L-MT-18-023, 10 CFR 50.55a Request RR-012: Inservice Inspection Impracticality in Accordance with 10 CFR 50 .55a(g)(5)(iii) During the Fifth Ten-Year Interval

From kanterella
(Redirected from ML18131A179)
Jump to navigation Jump to search
10 CFR 50.55a Request RR-012: Inservice Inspection Impracticality in Accordance with 10 CFR 50 .55a(g)(5)(iii) During the Fifth Ten-Year Interval
ML18131A179
Person / Time
Site: Monticello Xcel Energy icon.png
Issue date: 05/11/2018
From: Church C
Northern States Power Co, Xcel Energy
To:
Document Control Desk, Office of Nuclear Reactor Regulation
References
L-MT-18-023
Download: ML18131A179 (22)


Text

2807 West County Road 75 Monticello, MN 55362 fl Xcel Energy*

RESPONSIBLE BY NATURE ~

800.895.4999 xcelenergy.com May 11, 2018 L-MT-18-023 10 CFR 50.55a ATTN: Document Control Desk U.S. Nuclear Regulatory Commission Washington, DC 20555-0001 Monticello Nuclear Generating Plant Docket No. 50-263 Renewed Facility Operating License No. DPR-22 10 CFR 50.55a Request RR-012: lnservice Inspection Impracticality in Accordance with 10 CFR 50 .55a(g)(5)(iii) during the Fifth Ten-Year Interval Pursuant to 10 CFR 50.55a(g)(5)(iii), Northern States Power Company, a Minnesota corporation, doing business as Xcel Energy (hereafter "NSPM"), requests relief from certain examination coverage requirements imposed by the American Society of Mechanical Engineers Boiler and Pressure Vessel Code, Section XI, "Rules for lnservice Inspection of Nuclear Power Plant Components", for the Monticello Nuclear Generating Plant.

This 10 CFR 50.55a request is for nozzle-to-vessel weld examinations, performed during the 2017 refueling outage, where the required coverage of "essentially 100 percent" could not be obtained when examined to the extent practical. The basis for the 10 CFR 50 .55a request is that compliance with the specified requirements is impractical due to plant design .

NSPM is submitting this request for the Fifth Ten-Year lnservice Inspection Interval and requests approval by June 11, 2019.

If there are any questions or if additional information is needed, please contact Mr. Peter Gohdes at (612) 330-6503 or Peter.Gohdes@xenuclear.com.

Summary of Commitments This letter makes no new commitments and no revisions to existing commitments.

Christopher R. Church Site Vice President, Monticello Nuclear Generating Plant Northern States Power Company - Minnesota

Document Control Desk Page 2 Enclosure cc: Administrator, Region III, USNRC Project Manager, Monticello, USNRC Resident Inspector, Monticello, USNRC

L-MT-18-023 NSPM Enclosure 10 CFR 50.55a Request RR-012 Inservice Inspection Impracticality in Accordance with 10 CFR 50.55a(g)(5)(iii) during the Fifth Ten-Year Interval 1.0 ASME CODE COMPONENTS AFFECTED Components affected are American Society of Mechanical Engineers (ASME) Boiler and Pressure Vessel Code (Code), Section Xl, Class 1, Reactor Pressure Vessel (RPV), nozzle-to-vessel shell welds specified below and further in-detail in Attachment 1, Table A. This request is based upon examinations that were performed during the 2017 Monticello Nuclear Generating Plant (MNGP) refueling outage, which was in Period 2 of the Fifth Ten-Year Interval. The Fifth Ten-Year Interval began on September 1, 2012.

Recirculation Inlet Nozzle N-2E: Weld N-2E NV Feedwater Inlet Nozzle N-4A: Weld N-4A NV CRD Return Nozzle N-9 (Capped): Weld N-9 NV 2.0 APPLICABLE CODE EDITION AND ADDENDA The applicable ASME Section Xl Code for the MNGP Fifth Ten-Year Inservice Inspection (ISI)

Interval is the 2007 Edition with the 2008 Addenda. ASME Section XI, Appendix VIII requirements are implemented as required by 10 CFR 50.55a. Ultrasonic procedures and personnel are qualified to the Performance Demonstration Initiative (PDI). The PDI Program satisfies the requirements of the 2007 Edition with 2008 Addenda of Section XI, Appendix VIII, as modified by 10 CFR 50.55a.

