ML18142A962

From kanterella
Jump to navigation Jump to search
Letter 05/22/18 Fermi Power Plant - Information Request to Support the NRC Annual Baseline Emergency Action Level and Emergency Plan Changes Inspection
ML18142A962
Person / Time
Site: Fermi DTE Energy icon.png
Issue date: 05/22/2018
From: Steven Orth
NRC/RGN-III
To: Polson K
DTE Energy
References
Download: ML18142A962 (4)


Text

May 22, 2018 Mr. Keith Polson, Senior VP and Chief Nuclear Officer DTE Energy Company Fermi 2 - 260 TAC 6400 North Dixie Highway Newport, MI 48166

SUBJECT:

FERMI POWER PLANTINFORMATION REQUEST TO SUPPORT THE NRC ANNUAL BASELINE EMERGENCY ACTION LEVEL AND EMERGENCY PLAN CHANGES INSPECTION

Dear Mr. Polson:

This letter is to request information to support the Emergency Action Level and Emergency Plan change inspection that will be conducted during the third and fourth quarters of 2018. This inspection will be performed as an in-office review and in accordance with the U.S. Nuclear Regulatory Commission (NRC) Baseline Inspection Procedure 71114.04. The list of requested documents needed from your staff for this inspection is enclosed. We are requesting that these documents are for the time period specified in the list, as applicable.

The point of contact for this request is Gregg Hansen, Region III Senior Emergency Preparedness Inspector, and can be reached at 630-829-9610. We will keep in close communications with the Emergency Preparedness staff at your site regarding this request and the inspection when performed.

This letter does not contain new or amended information collection requirements subject to the Paperwork Reduction Act of 1995 (44 U.S.C. 3501 et seq.). Existing information collection requirements were approved by the Office of Management and Budget, Control Number 3150-0011. The NRC may not conduct or sponsor, and a person is not required to respond to, a request for information or an information collection requirement unless the requesting document displays a currently valid Office of Management and Budget Control Number.

K. Polson This letter and its enclosure will be made available for public inspection and copying at http://www.nrc.gov/reading-rm/adams.html and at the NRC Public Document Room in accordance with Title 10 of the Code of Federal Regulations, Part 2.390, Public Inspections, Exemptions, Requests for Withholding.

Sincerely,

/RA/

Steven K. Orth, Chief Plant Support Branch Division of Reactor Safety Docket No. 50-341 License No. NPF-43

Enclosure:

EAL and Emergency Plan Changes Inspection Document Request cc: Distribution via LISTSERV

K. Polson Letter to Keith Polson from Steven K. Orth dated May 22, 2018

SUBJECT:

FERMI POWER PLANTINFORMATION REQUEST TO SUPPORT THE NRC ANNUAL BASELINE EMERGENCY ACTION LEVEL AND EMERGENCY PLAN CHANGES INSPECTION DISTRIBUTION:

Jeremy Bowen RidsNrrDorlLpl3 RidsNrrPMFermi2 Resource RidsNrrDirsIrib Resource Steven West Darrell Roberts Richard Skokowski Allan Barker DRPIII DRSIII ADAMS Accession Number: ML18142A962 OFFICE RIII RIII RIII RIII NAME JKutlesa:jw GHansen SOrth DATE 05/21/18 05/21/18 05/22/18 OFFICIAL RECORD COPY

EAL AND EMERGENCY PLAN CHANGES INSPECTION DOCUMENT REQUEST We request that all information listed below be received no later than July 13, 2018.

The information is preferred electronically on a CD-ROM. Send the information requested to the U.S. Nuclear Regulatory Commission Region III office:

U.S. NRC Region III 2443 Warrenville Road Suite 210 Lisle, Illinois 60532-4352 Attn: Gregg Hansen, DRS Documents:

1. Current revision of the Emergency Plan
2. Current Emergency Action Level (EAL) scheme
3. Most recent Safety Evaluation Report for the Emergency Plan and EALs
4. On Shift Staffing Analysis baseline
5. Most recent Evacuation Time Estimate
6. Governing site document for Title 10 of the Code of Federal Regulations (CFR),

Part 50.54(q) evaluation process

7. Title 10 CFR 50.54(q) evaluator training program and qualification records
8. Title 10 CFR 50.54(q) screenings and evaluations for Emergency Plan and EAL changes that were completed between June 30, 2017, and June 30, 2018
9. For each change of the Emergency Plan and EALs, submit the previous revision, proposed revision, and the associated 50.54(q) screening and evaluation (if performed)
10. Corrective Action Program entries related to 50.54(q) screenings, 50.54(q) evaluations, EAL changes and Emergency Plan changes dated between June 30, 2017, and June 30, 2018 Enclosure