Notification of Conduct of a Triennial Fire Protection Baseline Inspection - U.S. Nuclear Regulatory Commission Inspection Report No. 05000400/2018011
ML18150A350
Person / Time
Site: Harris Duke energy icon.png
Issue date: 05/29/2018
From: Scott Shaeffer
NRC/RGN-II/DRS/EB2
To: Hamilton T
Progress Energy Carolinas
References
IR 2018011
Download: ML18150A350 (10)


See also: IR 05000400/2018011

Text

UNITED STATES

NUCLEAR REGULATORY COMMISSION

REGION II

245 PEACHTREE CENTER AVENUE NE, SUITE 1200

ATLANTA, GEORGIA 30303-1257

May 29, 2018

Tanya Hamilton

Site Vice President

Shearon Harris Nuclear Power Plant

5413 Shearon Harris Rd.

M/C HNP01

New Hill, NC 27562-0165

SUBJECT: SHEARON HARRIS NUCLEAR POWER PLANT - NOTIFICATION OF CONDUCT

OF A TRIENNIAL FIRE PROTECTION BASELINE INSPECTION-

U. S. NUCLEAR REGULATORY COMMISSION INSPECTION REPORT

NO. 05000400/2018011

Dear Ms. Hamilton:

The purpose of this letter is to notify you that the U.S. Nuclear Regulatory Commission (NRC)

staff will conduct a triennial fire protection baseline inspection at the Shearon Harris Nuclear

Power Plant in August 2018. The inspection will be conducted in accordance with IP 71111.05XT, the NRCs baseline fire protection inspection procedure for plants that have

transitioned their fire protection program to meet the requirements of Title 10 of the Code of

Federal Regulations (10 CFR) 50.48(c). The inspection team will be led by Mr. Jonathan

Montgomery, a Senior Reactor Inspector from the NRC Region II Office. The team will be

composed of personnel from the Region II Office.

On May 23, 2018, during a telephone conversation between Mr. Charles Yarley of your staff and

Mr. Montgomery, our respective staffs confirmed arrangements for a three-day information

gathering onsite visit and a two-week onsite inspection. The schedule for the inspection is as

follows:

  • Information gathering visit: July 24-26, 2018
  • Week 1 of onsite inspection: August 13-17, 2018
  • Week 2 of onsite inspection: August 27-31, 2018

The purposes of the information gathering visit are to obtain information and documentation

needed to support the inspection, to become familiar with the Harris plants fire protection

program, fire protection features, post-fire safe shutdown capabilities, plant layout, mitigating

strategies to address 10 CFR 50.54(hh)(2), and, as necessary, obtain plant specific site access

training and badging for unescorted site access.

T. Hamilton 2

The types of documents the team will be reviewing during conduct of the inspection are listed in

Enclosures 1 and 2. Please contact Mr. Montgomery at (404) 997-4880 prior to preparing

copies of the materials listed in the Enclosures. The inspection team will try to minimize your

administrative burden by specifically identifying those documents required for inspection

preparation.

During the information gathering visit, the team will also discuss the following inspection support

administrative details: office space; specific documents to be made available to the team in their

office space; arrangements for unescorted site access (including, as necessary, radiation

protection training, security, safety and fitness for duty requirements); and the availability of

knowledgeable plant engineering and licensing organization personnel to serve as points of

contact during the inspection.

We request that during the onsite inspection weeks you ensure that copies of analyses,

evaluations or documentation regarding the implementation and maintenance of the Harris fire

protection program, including post-fire safe shutdown capability, be readily accessible to the

team for their review. Of specific interest for the fire protection portion of the inspection are

those documents which establish that your fire protection program satisfies NRC regulatory

requirements and conforms to applicable NRC and industry fire protection guidance (i.e. fire

protection compliance assessment documents). For the 10 CFR 50.54(hh)(2) portion of the

inspection, those documents implementing your mitigating strategies and demonstrating the

management of your commitments for the strategies are of specific interest. Also, personnel

should be available at the site during the inspection who are knowledgeable regarding those

plant systems required to achieve and maintain safe shutdown conditions from inside and

outside the control room (including the electrical aspects of the relevant post-fire safe shutdown

analyses), reactor plant fire protection systems and features, and the Harris fire protection

program and its implementation.

