310 06 PT/B9. 40 129 VIR-1-4311 02 PT/B9. 40 130 VIR-1-4311 03 PT/B9.40 131 VIR-1-4311 04 PT/B9 .* 40 132 VIR-1-4311 05 PT/B9.40 133 VIR-1-4313 01 PT/B9. 40 134 VIR-1-4313 02 .* PT/B9. 40 135 VIR-1-4313 03 PT/B9. 40 136 VIR-1-4313 04 PT/B9. 40 137 DELETED
  • Page 6 Revision O September 15, 1988

SURRY UNIT 2 PERIOD 1

  • ITEM 138 139 140 VIR-1-4500 VIR-1-4501 VIR-1-4505 01DM 01DM 05 UT,PT/B5.20 UT;PT/B5.20 UT,PT/B9.ll 141 VIR-1-4506 06 UT,PT/B9.ll 142 VIR-1-4507 02 PT/B9.40 143 VIR-1-4507 03 PT/B9. 40 144 VIR-1-4507 04 PT/B9. 40 145 VIR-1-4507 05 PT/B9. 40 146 VIR-1-4507 06 PT/B9. 40 147 VIR-1-4600 16 PT/B9. 21 148 VIR-1-4600 17 PT/B9. 21 149 VIR-1-4600 33 PT/B9.21 150 VIR-1-4658 01 PT/C5.11 151 VIR-1-4658 13 PT/C5.11 152 VIR-1-4700 01 VT-1/B7.50 153 VIR-1-4700 02 VT-1/B7.50 154 VIR-1-4700 05 VT-1/B7.50 155 VIR-1-4700 09 VT-1/B7.50 156 VIR-1-4700 10 VT-1/B7.50 157 VIR-1-4700 13 VT-1/B7.50 158 VIR-1-4700 17 VT-1/B7.50 159 VIR-l-5100A FLGBLTS (Loop 1 Main Flange UT-O/B6.180 Bolting) 160 VIR-l-5100A SHBLTS (Loop 1 Main Seal VT-1/B6. 200 House Bolts)
  • Page 7 Revision o September 15, 1988

SURRY UNIT 2 PERIOD 1

. ITEM 161 VIR-l-5100B . 2-SCOl PT/Bl0.20 162 VIR-1-6100 05 (MOV-2594 Bolting) UT-O/B6.210 163 VIR-1-6100 06 (MOV-2595 Bolting) UT-O/B6.210 164 VIR-1-6200 34 VT-3/B12.40 165 VIR-1-6300 08 VT-1/B7. 70 166 VIR-1-6300 10 VT-1/B7.70 167 VIR-1-6300 16 VT-1/B7. 70 168 VIR-1-6300 26 VT-1/B7.70 169 VIR-1-6300 28 VT-1/B7. 70 170 VIR-1-6300 32 VT-1/B7.70 171 VIR-1-6300 46 VT-1/B7. 70

, 172 VIR-1-6300 60 VT-1/B7.70 173* VIR-1-6300 61 VT-1/B7. 70

  • 174 175 176 VIR-1-6300 VIR-1-6300 VIR-1-6300 62 63 64 VT-1/B7. 70 VT-1/B7. 70 VT-1/B7. 70 177 VIR-1-6300 65 VT-1/B7. 70 178 VIR-1-6300 66 VT-1/B7.70 179 VIR-1-6300 67 VT..-1/B7.70 180 VIR-1-6300 68 VT-1/B7.70 181 VI~-1-6300 69 VT-1/B7.70 182 VIR-1-6300 70 VT-1/B7.70 183 VIR-2-1100 1-02 UT/C1.30 Page 8 Revision o September 15, 1988

SURRY UNIT 2 PERIOD 1

  • ITEM 184 185 VIR-2-1100 1-06 Examine 360 Degrees DELETED UT/Cl.10 186 VIR-2-1100 1-09NIR (RELIEF REQUEST) VT-1/C2.22 Examine 100%

187 VIR-2-1100 2-03 UT/Cl.10 Examine O" through 142 11 188 VIR-2-1100 2-05 UT/Cl.10 Examine O" through 142 11 189 VIR-2-1100 2-06 UT/Cl.10 Examine 360 Degrees 190 VIR-2-1100 2-09 MT,UT/C2.21 Examine 0 11 through 16 11 191 VIR-2-1100 2-10 MT,UT/C2.21 Examine 0 11 through 33 11 192 VIR-2-1100 3-05 UT/Cl.10 Examine 360 Degrees 193 VIR-2-1100 3-08 UT/Cl. 20 Examine 360 Degrees 194 VIR-2-1110 01 UT/Cl. 20 Examine 0 11 through 12 11 195 VIR-2-:1110 02 UT/Cl.10 Examine O" through 12 11 196 VIR-2-1120 lA-02 UT/Cl.10 Examine O" through 22 11 197 VIR-2-1120 lB-01 UT/Cl. 20 Examine O" through 44 II 198 VIR-2-1120 lB-02 UT/Cl.10 Examine 22 II through 44" 199 DELETED

  • Page 9 Revision O September 15, 1988

SURRY UNIT 2 PERIOD 1 ITEM 200 VIR-2-1140 01 UT/Cl.10 Examine 1 11 through 30 11 201 VIR-2-1140 02 UT/Cl.10 Examine 1 11 through 30 11 202 VIR-2-1140 WS01 PT/C3.10 203 VIR-2-1300 4A-Ol UT/Cl. 20 Examine 1 11 through 12 11 204 VIR-2-1300 4A-WS03 PT/C3 .10.

205 VIR-2-1300 4B-02 UT/Cl.10 Examine 1 11 through 12 11

.206 VIR-2-2100 30 PT,UT/C5.21 207 DELETED 208 DELETED 209 VIR-2-2100 34 PT,UT/C5.21 210 VIR-2-:2100 37L PT,UT/C5.22 211 DELETED 212 VIR-2-2101 21 PT,UT/C5.21 213 VIR-2-2200 26 PT,UT/C5.21 214 DELETED 215 VIR-2-2200 32L PT,UT/C5.22 216 DELETED 217 VIR-2-2300 32 PT,UT/C5.21 218 DELETED 219 VIR-2-2303 01  !?T,UT/C5.21 220 VIR-2-2303 02 PT,UT/C5.21 221 VIR-2-2500 03 PT,UT/C5.21 Page 10 Revision O September 15, 1988

SURRY UNIT 2 PERIOD 1 ITEM 222 VIR-2-2500 09 PT,UT/C5.21 223 VIR-2-2500. 10 PT,UT/C5.21 224 VIR-2-2510 10 PT/C5.11 225 VIR-2-2510 20 PT/C5.11 226 VIR-2-2510 21 PT/C5.11 227 VIR-2-2510 33 PT/C5.11 228 VIR-2-2510 34 PT/C5.11 229 VIR-2-2520 01 PT,UT/C5.21 230 VIR-2-2522 05 PT,UT/C5.21 231 VIR-2-2522 06 PT,UT/C5.21 232 VIR-2-2522 07 PT,UT/C5.21 233 VIR-2-2522 08 PT,UT/C5.21 234 VIR-2;,...2541 01 PT,UT/CS.21 235 VIR-2-2541 02 PT,UT/C5.21 Page 11 Revision o September 15, 1988

Surry Unit 2 First Period Integral Attachment Inspection Plan

SURRY UNIT 2 PERIOD 1 INTEGRAL ATTACHMENTS

  • Item 1 MKS-0118Ll, H33, WCMU106-151 PSSK-118L133, FP247D VT-3/IWD VT-3/IWF 2 MKS-0118Gl, HOl, WAPD102-601 VT-3/IWD PSSK-118Gll, FP247F VT-3/IWF 3 MKS-0118Gl, H02, WAPD102-601, VT-3/IWD PSSK-118Gl2, FP247F VT-3/IWF 4 MKS-0118Gl, H03, WAPD104""."601, VT-3/IWD PSSK-118Gl3, FP247F VT-3/IWF 5 MKS-0118Ll, HOl, WCMU108-151, VT-3/IWD PSSK-118Lll, FP247L VT-3/IWF 6 MKS-0118G2, HOl, WAPDlOl-601, VT-3/IWD PSSK-118G21, FP247F VT-3/IWF 7 MKS-0118Ll, H28, WCMU107-151, VT-3/IWD PSSK-118L128, FP247D VT-3/IWF 8 MKS-0118Ll, H22, WCMU108-151, VT-3/IWD PSSK-118L122, FP247D VT-3/IWF.

9 MKS-0118Ll, H06, WCMU105-151, VT-3/IWD PSSK-118Ll6, FP247L VT-3/IWF 10 MKS-0118Ll, H04, WCMU108-151, VT-3/IWD PSSK-118L14, FP247F VT-3/IWF 11 MKS-0112AA1, H34, CC15-121, SURF./C-C PSSK-112AA134, FP202D VT-3/IWF 12 MKS-0112AA1, H32D, CC15-121, SURF./C-C PSSK-112AA132D, FP202BA VT-3/IWF 13 MKS-02022A4, H06, CC173-151, SURF./C-C PSSK-2022A46, FP202BC VT-3/IWF 14 MKS-02022A3, HOl, CC181-151, SURF./C-C PSSK-2022A31, FP202BD VT-3/IWF 15 MKS-02022B3, HOl, CC156-151, VT-3/IWD PSSK-2022B31, FP202BD VT-3/IWF 16 MKS-02022Bl, H19, CC160-151, VT-3/IWD PSSK-2022Bl19, FP202BC VT-3/IWF Page 1 Revision O September 15, 1988

SURRY UNIT 2 PERIOD 1 INTEGRAL ATTACHMENTS (CONT'D)

Item 17 MKS-CHl, H07E, CH515-152, SURF./B-K-1 PSSK-CH17E, FP202BE VT-3/IWF 18 MKS-CH9, H12, CH379-1502, SURF./B-K-1 PSSK-CH912, FP202L VT-3/IWF 19 MKS-CH9, H03, CH379-1502, SURF./B-K-1 PSSK-CH93, FP202P VT-3/IWF 20 MKS-CH59, H02, CH426-152 SURF./B-K-1 PSSK-CH592, VT-3/IWF 21 MKS-0127Gl, H02, SI317-152, SURF./C-C PSSK-127G12, VT-3/IWF 22 MKS-0127Gl, H09A, SI372-152, SURF./C-C PSSK-127G19A, FP206J VT-3/IWF 23 MKS-0127G2, H23, CH505-152, SURF./C-C PSSK-127G223, FP206V VT-3/IWF 24 MKS-0127G2, H24, CH505-152, SURF./C-C PSSK-127G224, FP206V VT-3/IWF

  • 25 26 MKS-0127Gl, H14A, SI319-152, PSSK-127G114A, MKS-0127Gl, H13A, SI318-152, PSSK-127G113A, SURF./C-C VT-3/IWF SURF./C-C VT-3/IWF 27 MKS-123C2, H03, CS104-153, SURF./C-C PSSK-123C23, FP202AW VT-3/IWF 28 MKS-123C2, HOl, CS104-153, SURF./C-C PSSK-123C21, FP202AW VT-3/IWF 29 MKS-123Cl, Hll, CS103-153, SURF./C-C PSSK-123Clll, FP202Y VT-3/IWF 30 MKS-123Cl, H09, CS103-153, SURF./C-C PSSK-123C19, FP202Y VT-3/IWF 31 MKS-123Cl, H07, CS103-153, SURF./C-C PSSK-123C17, FP202AB VT-3/IWF 32 MKS-123Cl, HOl, CS103-153, SURF./C-C PSSK-123Cll, FP202AX VT-3/IWF Page 2 Revision O September 15, 1988

SURRY UNIT 2 PERIOD 1 INTEGRAL ATTACHMENTS (CONT ID)

Item 33 MKS-123A2, H14, CS122-153, SURF./C-C PSSK-123A214, FP202AH VT-3/IWF 34 MKS-123A2, Hll, CS122-153, SURF./C-C PSSK-123A211, FP202AG VT-3/IWF 35 MKS-123Jl, HOl, CS134-153, SURF./C-C PSSK-123Jll, FP236B VT-3/IWF 36 MKS-123Jl, H04, CS134-153, SURF./C-C PSSK-123J14, FP236B VT-3/IWF ,

37 MKS-123Ml, H03, CSlOl-153, SURF./C-C PSSK-123M13, FP247D VT-3/IWF 38 MKS-123Ll, H04, CS102-153, SURF./C-C PSSK-123L14, FP247D VT-3/IWF 39 MKS-123Kl, H03, CS133-153, SURF./C-C PSSK-123K13, FP236B VT-3/IWF 40 MKS-123Al, H03, CS104-153, SURF./C-C PSSK-123A13 VT-3/IWF 41 MKS-123Al, H04, CS104-153, SURF./C-C PSSK-123A14, FP202AW VT-3/IWF 42 MKS-123A2, HOB, CS122-153, SURF./C-C PSSK-123A28, VT-3/IWF 43 MKS-123Al, H14, CS123-153, SURF./C-C PSSK-123A114, FP202AH VT-3/IWF 44 MKS-123Al, Hll, CS123-153, SURF./C-C PSSK-123Alll, FP202AJ VT-3/IWF 45 MKS-123Al, HOS, CS123-153, SURF./C-C PSSK-123A18, FP202AF VT-3/IWF 46 MKS-2101A9, H15, CS188-153, SURF./C-C PSSK-2101A915, FP202AH VT-3/IWF 47 MKS-2101A9, H12, CS188-153, SURF./C-C PSSK-2101A912, FP202AG VT-3/IWF 48 MKS-2101A9, H09, CS188-153, SURF./C-C PSSK-2101A99, FP202AF VT-3/IWF Page 3 Revision o September 15, 1988

SURRY UNIT 2 PERIOD 1 INTEGRAL ATTACHMENTS (CONT'D)

Item 49 MKS-2101A9, HOG, CS188-153, SURF./C-C PSSK-2101A96, FP202AF VT-3/IWF 50 MKS-2101A9, H21, CS188-153, SURF./C-C PSSK-2101A921, FP202AJ VT--3/IWF 51 MKS-2101A9, H18, CS188-153, SURF./C-C PSSK-2101A918, FP202AH VT-3/IWF 52 MKS-0137Al, H02, CVlOS-151, SURF./C-C PSSK-137A12, FP206N VT-3/IWF 53 MKS-0137Al, H03, CVlOS-151, SURF./C-C PSSK-137A13, FP206N VT-3/IWF 54 MKS-0102Gl, H04, WFPD109-601, SURF./C-C PSSK-102G14, FP202AC VT-3/IWF 55 MKS-OlOOGl, HOl, WFPD117-601, SURF./C-C PSSK-lOOGll, FP202AZ VT-3/IWF 56 MKS-0102Gl, H02, WFPD109-601, SURF./C-C PSSK-102G12, FP202AZ VT-:-3/IWF 57 MKS-OlOOGl, H04, WFPD117-601, SURF./C-C PSSK-100G14, FP202AD VT-3/IWF 58 MKS-OlOOGl, H05, WFPD117-601, SURF./C-C PSSK-100G15, FP202AD VT-3/IWF 59 MKS.:.OlOOGl, HOG, WFPD117"'.'601, SURF./C-C PSSK-100G16, FP202AD VT-3/IWF 60 MKS-OlOOGl, H07, WFPD117-601, SURF./C-C PSSK-100G17, FP202AE VT-3/IWF 61 MKS-OlOOGl, HOS, WFPD117-601, SURF./C-C PSSK-100G18, FP202AE VT-3/IWF 62 MKS-0101Gl, H02, WFPD113-601, SURF./C-C PSSK-101G12, FP202AZ VT-3/IWF 63 MKS-2018A5, HOl, WFPD117-601, SURF./C-C PSSK-2018A51, FP247G VT-3/IWF 64 MKS-SHP-1, H117, SHP145-601, SURF./C-C PSSK-SHP-1117, FP247L VT-3/IWF Page 4 Revision o September 15, 1988

SURRY UNIT 2 PERIOD 1 INTEGRAL ATTACHMENTS (CONT'D)

Item 65 MKS-SHP-1, H17, SHP145-601, SURF./C-C PSSK-SHP-117, FP247K VT-3/IWF 66 MKS-SHP-3, Hll5, SHP-147-601, SURF./C-C PSSK-SHP-3115, FP247L VT-3/IWF 67 MKS-SHP-2, Hll6, SHP-146-601, SURF./C-C PSSK-SHP-2116, FP247L VT-3/IWF 68 MKS-SHP2, Hl6, SHP-146-601, SURF./C-C PSSK-SHP216, FP247L VT-3/IWF 69 MKS-SHP3, Hl5, SHP-147-601, SURF./C-C PSSK-SHP315, FP247H VT-3/IWF 70 MKS-0101Dl, HOl, SHP102-601, SURF./C-C PSSK-101Dll, FP202AZ VT-3/IWF 71 MKS-0101Dl, H02, SHP102-601, SURF./C-C PSSK-101Dl2, FP202AZ VT-3/IWF 72 MKS-0102Dl, H02, SHP103-601, SURF./C-C PSSK-102Dl2, FP203A VT-3/IWF

  • 73 74 MKS-0102Dl, H03, SHP103-:-601, PSSK-102Dl3, FP202AZ MKS-0102Dl, H04, SHP103-601, PSSK-102Dl4, FP202AZ SURF./C-C VT-3/IWF SURF./C-C VT-3/IWF 75 MKS-0100Dl, HOB, SHPlOl-601, SURF./C-C PSSK-100Dl8, FP202AJ VT-3/IWF 76 MKS-0100Dl, H06, SHPlOl-601, SURF./C-C PSSK-100Dl6, FP202AH VT-3/IWF 77 MKS-0100Dl, H04, SHPlOl-601, SURF./C-C PSSK-100Dl4, FP202AH VT-3/IWF 78 MKS-0103Al, H28, SHP103-601, SURF./C-C PSSK-103Al28, FP203A VT-3/IWF 79 MKS-0103Al, H29, SHP102-601, SURF./C-C PSSK-103Al29, FP203A VT-3/IWF 80 MKS-0103Al, H30, SHPlOl-601, SURF./C-C PSSK-103Al30, FP203A VT-3/IWF Page 5 Revision O September 15, 1988