3.0 APPLICABLE CODE REQUIREMENT ASME Class 1 nozzle-to-vessel shell welds are subject to the examination requirements of Subsection IWB Table IWB-2500-1, as shown below, and are required to be examined once within the Fifth Ten-Year Interval:

Code Class: 1

References:

IWA-2200(c)

IWB-2500, Table IWB-2500-1 Examination Category: B-D, Full Penetration Welded Nozzles in Vessels Item Number: B3.90

Description:

Nozzle-to-Vessel Shell Welds Component Numbers: See Section 1.0 and Attachment 1, Table A System: Reactor Vessel Examination Method: Volumetric - Ultrasonic Testing (UT)

Examination Volume: Figure IWB-2500-7(b)

In August 2014, the NRC issued Regulatory Guide (RG) 1.147, Revision 17, Inservice Inspection Code Case Acceptability, ASME Section XI, Division 1 (Reference 1). In RG 1.147, Page 1 of 7

L-MT-18-023 NSPM Enclosure the NRC identified the ASME Code Cases determined to be acceptable alternatives to applicable parts of Section XI and indicated that licensees may use these Code Cases without requesting authorization from the NRC, provided that they are used with any identified limitations or modifications. RG 1.147, Table 1 lists ASME Code Case N-613-1 (Reference 2) as acceptable to the NRC for use by a licensee with no identified limitations or modifications.

As an acceptable alternative to ASME Section XI Figure IWB-2500-7(b) for RPV nozzle-to-vessel welds, ASME Code Case N-613-1 permits an examination volume that includes the width of the reactor-nozzle-to-shell weld plus one-half inch of adjacent base metal on each side of the widest part of the weld. In comparison, the examination volume required by the Figure IWB-2500-7(b) includes the width of the weld plus the adjacent base metal on each side of the widest part of the weld equal to one-half of the vessel shell wall thickness.

ASME Section XI IWA-2200(c) states in part:

When performing VT-1, surface, radiographic, or ultrasonic examination on a component with defined surface or volume, essentially 100% of the required surface or volume shall be examined. Essentially 100% coverage is achieved when the applicable examination coverage is greater than 90%...

Per IWA-2200(c), Nonmandatory Appendix S, Evaluating Coverage for Section XI Nondestructive Examination, may be used as a guideline to determine examination coverage, i.e., when the defined volume cannot be obtained due to a volumetric limitation.

Nonmandatory Appendix S, Article S-3000, specifically Sub-Article S-3500, provides examination coverage evaluation guidelines for ultrasonic examination of welds.

Nonmandatory Appendix S defines a volumetric limitation as:

Inability to examine the required volume because of interference, obstruction, geometrical configuration, or metallurgical condition of material being examined.

4.0 IMPRACTICALITY OF COMPLIANCE Construction Permit CPPR-31 was obtained for the MNGP on June 19, 1967. The MNGP systems and components were designed for construction before the examination requirements of ASME Section Xl were formalized and published. Therefore, because MNGP was not specifically designed to meet the requirements of ASME Section Xl, full compliance is not feasible or practical within the limits of the current plant design.

10 CFR 50.55a recognizes the limitations to inservice inspection of components in accordance with Section XI of the ASME Code, which are imposed due to early plants design and construction, as follows:

10 CFR 50.55a(g)(1): Inservice inspection requirements for older plants (pre-1971 CPs). For a boiling or pressurized water-cooled nuclear power facility whose construction permit was issued before January 1, 1971, components Page 2 of 7

L-MT-18-023 NSPM Enclosure (including supports) must meet the requirements of paragraphs (g)(4) and (g)(5) of this section to the extent practical.