This letter does not contain new or amended information collection requirements subject to the

Paperwork Reduction Act of 1995 (44 U.S.C. 3501 et seq.). Existing information collection

requirements were approved by the Office of Management and Budget, under control number

3150-0011. The NRC may not conduct or sponsor, and a person is not required to respond to,

a request for information or an information collection requirement unless the requesting

document displays a currently valid Office of Management and Budget control number.

In accordance with 10 CFR 2.390 of the NRC's "Rules of Practice," a copy of this letter and its

enclosures will be available electronically for public inspection in the NRC Public Document

Room or from the Publicly Available Records (PARS) component of NRCs document system

(ADAMS). ADAMS is accessible from the NRC Web site at http://www.nrc.gov/reading-

rm/adams.html (the Public Electronic Reading Room).

T. Hamilton 3

Your cooperation and support during this inspection will be appreciated. If you have questions

concerning this inspection, or the inspection team's information or logistical needs, please

contact Mr. Montgomery, the team leader, in the Region II Office at (404) 997-4880, or me

at (404) 997-4521.

Sincerely,

/RA/

Scott M. Shaeffer, Chief

Engineering Branch 2

Division of Reactor Safety

Docket No: 50-400

License No: NPF-63

Enclosures:

1. Triennial Fire Protection Inspection

Supporting Documentation

2. Mitigating Strategies Supporting

Documentation

cc: Distribution via ListServ

____________________ __ SUNSI REVIEW COMPLETE FORM 665 ATTACHED

OFFICE RII:DRS RII:DRS

SIGNATURE JMM9 SMS

NAME MONTGOMERY SHAEFFER

DATE 5/29/2018 5/29/2018

E-MAIL COPY? YES NO YES NO YES YES NO YES NO YES NO YES NO

N

Triennial Fire Protection Inspection Supporting Documentation

The documents and information requested below should generally be made available to the

inspection team during the on-site information gathering visit for the team's use both on-site and

off-site during the inspection. Electronic format is the preferred media, except where specifically

noted. If electronic media is made available via an internet based remote document

management system, then the remote document access must allow inspectors to download,

save, and print the documents in the NRC's regional office. Electronic media on compact disc

or paper records (hard copy) are acceptable. At the end of the inspection, the documents in the

team's possession will not be retained.

Approximately three weeks before the on-site information gathering visit, the following

documents should be made available to the team leader for review in the regional office:

  • Post-fire Nuclear Safety Capability, Systems, and Separation Analysis (request A.1)
  • Fire Hazards Analysis and/or NFPA 805 Design Basis Document (request A.2)
  • Fire Risk Evaluations (i.e., NFPA 805 Section 2.4.3) (request A.5)
  • Plant Change Evaluations (i.e., NFPA 805 Section 2.4.4) (request A.6)
  • List of the top 25 highest CDF scenarios for each unit
  • List of the top 25 highest LERF scenarios for each unit
  • Status of committed modifications and implementation items listed in Attachment S of

the NFPA 805 Transition Report

Based on review of the above eight documents, the team leader should identify a preliminary list

of fire areas being considered for inspection prior to the on-site information gathering visit.

During the information gathering visit, or shortly thereafter, the fire areas selected for inspection

will be determined.

This document request is based on typical documents that a generic plant might have. As such,

this generic document request is not meant to imply that any specific plant is required to have all

of the listed documents. It is recognized that some documents listed below may not be

available for your plant. In addition, the document titles listed below are based on typical

industry document names; your plant specific document titles may vary.

Enclosure 1

2

A. DESIGN AND LICENSING BASIS DOCUMENTS

A.1 Post-fire Nuclear Safety Capability, Systems, and Separation Analysis.

A.2 Fire Hazards Analysis and/or NFPA 805 Design Basis Document.

A.3 Fire PRA Summary Report

A.4 LIST of Fire PRA Calculations (i.e. Component Selection Calculation, Partitioning and

Frequency Calculation, etc.)

A.5 Fire Risk Evaluations (i.e., NFPA 805 Section 2.4.3).

A.6 Plant Change Evaluations (i.e., NFPA 805 Section 2.4.4).