SURRY UNIT 2 PERIOD 1 INTEGRAL ATTACHMENTS (CONT'D)

Item 81 MKS-0103Al, H04, SHP103-601, SURF./C-C PSSK-103A14, FP247H VT-3/IWF 82 MKS-RC2, HOl, RC416-1502, SURF./B-K-1 PSSK-RC21, FP202U VT-3/IWF 83 MKS-RC2, H02, RC416-1502, SURF./B-K-1 PSSK-RC22, FP202AP VT-3/IWF 84 MKS-RC3, HOl, RC431-1502, SURF./B-K-1 PSSK-RC31, FP202V VT-3/IWF 85 MKS-RC3, H02, RC431-1502 SURF./B-K-1 PSSK-RC32, FP202AL VT-3/IWF 86 MKS-RCl, HOl, RC447-1502, SURF./B-K-1 PSSK-RCll, FP202S VT-3/IWF 87 MKS-RCl, H02, RC447-1502, SURF./B-K-1 PSSK-RC12, FP202AS V'i'-3/IWF 88 MKS-0122Dl, HlO, RC323-1502, SURF./B-K-1 PSSK-0122D110, FP202Z VT-3/IWF

  • 89 90 MKS-0122Ll, H09, RC322-1502, PSSK-0122L19, FP202AL MKS-0125Al, H04, RC315-1502, PSSK-0125A14, FP202AV SURF./B-K-1 VT-3/IWF SURF./B-K-1 VT-3/IWF 91 MKS-0125Al, HOl, RC315-1502, SURF./B-K-1 PSSK-0125All, FP202AG VT-3/IWF 92 MKS-0125Al, H02, RC315-1502, SURF./B-K-1 PSSK-0125A12, FP202AG VT-3/IWF 93 MKS-0124A2, H05, RC340-602, SURF./B-K-1 PSSK-0124A25, FP202AG VT-3/IWF 94 MKS-0124A2, H113, RC337-1502, SURF./B-K-1 PSSK-0124A2113, FP202AL VT-3/IWF 95 MKS-0124A2, H114, RC340-602, SURF./B-K-1 PSSK-0124A2114, FP202AG VT-3/IWF 96 MKS-0124A2, H02, RC336-602, SURF./B-K-1 PSSK-0124A22, FP202AL VT-3/IWF Page 6 Revision O September 15, 1988

SURRY UNIT 2 PERIOD 1 INTEGRAL ATTACHMENTS (CONT'D)

Item 97 MKS-0124Al, H21A, RC339-1502, SURF./B-K-1 PSSK-0124Al21A, FP202AG VT-3/IWF 98 VIR-1-4306, Hl, 3"-RC-447 SURF./B-K-1 Examine 100% VT-3/IWF 99 VIR-l-5100B, lSC SURF./C-C RC PUMP B, Examine 100% VT-3/IWF 100 VIR-2-1140, WSOl SURF./C-C Non Regenerative Letdown VT-3/IWF Heat Exchanger 101 VIR-2-1300, WS03 SURF./C-C Seal Water Injection Filter 4A VT-3/IWF

  • Page 7 Revision o September 15, 1988

Surry Unit 2 Second Period Inspection Plan

SURRY* UNIT 2

  • PERIOD 2 REACTOR VESSEL COMPONENTS
  • ITEM 1 Weld 1, closure head flange, VIR-1-1300A, *179 in. to 358 in. clockwise.

(O' ref. stud hole #1 centerline)

UT,MT/Bl.40 2 N21 through N39, closure head nuts, MT/B6.10 Examine 100%, VIR-1-1400 3 S21 through S39, closure head studs, UT,MT/B6.30 Examine 100% when r*emoved, VIR-1-1400 4 CCW21 through CCW39, concave washers, VT-1/B6. 50 Examine 100%, VIR-1-1400 5 CVW21 through CVW 39, convex washers, VT-1/B6.50 Examine 1001, VIR-1-1400 6 Remaining closure studs and nuts, VT-1/Augmented Examine 100%, VIR-1-1400 (Each Refuel) 7 Rx vessel _interior, all accessible areas, VT-3/B13.10 VIR-1-1200, Examine areas made

  • accessible during normal refueling.

Page 1 Revision 1 September 15, 1988

SURRY UNIT 2 PERIOD 2 UPPER PRESSURIZER ITEM 8 Weld 7, VIR-1-2100; 2-RC-E-2, VT-2/B2.ll Examine 96 in. to 192 in. clockwise, Relief Request (O' ref. centerline of manway) 9 Weld 2, VIR-1-2100, 2-RC-E-2 VT-2/B2.12 Examine 4 in. to 8 in. Relief Reque_st (O' ref. intersection of weld 2 and 7)

  • 10 Weld 1DM, VIR-1-4502, C Pzr. safety, UT,PT/B5.20 Examine 100%

11 Weld 1DM, VIR-1-4503, A Pzr. safety UT,PT/B5.20 Examine 100%

12 16 bolts, VIR-1-2100, 2-RC-E-2, manway, VT-1/B7. 20 Examine in place under tension or wheri Each Refuel removed *.

13 8 studs, 8 nuts, SV-2551B VT-1/B7.70 (Item 85, VIR-1-6300), VIR-1-4501, Examine in place under tension or when removed.

14 8 studs, 8 nuts, SV-2551C, VT-1/B7.70 (Item 86, VIR-1-6300), VIR-1-4501 Examine in place under tension or when removed.

15 8 studs, 8 nuts, SV-2551A, VT-1/B7.70 (Item 87, VIR-1-6300), VIR-1-4503, Examine in place under tension or.when removed.

Page 2 Revision 1 September 15, 1988

SURRY UNIT 2 PERIOD 2 LOWER PRESSURIZER ITEM 16 Weld 4, VIR-1-2100, 2-RC-E-2, UT/B2 .11 Examine 96 to 192 in. clockwise,*

(O' ref. centerline of manway) 17 Weld 3, VIR-1-2100, 2-RC-E-2, UT/B2.12 Examine*4 to 8 in. clockwise, (O' ref. intersection of welds 3 and 4) 18 Weld l(BC), VIR-1-4507, 2-CH-368, PT/B9. 32 Examine 100%

19, 4 studs, 4 nuts, PCV-2455A, VT-1/B7.70 (Item 71, VIR-1-6300), VIR-1-4505, Examine in place under tension or when removed.

20 4 studs, 4 nuts, PCV-2455B, VT-1/B7. 70 (Item 72, VIR-1-6300), VIR-1-4506, Examine in place under tension or when removed.

20.1 15NIR. VIR-1-2100, 2-RC-E-2, VT-1/B3.120 Examine 100% external {Relief Request) I

  • Page 3 Revision 1 September 15, 1988.

SURRY UNIT 2 PERIOD 2 A LOOP ROOM/RCP CUBICLE ITEM 21 Weld 1, VIR-1-3100, 2-RC-E-lA, UT/B2. 40 Examine 100%, ( 0' ref. top centerline of hotleg manway 22 Weld 16, VIR-1.:..4100, 27.5-RC-303, UT,PT/B9.11 Examine 100%

23 Weld 15, VIR-1-4100, 27.5.,-RC-303, UT,PT/B9.11 Examine 100%

24 Weld 14, VIR-1-4100, 27.5-RC-303, UT,PT/B9.11 Examine 100%

25 Weld 13, VIR-1-4100, *27. 5-RC-303, UT,PT/B9.11 Examine 100%

26 Weld 12, VIR-1-4100, 27.5-RC-303, UT,PT/B9.11 Examine 100%

27 Weld 20, VIR-1-4100, 31-RC-302, . PT/B9 .12 Examine 100% Relief.Request 28 Weld 3, VIR-1-4101, 14-RH-101, UT,PT/B9.12 Examine 100%

29 Weld ..8, VIR-1-4103, 8-RC-311, UT, PT/B9. 11 Examine 100%

30 Weld 7, VIR-1-4103, 8-RC-311, UT,PT/B9.11 Examine 100%

31 Weld 6, VIR-:-1-4103, 8-RC-311, UT,PT/B9.11 Examine 100%

32 Weld 3, VIR-1-4103, 8-RC-311, UT,PT/B9.11 Examine 100%

33 Weld 3, VIR-1-4104, 6-RC-316, UT,PT/B9.11 Examine 100%

34 Weld 4, VIR-1-4104, 6-RC-316, UT,PT/B9.ll Examine 100%

35 Weld 3, VIR-1-4105, 6-RC-317, UT,PT/B9.11 Examine 100%

Revision 1 September 15, 1988

SURRY UNIT 2 PERIOD 2 A LOOP ROOM/RCP CUBICLE (CONT'D)

  • ITEM 36 Weld 6, VIR-1-4105, 6-SI-345, Examine 100%

UT,PT/B9.11 UT,PT/B9.11 37 Weld 7, VIR-1-4105, 6-SI-345, Examine 100%

38 Weld 8, VIR-1-4105, 6-SI-345, UT,PT/B9.11 Examine 100%

39 Weld 9, VIR-1-4105,

  • 6-SI-345, UT,PT/B9.11 Examine 100%

40 Weld 7; VIR-1-4106, 3-RC-431, PT/B9. 21 Examine 100%

41 Weld 8, VIR-1-4106,. 3-RC-431, PT/B9. 21 Examine 100%

42 Weld 9, VIR-1-4106, 3-RC-431, PT/B9. 21 Examine 100%

43 Weld 10, VIR-1-4106, 3-RC-431, PT/B9.21 Examine 100%

44 Weld 23, VIR-1-4109, 2-R<::;-345, PT/B9.40 Examine 100%

45 Weld 22, VIR-1-4109, 2-RC-345, PT/B9 .40 Examine 100%

46 Weld 21, VIR-1-4109, 2-RC-345, PT/B9. 40 Examine 100%

47 Weld 20, VIR-1-4109, 2-RC-345, PT/B9. 40 Examine 100%

48 Weld 19, VIR-1-4109, 2-RC-345, PT/B9.40 Examine 100"%

4*9 Weld 18, VIR-1-4109, 2-RC-345, PT/B9. 40 Examine 100%

50 Weld 17, VIR-1-4109, 2-RC-345, PT/B9. 40 Examine 100%

51 Weld 15, VIR-1-4111, 2-CH-305, PT/B9. 40 Examine 100%

  • Page 5 Revision 1 September 15, 1988

SURRY UNIT 2 PERIOD 2 A LOOP ROOM/ RCP CUBICLE (CONT'D)

ITEM 52 Weld 17, VIR-1-4111, 2-CH-305, PT/B9. 40.

Examine 100%

53 Weld 19, VIR-1-4111, 2-CH-305, PT/B9.40 Examine 100%

54 Weld 29, VIR-1-4112, 2-RC-429, PT/B9. 40 Examine 100%

55 Weld 27, VIR-1-4112, 2-RC-429, PT/B9.40 Examine 100%

56 Weld 2~, VIR-1-4112, 2-RC-429, PT/B9.40 Examine 100%

57 Weld 25, VIR-1-4112, 2-RC-429, PT/B9.40 Examine 100%

58 Weld 24, VIR-1-4112, 2-RC-429, PT/B9.40 Examine 100%

59 12 studs, 12 nuts, 2-SI-241, VT;...1/B7.70 (Item 76, VIR-1-6300) VIR-1-4105, Examine in place under tension or when removed.

60 16 studs, 16 nuts, 2-SI-109,* VT-1/B7.70 (Item 93, VIR-1-6300), VIR-1-4102, Examine in place under tension or when removed.

60.1 6 studs. 6 nuts. 2-CH-305. VT-1/B7.70 (Item 17, VIR-1-6300). VIR-1-4111, Examine in place under tension or when removed.

61 8 studs, 16 nuts, Flange A, VT-1/B7.50 (Item 3, VIR-1-4700), VIR-1-4112, Examine in place under tensio~

or when removed.

61.1 NIR lA. VIR-1-3100. nozzle inside radius. VT-1/B3.140 Examine 100% internal. A SIG I

61. 2 NIR lB. VIR-1-3100. nozzle inside radius, VT-1/B3.140 Examine 100% internal, A SIG I
  • Page 6 Revision 1 September 15, 1988

SURRY UNIT 2 PERIOD 2 BLOOP ROOM/RCP CUBICLE ITEM 62 Weld 2, VIR-2-1100, 2-RC-E-lB, UT/Cl. 30 Examine 144 to 284 in. clockwise, (O' ref. centerline of feedwater nozzle) 63 B pump flange bolting (24), UT/B6.180 Examine in place under tension or when removed, VIR-1-5100A.

64 B pump flange surface if made VT-1/B6.190 accessible by bolt removal, Examine 1 inch annular surface, VIR-1-5100A.

65 Weld 5DM, VIR-1-4200, B S/G inlet, UT,PT/B5.30 Examine 100%

66 Weld 6DM, VIR-1-4200, B S/G outlet, UT,PT/B5.30 Examine 100%

67 Weld 10, VIR-1-4201, 12-SI-246, UT,PT/B9.ll Examine 100%

68 Weld 11, VIR-1-4201, 12-SI-246, UT,PT/B9.ll Examine 100%

69 Weld 13 (BW), VIR-1-4204, 2-SI-281, PT/B9.21 Examine 100%

70 Weld 17, VIR-1-4205, 2-SI-285, PT/B9.40 Exan.line 1 oo%

71 Weld 14, VIR-1-4205, 2-SI-285, PT/B9.40 Examine 100%

72 Weld 13, VIR-1-4205, 2-SI-_285, PT/B9. 40 Examine* 100%

73 Weld 12, VIR-1-4205, 2-SI-285, PT/B9. 40 Examine 100%

74 Weld 11, VIR-1-4205, 2-SI-285, ._ PT/B9. 40 Examine 100%

75 Weld 14, VIR-1-4206, 3-RC-416, PT/B9. 21 Examine 100%

Page 7 Revision 1 September 15, 1988

SURRY UNIT 2 PERIOD 2 BLOOP ROOM/RCP CUBICLE (CONT'D)

ITEM 76 Weld 11, VIR-1-4206, 3-RC-416, PT/B9. 21 Examine 100%

77 Weld 10, VIR-1-4206, 3-RC-416, PT/B9. 21 Examine 100%

78 Weld 9, VIR-1-4206, 3-RC-416, PT/B9. 21 Examine 100%

79 Weld 6, VIR-1-4209, 2-RC-499,

  • PT/B9.40 Examine 100%

80 Weld 5, VIR-1-4209, 2-RC-499 ,. PT/B9. 40 Examine 100%

81 Weld 4, VIR-1-4209, 2-RC-499, PT/B9. 40 Examine 100%

82 Weld 3, VIR-1-4209, 2-RC-499. , PT/B9;40 Examine 100%

83 Weld 2, VIR-1-4209, 2-RC-499, PT/B9.40 Examine 100%*

84 Weld 28, VIR-1-4210, 2-RC-346, PT/B9.40 Examine 100%

85 Weld 27, VIR-1-4210, 2-RC-346, PT/B9. 40 Examine 100%

86 Weld 26, VIR-1-4210, 2-RC-346, PT/B9. 40 Examine 100%

87 Weld 25, VIR-1-4210, 2-RC-346, PT/B9.40 Examine 100%

88 Weld 24, VIR-1-4210, 2-RC-346, PT/B9. 40 Examine 100%

89 Weld 10, VIR-1-4212, 2-RC-421, PT/B9. 40 Examine 100%

90 Weld 11, VIR-1-4212, 2-RC-421, - PT/B9. 40 Examine. 100%

Page 8 Revision 1 September 15, 1988

SURRY UNIT 2 PERIOD 2 BLOOP ROOM/RCP CUBICLE (CONT'D)

  • ITEM 91 92 Weld 12, VIR-1-4212, 2-RC-421, Examine 100%

Weld 13, VIR-1-4212, 2-RC-421, PT/B9.40 PT/B9.40 Exa,mine 100%

93 32 Bolts, VIR-1-3100, B S/G VT-1/B7.30 manways, Examine in place under tension, or when removed.

94 12 studs, 12 nuts, 2-SI-88, VT-1/B7.70 (Item 77, VIR-1-6300) VIR-1-4202, Examine in place under tension or when removed.

95 8 studs, 16 nuts, Flange A, VT-1/B7.50 I (Item 8, VIR-1-4700), VIR-1-4211, Examine in place under tension or when removed.

96 Weld 2, VIR-2-2543, 6-SI-344, .PT,UT/B5.21

  • Examine 100%

97 Weld 3, VIR-2-2543, 6-SI-344, PT,UT/B5.21 Examine 100%

98 Weld 4, VIR-2-2543, 6-SI-344, PT,UT/B5.21 Examine 100%

99 12 studs, 12 nuts, 2-SI-238, VT-1/B7.70 (Item 78, VIR-1-6300), VIR-1-4204, Examine in place under tension or when removed.

100 12 studs, 12 nuts, 2-SI-82, VT-1/B7.70 (Item 79, VIR-1-6300), VIR-1-4205, Examine in place under tension or when removed.

  • 101 12 studs, 12 nuts, 2-SI-242, VT-1/B7. 70 .

(Item 80, VIR-1-6300), VIR-1-4205, Examine in place under tension or when removed.

Page 9 Revisioril 'September 15, 1988

SURRY UNIT 2 PERIOD 2 BLOOP ROOM/RCP CUBICLE (CONT'D)

ITEM 102 16 studs, 16 nuts, 2-SI-130, VT-1/B7.70 (Item 95, VIR-1-6300), VIR-1-4201; Examine in place under tens*ion or when removed.