10 CFR 50.55a(g)(4): Inservice inspection standards requirement for operating plants. Throughout the service life of a boiling or pressurized water-cooled nuclear power facility, components (including supports) that are classified as ASME Code Class 1, Class 2, and Class 3 must meet the requirements, except design and access provisions and preservice examination requirements, set forth in Section XI of editions and addenda of the ASME [Boiler and Pressure Vessel]

Codeto the extent practical within the limitations of design, geometry, and materials of construction of the components.

10 CFR 50.55a(g)(5)(iii): ISI program update: Notification of impractical ISI Code requirements. If the licensee has determined that conformance with a Code requirement is impractical for its facility the licensee must notify the NRC and submit, as specified in § 50.4, information to support the determinations.

The examination limitations on the subject components are due to inherent nozzle design geometric contours (see Attachment 1, Table A and Attachment 2).

A description of the examination methodology used to provide the maximum obtainable coverage is provided in Section 6 of this request. This methodology is based on ASME Section XI, Appendix VIII qualification and was applied to the extent practical within the design constraints of the components. Attachment 2 provides cross-sectional diagrams of the subject welds showing the geometric contour of the component design in relation to the welds and the coverage obtained within the examination volume requirements of ASME Code Case N-613-1, Figure 2.

5.0 BURDEN CAUSED BY COMPLIANCE Compliance with the examination coverage requirements of ASME Section XI would require modification, redesign, or replacement of components where geometric contour and physical obstruction is inherent to the component design and installation.

6.0 PROPOSED ALTERNATIVE AND BASIS FOR USE 6.1 Proposed Alternative In accordance with 10 CFR 50.55a(g)(5)(iii), Northern States Power Company, a Minnesota corporation, doing business as Xcel Energy (hereafter NSPM), requests relief for the components listed in Attachment 1, Table A on the basis that the required examination coverage of "essentially 100 percent" is impractical due to physical obstructions and the limitations imposed by design, geometry and materials of construction.

Page 3 of 7

L-MT-18-023 NSPM Enclosure NSPM has performed qualified examinations that achieved the maximum, practical amount of coverage obtainable within the limitations imposed by the design of the components with no detectable indications.

Therefore, pursuant to 10 CFR 50.55a(g)(5)(iii), NSPM requests authorization of an alternative to the requirements of ASME Section XI Table IWB-2500-1, Category B-D, Item B3.90 and associated ASME Code Case N-613-1, and proposes to utilize these completed exams as an acceptable alternative that provides reasonable assurance of continued structural integrity.

6.2 Basis for Use 6.2.1 Nozzle-to-Vessel Shell Welds (N-2E NV, N-4A NV, N-9 NV)

The NSPM Nondestructive Examination (NDE) UT procedures incorporate inspection techniques qualified under Appendix VIII of the ASME Section XI Code by the PDI.

Examinations of the RPV nozzle-to-shell welds were performed from the RPV exterior surface using a manual contact method from the nozzle blend radius, the nozzle-to-vessel shell weld, and vessel shell surface. Coverage using the alternative examination volume permitted by Code Case N-613-1 was obtained by following the scan parameters designated within NSPM NDE procedures for each nozzle configuration and angle, including those parameters defined by MNGP-specific Electric Power Research Institute (EPRI) computer modeling reports (References 3 and 4). Note that the scans defined by the EPRI reports are applicable only to the inner 15 percent of the weld volume and only when scanning in a circumferential direction, parallel to the weld.

The refracted longitudinal wave mode of propagation was applied for all scans of the exam volume in the radial direction, perpendicular to the weld. The refracted longitudinal wave mode of propagation was also applied to the outer 85 percent of the exam volume for parallel scans.

As required by the NSPM NDE procedures and the EPRI computer modeling reports, the shear wave mode of propagation was applied for each of the transducer and wedge combinations required for the remaining inner 15 percent of the parallel scan exam volume.

The subject nozzle-to-vessel welds received the required examination(s) to the extent practical within the limited access of the component design. One hundred percent coverage was obtained for the inner 15 percent of the examination volume for the radial and parallel scans.

The examination limitations for the subject components were encountered within the outer 85 percent of the examination volume for the parallel and radial scans. For the examinations conducted, satisfactory results were achieved, and no flaw indications were detected.