A.7 Fire Protection Program and/or Fire Protection Plan.

A.8 LIST of post-fire safe shutdown components (i.e., safe shutdown equipment list), if

not already included in A.1 document.

A.9 Fire Protection System Design Basis Document.

A.10 COPY of NRC approved exemptions for plant fire protection and post-fire nuclear

safety capability features.

A.11 LIST of nuclear safety capability design changes completed in the last three years

(including their associated 10 CFR 50.59 and NFPA 805 plant change evaluations).

A.12 Facility Operating License.

A.13 Technical Specifications (electronic format only).

A.14 Technical Requirements Manual, or equivalent (electronic format only).

B. GENERAL PLANT DESIGN DOCUMENTS

B.1 Piping and instrumentation diagrams (P&IDs) and legend list for systems used to

achieve and maintain nuclear safety performance criteria for: (C-size paper drawings

& electronic format)

  • Fires outside the main control room; and
  • Fires in areas requiring recovery actions at other than primary control stations.

B.2 P&IDs and legend list for fire protection systems, including fire water supply, water

suppression sprinklers & deluge, and CO2 and Halon systems (C-size paper

drawings & electronic format).

B.3 Yard layout drawings for underground fire protection buried piping (C-size paper

drawings & electronic format).

B.4 AC and DC electrical system single line diagrams, from off-site power down to the

highest safety-related bus level (typically 4kV, EDG bus) (C-size paper drawings &

electronic format).

3

B.5 Single line diagrams for motor control centers (MCCs) that supply post-fire nuclear

safety component loads (only for selected fire areas) (C-size paper drawings &

electronic format).

C. CLASSIC FIRE PROTECTION

C.1 COPY of fire protection program implementing procedures (e.g., administrative

controls, surveillance testing, fire brigade).

C.2 LIST of calculations and engineering analyses, studies, or evaluations for the fire

protection system, including the fire water system.

C.3 Hydraulic calculation or analysis for fire protection water system.

C.4 Last two completed surveillance's of fire protection features in the selected fire areas

(detection, suppression, damper inspections, damper tests, penetration inspections,

barrier inspections, etc.).

C.5 LIST of routine tests, surveillances, and preventive maintenance on fire pumps,

including pump controllers and batteries.

C.6 Last two completed annual fire pump pressure and flow tests.

C.7 Last two completed monthly and/or quarterly fire pump tests.

C.8 Last two completed fire loop flow tests and loop flushes.

C.9 CO2 and Halon initial discharge testing or calculation that determined appropriate

concentrations and soak or hold times can be achieved (only for selected fire areas).

C.10 For Fire Brigade Drills, provide the following:

  • Last five fire brigade drill critiques;
  • Summary of any unsatisfactory drill performance items for last three years; and
  • Last unannounced drill critique by a qualified individual independent of the

licensee's staff.

C.11 For fire brigade equipment provide the following:

  • Procedure for inventory and inspection; and
  • Most recent inspection and inventory results.

C.12 Fire Brigade Qualifications, including self-contained breathing apparatus (SCBA) and

training lesson plans.

C.13 COPY of the evaluation or analysis of the effects of fire suppression activities on the

ability to achieve the nuclear safety performance criteria (only for selected fire areas),

including:

  • An automatic or manually actuated suppression system, due to a fire in a single

location, will not indirectly cause damage to the success path; and

4

  • inadvertent actuation or rupture of a suppression system will not indirectly cause

damage to the success path; and

  • demonstration of adequate drainage for areas protected by water suppression

systems;

  • hydrostatic rating of any floor penetration seals installed within the fire areas that

are credited with keeping water from leaking into fire areas below.

C.14 LIST of work orders for work performed on any credited fire barrier (i.e., door,

penetration seal, fire wrap, etc.) in the last three years.

C.15 Fire protection system health reports for the two most recent quarters.

C.16 Fire protection program health report for the two most recent quarters.

C.17 LIST of fire protection system design changes completed in the last three years

(including their associated 10 CFR 50.59 and NFPA 805 plant change evaluations).

C.18 LIST of fire protection system NFPA 805 engineering equivalency evaluations

completed in the last three years.