103 8 studs, 16 nuts, FE-491, VT-1/B7.50 (Item 6, VIR-1-4700), VIR-1-4206, Examine in place under tension or when removed.

104 Weld 5, shell circumferential, UT/Cl.10 VIR-2-1100, Examine 101 to 284 in.

clockwise, B S/G, (O' ref. centerline of feed nozzle) 105 Weld 8, head circumferential, VIR-2-1100, UT/Cl.20 Examine 156 to 370 in. clockwise, B S/G, (O' ref. centerline of feed nozzle) 106 Weld 2, VIR-2-2200, 30-SHP-102, UT,MT/C5.21 Examine 100%

  • 106.1 Weld 9NIR. VIR-2-1100. feed nozzle VT-l/C2.22 inside radius. Examine 100% (Relief Request) surface area. SIG B.

106.2 Weld lONIR. VIR-2-1100 1 main steam VT.;.l/C2.22 nozzle inside radius. Examine 100% (Relief Request) surface area. S/G B.

Page 10 Revision 1

  • September 15, 1988

SURRY UNIT 2 PERIOD 2 C LOOP ROOM/RCP CUBICLE ITEM 107 Weld 3, shell circumferential, VIR-2-1100, UT/Cl.10 Examine 142 to 284 in. clockwise, C S/G, (O' ref. centerline of feednoizle) 108 Weld 12, VIR-1-4305, 2-SI-275, PT/B9.40 Examine 100%

109 Weld 11, VIR-1-4305, 2~sI-275, PT/B9.40 Examine 100%

110 Weld 3, VIR-1-4306, 3-RC-447, PT/B9.21 Examine 100%

111 Weld 4, VIR-1-4306, 3-RC-447, PT/B9.21 Examine 100%

112 Weld 5, VIR-1-4306, 3-RC-447, ~T/B9.21 Examine 100_%

113 Weld 6, VIR-1-4306, 3-RC-447, PT/B9.21 Examine 100%

114 Weld 8, VIR-1-430~, 2-CH-310, PT/B9.40 Examine 100%

115 Weld 6, VIR-1-4308, 2-RC-500, PT/B9.40 Examine 100%

116 Weld 5, VIR-1-4308, 2-RC-500, PT/B9.40 Examine 100%

117 Weld 4, VIR-1-4308, 2-RC-500, PT/B9.40 Examine 100%

118 Weld 3, VIR-1-4308, 2-RC-500, PT/B9.40 Examine 100%

119 Weld 2, VIR-1-4308, 2-RC-500, PT/B9.40 Examine 100%

120 Weld l(BC), VIR-1-4506, 4-RC-315, UT,PT/B9.31 Examine 100%

Page 11 Revision 1 September 15, 1988

SURRY UNIT 2 PERIOD 2 C LOOP ROOM/RCP CUBICLE (CONT'D)

  • ITEM 121 122 Weld l(BC), VIR-1-450a, 1.5-RC-405, Examine 100%
  • 12 bolts, VIR-l-5100A, C RCP PT/B9. 32 VT...,1/B7. 60
  1. 1 seal house bolting, Examine in place under tension, or when removed.

123 8 studs, 16 nuts, Flange A, VT-1/B7.50 (Item 14, VIR-1-4700), VIR-1-4311, Examine in place under tension, or when removed.

124 4 studs, 8 nuts, Flange A, VT-1/B7.50 (Item 16, VIR-1-4700), VIR-1-4313, Examine in place under tension or when removed.

125 4 studs, 8 nuts, Flange A, VT-1/B7.50 (Item 20, VIR-1-4700), VIR-1-4508, Examine in place under tension or when removed.

125.1 16 studs. 16 nuts. 12~RC-324 VT-1/B7.70 (Item 97. VIR-1-6300) .

Examine in place under tension or when removed.

Page 12 Revision 1 September 15, 1988

SURRY UNIT 2 PERIOD 2 C SIG CUBICLE

  • ITEM 126 Weld 6, shell circumferential, VIR-2-1100 Examine 184 to 369 in. clockwise*,

C S/G, (O' ref. centerline of feed nozzle)

UT/Cl.10 127 Weld 9, VIR-2-1100, c S/G feed nozzle, UT,MT/C2.21 Examine 16 to 33 in. clockwise, (O' ref. top feed nozzle) 128 Weld 10, VIR-2-1100, C S/G main steam UT,MT/C2.21 nozzle Examine 33 to 67 in. clockwise, (O' ref. top centerline of feed nozzle) 129 Weld 9, VIR-2-1100, C S/G feed nozzle, MT/C2.21 Examine Oto 16 in. clockwise, (O' ref. top feed nozzle) 130 Weld 10, VIR-2-1100, C S/G main steam MT/C2.21 noz. Examine o to 33 in. clockwise, (O' ref~ top centerline of feed nozzle)

Page 13 Revision 1 September 15, 1988

SURRY UNIT 2 PERIOD 2 RHR FLATS ITEM 131 Weld 2, VIR-2-1120, 2-RH-E-lA, UT/Cl.10 Examine 44 to 66 in. clockwise, (O' ref. centerline 10 in. inlet nozzle) 132 Weld 2, VIR-2-1120, 2-RH-E-lB, UT/Cl.10 Examine 66 to 88 in. clockwise, (O' ref. centerline 10 in. inlet nozzle) 133 Weld 1, VIR-2-1120, 2-RH-E-lA, UT/Cl.20 Examine 44 to 88 in. clockwise, (O' ref. centerline 10 in. inlet nozzle) 134 Weld 1, VIR-2-1110, 2-CH-E-4, UT/Cl. 20 Examine 10 to 20 in. clockwise, (O' ref. centerline 2 in. inlet nozzle) 135 Weld 2, VIR-2-1110, 2-CH-E-4, UT/Cl.10 Examine 10 to 20 in. clockwise, (O' ref. centerline 2 in. inlet nozzle) 136 10 in. inlet nozzle pad fillet weld, PT/C2. 21 VIR-2-1120, Examine 100%, C2.22 2-RH-E-lA . (Relief Request)

  • 137 138 Weld 26, VIR-2-2510, 10-RH-107, Examine 100%

Weld 25, VIR-2-2510, 10-RH-107, Examine 100%

PT/CS.11 PT/C5.ll 139 Weld 22, VIR-2~2510, 12-RH-112, PT/CS.11 Examine 100%

140 Weld 42, VIR-2-2510, 12-RH-112, PT/CS.11 Examine 100%

141 Weld 43, VIR-2-2510, 12-RH-112, PT/CS.11 Examine 100%

142 Weld 44, VIR-2-2510, 12-RH-112, PT/CS.11 Examine 100%

143 Weld 45, VIR-2-2510, 12-RH-112, PT/CS.11 Examine 100%

Page 14 Revision 1

  • September 15, 1988

SURRY UNIT 2 PERIOD 2 RHR FLATS (CONT'D)

ITEM 144 .Weld 26, VIR~2-2500, 14-RH-118, PT/CS .11 Examine 100%

145 Weld 25, VIR-2-2500, 14-RH-118, PT/C5.ll Examine 100%

Page 15 Revision 1 September 15, 1988

SURRY UNIT 2 PERIOD 2 CONTAINMENT PENETRATION AREA ITEM 146 Weld 18, VIR-2-2201, 14-WFPD-113, UT,MT/C5.21 Examine 100%

  • Page 16 Revision 1 September 15, 1988

SURRY UNIT 2 PERIOD 2 CONTAINMENT BASEMENT ITEM 147 Weld 8, VIR-1-4102, 12-SI-245, UT,PT/B9.11 Examine 100%

148 Weld 9, VIR-1-4102, 12-SI-245, UT,PT/B9.11 Examine 100%

149 Weld 10, VIR-1-4102, 12-SI-245, UT,PT/B9.il Examine 100%

150 Weld 11~ VIR-1-4102, 12-SI-245, I UT,PT/B9.11 Examine 100%

151 Weld 30, VIR-1-4107, 2-RC-353, PT/B9. 40 Examine 100%

152 Weld 31, VIR-1-4107, 2-RC-353, PT/B9.40 Examine 100%

153 Weld 32, VIR-1-4107, 2-RC-353, PT/B9. 40 Examine 100%

154 Weld 33, VIR-1-4107, 2-RC-353, PT/B9.40 Examine 100%

Page 17 Revision 1 September 15, 1988

SURRY UNIT 2 PERIOD 2 CONTAINMENT BASEMENT (CONT'D)

ITEM 155 Weld 44, VIR-1-4108, 2-CH-308, PT/B9.40 Examine 100%

156 Weld 43, VIR-1-4108, 2-CH-308, PT/B9.40 Examine 100%

157 Weld 42, VIR-1-4108, 2-CH-308, PT/B9. 40 Examine 100%

158 Weld 47, VIR-1-4110, 2-SI-277, PT/B9.40 Examine 100%

159 Weld 46, VIR-l-4ilO, 2-SI-277, PT/B9. 40 Examine iOO%

160 Weld 45, VIR-1-4110, 2-SI-277, PT/B9.40 Examine *100%

  • 161 Weld 44, VIR-1-4110, 2-SI-277, PT/B9. 40 Examine 100%

162 Weld 43, VIR-1-4110, 2-SI-277, PT/B9. 40 Examine 100%

163 Weld 38, VIR-1-4110, 2-SI-277, PT/B9. 40 Examine 100%

164 Weld 4, VIR-1-4202, 10-RH-117, UT,PT/B9.11 Examine 100%

165 Weld 5, VIR-1-4202, 10-RH-117, UT,PT/B9.11 Examine 100%

166 Weld 30, VIR-1-4208, 2-RC-357, PT/B9.40 Examine 100%

167 Weld 32, VIR-1-4208, 2-RC-353 1 PT/B9. 40 Examine 100%

168 Weld 31,_VIR-1-4208, 2-RC-353, PT/B9. 40 Examine 100%

169 Weld 28, VIR-1-4207, 3-CH-301, PT/B9. 40 Examine 100%

  • Page 18 Revision 1 September 15, 1988

SURRY UNIT 2 PERIOD 2*

CONTAINMENT BASEMENT (CONT'D)

  • ITEM 170 171 Weld 29, VIR-1-4207, 3-CH-301, Examine 100%

16 studs, 16 nuts, MOV-2720B, PT/B9.40 VT-1/B7.70 (Item 92, VIR-1-6300) VIR-1-4302, Examine in place under tension or when removed.

172 16 studs, 16 nuts, 2-SI-107, VT-1/B7.70 (Item 94, VIR-1-6300), VIR-1-4102, Examine in place under tension

.. or when removed.

173 Weld 12, VIR-2-2103, UT,PT/C5.21 6 11 -SI-249, Examine 100%

174 Weld 13, VIR-2-2103, UT,PT/C5.21 6 11 -SI-249, Examine 100%

175 Weld 14, VIR-2-2103, UT,PT/C5.21 6 11 -SI-249, Examine 100%

176 Weld 3, VIR-2-2520, UT,PT/C5.21 10-RH-116, Examine 100%

177 Weld 2, VIR-2-2520, UT,PT/C5.21 10-RH-116, Examine 100%

178 Weld 2, VIR-1-4654, PT/C5.ll 10-RS-101, Examine 100%

Page 19 Revision 1 September 15, 1988

SURRY UNIT 2 PERIOD 2 REGEN ROOM ITEM 179 Weld 4, VIR-1-3200, 2-CH-E-3, UT/Cl. 20 Examine 6 to 19 in.

(0 I ref. top centerline of weld) 180 Weld 24, VIR-3200, 2-CH-E-3, UT/Cl. 20 Examine 6 to 19 in.,

( 0 I ref. top centerline of weld) 181 Weld 22, VIR-1-3200, 2-CH-E-3, UT/Cl. 30 Examine 6 to 19 in.,

(0 I ref. top centerline of weld) 182 Weld 23, VIR-1-3200, 2-CH-E-3, UT/Cl. 30 Examine 6 to 19 in.,

(0 I ref. top centerline of weld) 183 Weld 60, VIR-1-4207, 3-CH-379, PT/B9.21 Examine 100%

184 Weld 59, VIR-1-42*07, 3-CH-379, PT/B9. 21 Examine 100%

  • Page 20 Revision 1 September 15, 1988

SURRY UNIT 2

. PERIOD 2 AUX BASEMENT

  • ITEM 185 186 DELETED DELETED 187 DELETED 188 Weld 2, VIR-2-1300, 2-CH-FL-4A, UT/Cl.10 Examine 12 to 23 in. clockwise, (0 I ref. centerline of 2 in. inlet nozzle) 189 Weld 2, VIR-2-1140, 2-CH-E-2, UT/Cl.10 Examine 30 to 58 in. cl*ockwise,

( 0 I ref. centerline of 2 in. inlet nozzle) 190 DELETED 191 Weld 2, VIR-2-1300, 2-CH-FL-4B, UT/Cl. 20 Examine 12 to 23 in clockwise, (0 I ref. centerline of 2 in. inlet nozzle) 192 DELETED 193 DELETED

  • 194 195 Weld 1, VIR-2-1140, 2-CH-E-2, Examine 30 to 58 in. clockwise, (0 I ref. centerline of 2 in. inlet nozzle)

DELETED UT/Cl.20

  • Page 21 Revision 1 September 15, 1988

SURRY UNIT 2 PERIOD 2 SAFEGUARDSLMSVH

- ITEM 196 197 Weld 4, VIR-2-2522; 10-SI-352, Examine 100%

Weld 3, VIR-2-2522, 10-SI-352, PT, UT/C5. 21 PT,UT/C5.21 Examine 100%

198 Weld 2, VIR-2-2522, 10-SI-352, PT,UT/C5.21 Examine 100%

199 Weld 1, VIR-2-2522, 10-SI-352, PT,UT/C5.21 Examine 100%

200 Weld 33, VIR-2-2542, 6-SI-345, PT,UT/C5.21 Examine 100%

201 Weld 6, VIR-2-2102, 6-SHP-145, MT/C5.ll Examine 100%

202 Weld 25, VIR-1-4658, 10-RS-110, PT/C5.ll Examine 100%

203 Weld 9, VIR-1-4658, 10-RS-109, PT/C5.11 Examine 100%

204 Weld 19, VIR-2-2540, 6-SI-49 UT,PT/C5.21 Examine. 100.%

Page 22 Revision 1 September 15, 1988

Surry Unit 2 Second Period Integral Attachment Inspection Plan

SURRY UNIT 2 PERIOD 2

. INTEGRAL ATTACHMENTS Item 1 MKS-0118Al, Hl, WAP.D-101-601, VT-3/IWD PSSK 118All, FP202AD VT-3/IWF 2 MKS-0118Al, H2, WAPD-101-601, VT-3/IWD PSSK ll~A12, FP202AY VT-3/IWF 3 MKS-0118Al, H3, WAPD-101-601, VT-3/IWD PSSK 118Al3, FP202AD VT-3/IWF 4 MKS-0118Al, H4, WAPD-101-601, VT-3/IWD PSSK 118Al4, FP202AD VT-3/IWF 5 MKS-0118A1, H8, WAPD-114-601, VT-3/IWD PSSK-118A18, FP202AY VT-3/IWF 6 MKS-0118A2, H5, WAPD-109-601, VT-3/IWD PSSK-118A25, FP202AD VT-3/IWF 7 MKS-0118A2, H6, WAPD-111-601, VT-3/IWD PSSK-118A26, FP202AD VT-3/IWF 8 MKS-0103A1, H5, SHP-103-601, SHRF-:-fe-e I PSSK-103Al5, FP247H VT-3/IWF 9 MKS-0103A1, H6, SHP-102-601, SHRF-:-fe-e PSSK-103A16, FP247H VT-3/IWF 10 MKS-0103A1, H7, SHP-102-601, SHRF-:-fe-e PSSK.-103A17, FP247H VT-3/IWF 11 MKS-0103A1, H8, SHP-101-601, SHRF-:-fe-e PSSK-103A18, FP247H VT-3/IWF 12 MKS-0103Al, H9, SHP-101-601, SHRP-:-fe-e PSSK-103A19, FP247H VT-3/IWF 13 MKS-0103A2, H79, SAE-102-121, SHRF-:-fe-e PSSK-103A279, FP247J VT-3/IWF 14 MKS-0103A2, H60, SHP-147-601, . SHRF-:-fe-e PSSK-103A260, B268 VT-3/IWF 15 MKS-0103A2, H61, SHP-146-601, SHRP-:-fe-e PSSK-103A261, B268 VT-3/IWF 16 MKS-0103A2, H62, SHP-145-601, SHRP-:-fe-e PSSK-10;3A262, B268 VT-3/IWF Page 1 Revision 1 September 15, 1988

SURRY UNIT. 2 PERIOD 2 INTEGRAL ATTACHMENTS (CONT'D)

Item 17 MKS-0103A2, H63, SHP-147-601, SBRF-;-fe-e I PSSK-103A263, B268 - VT-3/IWF 18 MKS-Ol03A2, H64, SHP-146-601, SBRF-;-fe-e PSSK-103A264, B268 VT-3/IWF 19 MKS-0103A2, H65, *sHP-145-601, SBRF-;-fe-e PSSK-103A265 VT-3/IWF 20 MKS-0103Al, H34, SHP-i04-601, SURF./C-C PSSK-103A134 VT-3/IWF 21 MKS-0103Al, H35, SHP-104-601, SURF./C-C PSSK-103A135, FP203A VT-3/IWF 22 MKS-0103A2, H36, SHP-124-601, SURF./C-C PSSK-103A236, FP247J VT-3/IWF 23 MKS-0103A2, H.37, SHP-123-601, SURF./C-C PSSK-103A237, FP247J VT-3/IWF 24 MKS-0103A.2, H38, SHP-122-601, SURF./C-C PSSK-103A238, FP247J VT-3/IWF

  • 25 26 MKS-0103A2, H39, SHP-124-601,.