Due to the design of these nozzle-to-shell welds, it was not feasible to effectively perform a volumetric examination of "essentially 100 percent" of the required volume. The nozzle-to-vessel welds are accessible from the vessel plate side of the weld and are examined to the extent practical with qualified techniques; however, the curvature of the nozzle forging and proximity to the weld preclude obtaining further coverage of the excluded areas within the outer 85 percent of the examination volume.

Page 4 of 7

L-MT-18-023 NSPM Enclosure 6.2.2 Exam Coverage Determination As required by procedure, when limitations to ISI examinations are encountered that prevent obtaining full coverage of a required volume, the limitations are required to be quantified and recorded.

The method used to determine coverage is based on field measurements applied to a two dimensional plot. This allows an informed approximation to be made of the coverage achieved.

The methodology is appropriate to the application in that the limitations are physical and the methods applied to the examination are established by qualified techniques.

The coverage drawings in Attachment 2 give a representation of the examination volume and the weld interface line shown in Figure 2 of Code Case N-613-1 for the nozzle-to-vessel welds.

The areas of examination volume coverage and areas of no examination volume coverage are identified on the respective drawing for each nozzle. The contour on the exterior surface of the nozzles causes transducer liftoff and inhibits the ability to maintain adequate coupling necessary to transmit and receive the ultrasonic sound energy.

Additional coverage with meaningful results was not achievable or practical for the limited areas with implementation of performance based examination methods without redesigning and modifying the components to allow additional scanning surfaces. NSPM has concluded that if significant service-induced degradation existed in the subject welds, it would have been identified by the examinations performed. Therefore, in accordance with 10 CFR 50.55a(g)(1) and (4), each of the subject welds were examined to the extent practical.

For comparison with current results, Table B of Attachment 3 provides historical examination results from the Fourth Interval for the subject welds, including percent coverage and their corresponding, granted 10 CFR 50.55a requests (References 7 and 8). The coverage obtained for the Fourth Interval exams was substantially similar to those obtained for the current exams, as listed in Attachment 1, Table A, however, the percent of coverage shown for N-2E and N-4A in the Fifth Interval is slightly higher than the Fourth Interval coverage values due to refinement in determination of coverage values.

6.2.3 Materials, Aging Management, Similar Components The materials for the subject components are A508 Class 2 nozzle forgings welded to A533 Grade B, Class 1 vessel shell plate. The weld filler material for the subject joints was E8018NM. Internal surface cladding materials are E309-15 for the base layer and ER308L or E308L-15 for subsequent layers.

The MNGP reactor vessel water chemistry is controlled in accordance with Revision 1 of the BWR Water Chemistry Guidelines (Reference 5). Hydrogen water chemistry system is used to reduce the oxidizing environment in the reactor coolant. Beginning in 2013, MNGP has also implemented Online Noble-Metal Chemistry. These additional measures provide added assurance against the initiation of cracking or corrosion from the inside surface of the reactor Page 5 of 7

L-MT-18-023 NSPM Enclosure vessel. An inerted primary containment environment during operation provides assurance of corrosion protection on the outside surface of the reactor vessel.

Additionally, as Class 1 Examination Category B-P components, system pressure testing with VT-2 visual examinations are required every outage prior to startup. The VT-2 examinations were performed on the subject components in association with the Reactor Coolant Pressure Boundary system pressure test performed during the 2017 refueling outage. No evidence of pressure boundary leakage was identified during this system test.

As shown in Table C of Attachment 3, five nozzle-to-vessel welds with limitations to coverage were examined during previous outages in the current Interval and relief was granted by the NRC (Reference 6) pursuant to 10 CFR 50.55a(g)(6)(i).

6.2.4 Summary The provisions described above, as an alternative to the Code requirement for examination coverage, will continue to provide reasonable assurance of the structural integrity of the subject welds. The volumetric examinations were completed to the extent practical and no unacceptable flaws were identified. VT-2 examinations performed on the subject components during system pressure testing each refueling outage in accordance with examination Category B-P provide continued assurance that the structural integrity of the subject components is maintained. Additionally, the MNGP Water Chemistry Program and inerted primary containment environment provide added measures of protection for the component materials.