D. ELECTRICAL

D.1 Identify whether the cables in the selected fire areas are predominantly Thermoset or

Thermoplastic.

D.2 Nuclear safety circuit coordination analysis for fuse and breaker coordination of

nuclear safety capability components.

D.3 Last surveillance demonstrating operability of those components operated from the

primary control stations.

D.4 LIST of post-fire nuclear safety capability system and component design changes

completed, in the last three years.

E. OPERATIONS

E.1 LIST of licensed operator Job Performance Measures (JPMs) for recovery actions

required to achieve and maintain post-fire nuclear safety performance criteria.

E.2 LIST of non-licensed operator training associated with recovery actions required to

achieve and maintain post-fire nuclear safety performance criteria (including JPMs,

in-field training walkdowns, simulations, or initial qualification).

E.3 For required and defense-in-depth recovery actions, provide the following:

  • Recovery Action Feasibility Study;
  • Operator Time Critical Action Program;
  • Time lines for time-critical recovery actions; and
  • Time line validations.

5

E.4 If applicable, thermal hydraulic calculation or analysis that determines the time

requirements for recovery actions and defense-in-depth actions.

E.5 Operating procedures to achieve and maintain nuclear safety performance criteria

from the control room, with a postulated fire in the selected fire areas.

E.6 Operating procedures to achieve and maintain nuclear safety performance criteria

from outside the control room, with a postulated fire in the control room, cable

spreading room, or any area requiring recovery actions (other than recovery actions

performed in the control room or primary control stations).

E.7 For equipment and tools required for recovery actions, provide the following:

  • Procedure for inventory and inspection; and
  • Most recent inspection and inventory results.

F. ADMINISTRATIVE CONTROL, OVERSIGHT, AND CORRECTIVE ACTION PROGRAMS

F.1 Self assessments, peer assessments, and audits of fire protection activities for the

last three years.

F.2 Self assessments, peer assessments, and audits of post-fire nuclear safety capability

methodology for the last three years.

F.3 LIST of open and closed condition reports for the fire protection system for the last

three years.

F.4 LIST of fire event analysis reports for the last three years.

F.5 LIST of open and closed condition reports for post-fire nuclear safety capability issues

for the last three years. This includes issues affecting the nuclear safety capability

analysis, fire hazards analysis, NFPA 805 design basis, fire risk evaluations, plant

change evaluations, post-fire operating procedures and/or training, timeline

evaluations for operator actions, and supporting engineering evaluations, analysis, or

calculations.

F.6 LIST of procedures that control the configuration of the fire protection program,

features, and post-fire nuclear safety capability methodology and system design.

F.7 Site procedure governing the NFPA 805 Monitoring Program

Mitigating Strategies Supporting Documentation

G. 10 CFR 50.54(hh)(2) MITIGATING STRATEGIES DOCUMENTS

G.1 LIST of all changes to regulatory commitments made to meet the requirements of

Title 10 of the Code of Federal Regulations (10 CFR) 50.54(hh)(2).

G.2 LIST of procedures and guidelines that were revised or generated to implement the

mitigating strategies. These could be extensive damage mitigation guidelines

(EDMGs), severe accident management guidelines (SAMGs), emergency operating

procedures (EOPs), abnormal operating procedures (AOPs), etc.

G.3 LIST of engineering evaluations or calculations that were used to verify the

engineering bases for the mitigating strategies.

G.4 LIST of modification packages or summary descriptions of modifications with

simplified drawings, for necessary facility changes to implement the mitigating

strategies.

G.5 LIST of routine tests, surveillances, and preventive maintenance for equipment and

tools needed to implement 10 CFR 50.54(hh)(2) strategies.

G.6 For equipment and tools needed to implement 10 CFR 50.54(hh)(2) strategies,

provide the following:

  • Procedures for inventory and inspection; and
  • Most recent inspection and inventory results.

G.7 LIST of 10 CFR 50.54(hh)(2) strategies, if any, which have implementing details that

differ from that documented in the submittals or the safety evaluation report.

G.8 Training records, training matrix, and lesson plans related to 10 CFR 50.54(hh)(2).

G.9 Copies of memoranda of understanding (MOU) (e.g., with local fire departments)

required to implement any mitigating strategies.