PSSK-103.A239, FP247J MKS-0103A2, H40, SHP-123-601, PSSK-103A240, FP247J SBRF-;-fe-e VT-3/IWF SBRF-;-fe-e VT-3/IWF 27 MKS-0103A2, H41, SHP-122-601, SBRF-;-fe-e PSSK-103A241, FP247J VT-3/IWF 28 MKS-0103A2, H83, SAE-101-121~

PSSK-103A283, FP247J SSRF-;-fe-e I VT-3/IWF 29 MKS-0103A2, H81, SAE-103-121, SSRF-;-fe-e PSSK-103A281, FP247J VT-3/IWF

. 30 MKS-0124Al, H15, RC-334.-1502, SBRF-;-fB-K-%

  • PSSK-124All5, FP202AG VT-3/IWF 31 MKS-0124Al, H17, RC=320~602, Sl:JRP-;-f B-K-%.

PSSK-124All7, FP202AG VT-3/IWF Page 2 Revision 1 September 15, 1988

SURRY UNIT 2 PERIOD 2 INTEGRAL ATTACHMENTS (CONT'D)

Item 32 MKS-0124Al, H18, RC-335-1502, SBRF-:-fB-*-3::

PSSK-124A118, FP202AG VT-3/IWF 33 MKS-0124Al, H8, RC-362-601, SURF./B-K-1 PSSK-124A18, FP202AG VT-3/IWF 34 MKS-0124Al, H9, RC-362-601, SBRF-:-fB-*-3::

PSSK-124A19, FP202AG VT-3/IWF 35 MKS-0124Al, HlO, RC-362-602, SBRF-:-fB-*-3::

PSSK-124Al10, FP202AG VT-3/IWF 36 MKS-0124Al, Hll, RC-361-1502, SBRF-;-fB-*-3::

PSSK-124Alll, FP202AG VT-3/IWF 37 MKS-0124Al, H12, RC-361-1502, SBRF-;-fB-*-3::

PSSK-124A112, FP202AG VT-3/IWF 38 MKS-0124Al, *H13, RC-334-1502, SBRF-;-fB-*-3::

PSSK-124A113, FP202AG VT-3/IWF 39 MKS-0124Al, H04A, RC-338-1502, SBRF-;-fB-*-3::

PSSK-124A14A, FP202AL VT-3/IWF 40 MKS-0124Al, H6, RC-362-602, SBRF-;-fB-*-3::

PSSK-124A16, FP202AG VT-3/IWF 41 MKS-:-0125Al, H38, RC-315-1502, SBRF-;-fB-*-3::

PSSK-125A138, FP202AS VT.:..3/IWF 42 MKS-0125Al, H39, RC-315-1502, SBRF-;-fB-*-3::

PSSK-125Al39, FP202AS VT-3/IWF 43 MKS-0125Al, H31, RC-314-1502, SBRF-;-fB-*-3::

PSSK-125A131, FP202AV VT-3/IWF 44 MKS-0125Al, H32, RC-315-1502, SBRF-;-fB-*-3::

PSSK-125A132, FP202AV VT-3/IWF 45 MKS-0125Al, H23, RC-314-1502, SURF./B-K-1 PSSK-125A123, FP202Q VT-3/IWF

  • Page 3 Revision 1 September 15, 1988

SURRY*UNIT 2 PERIOD 2 INTEGRAL ATTACHMENTS (CONT'D)

Item 46 MKS-0125Al, H15, RC-314-1502, S'SRFTfB-1(-:!:

PSSK-125A115, FP202P VT-3/IWF 47 MKS-0125Al, H16, RC-315-1502, SURF./B-K-1 PSSK-125All6, FP202P VT-3/IWF 48 MKS-0125Al, H6, RC-315-1502, S'SRFTfB-1(-:!:

PSSK-125A16, FP202Z VT:-3/IWF 49 MKS-0125Al, H7, RC-314-1502, SBRFTfB-1(-:!:

PSSK-125A17, FP202W VT-3/IWF 50 MKS-0124Al, H4, RC-341-602, SBRFTfe-e PSSK-124A14, FP202AG VT-3/IWF 51 MKS-0124Al, H2, RC-341-602, SBRFTfe-e PSSK-124A12, FP ?02AG VT-3/IWF 52 MKS-0117Bl, H28, RH-112-602, SBRFTfe-e PSSK-117B128, FP202A VT-3/IWF 53 . MKS-0117B1, H31, RH-120-152, SBRFTfe-e I_

PSSK-117B131, FP236A VT-3/IWF 54 MKS-0117B1, H26, RH-112-602, SBRFTfe-.e I PSSK-117B126, FP202A VT-3/IWF 55 MKS-0117Bl, H18A, RH-120-152, SBRFTfe-e PSSK-117Bll8A, FP202L VT-~/IWF 56 MKS-0117Bl, H13, RH-120-152, SBRFTfe-e PSSK-117Bll3, FP202BE VT-3/IWF 57 MKS-0117Bl, H14, RH-120-152, SBRFTfe-e PSSK-117B114, FP202N VT-3/IWF

_ 58 MKS-0117Bl, Hll, RH-137-602, S'SRFTfe-e I PSSK-117Blll, FP202A VT-3/IWF 59 MKS-0117Al, H2, RH-108-602, SBRFTfe-e PSSK-117A12, FP202BA VT-3/IWF Page 4 Revision 1 September 15, 1988

SURRY UNIT 2 PERIOD 2 INTEGRAL ATTACHMENTS (CONT'D)

  • Item 60 61 MKS-0117Al, H3, RH-109-602, PSSK-117Al3, FP202BA MKS-0117Al, H5, RH-107-602, sBRFTfe-e VT-3/IWF S'SRF*:f e-e PSSK-117A15, FP202BA VT-3/IWF 62 MKS-0117Al, H6, RH-110-602 ,

. SBRFTfe-e PSSK-117A16, FP 202BA VT-3/IWF 63 MKS-0117A1, H20, RH-118-602, S'SRFfe-e I PSSK-117A120, FP202A VT-3/IWF 64 MKS-0117Al, H21, RH-118-602, SBRFTfe-e PSSK-117A121, FP202A VT-3/IWF 65 MKS-0117A1, H17, RH-101-1502, SBRFTfe-e PSSK-117A117, FP202D VT-3/IWF 66 MKS-0117A1, H13, RH-119-602, SBRFTfe-e I PSSK 117A113, FP202BA VT-3/IWF 67 MKS-0117A1, H14, RH-101-1502, SBRFTfe-e PSSK-117A114, FP202AK VT-3/IWF 68 MKS-0117Al, HS, RH-110-602, SBRFTfe-e.

PSSK-117Al8, FP202R VT-3/IWF 69 MKS-0117Bl, H7, RH-116-1502, SURF./C-C PSSK..:.117B17, FP202A VT-3/IWF 70 MKS-0117Bl, Hl, RH-116-1502, SBRFTf e-e -

PSSK-117Bll, FP202E VT-3/IWF 71 MKS-0117Al, H35, RH-112-602, SBRPTfe..;e PSSK-117A135, FP202BA VT-3/IWF 72 MKS-0117Al, H34, RH-112-602, SBRFTfe-e PSSK-117A134, FP202BA VT-3/IWF 73 MKS-0117Al, H30, RH-102-602, SURF./C-C PSSK-117Al30, FP202BA VT-3/IWF 74 MKS-0117Al, H31, RH..:.104-602, SBRPTfe-e PSSK~ll7Al31, FP202BA VT-3/IWF .

  • Page 5 Revision 1 September 15, 1988

SURRY UNIT 2 PERIOD 2 INTEGRAL ATTACHMENTS (CONT'D)

Item 75 MKS-0117A1, H28, RH-105-602, SBRP-:-fe-e PSSK-117A128, FP202R VT-3/IWF

76. MKS-0117A1, H27, RH-105-602, SBRP-:-fe-e PSSK-117A127, FP202BA VT-3/IWF 77 MKS-0117A1, H25, RH-102-602, SBRP-:-fe-e PSSK-117A125, FP202G VT-3/IWF 78 MKS-0117A1, H26, 2-RH-P-1B, SURF./C-C PSSK-117A126, 200 VT-3/IWF 79 MKS-0123Q2, H67A, RS-102-153, SURF./C-C PSSK-123Q267A, FP202AY VT-3/IWF 80 MKS-0123Q1, H55, RS-101-153, SURF./C-C PSSK-123Q155, FP202T VT-3/IWF 81 MKS-0123N1, H2, RS-109-153, SBRP-:-fe-e PSSK-123N12, FP236A VT-3/IWF 82 MKS-0123N1, H3, RS-109-153, SBRP-:-fe-e PSSK-123N13, FP236A VT-3/IWF 83 MKS-0123N1, H4, RS-109-153, SBRP-:-fe-e*

PS.SK-123Nl4, FP236A VT-3/IWF 84 MKS-0123N2, H2, RS-110-153, SBRP-:-fe-e PSSK-123N22, FP236A VT-3/IWF 85 MKS-0123N2, H3, RS-110-153, SBRP-:-fe-:-e PSSK-123N23, FP236A VT-3/IWF 86 MKS-0123H2, H9, RS-111-153, SBRP-:-fe-e PSSK-123829, FP202C VT-3/IWF 87 MKS_-0123Hl, HS, RS-103-153, SSRP-:-fe-e PSSK-123Hl5, FP202C VT-3/IWF 88 MKS-0123Hl, Hl, RS-103-153, SBRP-:-fe-e PSSK-123Hll, FP202AT VT-3/IWF Page 6 Revision 1 September 15, 1988

SURRY UNIT 2 PERIOD 2 INTEGRAL ATTACHMENTS (CONT'D)

Item 89 MKS-0123G2, H2, RS-109-153, SBRFTfe-e PSSK-123G22, FP202T VT-3/IWF 90 MKS-0123Gl, H103, RS-110-153, SBRFTfe-e I PSSK-123Gl103, FP202T VT-3/IWF 91 MKS-0123Gl, H104, RS-110-i53, SBRF-ife-e PSSK-123G1104, FP202T VT-3/IWF 92 MKS-0123Gl, H67, RS-110-153, SURF./C-C PSSK-123G167, FP202T VT-3/IWF 93 VIR-1-2100, WS, Pressurizer SURF./B-H Examine 0-145 11 clockwise VT-3/IWF (o' ref. centerline of manway) 94 DELETED 95 DELETED 96 VIR-2-1300, WS2, Seal Water Inj. ~ilt. SURF./C-C Examine 100% (2-CH-E-4B) VT-3/IWF 97 DELETED 98 *VIR-2-1120, WSl, Residual Heat Ex. SURF./C-C Examine 100% (2-RH-E-lA) VT-3/IWF 99 VIR-1-4107, Hl, 2 11 -RC-353, SURF./B-K-1 Examine 100% VT-3/IWF 100 VIR-1-4107, H2, 2"-RC-353, SURF./B-K-1 Examine 100% VT-3/IWF 101 VIR-1-4208, Hll, 2 11 -RC-353, SURF./B-K-1 Examine 100% VT-3/IWF 102 VIR-1-4208, H14, 2 11 -RC-353, SURF./B-K-1 Examine 100% VT-3/IWF 103 VIR-1-4106, H2, SURF./B-K-1 Examine 100% VT-3/IWF

  • Page 7 Revision 1 September 15, 1988

SURRY UNIT 2 PERIOD 2 INTEGRAL ATTACHMENTS (CONT'D)

Item 104 VIR-1-4106, H3, SURF./B-K-1 Examine 100% VT-3/IWF 105 VIR-1-4110, H6, SURF./B-K-1 Examine 100% VT-3/IWF 106 VIR...;,1-4204, Hl, SURF./B-K-1 Examil)e 100% VT-3/IWF 107 VIR-1-4204, H3, SURF./B-K-1 Examine 100% VT-3/IWF 108 VIR-1-4207, Hl, SURF./B-K-1 Examine 100% VT-3/IWF 109 VIR-1-4207, H2, SURF./B-K-1 Examine 100% VT-3/IWF 110 VIR-1-4207, H19, SURF./B-K-1 Examine 100% VT-3/IWF 111

  • VIR-1-4207, H20, SURF./B-K-1 Examine 100% . VT-3/IWF 112 VIR-1-4*207, H21, SURF./B-K-1 Examine 100% VT-3/IWF 113 VIR-2-2100, H6, SURF./B-K-1 Examine 100% VT-3/IWF 114 VIR-2-2100, HS, SURF./B-K-1 Examine 100% .VT-3/IWF.

115 VIR-2-2102, H4, SURF./B-K-1 Examine 100% VT-3/IWF 116 VIR-2-2200, H2, SURF./B-K-1 Examine 100% VT-3/IWF 117 VIR-2-2201, H4, SURF./B-K-1 Examine 100% VT-3/IWF

  • Page 8 Revision 1 September 15, 1988

SURRY UNIT 2 PERIOD 2 INTEGRAL ATTACHMENTS (CONT'D)

Item 118 VIR-2-2203, H13, SURF./C-C Examine 100% VT-3/IWF 119 VIR-1-SlOOB, SCl, SURF./B-K-1 Examine 100% (A RCP) VT-3/IWF 120 VIR-1-SlOOB, SC2, SURF./B-K-1 Examine 100% (A RCP) VT-3/IWF 121 VIR-1-SlOOB, SC3, SURF./B-K-1 Examine 100% (A RCP) VT-3/IWF 122 VIR-1-SlOOB, SC4, SURF./B-K-1 Examine 100% (A RCP) VT-3/IWF i~3---VIR-i-5i00B,-Sei,------------------~------------SBRP~fB-H-i


Exam~ne-%00%-fB~RePt-------------------------------v~-3fIWP 124 VIR-1-SlOOB, SC2, SURF ./B-K-1 Examine 100% (B RCP) VT-3/IWF Page 9 Revision 1 September 15, 1988

Surry Unit 2 Third Period Inspection Plan

SURRY UNIT 2 PERIOD 3 RX VESSEL

  • ITEM 1 Weld 1, head-to-flange, VIR-1-1300A, 358 in. to 537 in.

clockwise. (O' ref. centerline of stud hole #1)

UT,MT/Bl.40 2 Weld 2, circumferential shell, UT/Bl.11 VIR-1-1100, Examine 100% (Tool) 3 Weld 7, long{tudinal shell, UT/Bl.12 VIR-1-1100, Examine 100% (Tool) 4 Weld 5, circumferential head, UT/Bl. 21 VIR-1~1100, Examine 100% accessible (Tool) 5 Weld 1, shell-to-flange, UT/Bl.30 VIR-1-1100, centerline of stud hole (Tool) 18 at 105.5 degrees to Centerline of stud hole 27 at 161.4 degrees centerline stud hole 34 at 204.8 degrees to Centerline_ of stud hole 48 at 291.7 degrees and centerline of stud hole 1 at o degrees to centerline of stud hole 8 at 43.4 degrees.

6 Weld 11, VIR-1-llOOa, nozzle-to-vessel~ UT/B3.90 Examine 100% (Tool) 7 Weld 13, VIR-1-llOOa, nozzle-to-vessel, UT/B3.90 Examine 100% (Tool) 8 Weld 15, VIR-1-llOOa, nozzle-to-vessel, UT/B3.90 Examine 100% (Tool) 9 Weld llNIR, VIR-1-llOOa, nozzle inside rad.1.us, UT/B3.100 Examine 100% (Tool) 10 Weld 13NIR, VIR-1-llOOa, _nozzle inside radius, UT/B3.100 Examine 100% (Tool).

11 Weld 15NIR, VIR-1-llOOa, nozzle inside radius, UT/B3.100 Examine 100% (Tool) 12 N40 through NSS, closure head nuts, MT/B6.10 Examine 100%, VIR-1-1400

  • Page 1 Revision 1 September 15, 1988

SURRY UNIT 2 PERIOD 3 RX VESSEL (CONT'D)

  • ITEM 13 S40 through S58, closure head studs, Examine 100% when removed, VIR-1-1400 th21 through th58, threads in flange

.UT,MT/B6.30 UT/B6. 40 14 Examine 100%~ VIR-1-llOOA 15 CCW40 through CCW58, concave washers, VT-:1/B6.50 Examine 100%, VIR-1-1400 16 CVW40 through CVW58, convex washers VT-1/B6.50 Examine 100%, VIR-1-1400 17 ~11 remaining closure studs and nuts, VT-1/Augmented Examine 100%, VIR-1-1400 ( Each Refuel) 17.1 Rx Vessel head marmon clamps VT-1/B7.10 VIR-1-1300 ,_ Examine all 4 100%

18 Weld 17DM, VIR-1-4100, A inlet, UT/B5.10 Examine 100% Relief Request 19 Weld 17DM, VIR-1-4200, B inlet, UT/BS .10 Examine 100% Relief Request 20 Weld 17DM, VIR-1-4300_, C inlet, UT/B5 .10 Examine 100% Relief Request 21 Rx vessel interior, all accessible areas, VT-3/Bl3.10 VIR-1-1200, Examine areas made accessible during normal refueling 22 Rx core support structure, VT-3/Bl3.30 accessible welds and accessible surfaces, the structure will be removed from the reactor vessel for examination. (VIR-1-1200) 23 CRD Housing welds, Examine UT or PT/B14.10 10% of the peripheral housings 23.1 Rx Vessel CRD housing welds, Examine VT-2/B4.12 25% of the CRD penetrations Page 2 Revision 1 September 15, 1988

SURRY UNIT 2 PERIOD 3 UPPER PRESSURIZER

  • ITEM 24 Weld 7, VIR-1-2100, 2-RC-E-2, Examine 192 to 290.05 in. clockwise, (O' ref. centerline of manway)

VT-2/B2.ll Relief Request 25 Weld 2, VIR-1-2100, 2-RC-E-2, VT-2/B2.12 Examine 8 to 12 in. Relief Request (O' ref. intersection of welds 7 and 2) 26 DELETED

---1eN%R,-V%R-1-21ee,-2-Re-E-z,-------------------v~-ifB3Tire I


Examine-i99%-in~e~fta%-----------------------Re%ie£-ReE;Ittes~ .

