MONTHYEARIR 05000454/20230042024-02-0202 February 2024 Integrated Inspection Report 05000454/2023004 and 05000455/2023004 ML24016A1902024-01-30030 January 2024 International, Inc. - Notice of Violation; the U.S. Nuclear Regulatory Commission Inspection Report 07201014/2022201 ML24022A2722024-01-23023 January 2024 Request for Information for an NRC Post-Approval Site Inspection for License Renewal Inspection Report 05000454/2024011 ML24018A1992024-01-18018 January 2024 International, Administrative Change to HI-2200343-A ML24018A0362024-01-17017 January 2024 Paragon Energy Solutions, Defect with Detroit Diesel/Mtu Fuel Injectors P/N R5229660 Cat Id 0001390618 ML23363A0312024-01-0404 January 2024 Application for HI-STORM 100 Cask System, Amendment No. 19 - Acknowledgement of Withdrawal and Notification of the U.S. Nuclear Regulatory Commission Staff Efforts Closure ML23355A0842023-12-21021 December 2023 International, Withdrawal of HI-STORM I00 Multipurpose Canister Storage System Amendment ML23320A1762023-12-13013 December 2023 Exemption from Select Requirements of 10 CFR Part 73 (EPID L-2023-LLE-0027 (Security Notifications, Reports, and Recordkeeping and Suspicious Activity Reporting)) ML23277A0032023-12-11011 December 2023 Issuance of Amendments Regarding Adoption of TSTF-370 ML23324A0952023-12-0606 December 2023 Amendment No. 19 to Certificate of Compliance No. 1014 for the HI-STORM 100 Multi-purpose Canister Storage System - Request for Additional Information ML23328A0052023-12-0505 December 2023 Issuance of Renewed Certificate of Compliance No. 1014, Amendment No. 17 for the Hi-Storm 100 Cask System (Cac/Epid 001028/L-2021-LLA-0140) ML23338A3052023-12-0404 December 2023 International, Submittal of Supplement to RAI Responses on HI-STORM 100 Amendment 18 ML23318A5102023-12-0101 December 2023 Relief from the Requirements of the ASME Code ML23334A1912023-11-30030 November 2023 International, Submittal of Topical Report HI-2210161-A Version IR 05000454/20233012023-11-27027 November 2023 NRC Initial License Examination Report 05000454/2023301 and 05000455/2023301 BYRON 2023-0065, Unit 2 - Notification of Deviation from Electric Power Research Institute (EPRI) Topical Report MRP-227, Revision 1-A, Materials Reliability Program: Pressurized Water Reactor Internals Inspection and Evaluation Guideline2023-11-17017 November 2023 Unit 2 - Notification of Deviation from Electric Power Research Institute (EPRI) Topical Report MRP-227, Revision 1-A, Materials Reliability Program: Pressurized Water Reactor Internals Inspection and Evaluation Guideline ML23321A2172023-11-17017 November 2023 International, Responses to NRC Questions Form EA-23-044 Pre-Decisional Enforcement Conference BYRON 2023-0063, Day Inservice Inspection Report for Interval 4, Period 3, (B2R24)2023-11-16016 November 2023 Day Inservice Inspection Report for Interval 4, Period 3, (B2R24) JAFP-23-0063, Registration of Spent Fuel Cask Use2023-11-13013 November 2023 Registration of Spent Fuel Cask Use IR 05000454/20230032023-11-13013 November 2023 Integrated Inspection Report 05000454/2023003 and 05000455/2023003 and Exercise of Enforcement Discretion RS-23-117, Supplemental Information Letter for Part 73 Exemption Request - Responses to Request for Confirmatory Information2023-11-10010 November 2023 Supplemental Information Letter for Part 73 Exemption Request - Responses to Request for Confirmatory Information ML23317A1192023-11-10010 November 2023 Constellation Energy Generation, LLC - 2023 Annual Report - Guarantees of Payment of Deferred Premiums ML23310A0362023-11-0909 November 2023 International, Inc. - U.S. Nuclear Regulatory Commission Inspection Report 07201014/2023201 ML23313A0852023-11-0909 November 2023 Submittal of 2023-301 Byron Initial License Examination Post-Examination Comments ML23283A1262023-11-0202 November 2023 Letter - Second Request for Additional Information - HI-STORM 100 Amd 18 RS-23-114, Proposed Alternative for Examination of Pressurizer Circumferential and Longitudinal Shell-to-Head Welds and Nozzle-to-Vessel Welds2023-11-0101 November 2023 Proposed Alternative for Examination of Pressurizer Circumferential and Longitudinal Shell-to-Head Welds and Nozzle-to-Vessel Welds ML23297A2352023-10-26026 October 2023 Information Request for the Cyber Security Baseline Inspection, Notification to Perform Inspection ML23289A1582023-10-16016 October 2023 Decommissioning International - Registration of Spent Fuel Casks and Notification of Permanent Removal of All Indian Point Unit 3 Spent Fuel Assemblies from the Spent Fuel Pit RS-23-100, Request for Exemption from Enhanced Weapons, Firearms Background Checks, and Security Event Notifications Implementation2023-10-13013 October 2023 Request for Exemption from Enhanced Weapons, Firearms Background Checks, and Security Event Notifications Implementation RS-23-097, Constellation Energy Generation, LLC, Advisement of Leadership Changes and Submittal of Updated Standard Practice Procedures Plans2023-10-12012 October 2023 Constellation Energy Generation, LLC, Advisement of Leadership Changes and Submittal of Updated Standard Practice Procedures Plans RS-23-108, Proposed Alternative for