Five nozzle-to-vessel weld examinations, as shown in Table C of Attachment 3, were previously performed during the Fifth Ten-Year Interval having limitations with respect to coverage, and relief was granted by the NRC pursuant to 10 CFR 50.55a(g)(6)(i). Similarly, relief was granted in the Fourth Ten-Year Interval, as shown in Table B of Attachment 3, for the components included in this request.

Therefore, pursuant to 10 CFR 50.55a(g)(5)(iii), NSPM requests that the NRC grant relief from the ASME Section XI examination requirements for the subject nozzle-to-vessel welds.

7.0 DURATION OF PROPOSED ALTERNATIVE NSPM requests the granting of this relief for the MNGP Fifth Ten-Year Inservice Inspection Interval Program that is currently scheduled to end on May 31, 2022.

8.0 PRECEDENTS The NRC has previously granted similar relief for the MNGP for the Fifth Ten-Year Inservice Inspection Interval (Reference 6). The NRC also granted similar relief for these components during the Fourth Ten-Year Inservice Inspection Interval (References 7 and 8).

Page 6 of 7

L-MT-18-023 NSPM Enclosure

9.0 REFERENCES

1. NRC Regulatory Guide 1.147, Revision 17, Inservice Inspection Code Case Acceptability ASME Section XI, Division 1, dated August 2014. (ADAMS Accession No. ML13339A689)
2. ASME Section XI Code Case N-613-1, Ultrasonic Examination of Full Penetration Nozzles in Vessels, Examination Category B-D, Item Nos. B3.10 and B3.90, Reactor Nozzle-To-Vessel Welds, Figs. IWB-2500-7(a), (b), and (c), Section XI, Division 1, dated August 20, 2002.
3. EPRI Internal Report IR-2004-63, Monticello Nozzle Inner Radius and Nozzle-to-Shell Weld Examinations, dated December 2004.
4. EPRI Internal Report IR-2006-100, "Monticello Nozzle Inner Corner Region and Nozzle-to-Shell Weld Examinations, dated January 2006.
5. EPRI Report 3002002623, BWRVIP-190 Revision 1: BWR Vessel and Internals Project, Volume 1: BWR Water Chemistry Guidelines - Mandatory, Needed, and Good Practice Guidance, dated April 2014.
6. NRC letter to NSPM, Monticello Nuclear Generating Plant - Relief Request RR-009 Regarding Relief from Examination Coverage Requirements of Section XI of the American Society of Mechanical Engineers Boiler and Pressure Vessel Code for the Fifth 10-Year Inservice Inspection Program Interval (TAC No. MF4258), dated February 19, 2015. (ADAMS Accession No. ML15028A152)
7. NRC letter to Nuclear Management Company (NMC), Monticello Nuclear Generating Plant (MNGP) - Fourth 10-Year Interval lnservice Inspection (lSI) Program Plan Relief Request No. 13 (TAC No. MC8882), dated July 18, 2006. (ADAMS Accession No. ML061780172)
8. NRC letter to NMC, Monticello Nuclear Generating Plant (MNGP) - Granting of Relief Regarding Limited Ultrasonic Examination Coverage of Five Welds (TAC No.

MD6854), dated May 19, 2008. (ADAMS Accession No. ML081050678)

Page 7 of 7

ENCLOSURE, ATTACHMENT 1 MONTICELLO NUCLEAR GENERATING PLANT 10 CFR 50.55a Request RR-012 Inservice Inspection Impracticality in Accordance with 10 CFR 50.55a(g)(5)(iii) during the Fifth Ten-Year Interval

SUMMARY

OF 2017 REFUELING OUTAGE EXAMS FOR WHICH ESSENTIALLY 100 PERCENT COVERAGE WAS NOT OBTAINED ON CATEGORY B-D NOZZLE-TO-VESSEL WELDS (1 Page Follows)