-2e----~iN%R,-V%R-i-2iee,-2-Re-E-z,-------------------v~-ifB3Tire


Examine-i99%-in~e~fta%-----------------------Re%ie£-ReE;Ittes~

I

---irN%R,-V%R-i-riee 7 -z-Re-E-2,-------------------v~-ifB3Tire I


Examine-i99%-in~e~na%-----------------------Re%ie£-ReE;{ttes~

30 13NIR, VIR-1-2100, 2-RC-E-2, VT-1/B3.120 Examine 100% internal Relief Request 31 14NIR, VIR-1-2100, 2-RC-E-2, VT-1/B3.120 Examine 100% internal Relief Request 32 Weld 1DM, VIR-1-4504, Prz. relief, UT,PT/B5.20 Examine 100%

33 Weld 36DM, VIR-1-4506, Prz. spray, UT,PT/B5.20 Examine 100%

34 Weld 14, VIR-1-4504, 3 RC 335 PT/B9. 21 Examine 100%

35 Weld 15, VIR-1-4504, 3 RC 335 PT/B9. 21 Examine 100%

Page 3 Revision 1 September 15, 1988

SURRY UNIT 2 PERIOD 3 UPPER PRESSURIZER (CONT'D)

  • ITEM 36 16 bolts, VIR-1-2100, 2-RC-E-2, manway, Examine in place under tension or when removed.

VT-1/B7.20 Each Refuel 12 studs, 24 nuts, flange A, VT-1/B7. 50 *

(item 18, VIR-1-4700), VIR-1-4502, Examine in place under tension or when removed.

38 12 studs, 24 nuts, flange A, VT-1/B7.50 (item 19, VIR-1-4700), VIR-1-4503, Examine in place under tension or when removedo 39 Valve body internal surface, SV-2551A, UT/B12.40 (item 15, VIR-1-6200), VIR-1-4503 Wall thickness Examine 100% (if removed perform VT-3 on relief request internal surface).

Page 4 Revision 1 September 15, 1988

SURRY UNIT 2 PERIOD 3 LOWER PRESSURIZER

  • ITEM
  • 40 Weld 4, VIR-1-2100, 2-RC-E-2, Examine 192 to 290.05 in. clockwise, (O' ref. centerline of manway)

UT/B2.ll 41 Weld 3, VIR-1-2100, 2-RC-E-2, UT/B2.12 Examine 8 to 12 in.,

(O'ref. intersection of welds 3 and 4)

Page 5 Revision 1 September 15, 1988

SURRY UNIT 2 PERIOD 3 A-LOOP ROOM/RCP CUBICLE

  • ITEM 42 Weld 3, shell circumferential, VIR-2-1100, Examine 284 to 423.9 in. clockwise A S/G. (O' ref. centerline of feednozzle)

UT/Cl.10 43 Weld 6DM, VIR-1-4100, A outlet S/G, UT,PT/B5.30 Examine 100%

44 Weld 12, VIR-1-4106, 3-RC-431, PT/B9. 21 Examine 100%

45 Weld 11, VIR-1-4106, 3-RC-431, PT/B9. 21 Examine 100%

46 Weld 48(BW), VIR-1-4110, 2-SI-277, PT/B9. 21 Examine 100%

47 Weld l(BC), VIR-1-4505 UT,PT/B9.31 Examine 100%

48 Weld 3, VIR-1-4113, 2-RC-432, PT/B9.40 Examine 100%

49 Weld 2, VIR-1-4113, 2-RC-432, PT/B9. 40 Examine 100%

50 Weld l(BW), VIR-1-4113, 2-RC-432, PT/B9. 21 Examine 100%

  • 51 32 bolts, VIR-1-3100, A S/G VT-1/B7. 30 manways, Examine in-place under tension, or when removed.

52 12 studs, 12 nuts, 2-SI~91, VT-1/B7.70 (item 73, VIR~l-6300), VIR-1-4104, Examine in place under tension or when removed.

53 12 studs, 12 nuts, 2-SI-239, VT-1/B7.70 (item 74, VIR-1-6300), VIR-1-4104, Examine in place under tension or when removed *

  • Page 6 Revision 1 September 15, 1988

SURRY UNIT 2 PERIOD 3 A LOOP ROOM/RCP CUBICLE {CONT'D)

ITEM 54 12 studs, 12 nuts, 2-SI-79, VT-1/B7.70 (item 75, VIR-1~6300), VIR-1-4105, Examine in place under tension or when removed.

55 4 studs, 4 nuts, MOV-2585, VT-1/B7.70 (item 88, VIR-1-6300), VIR-1-4103, Examine in place under tension or when removed.

56 16 studs, 16 nuts, MOV-2700, VT-1/B7.70 (item 99, VIR-1-6300), VIR-1-4101 Examine in place under tension or when removed.

57 16 studs, 16 nuts, Mov~2101, VT-1/B7. 70 (item 100, VIR-1-6300), VIR-1-4101, Examine in place under tension or when removed.

58 s studs, 16 nuts, Flange A, VT-1/B7.50 (item 4, VIR-1-4700), VIR-1-4113, Examine in place under tension or when removed

  • 59 Valve body internal surface, MOV-2701, UT/B12.40 (item 28, VIR-1-6200), VIR-1-4101, wall thickness Examine 100% relief request 60 Valve body internal surface, 2-SI-109, UT/Bl2.40 (item 21, VIR-1-6200), VIR-1-4102, 'wall thickness Examine 100% relief request Page 7 Revision 1 September 15, 1988

SURRY UNIT 2 PERIOD 3 A S/G CUBICLE

  • ITEM 61 Weld 5, shell circumferential, VIR-2-1100, Examine 284 to 17 in. clockwise, A S/G, (O' ref. centerline of feed nozzle)

UT/Cl.10 62 Weld 8, head circumferential, VIR-2-1100, UT/Cl.20 Examine 370 to 12 in. clockwise, A S/G, (O' ref. centerline of feed nozzle) 63 Weld 9,- VIR-2-1100, A S/G feed nozzle, UT,MT/C2.21 Examine 33 to 50.27 in. clockwise, (O' ref. top centerline of feed nozzle) 64 Weld*10, VIR-2-1100, A S/G main steam nozzle, UT,MT/C2.21 Examine 67 to 100.53 in. clockwise, (O' ref. top centerline of feed nozzle)

---weia-9NiR,-ViR-%-%%88,-£eea-neHHie--------------v~-%fe%~rr


:i:ns:i:ae-raa:i:'t:1!1,-Exam:i:ne..;.%88%-----------------rei:i:e£-reqi:iest:


ser£aee-area~

66 Weld 10NIR, VIR-2-1100, main steam VT-1/C2.22 nozzle inside radius, Examine relief request ID and OD .

Page 8 Revision 1 September 15, .1988

SURRY UNIT 2 PERIOD 3 B LOOP ROOM/RCP CUBICLE ITEM 67 NIR 2A, ViR-1-3100, nozzle inside radius, VT-1/B3.140 Examine 100% internal B S/G 68 NIR 2B, VIR-1-3100, nozzle inside radius, VT-1/B3.140 Examine 100% internal !l S/G 69 Weld 8, VIR-1-4203, 8-RC-312 PT,UT/B9.ll Examine 100%

70 Weld 7, VIR-1-4203, 8-RC-312 PT,UT/B9.ll Examine 100%.

71 Weld 4, VIR-1-4204, 6-RC-318 PT,UT/B9.ll Examine 100%

72 Weld 5, VIR-1-4204, 6-RC-318 PT, UT/B9 .11 .

Examine 100%

73 Weld 6, VIR-1-4204, 6-RC:-318 PT,UT/B9.ll Examine 100%

74 Weld 7, VIR-1-4204, 6-RC-318 PT,UT/B9~11 Examine 100%

75 Weld 5, VIR-1-4205, 6-SI-344 PT,UT/B9.ll Examine 100%

76 Weld 6, VIR-1-4205, 6-SI-344 PT,UT/B9.ll Examine 100%

77 Weld 7 ,* VIR-1-4205, 6-SI-344 PT,UT/B9.ll Examine 100%

78 Weld 7, VIR-1-4206, 3-RC-416 PT/B9. 21 Examine 100%

79 Weld 8, VIR-1-4206, 3-RC-416 PT/B9.21 Examine 100%

80 Weld 9, VIR-1-4213, 2-CH-395 PT/B9. 40 Examine 100%

  • 81 Weld 8, VIR-1-4213, 2-CH-395 PT/B9. 40
  • Examine 100%

Page 9 Revision 1 September 15, 1988

SURRY UNIT 2 PERIOD 3 BLOOP ROOM/RCP CUBICLE (CONT'D)

  • ITEM 82 83 Weld 7, VIR-1-4213, 2-CH-395 Examine 100%

Weld 6, VIR-1-4213, 2-CH-395 PT/B9. 40 PT/B9. 40 Examine 100%

84 Weld 5, VIR-1-4213, 2-CH-395 PT/B9. 40 Examine 100%

85 12 bolts, VIR-1-5100A, BRCP, VT-1/B7.60

  1. 1 seal house bolting, Examine in place under tension or when removed.

86 4 studs, 4 nuts, MOV-2586, VT-1/B7. 70 (item 89, VIR-1-6300), VIR-1-4203, Examine in place under tension or when removed.

87 16 studs, 16 nuts, 2-RH-47, VT-1/B7.70 (item 91, VIR-1-6300), VIR-1-4202, Examine in place under tension or when removed.

88 8 studs, 16 nuts, FE-481, VT-1/B7.50 (item 7, VIR-1-4700), VIR-1-*4210, Examine in place under tension or when removed *

  • Page 10 Revision 1 September 15, 1988

SURRY UNIT 2 PERIOD 3 B S/G CUBICLE ITEM 89 Weld 6, shell circumferential, VIR-2-1100 UT/Cl.10 Examine 368 to 551.9 in. clockwise,

  • B S/G, (O' ref. centerline of feednozzle) 90 Weld 2, VIR-2-2200, 30-SHP-102 MT,UT/C5.21 r

Examine 100%

Page*11 Revision 1 September 15, 1988

SURRY UNIT 2 PERIOD 3 C LOOP ROOM/RCP CUBICLE ITEM 91 Weld 2, VIR-2-1100, 2-RC-E-lC UT/Cl. 30 Examine 284 to 21 in. clockwise, (O' ref. centerline of feedwater nozzle) 92 Weld 1, VIR-1-3100, 2-RC-E-lC UT/B2.40 Examine 100%, (O'-ref. top centerline of hotleg manway)

--93----N%R-3A,-V%R-i-3%88,-ne~~ie-insiae-raaies 7 ------v~-%fB3T%49 1-


Examine-%88%-insiae-e-sfs-----------------fReiie£-ReE;Ittes~t

---N%R-3B,-V%R-%-3i88,-~e~~ie-insiae-raaies,------v~-ifB3Ti48 I


Examine-i88%-insiae-e-sfs-----------------fReiie£-ReE;Ittes~t 95 C pump flange bolting (24), UT/B6.180 Examine in place under tension, or when removed, VIR-l-5100A.

96 C pump flange surface if made VT-1/B6.190 accessible by bolt removal, Examine 1 inch annular surface, VIR-l-5100A.

97 Weld 5DM, VIR-1-4300, C inlet S/G, UT,PT/B5.30 Examine 100%

98 Weld 16, VIR-1-4300, 27.5-RC-309, PT,UT/B9.11 Examine 100%

99 Weld 15, VIR-1-4300, 27.5-RC-309, PT,UT/B9.11 Examine 100%

  • Page 12 Revision 1 September 15, 1988

SURRY UNIT 2 PERIOD 3 C LOOP ROOM/RCP CUBICLE (CONT'D)

ITEM 100 Weld 14, VIR-1-4300, 27.5-RC-309, PT,UT/B9.11 Examine 100%

101 Weld 13~ VIR-1-4300, 27.5-RC-309, PT, UT/B9 .11 Examine 100%

102 Weld 12, VIR-1-4300, 27.5-RC-309, PT,UT/B9.ll Examine 100%

103 Weld 11, VIR-1-4300, 31-RC-308, PT,UT/B9.11 Examine 100%

104 Weld 20, VIR-1-4300, 31-RC-308, PT/B9.12 Examine 100% Relief Request 105 W~ld 21, VIR-1-4300, 31-RC-308, PT/B9.12 Examine 100% Relief Request 106 Weld 10, VIR-1-4300, 31-RC-308, PT,UT/B9.11 Examine 100%

107 Weld 22, VIR-1-4300, 29-RC-307

. ' PT,UT/B9.11 Examine 100%

108 Weld 4, VIR-1-4301, 12-RC-324, PT,UT/B9.ll Examine 100%

.109 Weld 5, VIR-1-4301, 12-RC-324 PT, UT/B9. 11 .

Examine 100%

110 Weld 6, VIR-1-4301, 12-RC-324 PT,UT/B9.ll Examine 100%

111 Weld 7, VIR-1-4301, 12-RC-324 PT,UT/B9.11 Examine 100%

112 Weld 8, VIR-1-4301, 12-RC-324 PT,UT/B9.11 Examine 100%

113 Weld 8, VIR-1-4303, 8-RC-313, PT,UT/B9.11 Examine 100%

114 Weld 7, VIR-1-4303, 8-RC-313, PT,UT/B9.11 Examine 100%

115 Weld 6, VIR-1~4303, 8-RC-313, PT,UT/B9.11 Examine 100%

Page 13 Revision 1 September 15, 1988

SURRY UNIT 2 PERIOD 3 C LOOP ROOM/RCP CUBICLE (CONT'D)

ITEM 116 Weld 5, VIR-1-4303, 8-RC-313, PT,UT/B9.11 Examine 100%

117 Weld lO(BW), VIR-1-4305, 2-SI-275, PT/B9. 21 Examine 100%

118 Weld 11, VIR-1-4306, 3-RC-447, PT/B9. 21 Examine 100%

119 Weld 10, VIR-1-4306, 3-RC-447, PT/B9. 21 Examine 100%

  • 120 Weld 10, VIR-1-4308, 2-CH-310, PT/B9. 40 Examine 100%

121 Weld 9, VIR-1-4308, 2-CH-310, PT/B9. 40 Examine 100%

122 Weld l(BC), VIR-1-4309, 2-RC-344, PT/B9. 32 Examine 100%

123 Weld 21, VIR-1-4309, 2-RC-344, PT/B9. 40 Examine 100%

124 Weld 22, VIR-1-4309, 2-RC-344, PT/B9.40 Examine 100%

125 Weld 23, VIR-1-4309, 2-RC-344, PT/B9. 40 Examine 100%

126 Weld 24, VIR-1-4309, 2-RC-344, PT/B9. 40 Examine 100%

127 Weld 25, VIR-1-4309, 2-RC-344, PT/B9.40 Examine 100%

128 Weld 26, VIR-1-4309, 2-RC-344, PT/B9. 40

  • Examine 100%

129 Weld 27, VIR-1-4309, 2-RC-344, PT/B9. 40 Examine 100%

130 Weld l(BC), VIR-1-4310, 2-SI-279, PT/B9. 32 Examine 100% *

  • Page 14 Revision 1 September 15, 1988

SURRY UNIT 2 PERIOD 3 C LOOP ROOM/RCP CUBICLE (CONT'D)

ITEM 131 Weld l(BC), VIR-1-4311, 2-RC-446, PT/B9. 32

  • Examine 100%

132 Weld 23, VIR-1-4311, 1.5-RC-441, PT/B9. 40 Examine 100%

133 Weld 24, VIR-1-4311, 1.5-RC-441, PT/B9. 40 Examine 100%

134 Weld 25, VIR-1-4311, 1.5-RC-441, PT/B9. 40 Examine 100%

135 Weld 26, VIR-1-4311, 1.5-RC-441, PT/B9. 40 Examine 100%

136 Weld 27, VIR-1-4311, 1.5-RC~441, PT/B9. 40 Examine 100%

137 Weld 28, VIR-1-4311, 1.5-RC-441, PT/B9. 40 Examine 100%

138 Weld 7, VIR-1-4312, 2-RC-451, PT/B9. 40 Examine 100%

139 Weld 6, VIR-1-4312, 2-RC-451, PT/B9. 40 Examine 100%

140 Weld 5, VIR-1-4312, 2-RC-451, PT/B9. 40 Examine 100%

141 Weld~' VIR-1-4312, 2-RC-448, PT/B9. 40 Examine 100%

142 Weld 2, VIR-1-4312, 2-RC-448, PT/B9.40 Examine 100%

143 Weld 12, VIR-1-4313, 2-CH-393, PT/B9 .40 Examine. 100%

144 Weld 13, VIR-1-4313, 2-CH-393, PT/B9 .40 Examine 100%

145 Weld 14, VIR-1-4313, 2-CH-393, PT/B9. 40 Examine 100%

  • Page 15 Revision 1 September 15, 1988

SURRY UNIT 2 PERIOD 3 C LOOP ROOM/RCE CUBICLE (CONT'D)

  • ITEM 146 Weld 15, VIR-1-4313, 2-CH-393 Examine 100%

PT/B9. 40 PT/B9. 40 147 Weld 16, VIR-1-4313, 2-CH-393

  • Examine 100%

148 Weld 17, VIR-1-4313, 2-CH-393 PT/B9. 40 Examine 100%

149 Weld 18, VIR-1-4313, 2-CH-393 PT/B9. 40 Examine 100%

150 Weld.6, VIR-1-4508

. , 1. 5-RC-40 PT/B9. 40 Examine 100%

151 Weld 7, VIR-1-4508, 1. 5-RC-40 PT/B9. 40 Examine 100%

152 Weld 8, VIR-1-4508, l.5-RC-40 PT/B9. 40 Examine 100%

153 Weld 9, VIR-1-4508, l.5-RC-40 PT/B9 .48 Examine 100%

154 Weld 10, VIR-1-4508, 1. 5-RC-405, PT/B9. 40 Examine 100%

155 Weld 2, VIR:-1-4508, 1.5-RC-405, PT/B9 .40 Examine 100%

156 Weld 3, VIR-1-4508, 1.5-RC-405, PT/B.9. 40 Examine 100%

157 Weld 4, VIR-1-4508, 1. 5-RC-405, PT/B9. 40 Examine 100%

158 Weld 5, VIR-1-4508, 1. 5-RC"".'405, PT/B9 .40 Examine 100%

159 12 studs, 12 nuts, 2-SI-94, VT-l/B7. 70 (item 81, VIR-1-6300), VIR-1-4304, Examine in place under tension or when removed *

  • Page 16 Revision 1 September 15, 1988

SURRY UNIT 2 PERIOD 3 C LOOP ROOM/RCP CUBICLE (CONT'D)

ITEM 166 12 studs, 12 nuts, 2-SI-240, VT-1/B7.70 (item 82, VIR-1-6300), VIR-1-4304, Examine in place under tension or when removed.