Examinations of Examination Categories B-B, B-D, and C-A Steam Generator Pressure Retaining Welds and Full Penetration Welded Nozzles2023-10-11011 October 2023 Proposed Alternative for Examinations of Examination Categories B-B, B-D, and C-A Steam Generator Pressure Retaining Welds and Full Penetration Welded Nozzles RS-23-105, Proposed Alternative for Examinations of Examination Category C-B Steam Generator Nozzle-to-Shell Welds and Nozzle Inside Radius Sections2023-10-10010 October 2023 Proposed Alternative for Examinations of Examination Category C-B Steam Generator Nozzle-to-Shell Welds and Nozzle Inside Radius Sections ML23278A0272023-10-0505 October 2023 Operator Licensing Examination Approval - Byron Station, October 2023 ML23251A1622023-09-29029 September 2023 Steam Generator Tube Inspection Reports to Reflect TSTF-577 Reporting Requirements RS-23-093, License Amendment to Braidwood Station, Units 1 and 2, and Byron Station, Units 1 and 2, Technical Specifications 3.7.15, Spent Fuel Pool Boron Concentration, 3.7.16, Spent Fuel.2023-09-29029 September 2023 License Amendment to Braidwood Station, Units 1 and 2, and Byron Station, Units 1 and 2, Technical Specifications 3.7.15, Spent Fuel Pool Boron Concentration, 3.7.16, Spent Fuel. RS-23-094, Relief Request I4R-24, Alternative for Post-Peening Reexamination Frequency for Reactor Pressure Vessel Head Penetration Nozzle Number 752023-09-29029 September 2023 Relief Request I4R-24, Alternative for Post-Peening Reexamination Frequency for Reactor Pressure Vessel Head Penetration Nozzle Number 75 ML23270A0082023-09-27027 September 2023 Registration of Spent Fuel Casks RS-23-091, Relief Request I4R-25, Alternative Requirements for Reactor Pressure Vessel Inservice Inspection Intervals2023-09-26026 September 2023 Relief Request I4R-25, Alternative Requirements for Reactor Pressure Vessel Inservice Inspection Intervals ML23263B1232023-09-20020 September 2023 HI-STORM 100 Amendment 16 Responses to Second Round Requests for Additional Information ML23226A0062023-09-19019 September 2023 Review of License Renewal Commitment Number 10 Submittal ML23234A1572023-09-14014 September 2023 Letter to Holtec International Final Safety Evaluation for Hi-2210161, Revision No. 4, Topical Report on the Radiological Fuel Qualification Methodology for Dry Storage Systems ML23145A1752023-09-12012 September 2023 NRC Choice Letter to Holtec International with Attached Safety Inspection Report, IR 72-1014/2022-201, December 12-15, 2022, Inspection of Holtec International in Camden, New Jersey (Docket Nos.: 72-1014, 72-1032) ML23180A1692023-09-11011 September 2023 Calvert Cliff Units 1 & 2, and R.E. Ginna Plant - Withdrawal of Proposed Alternatives to American Society of Mechanical Engineers (ASME) Requirements (Epids L-2022-LRR-0074, 0076, 0079, 0091, 0092, 0093 and 0094) ML23251A2512023-09-0808 September 2023 International, Submittal of Supplement to RAI Responses on HI-STORM 100 Amendment 18 ML23250A0812023-09-0707 September 2023 Registration of Spent Fuel Casks 2024-02-02
[Table view] |
Text
- __
Byron Generating Station E:zZ Exe[onGeneration 445ONorthGrrnanChurchRd www.exeloncorp.com 10 CFR 72212 May 18, 2018 LTR: BYRON 2018-0050 File: 1.10.0101 (SF104)
ATIN: Document Control Desk Director, Division of Spent Fuel Storage and Transportation Office of Nuclear Material Safety and Safeguards U. S. Nuclear Regulatory Commission Washington, DC 20555-0001 Byron Station, Units 1 and 2 Renewed Facility Operating License Nos. NPF-37 and NPF-66 NRC Docket Nos. STN 50-454, STN 50-455 and 72-68
Subject:
Registration of Use of Cask to Store Spent Fuel In accordance with 10 CFR 72.212, Conditions of general license issued under 10 CFR 72.210, paragraph (b)(2), Exelon Generation Company, LLC (EGC) is registering with the NRC, the use of two casks under the general license to store spent fuel at Byron Station. The initial use of these casks to store spent fuel occurred on April 27, 201 8 and May 1 1 201 8. This registration is required to be submitted within 30 days.
The following information is provided in accordance with 10 CFR 72.212(b)(2):
Licensee Name Exelon Generation Company, LLC Licensee Address Byron Generating Station 4450 North German Church Road Byron, IL 61010 Reactor License Number NPF-37 and NPF-66 Reactor Docket Number 50-454 and 50-455 Independent Spent Fuel Storage Installation Docket Number 72-68 Contact Person and Title Douglas Spitzer Regulatory Assurance Manager
May 18, 2018 LIR: BYRON 2018-0050 U.S. Nuclear Regulatory Commission Page 2 Cask Certificate Number 1014, Amendment 9, Revision No. 1 Cask Model Number HI-STORM 1005 Version B (218)
April 27, 2018 Cask Identification Number Multi-Purpose Canister Type 32, Serial No. 411 HI-STORM 1005 Version B (218) Serial No. 851 May 11, 2018 Cask Identification Number Multi-Purpose Canister Type 32, Serial No. 498 HI-STORM 1005 Version B (218) Serial No. 1089 Should you have any questions concerning this matter, please contact Mr. Douglas Spitzer, Regulatory Assurance Manager, at (81 5) 406-2800.
Respectfully, Mark E. Kanavos Site Vice President Byron Generating Station M EK/GC/rm cc: NRC Regional Administrator Region III