161 12 studs, 12 nuts, 2-SI-85, VT-1/B7. 70 (item 83, VIR-1-6300), VIR-1-4305, Examine in place under tension or when removed.

162 12 studs, 12 nuts, 2-SI-249, VT-1/B7.70 (item 84, VIR-1-6300), VIR-1-4305, Examine in place under tension or when removed.

163 4 studs, 4 nuts, MOV-2587, VT-1/B7. 70 (item 90, VIR-1-6300), VIR-1-4303, Examine in place under .tension or when removed.

164 16 studs, 16 nuts, 2-SI-147, VT-1/B7. 70 (item 97, VIR-1-6300), VIR-1-4301, Examine in place under tension or when removed.

165 6 studs, 6 nuts, HCV-2557C, VT-1/B7.70 (item 101, VIR-1-6300), VIR-1-4307, Examine in place under tension or when removed.

166 8 studs, 16 nuts, FE 492, VT-1/B7.50 (item 11, VIR-1-4700), VIR-1-4306, Examine in place under tension or when removed.

167 8 studs, 16 nuts, Fla'nge A, VT-1/B7.50 (item 12, VIR-1-4700), VIR-1-4306, Examine'in place under tension or when removed.

168 8 studs, 16 nuts, Flange A, VT-1/B7.50 (item 15, VIR-1-4700), VIR-1-4312, Examine in place under tension or when removed *

  • Page 17 Revision 1
  • September 15, 1988

SURRY UNIT 2 PERIOD 3 C LOOP ROOM/RCP CUBICLE (CONT'D)

  • ITEM 169 Weld 1, VIR-1-5100C, C pump(RCP) casing weld, Examine 100%

Internal surface, C RCP pump casing RT/B12.10 VT-3/B12.20 Examine 100% (VIR-1-5100) 170 Valve body internal surface, MOV-2595, UT/B12.20 (item 34, VIR-1-6200), VIR-1-4300, wall thickness Examine 100% (Relief Request) 171 Valve body internal surface, 2-SI-240, . UT/B12. 40 (item 10, VIR-1~6200), VIR-1-4304, wall thickness Examine 100% (Reli.ef Request) 172 Valve body internal surface, MOV-2587, UT/Bl2.40 (item 18, VIR-1-6200), VIR-1-4303, wall thickness Examine 100% relief request 173 Weld 6, VIR-2-2544, 6-SI-353 UT,PT/B5.21 Examine 100%

174 Weld 7, VIR-:2-2544, 6-SI-353 UT,PT/B5.21 Examine 100%

175 Weld 8, VIR-2-2544, 6-SI-353 UT,PT/B5.21 Examine 100%

Page 18 Revision 1 September 15, 1988

SURRY UNIT 2 PERIOD 3 C SIG CUBICLE Weld 9 NIR, VIR-2-1100, nozzle(feed) VT-1/C2.22 inside radius, Examine 100% Relief Request surface area.

177 Weld 10 NIR, VIR-2-1100, nozzle (main) VT-1/C2.22 inside radius, Examine ID and Relief Request OD.

Page 19 Revision 1 September 15, 1988

SURRY UNIT 2 PERIOD 3 RHR FLATS ITEM 178 Weld 2, VIR-2-1120, 2-RH-E-lA, UT/Cl.10 Examine 88 to 110 in. clockwise (O' ref. centerline 10 in. inlet nozzle) 179 Weld 2, VIR-2-1120, 2-RH-E-lB, UT/Cl.10 Examine 110 to 131.88 in. clockwise, (O' ref. centerline 10 in. inlet nozzle) 180 Weld 1, VIR-2-1120, 2-RH7E-lB UT/Cl. 20 Examine 88 to 131.88*in. clockwise, (O' ref. centerline 10 in. inlet nozzle) 181 Weld 1, VIR-2-1110, 2-CH-E-4, UT/Cl.20 Examine 20 to 29.83 in. clockwise, (O' ref. centerline of 2 in. inlet nozzle) 182 Weld 2, VIR-2-1110, 2-CH-E-4, UT/Cl.10 Examine 20 to 29.83 in. clockwise, (O' ref. centerline of 2 in. inlet nozzle) 183 Weld 3, VIR-1-4302, 10-RH-117 PT,UT/B9.11 Examine 100% '

184 Weld 2, VIR-1-4302, 10-RH-117 PT,UT/B9.11 Examine 100%

185 Weld. 28, VIR-2-2510, 10-RH-107 PT/C5.11 Examine 100%

186 Weld 27, VIR-2-2510, 10-RH-107 PT/C5-.11 Examine iOO%

187 Weld 46, VIR-2-2510, 10-RH-112 PT/C5.11 Examine 100%

188 Weld 47, VIR-2-2510, 12-RH-112 PT/C5.11 Examine 100%

189 Weld 48, VIR-2-2510, 12-RH-112 PT/C5.11 Examine 100% ~

190 Weld 49, VIR-2-2510, 12-RH-112, PT/C5.11 Examine 100%

  • Page 20 Revision 1 September 15, 1988

SURRY UNIT 2 PERIOD 3 RHR FLATS (CONT'D)

ITEM 191 Weld ~o, VIR-2-2510, 12-RH-112, PT/C5.11 Examine 100%

192 10 in. outlet nozzle pad fillet weld, PT/C2. 21 VIR-2-1120, Examine 100%, C2.22 2-RH-E-lB Relief Request (VT-2 required) 193 Weld 4, VIR-2-2500, PT/CS.11 14-RH-102, Examine 100%

194 Weld 5, VIR-2-2500, PT/CS.11

  • 14-RH-102, Examine 100%

195 Weld 6, VIR-2-2500, PT/CS.11 14-RH-102, Examine 100%

Page 21 Revision 1 September 15, 1988

SURRY UNIT 2 PERIOD 3 CONTAINMENT PENETRATION AREA ITEM 196 Weld 31, VIR-2-2542, 6-SI-345, PT,UT/C5.21 Examine 100%

197 Weld 30, VIR-2-2542, 6-SI-345

. I PT,UT/C5.21 Examine 100%

198 Weld 29, VIR-2-2542, 6-SI-345, PT,UT/C5.21 Examine 100%

199 Weld 28, VIR-2-2542, 6-SI-345, PT,UT/C5.21 Examine 100%

200 Weld 32, VIR-2-2542, 6-SI-345, PT,UT/C5.21 Examine 100%

201 Weld 18, VIR-1-4656, 10 11 -RS-109, PT/C5.11 Examine 100%

202 Weld 16, VIR-1-4657, 10"-RS-110, PT/C5.11 Examine 100%

Page 22 Revision 1 September 15, 1988

SURRY UNIT 2 PERIOD 3 CONTAINMENT PENETRATION AREA (CONT'D)

ITEM 203 Weld 3, VIR-2-2540, 6-SI-248, UT,PT/C5.21 Examine 100%

204 Weld 18, VIR-2-2101, 14-WFPD-117, UT,MT/C5.21 Examine 100%

  • Page 23 Revision 1 September 15, 1988

SURRY UNIT 2 PERIOD 3 CONTAINMENT BASEMENT

  • ITEM 205 Weld 64, VIR-1-4207, 3-CH-379, Examine 100%

PT/B9. 21 206 Weld 65, VIR-1-4207, 3-CH-379, PT/B9. 21 Examine 100%

207 Weld 66, VIR-1~4207, 3-CH-379, PT.B9.21 Examine 100%

208 Weld 67, VIR-1-4207, 3-CH-379, PT/B9. 21 Examine 100%

209 Weld 68, VIR-1-4207, 3-CH-379, PT/B9. 21 Examine 100%

210 Weld 69, VIR-1-4207, 3-CH-379, PT/B9. 21 Examine 100%

211 Weld 55, VIR~l-4307, 2-RC-358, PT/B9.40 Examine 100%

212 Weld 54, VIR-1-4307, 2-RC-358, PT/B9.40 Examine 100%

213 Weld 53, VIR-1-4307, 2-RC-358, PT/B9.40 Examine 100%

214 Weld 52, VIR-1-4307, 2-RC-358, PT/B9. 40 Examine 100%

Page 24 Revision 1 September 15, 1988

SURRY UNIT 2 PERIOD 3 CONTAINMENT BASEMENT (CONT'D)

ITEM 215 Weld 14, VIR-1-4308, 2-CH-310 PT/B9. 40 Examine 100%

216 Weld 13, VIR-1-4308, 2-CH-310 PT/B9.40 Examine 100%

217 Weld 12, VIR-1-4308, 2-CH-310 PT/B9.40 Examine 100%

218 Weld 11, VIR-1-4308, 2-CH-310 PT/B9. 40 Examine 100%

219 Weld 7, VIR-1-4310, 2-SI-279, PT/B9. 40 Examine 100%

220 Weld 8, VIR-1-4310, 2-SI-279, .. PT/B9. 40 Examine 100%

221 Weld 9, VIR-1-4310, 2-SI-279, PT/B9.40 Examine 100%

222 Weld 10, VIR-1-4310, 2-SI-279 PT/B9. 40 Examine 100%

223 Weld 11, VIR-1-4310, 2-SI-279 PT/B9. 40 Examine 100%

224 Weld 50, VIR-1-4310, 2-SI-272 P'r/B9.40 Examine 100%

225 Weld 51, VIR-1-4310, 2-SI-272 PT/B9.40 Examine 100%

226 Weld.52, VIR-1-4310, 2-sr:..212 PT/B9. 40 Examine 100%

227 Weld 53, VIR-1-4310, 2-SI-272 PT/B9. 40 Examine 100%

228 Weld 54, VIR-1-4310, 2-SI-272 PT/B9. 40 Examine 100%

Page 25 Revision 1 September 15, 1988

SURRY UNIT *2 PERIOD 3 CONTAINMENT BASEMENT (CONT'D)

ITEM 229 Weld 55, VIR-1-4310, 2-SI-272, PT/B9.40 Examine 100%

230 Weld 21, VIR-1-4507, 2~cH-368, PT/B9. 40 Examine ioo%

231 Weld 22, VIR-1-4507, 2-CH~368, PT/B9 .40 Examine 100%

232 Weld 23, VIR-1-4507, 2-CH-368, PT/B9.40 Examine 100%

233 Weld 24, VIR-1-4507, 2-CH-368, PT/B9. 40 Examine 100%

234 16 studs, 16 nuts, 2-SI-128, VT-l/B7.70 (item 96, VIR-1-6300), VIR-1-4201, Examine in place under tension or when removed.

235 16 studs, 16 nuts, 2-SI-145, VT-l/B7.70 (item 98, VIR-1-6300), VIR-1-4301, Examine in place under tension or.when removed.

236 Valve body internal surface, MOV-2720B, UT/B12.40 (item 20, VIR-1-6200, VIR-1-4302), wall thickness Examine 100% relief request 237 Valve body internal surface, 2-RH-4 UT/B12.40 (item 19, VIR-1-6200), VIR-1-4202, -wall thickness Examine 100% relief request 238 Weld 5, VIR-2-2203, UT, PT/CS. 21 .

6-SI-248, Examine 100%

239 Weld 6, VIR-2-2203, UT,PT/CS.21 6-SI-248, Examine 100%

240 Weld 7, VIR-2-2203, UT,PT/CS.21 6-SI-248, Examine 100%

Page 26 Revision 1 September 15, 1988

SURRY UNIT 2 PERIOD 3 CONTAINMENT BASEMENT (CONT'D)

ITEM 241 Weld 5, VIR-2-2520, UT,PT/C5.21 10-RH-116, Examine 100%

242 Weld 4, VIR-2-2520, UT,PT/C5.21 10-RH-116, Examine 100%

243 Weld 1, VIR-1-4655, PT/C5.11 10-RS-102, Examine 100%

244 Weld 2, VIR-1-4655, PT/C5.11 10-Rs-102, Examine 100%

Page 27 Revision 1 September 15, 1988

SURRY UNIT 2

, PERIOD 3 REGEN ROOM, Weld 4, VIR-1-3200, 2-CH-E-3, UT/Cl. 20 Examine 19 to 28.86 in.,

(O' ref. top centerline of weld) 246 Weld 24, VIR-1-3200, 2-CH-E-3, UT/Cl. 20 Examine 19 to 28.86 in.,

(O' ref. top centerline of weld) 247 Weld 22, VIR-1-3200, 2-CH-E-3, UT/Cl. 30 Examine 19 to 28.86 in.,

(O' ref. top centerline of weld) 248 Weld 23, VIR-1-3200, 2-CH-E-3, UT/Cl. 30 Examine 19 to 28.86 in.,

(O' ref. top centerline of weld)

  • Page 28 Revision 1 September 15, 1988

SURRY UNIT 2 PERIOD 3 AUX BASEMENT/SAFEGUARDS/MSVH

  • ITEM 249 250 DELETED DELETED 251 DELETED 252 We%a-r,-V%R-r-~3ee 7-r-eH-F~-4---------------------B~fe~T~e

Exam~ne-r3-~e-~-~ftT-e%eekw~se,


fei-re£T-een~er%~fte-e£-r-~ftT-~ft%e~-ne~~%et 252.1 Weld 1. VIR-2-1300. 2-CH-FL-4B UT/Cl.10 Examine 23 to 1 in. clockwise.

(O' ref. centerline of 2 in. inlet nozzle) 253 Weld 2, VIR-2-1140, 2-CH-E-2, UT/Cl.10 Examine 58 to 1 in. clockwise, (O' ref. centerline of 2 in. inlet nozzle) 254 DELETED 255 Weld 2, VIR-2-1300, 2-CH-FL-4A, UT/Cl. 20 Examine 23 to 1 in. clockwise, (0 I ref. centerline of 2 in. inlet nozzle) 256 DELETED 257 DELETED 258 Weld 1, VIR-2-1140, 2-CH-E-2, UT/Cl. 20 Examine 58 to 1 in. clockwise, (0 I ref. centerline of 2 in. inlet nozzle) 259 DELETED 260 Weld 20, VIR-2-2540, 10-SI-35 PT/C5.ll Examine 100%

  • Page 29 Revision 1 September 15, 1988

SURRY UNIT 2 PERIOD 3 MSVH ITEM 261 Weld 7, VIR-2-2102, 6 SHP 145, MT/C5.11 Examine 100%

262 Weld 28, VIR-2-2100, MT/CS .11 SV-MS-201A, Examine 100%

263 Weld 27BC, VIR-2-2100, MT/C5.31

'A' main steam safety valve header, Examine 100%

264 Weld 35L, VIR-2-2100, MT/C5.12

'A' main steam safety valve header, Examine 100%

Page 30 Revision 1 September 15, 1988

Surry Unit 2 Third Period Integral Attachment Inspection Plan

SURRY UNIT 2 PERIOD 3 INTEGRAL ATTACHMENTS Item 1 MKS-0118A2, H9, WAPD-113-601, . VT-3/IWD PSSK-118A29, FP202AY VT-3/IWF 2 MKS-0118A2, HlO, WAPD-102-601, VT-3/IWD PSSK-118A210, FP202AC VT-3/IWF 3 MKS-0118A2, H31, WAPD-150-601, VT-3/IWD PSSK-118A231, FP202AY VT-3/IWF

.4 MKS-0118A2, H20, WAPD-111-601, VT-3/IWD PSSK-118A220, FP202AY VT-3/IWF 5 MKS-0118A2, H21, WAPD-113-601, VT-3/IWD PSSK-i18A221, FP202AY VT-3/IWF 6 MKS-0118A2, H22, WAPD-113-601, VT-3/IWD PSSK-118A222, FP202AC VT-3/IWF 7 MKS-0118A2, H23, WAPD-113-601, VT-3/IWD PSSK-118A223, FP202AY VT-3/IWF 8 MKS-0118A2, H24, WAPD-150-601, VT-3/IWD PSSK-118A224, FP202BC VT-3/IWF 9 MKS-0118A2, Hl8, WAPD-111-601, VT-3/IWD PSSK-118A218, FP202AY V'.1'-3/IWF 10 MKS-0118A2, Hl4, WAPD-109-601, VT-3/IWD PSSK-118A214, FP202AY VT-3/IWF 11 MKS-0118A2, HlS, WAPD-109-601, VT-3/IWD PSSK-118A215, FP202AD VT-3/IWF 12 MKS-0118A2, H16, WAPD-109-601, VT-3/IWD PSSK-118A216, FP202AY VT-3/IWF 13 MKS-0118A2, H34, WAPD-151-601,

  • VT-3/IWD PSSK-118A234, FP202AY VT-3/IWF 14 MKS-0125Al, HS, RC-315-1502, SURF./B-K-1

. PSSK-125Al8, FP202W VT-3/IWF 15 MKS-Ol23El, H49A, RS-112-153, SURF./C-C PSSK-123El49A, FP202AW VT-3/IWF Page 1 Revision o January 29, 1988

  • SURRY UNIT 2 PERIOD 3 INTEGRAL ATTACHMENTS (CONT'D)

Item 16 MKS-0123D4, H20, RS-122-153, SURF./C-C PSSK-123D420, FP202AF VT-3/IWF 17 MKS-0123D4, H24, RS-111-153, SURF./C-C PSSK-123D424, FP202AX VT-3/IWF 18 MKS-0123D4, H16, RS-120-153, SURF./C-C PSSK-123D416, FP202AJ VT-3/IWF 19 MKS-0123D3, H24, RS-103-153, SURF./C-C

  • PSSK-123D324, FP202AX VT-3/IWF 20 MKS-0123D4, Hll, RS-122-153, SURF./C-C PSSK-123D411, FP202AH VT-3/IWF 21 MKS-0123D3, H20, RS-120-153, SURF./C-C PSSK-123D320, FP202AF VT-3/IWF 22 MKS-0123D3, H16, RS-120-153, SURF./C-C PSSK-123D316, FP202AJ VT-3/IWF 23 MKS-0123D2, H22, RS-104-153, SURF./C-C PSSK-123D222, FP202AW VT-3/IWF 24 MKS-0123D3, Hll, RS-120-153, SURF./C-C PSSK-123D311, FP202AH VT-3/IWF 25 MKS-0123D2, HlO, RS-121-153, SURF./C PSSK-123D210, FP202AH VT-3/IWF 26 MKS-0123D2, HS, RS-121-153, SURF./C-C PSSK-123025, FP202AG VT-3/IWF 27 MKS-012302, Hl, RS-121-153, SURF./C-C PSSK-123021, FP202AF VT-3/IWF 28 MKS-012301, H2, RS-123-153, SURF./C-C PSSK-123012, FP202AF VT-3/IWF 29 MKS-0122Ll, Hl, SI-245-1502, SURF./B-K-1 PSSK-122Lll, FP202D VT-3/IWF 30 MKS-0122Ll, H2, SI-245-1502, SURF./B-K-1 PSSK-112L12, FP2020 VT-3/IWF Page 2 Revision o January 29, 1988

SURRY UNIT 2 PERIOD 3 INTEGRAL ATTACHMENTS (CONT'D)

Item 31 MKS-0122Ll, H3, SI-245-1502, SURF./B-K-1 PSSK-122Ll3, FP202BE VT-3/IWF 32 MKS-0122Ll, H4, SI-245-1502, SURF./B-K-1 PSSK-122Ll4, FP202BE VT-3/IWF 33 MKS-0122Ll, HS, SI-245-1502, SURF./B-K-1 PSSK-122Ll5, FP202M VT-3/IWF 34 MKS-0122Ll, H7, SI-245-1502, SURF./B-K-1 PSSK-122Ll7, FP202AU VT-3/IWF.

35 MKS-0122Ll, HS, SI-245-1502, SURF./B-K-1 PSSK-122L18, FP202AU VT-3/IWF 36 MKS-0122Dl, HS, SI-246-1502, SURF./B-K-1 PSSK-122018, FP202AQ VT-3/IWF 37 MKS-0122Dl,.H9, SI-246-1502, SURF./B-K-1 PSSK-122D19, FP202AQ VT-3/IWF

- 38 MKS-0122Dl, H6, SI-246-1502, SURF./B-K-1 PSSK-122016, FP202BE VT-3/IWF 39 MKS-0122Dl, HJ, SI-246-1502, SURF./B-K-1 PSSK-122013, FP200C VT-3/IWF 40 MKS-0122Dl, H4, SI-246-1502, SURF./B-K-1

  • PSSK-122014, FP202BE VT-3/IWF 41 MKS-0122Al, Hl, SI-24 7-1502 ,* SURF./B-K-1 PSSK~l22All, 200 VT-3/IWF 42 MKS-0122Al, H2, SI-247-1502, SURF./B-K-1 PSSK-122A12, 200 VT-3/IWF 43 MKS-0122Al, H6, SI-247-1502, SURF./B-K-1 PSSK-122A16, FP202AQ VT-3/IWF 44 MKS-0122Al, H7, SI-247-1502, SURF./B-K-1 PSSK-122A17, FP202AQ VT-3/IWF 45 MKS-0122Al, HS, SI-247-1502, SURF./B-K-1 PSSK-122Al8, FP202AQ VT-3/IWF
  • Page 3 Revision o January 29, 198E

SURRY UNIT 2 PERIOD 3 INTEGRAL ATTACHMENTS (CONT'D)

Item 46 MKS-0112Al, H9, SI-247-1502, SURF./B-K-1 PSSK-122A19, 82 VT-3/IWF 47 MKS-0122Al, H4, SI-247-1502, SURF./B-K-1 PSSK-122A14, FP202G VT-3/IWF 48 MKS-0122Kl, H9, SI-248-1502, SURF./C-C PSSK-122Kl9, FP202AN VT-3/IWF 49 MKS-0122Kl, H2, SI-248-1502, SURF~/C-C PSSK-122K12, FP202L VT-3/IWF 50 MKS-0122Kl, Hl, SI-249-1502, SURF./C-C PSSK-122Hll VT-3/IWF 51 MKS-0122Jl, HJ, SI-250-1502, SURF./C-C PSSK-122J13, FP202AR VT~J/IWF 52 MKS-0122Hl, H7, SI-249-1502, SURF./C-C PSSK-122Hl7, FP202L VT-3/IWF 53 MKS-0122Hl, Hl, SI-249-1502, SURF./C-C.

PSSK-122Hll VT-3/IWF 54 MKS-0127Cl, H2, SI-249-1502, SURF./C-C PSSK-127C12, FP236A VT-3/IWF 55 MKS-0127C2, Hll, SI-283-152, SURF./C-C PSSK-127C211, FP236A VT-3/IWF 56 MKS-0127Cl, HS, SI-284-152, SURF./C-C PSSK-127Cl5, FP236 VT-3/IWF 57 MKS-0127D2, H47, SI-292-153, SURF./C-C PSSK-127D247, FP247C VT-3/IWF 58 MKS-0127D2, HA14, SI-292-153, SURF./C-C PSSK127D2Al4, FP247C VT-3/IWF 59 MKS-0127Dl, H48, SI-214-153, SURF./C-C PSSK-127Dl48, FP247C VT-3/IWF 60 MKS-0127Dl, HA16, SI-214-153, SURF./C-C PSSK-127D1Al6, FP247C VT-3/IWF 61 MKS-0127C2, Hl8, SI-352-1502, SURF./C-C PSSK-127C218, FP236B VT-3/IWF Page 4 Revision o January 29, 1988

SURRY UNIT 2 PERIOD 3 INTEGRAL ATTACHMENTS (CONT'D)

Item 62 MKS-0127C2, H13, SI-349-153, SURF./C-C PSSK-127C213, FP236A VT-3/IWf 63 MKS-0127C2, H14, SI-:348-153, SURF./C-C PSSK-127C214, FP236A VT-3/-IWF 64 MKS-0127C2, HlS, SI-248-1502, SURF./C-C

.PSSK-127C215, FP236A VT-3/IWF 65 MKS-0127C2, H16,* SI-350-153, SURF./C-C PSSK-127C216, FP236A VT-3/IWF 66 MKS-SI-6, H6A, SI-205-153, SURF./C-C PSSK-SI-66A VT-3/IWF 67 MKS-SI-6, HJ, SI-205-153,

  • SURF./C-C PSSK-SI~63, FP236B VT-3/IWF 68 MKS-SI-6, H4, SI-205-153, SURF./C-C PSSK-SI-64, FP236B VT-3/IWF 69 MKS-SI-5, H2, SI-363-153, SURF./C-C PSSK-SI-52, FP236B ~-3/IWF 70 MKS-SI-4, H2, SI-362-153, SURF./C-C PSSK-SI-42, FP236B VT-3/IWF 71 MKS-0127K2, H7, SI-292-153, SURF./C-C PSSK-127K27, FP247C VT-3/IWF 72 MKS-0127Kl, HS, SI-214-153, SURF./C-C PSSK-127IC18, FP247C VT-3/IWF 73 MKS-0127IC2, H2, SI-292-153, SURF./C-C PSS1C-1271C22, FP247B VT-3/IWF 74 MKS-0127J5, H23, SI-344-1502, SURF./C-C PSSK-127J523, FP202G VT-3/!WF 75 MKS-0127Kl, H2, SI-214-153 SURF./C-C PSSK-127K12, FP247B VT-3/IWF 76 MKS-0127J5, H21, SI-.344-1502, SURF./C-C PSSK-127J521, FP202AQ VT-3/IWF Page 5 Revision o January .29, 1988

SURRY UNIT 2

.PERIOD 3 INTEGRAL ATTACHMENTS (CONT'D)

Item 77 MKS-0127J5, Hl6, SI-344-1502, SURF./C-C PSSK-127J516, FP202H VT-3/IWF 78 MKS-0127J5, Hl7, SI-344-1502, SURF./C-C.

PSSK-127J517, FP202H VT-3/IWF 79 MKS-0127J5, Hll, SI-345-1502, SURF./C-C PSSK-127J511, FP202H VT-3/IWF 80 MKS-0127J5, H7, SI-345-1502, SURF./C-C PSSK-127J57, FP202H VT-3/IWF 81 MKS-0127G2, H25, SI-207-152, SURF./C-C PSSK-127G225, 82 VT-3/IWF 82 MKS-0127Gl, H22, SI-292-152, SURF./C-C PSSK-127Gl22, FP206K VT-3/IWF 83 MKS-0127Gl, H48, SI-292-152, SURF./C-C PSSK-127Gl48, 82 VT-3/IWF 84 MKS-0127Gl, Hll, SI-217-152, .SURF./C-C P~SK-127Glll, FP206N VT-3/IWF 85 MKS-0127J5, H4, SI-345-1502, SURF./C-C PSSK-127J54, FP202J VT-3/IWF 86 MKS-0127J4, HS, SI-353-1502, SURF./C-C PSSK-127J545, FP202AY VT-3/IWF 87 MKS-0127J3, H6, SI-353-1502, SURF./C-C PSSK-127J36, FP202AQ VT-3/IWF 88 MKS-0127J4, Hl, SI-353-1502, SURF~/C-C PSSK-127J541, FP202AQ VT-3/IWF.

89 MKS-0127J2; H6, SI-344-1502, SURF./C-C PSSK-127J26, FP202AQ VT-3/IWF 90 MKS-0127G2, H45, SI-214-153, SURF./C-C PSSK-127G245, FP206K VT-3/IWF, 91 MKS-0127G2, H47, SI-302-152, SURF./C-C PSSK-127G247, FP206V VT-3/IWF 92 MKS-0127G2, H57, SI-214~153, SURF./C-C PSSK-127G257, FP206V . VT-3/IWF Page 6 Revision o January 29~ 198c

  • SURRY UNIT 2
  • PERIOD 3 INTEGRAL ATTACHMENTS (CONT'D)

Item 93 MKS-0127G2, H58, SI-170-153, SURF./C-C PSSK-127G258, FP206N VT-3/IWF 94 MKS-0127Jl, Hl, SI-345-1502, SURF./C-C PSSK-127Jll, FP202AU VT-3/IWF 95 MKS-0127G2, H37, SI-206-153, SURF./C-C PSSK-127G2377, FP206K VT-3/IWF 96 MKS-0127G2, H26, SI-170-153, SURF./C-C PSSK-127G226, FP206V VT-3/IWF 97 MKS-0127G2, H27, SI-170-153, SURF./C-C PSSK-127G227, FP206V VT-3/IWF 98 VIR-1-4301, H3, SURF./B-K-1 EXAMINE 100% VT-3/IWF 99 VIR-1-4504, H2, SURF./B-K-1 EXAMINE 100% VT-3/IWF 100 VIR-1-4504, H4, SURF./B-K-1 EXAMINE 100% VT-3/IWF 101 VIR-1-4504, HS, SURF./B-K-1 EXAMINE 100% VT-3/IWF 102 VIR-1-4505, HS, SURF./B-K-1 EXAMINE 100% VT-3/IWF 103 VIR-1-4505, HlO, SURF./B-K-1 EXAMINE 100% VT-3/IWF 104 VIR-1-4600, Hl, SURF./B-K-1 EXAMINE 1001 VT-3/IWF 105 VIR-1-4600, H4, SURF./B-K-1 EXAMINE 1001 VT-3/IWF 106 VIR-1-4209, HJ SURF./B-K-1 EXAMINE 1001 VT-3/IWF 107 VIR-1-4307, H6, SURF./B-K-1 EXAMINE 100% VT-3/IWF 108 VIR-2-2300, H4, SURF./C-C EXAMINE 100% VT-3/IWF Page 7 Revision 0 January 29, 198

SURRY UNIT 2 PERIOD 3 INTEGRAL ATTACHMENTS (CONT'D}

Item 109 VIR-2-2301, H6, SURF./C-C EXAMINE 100% VT-3/IWF 110 VIR-2-2511, H3, SURF./C-C EXAMINE 100% VT-3/IWF.

111 VIR-2-2520, H9, SURF./C-C EXAMINE 100% VT-3/IWF 11~ VIR-2~2540~ HJ, SURF./C-C EXAMINE ioo% VT-3/IWF.

113. DELETED 114 DELETED 115 VIR-2-1140, WS-2 SURF./C-C .

2-CH-E-2, EXAMINE 100% VT-3/IWF 116 VIR-2-1300WS-l, SURF./C-C 2-CH-FL-4A, EXAMINE 100% VT-3/IWF 117 DELETED 118 DELETED 119 VIR-2-1120, ws-2, SURF./C-C 2-RH-E-lB, .EXAMINE 100% VT-3/IWF 120 VIR-1-2100, wa, PRESSURIZER SURF./B-H EXAMINE 145 11 -290 11 CLOCKWISE VT-3/IWF (0 1 REF. CENTERLINE OF MANWAY) 121 VIR-l-5100B, sc-1, SURF./B-K-1 EXAMINE 1001, (CRCP) VT-3/IWF 122 VIR-1-5100B, sc-2, SURF./B-K-1 EXAMINE 1001 (CRCP) VT-3/IWF 123 VIR-1-51008, SC-3, SURF./B-K-1 EXAMINE 1001 (CRCP) VT-3/IWF Page 8 Revision o January 29, 1988

SURRY UNIT.2 PERIOD 3 INTEGRAL ATTACHMENTS (CONT'D)

Item 124 VIR-1-5100B, SC-4, SURF./B-K-1 EXAMINE 100%, (CRCP) VT-3/IWF 124.1 VIR-1-5100B, SC-3, SURF./B-K-1 EXAMINE 100%, (BRCP) VT-3/IWF 124.2 VIR-l-5100B, SC-4, SURF./B-K-1 EXAMINE 100%, (BRCP) VT-3/IWF 125 MKS-0118Ll, H28, WCMU-107-151, VT-3/IWD PSSK-118L128, FP247D VT-3/IWF.

126 H6, CC-173-151, MKS-2022A4, VT-3/IWF PSSK-2022A46, FP202BC NO SURF. 3/4 (C-C) 127 Hl, CC-181-151, MKS-2022A3, VT-3/IWF PSSK-2022A31, FP202BD NO SURF. 3/4 (C-C) 128 H7E, CH-515-152 ,. MKS-CH-1, VT-3/IWF PSSK-CH17E, FP-202BE NO SURF. 5/8 (C-C) 129 Hl2, CH-379-1502, MKS-CH-9 VT-3/IWF PSSK-CH912, FP-202L NO SURF. 5/8 (C-C) 130 HJ, CH-379-1502, MKS-CH-9, VT-3/IWF PSSK-CH93, F'P-202P NO SURF. 5/8(B-K-l) 131 H2, CH-426-152, MKS-CH-59, VT-3/IWF PSSK-CH592 NO SURF. 5/8(C-C) 132 H2, SI-317-1S2, MKS-Ol27Gl, VT-3/IWF PSSK-127Gl2 NO SURF. 3/4 (C-C) .

133 H9A, SI-372-1S2, MKS-0127Gl, VT-3/IWF PSSK-127Gl9A, FP206J NO SURF. 3/4(C-C) 134 H23, CH-SOS, MKS-0127G2, VT-3/IWF PSSK-127G223,-FP-206V NO SURF. 3/4(C-C) 135 H24, CH-S05-1S2, MKS-0127G2, VT-3/IWF PSSK-127G224, FP-206V NO SURF. 3/4(C-C) 136 Hl4A, SI-319-1S2, MKS-0127Gl, VT-3/IWF PSSK-127Gll4A NO SURF. 3/4(C-C)

Page 9 Revision o January 29, 198

SURRY UNIT 2 PERIOD 3 INTEGRAL ATTACHMENTS (CONT'D)

Item 137 H13A, SI~318-152, MKS-0127Gl, VT-3/IWF PSSK-127G113A NO SURF. 3/4 (C-C) 138 H3, CS-104-153, MKS-0123C2, VT-3/IWF PSSK-123C23, FP-202AW NO SURF. 3/4(C-C) 139 Hl, CS-104-153, MKS-Ol23C2 ,. VT-3/IWF PSSK-123C21, FP-202AW NO SURF. 3/4(C-C) 140 Hll, CS=lOJ-153, MKS-0123Cl, VT-3/IWF PSSK-123Clll, FP-202Y' NO SURF. 3/4(C-C) 141 H9, CS-103-153, MKS-Ol23Cl, VT-3/IWF PSSK-123Cl9, FP202Y' 142 H7, CS-103-153, MKS-0123Cl, VT-3/IWF PSSK"."'123Cl 7, FP-202AB NO SURF. 3/4(C-C) 143 Hl, CS-103-153, MKS-0123Cl, VT-3/IWF PSSK-123Cll, FP-202AX 144 Hl4, CS-122-153, MKS-0123A2, VT-3/IWF PSSK-123A214, FP202AH NO SURF~ 3/4(C-C) 145 Hll, CS-122-153, MKS-0123A2, VT-3/IWF PSSK-123A211, FP202AG NO SURF. 3/4(C-C) 146 Hl ,* CS-134-153, MKS-0123Jl, VT-3/IWF PSSK-123Jll, FP236B . NO SURF

  • 3/4 (C-C) 147 H4, CS-134-153, MKS-0123Jl, VT-3/IWF PSSK-123Jl4, FP236B 148 H3, CS-101-153, MKS-0123Ml, VT-3/IWF PSSK-123Ml3, FP247D 149 H4, CS-102-153, MKS--0123Ll, VT-3/IWF PSSK-123Ll4, FP-247D NO SURF. 3/4 (C-C) 150 HJ, CS-133-153, MKS-0123Kl, VT-3/IWF PSSK-123K13, FP-236B 151 HJ, CS-104-153, MKS-0123Al, VT-3/IWF PSSK-123Al3 NO SURF. 3/4(C-C) 152 H4, CS-104-153, MKS-0123,Al, SURF./C-C PSSK-123Al4, FP-202AW VT-3/IWF Page 10 Revision o January 29, 1988

SURRY UNIT.2 PERIOD 3 INTEGRAL ATTACHMENTS (CONT'D)

Item 153 HS, CS-122-153, MKS-0123A2, VT-3/IWF PSSK-123A28 NO SURF. 3/4(C-C) 154 Hl4, CS-123-153, MKS-0123Al, VT-3/IWF PSSK-123All4, FP-202AH NO SURF. 3/4(C-C) 155 Hll, CS-123-153, MKS-Ol23Al, VT-3/IWF PSSK-123Alll, FP-202AJ NO SURF. 3/4(C-C) 156 HS, CS-1.23-153, MKS-0123Al, VT-3/IWF PSSK-123Al8, FP-202AF NO SURF. 3/4(C-C) 157 Hl5, CS-188-153, MKS-2101A9, VT-3/IWF PSSK-2101A915, FP-202AH NO SURF. 3/4(C-C) 158 Hl2, CS-188-153, MKS-2101A9, VT-3/IWF PSSK-2101A912, FP-202AG NO SURF. 3/4(C-C) 159 H9, CS-188-153, MKS-2101A9, VT-3/IWF PSSK-2101A99, FP-202AF NO SURF. 3/4(C-C)

. 160 H6, cs*-1aa-1s3, MKs-2101A9, VT-3/IWF PSSK-2101A96, FP-202AF NO SURF. 3/4(C-C) 161 H21, CS-188-153, MKS-2101A9, VT-3/IWF PSSK-2101A921, FP-202AJ NO SURF. 3/4(C-C) 162 HlS, CS-188-153, MKS-2101A9, VT-3/IWF PSSK-2101A918, FP-202AH NO SURF. 3/4 (C-C) 163 H2, CV-108-151, MKS-0137Al, VT-3/IWF PSSK-137Al2, FP206N 164 HJ, CV-108-151, MKS-0137Al, VT-3/IWF PSSK-137Al3, FP206N NO SURF. 3/4(C-C) 165 H4, WFPD-109-601, MKS-0102Gl, VT-3/IWF PSSK-102Gl4, FP-202AC 166 Hl, WFPD-117-601, MKS-OlOOGl, VT-3/IWF PSSK-lOOGll, FP-202A2 167 H2, WFPD-109-601, MKS-0102Gl, VT-3/IWF PSSK-102Gl2, FP-202AZ 168 H4, WFPD-117-601, MKS-OlOOGl, VT-3/IWF PSSK-100Gl4, FP202AD Page 11 . Revision o January 29, 1988

SURRY UNIT 2 PERIOD 3 INTEGRAL ATTACHMENTS (CONT'D)

Item 169 HS, WFPD-117-601, MKS-OlOOGl, VT-3/IWF PSSK-100G15, FP202AD 170 H6, WFPD-117-601, MKS-OlOOGl, VT-3/IWF PSSK-100Gl6, FP-202AD 171 H7, WFPD-117-601, MKS-OlOOGl, VT-3/IWF PSSK-100Gl7, FP-202AE 172 HS, WFPD-117-601, MKS-OlOOGl, VT-3/IWF PSSK-100Gl8, FP-202AE 173 H2, WFPD-113-601, MKS-0101Gl, VT-3/IWF PSSK-101Gl2, FP-202AZ 174 Hll7, SHP-145-601, MKS-SHP-1, VT-3/IWF PSSK-SHP-1117, FP-247L 175 Hl7, SHP-145-601, MKS-SHP-1, VT-3/IWF PSSK-SHP-117, FP247K 176 Hll5, SHP-147-601, MKS-SHP-3 VT-3/IWF PSSK-SHP-3115, FP-247L 177 Hll6, SHP-146-601, MKS-SHP-2, VT-3/IWF PSSK-SHP-2116, FP-247L 178 Hl6, SHP-146-601, MKS-SHP-2, VT-3/IWF PSSK-SHP-216, FP247L 179 HlS, SHP-147-601, MKS-SHP-3, VT-3/IWF PSSK-SHP-315, FP246H 180 Hl, SHP-102-601, MKS-Ol01Dl, VT-3/IWF PSSK-101011, FP-202AZ 181 H2, SHP-103-601, MKS-0102Dl, VT-3/IWF PSSK-102Dl2, FP-203A 182 HJ, SHP-103-601, MKS-0102Dl, VT-3/IWF PSSK-102Dl3, FP202AZ 183 H2, SHP-102-601, MKS-010101, VT-3/IWF PSSK-l01Dl2, FP-202AZ 184 H4, SHP-103-601, MKS-01Q2Dl, VT-3/IWF PSSK-102014, FP202AZ Page 12 Revision o January 29, 198

SURRY UNIT 2 PERIOD 3 INTEGRAL ATTACHMENTS (CONT'D)

Item 185 HS, SHP-101-601, MKS-0100Dl, VT-3/IWF PSSK-100Dl8, FP-202AJ 186 H6, SHP-101-601, MKS-OlOODl, VT-3/IWF PSSK-100016, FP-202AH 187 H4 -;* SHP-101-601, MKS-0100Dl, VT.-3/IWF PSSK-100Dl4, FP-202AH*

188 H4, SHP-103-601, MKS-0103Al, VT-3/IWF PSSK-103A14, FP-247H 189 Hl, RC-416-1502, MKS-RC-2, VT-3/IWF PSSK-RC21, FP-202U NO SURF. 5/8 (B-K-1) 190 H2, RC-416-1502, MKS-RC-2

  • VT-3/IWF PSSK-RC22, FP-202AP NO SURF. 5/8 (B-K-1) 191 Hl, RC-431-1502, MKS-RC-3, SURF./B-K-1 PSSK-RC31, FP-202V VT-3/IWF 192 H2, RC-431-1502, MKS-RC-3, SURF./B-K-1 PSSK-RC32, FP-202AL VT-3/IWF 193 Hl, RC-447-1502, MKS-RC-1, VT-3/IWF PSSK-RC-11, FP-202S NO SURF. 5/8 (B-K-1) 194 H2, RC-447-1502, MKS-RC-1, VT-3/IWF PSSK-RC12, FP-202AS NO SURF. 5/8 (B-K-1) 195 HlO, RC-323-1502, MKS-012201, VT-3/IWF PSSK-1220110, FP-202Z 196 H9, RC-322-1502, MKS-0122Ll, VT-3/IWF PSS~-122L29, FP-202AL 197 H4, RC-315-1502, MKS-0125Al, VT-3/IWF PSSK-125Al4, FP-202AV NO SURF. 5/8(B-K-l) 198 Hl, RC-315-1502, MKS-0125Al, VT-3/IWF PSSK-125All, FP-202AG NO SURF. 5/8(B=K-1) 199 H2, RC-315-1502~ MKS-0125Al, VT-3/IWF PSSK-125A12, FP-202AG NO SURF. 5/8(B-K-1) 200 HS, RC-340-602, MKS-0124:A2, VT-3/IWF PSSK-124A25, FP-202AG NO SURF. 5/8 (B-K-1)

Page 13 Revision 0 January 29, 198

SURRY UNIT 2 PERIOD 3 INTEGRAL ATTACHMENTS {CONT'D}

Item 201 H113, RC-337-1502, MKS-0124A2, VT-3/IWF PSSK-124A2113, FP~202AL NO SURF. 5/8 (B~K-1) 202 H114, RC-340-602, MKS-0124A2, SURF./B-K-1 P5SK-124A2114, FP202AG VT-3/IWF 203 H2, RC-336-602, MKS-0124A2, VT-3/IWF P5SK-l24A22, FP-202AL 204 H21A, RC-339-1502, MKS-0124Al, SURF./B-K-1 PSSK-124Al21A, FP-202AG VT-3/IWF Page 14 Revision o January 29, 198E

Attachment 5 Surry Unit 1 and 2 Listing of Ultrasonic Calibration Standards

SURRY POWER STATION ULTRASONIC CALIBRATION BLOCKS VIR/VPA IDENTIF. SIZE OR SCHEDULE HEAT NUMBER MATERIAL COMPONENT OR SYSTEM VIR 1 27.S"ID x 2 3/16"T 143325 SA351 GRCF8A Reactor Coolant Pipe 11 VIR IA 29"ID x 2.758 T 516 OC-1 SA351 CF8A Reactor Coolant Piping VIR 2 30" 1.l"T 3G5682 SA515 Grade 70CS 30" Mainsteam VIR 3 14" Sch 140 1.25"T '2637-4-2 A376TP316SS 14" Sch 140 VIR 4 14" Sch 80 .750"T 145865 Al06 Grade B cs 14" Sch 80 VIR 5 14" Sch 40 .438"T 71771 A358 CLlTP 316SS 14" Sch 40 VIR 6 12 11 Sch 140 1.125 11 T F0959 A312 TP304SS 12" Sch 140 VIR 7 12" Sch 40S * ,375"T 805222-1 A312 TP304SS 12" Sch 40S VIR 8 12" Sch 20 .250"T 8051726 A312 TP304SS Seal Water Heat

.VIR Exchanger 9 10" Sch 140 1.00"T D61232 A312 TP304SS 10" Sch 140 VIR 10 10" Sch 120 .844"T 6-448 A312 TP304SS Seal Water Injection Filter VIR 11 10" Sch 40S .365"T 1971-12-1-2 A312 TP316SS 10" Sch 40S VIR 12 8" Sch 160 .905"T 2626-8-1 A312 TP304SS Regenerative Heat Exchanger VIR 13 811 Sch 120

  • 719"T M0176 A312 TP304SS Excess Letdown HX/8" Sch 120 VIR 14 6" Sch 160
  • 719"T M2060 A376 TP304SS 6" Sch 160 VIR 15 6" Sch 120 .562"T . M9948 A376 TP316SS 6" Sch 120 VIR 16 6" Sch 80 .432"T Nl4446 A106 Grade B cs 6" Sch 80 VIR 17 31" I.ST" 3G8217 A515 Grade 70 cs 32" Mainsteam VIR 18 4" Sch 160 .531"T 01038 A312 TP304SS 4" Sch 160; Control Rod Drive Mechanism VIR 19 4" Sch 120 .428"T M6108 A376 TP316SS 4" Sch 120 VIR 20 3" Sch 160 .438"T N7212 A376 TP316SS 3" Sch 160 VIR 21 2" Sch 160 .344"T 01003 A376 TP316SS 2" Sch 160 VIR 22 1.S"Sch 160 .281"T NNN7B A376 TP316SS 1 1/2" Sch 160

~

SIZE OR SCHEDULE HEAT NUMBER MATERIAL COMPONENT OR SYSTEM VIR 23 6.2"Tx6"Wx21.8"L B&W Piece 1 A508 Class 2 Reactor Vessel Closure Head; R. V. Ligaments VIR 24 5.2"Tx6"Wxl8.2"L B&W Piece 1 A508 Class 2 Channel Head to Tubesheet VIR 25 4.375"Tx6"Wxl5.5"L D8366-5 SA533 Gracl .1 Pressurizer VIR 26 3.5"Tx6"Wxl8.2"L D8366-5 SA533 Gracl .1 Steam Generator (Secondary Side)

VIR 27 1. 5"Tx4"Wxl3"L 66B093 SA515 Grade 70CS Pressurizer Skirt VIR 28 .875"Tx4"Wx9"L 30106 A240 TP304SS Residual Heat Exchanger VIR 29 .625"Tx4"Wx9"L 30106 A240 TP304SS Non-Regenative Heat Exchanger VIR 30 .313"Tx4"Wx9"L 30106 A240 TP304SS Volume Control Tank VIR 31 6"L Stud P3199 SA540 R.V. Studs/R.C. Pump VIR 32 6" Sch 40S .280"T M9959 A312 TP305SS 6" Sch 40S R 33 8" Sch 40S .322"T M0937 A312 TP316SS 8" Sch 40S 16" Sch 80 .844"T L21488 SA106 Grade B CS 16" Feedwater Nozzle VIR 35 30"-l.74"T 67B344 SA155 KC60CL.1CS 30" Tee Mainsteam VIR 36 5.75"Dia. xl0.50" 112863 SA540 6RB24 Reactor Vessel-Stud 80W80 VIR 37 5. 75"Dia. xl8.00" 112863 SA540 6RB24 Reactor Vessel-Stud 80W80 VIR 38 5.75"Dia. x33.00 112863 SA540 6RB24 Reactor Vessel-Stud 80W80 VIR 39 4.32"Dia. xl8.25" 112863 SA540 6RB24 Reactor Coolant Pump Stud 80W80 VIR 40 4. 32"Dia. xlO. 63" 112863 SA540 6RB24 Reactor Coolant Pump Stud 80W80 VIR 41 4.32"Dia. x6.18" 112863 SA540 6RB24 Reactor Coolant Pump Stud 80W80 VIR 44 8"T x 6"W x 28"L D8366-5 SS309/308 Reactor Vessel R 45 2.47"T x6"W xl3"L Cl048 A508/A351 Reactor Vessel Safe-Ends VIR 46 17"T x 7"W x 40"L 125J596 SA508 Class 2A R.V.Flange-to-Shell, Nozzle-to-Shell,Ligaments

Attachment 6 Surry Unit 1 and 2 Listing of Nondestructive Examination Procedures

The following NDE procedures have been used during previous Surry outages for the 2nd Interval.

WESTINGHOUSE PROCEDURES, VPA/VIR-, (All Rev.O)

ISI-10 Qualification of Ultrasonic Manual Equipment ISI-8 Visual Examination ISI-11 Liquid Penetrant Examination ISI-41 Manual Ultrasonic Examination of Reactor Coolant Pump Flywheels ISI-47 Manual Ultrasonic Examination of Welds in Vessels ISI-70 Magnetic Particle Examination ISI-88 Underwater Remote Visual Examination ISI-206 Manual Ultrasonic Examination of Welds VIRGINIA POWER NDE-UT-204, Rev.O Ultrasonic Examination of Bolting NDE-UT-201, Rev.O Manual Ultrasonic Examination of Piping Welds NDE-MT-1, Rev. 4 Magnetic Particle Examination NDE-PT-1, Rev. 5 Liquid Penetrant Examination NDE-UT-8, Rev. 0 Ultrasonic Examination of Pipe Welds NDE-VT-2, Rev. 2 Visual Examination of Pipe and Piping Components SWADM. M-20 (ADM-89.5) Visual Examination of Pipe Supports(VT-3,IWD/IWF)

SUADM. M-21 (ADM-60) T-NDE-VT-003, Rev.O, Temporary Procedure Written to Replace NDE-VT-2 The following Virginia Power NDE procedures will be used during subsequent 2nd Internal outages:

NDE-7.2 General Requirements for Inservice Inspection NDE-PT-201 Liquid Penetrant Examination NDE-MT-201 Magnetic Particle Examination NDE-MT-202 Magnetic Particle Examination of Bolting NDE-UT-201 Manual Ultrasonic Examination of Piping Welds NDE-UT-202 Ultrasonic Examination of Vessel Welds Less Than 2" In Thickness NDE-UT-203 Ultrasonic Examination of Vessel Welds Greater Than 2" In Thickness NDE-UT-204 Inservice Ultrasonic Examination of Bolting NDE-UT-205 Manual Ultrasonic Examination of Reactor Coolant Piping Welds VT-1 Visual Examination Procedure VT-2 Visual Examination Procedure VT-3 Visual Examination Procedure

  • We anticipate that the following contractor during subsequent 2nd Interval outages:

procedures will be used Westinghouse:

ISI-10 Qualification of Ultrasonic Manual Equipment ISI-41 Manual Ultrasonic Examination of Reactor Coolant Pump Flywheels ISI-88 Underwater Remote Visual Examination ISI-154 Inservice Examination of Reactor Vessels Southwest Research Institute:

A procedure is presently being developed by Southwest Research Institute for CGWT examination of Loop Stop Valve bolting

  • 1 Attachment 7 Surry Unit 1 and 2 Sketch of Typical Nozzle-to-Safe End Weld

r

.(

)

  • I NCONEL BAND

-0.20 11 WIDE SIG NOZZLE PJPE t

D


~---f I 1/3 t I

I STAINLESS CLADDING NOZZLE-TO-SAFE END WELD EXAM VOLUME


~~~- C-0-E-F~~~--...j TYP STEAM GENERATOR NOZZLE r