L-MT-18-023 NSPM Enclosure, Attachment 1 Table A: 2017 Refueling Outage, Summary of Exams, Essentially 100 Percent Coverage Not Obtained, Category B-D, Full Penetration Welds of Nozzles in Vessels, Item No. B3.90 Code System Code Component Category and and Percent Exam and Component Component Examination Volume Coverage Indications Report Item No. Description ID Required Obtained Limitations Reported Numbers Reactor Vessel Nozzle-to-Vessel Weld, Limited due B-D 1 2017UT029 Recirculation Inlet N-2E NV Code Case N-613-1 83% to nozzle None B3.90 configuration 2017UT030 Nozzle N-2E Figure 2 Reactor Vessel Nozzle-to-Vessel Weld, Limited due B-D 2017UT016 Feedwater Inlet N-4A NV Code Case N-613-1 83%1 to nozzle None B3.90 configuration 2017UT017 Nozzle N-4A Figure 2 Reactor Vessel Nozzle-to-Vessel Weld, Limited due B-D CRD-Return 2017UT018 N-9 NV Code Case N-613-1 85% to nozzle None B3.90 (capped) 2017UT020 Figure 2 configuration Nozzle N-9 1

Coverage is slightly higher than 4th Interval exam shown in Table B of Attachment 3, due to refinement in determination of coverage values.

Page 1 of 1

ENCLOSURE, ATTACHMENT 2 MONTICELLO NUCLEAR GENERATING PLANT 10 CFR 50.55a Request RR-012 Inservice Inspection Impracticality in Accordance with 10 CFR 50.55a(g)(5)(iii) during the Fifth Ten-Year Interval EXAM LIMITATIONS IMPOSED BY COMPONENT DESIGN AND CONSTRUCTION (7 Pages Follow)

L-MT-18-023 NSPM Enclosure, Attachment 2 Exam Limitations Imposed by Component Design and Construction This attachment contains a series of excerpts from the Inservice Inspection (ISI) Ultrasonic Testing (UT) reports applicable to the subject components.

These excerpts contain sketches depicting the component configuration with physical limitations imposed by the design, e.g., geometrical contour and weld position. The sketches provide a cross sectional view depicting the UT coverage and coverage limitations in relation to the required examination volume.

Descriptive details are also included with the sketches to provide reference to the configuration, e.g., interior/exterior surface, shell side / nozzle side of weld, weld area, required exam volume, area of coverage, etc.

Component Report No. Page(s)

N-2E NV 2017UT029 Pages 2 - 3 N-4A NV 2017UT016 Pages 4 - 5 N-9 NV 2017UT018 Pages 6 - 7 Page 1 of 7

L-MT-18-023 NSPM Enclosure, Attachment 2 Component N-2E NV Report No. 2017UT029 Axial (Radial) Scan Plot NOTES:

Weld Region: Points B-C-F-G Shell Region: Points C-D-E-F Nozzle Cylinder Region: Points A-B-G-H Required Exam Volume: Points A-B-C-D-E-F-G-H Vessel Exterior Surface: Points A-B-C-D Vessel Interior Surface: Points E-F-G-H Bolded area indicates exam area of coverage obtained.

Page 2 of 7

L-MT-18-023 NSPM Enclosure, Attachment 2 Component N-2E NV Report No. 2017UT029 Parallel (Circumferential) Scan Plot NOTES:

Weld Region: Points B-C-F-G Shell Region: Points C-D-E-F Nozzle Cylinder Region: Points A-B-G-H Required Exam Volume: Points A-B-C-D-E-F-G-H Vessel Exterior Surface: Points A-B-C-D Vessel Interior Surface: Points E-F-G-H Bolded, slashed pattern area indicates exam area of coverage obtained.

Report No. 2017UT030 applicable to inner 15% for parallel (circ) scan Page 3 of 7

L-MT-18-023 NSPM Enclosure, Attachment 2 Component N-4A NV Report No. 2017UT016 Axial (Radial) Scan Plot NOTES:

Weld Region: Points B-C-F-G Shell Region: Points C-D-E-F Nozzle Cylinder Region: Points A-B-G-H Required Exam Volume: Points A-B-C-D-E-F-G-H Vessel Exterior Surface: Points A-B-C-D Vessel Interior Surface: Points E-F-G-H Bolded, slashed pattern area indicates exam area of coverage obtained.

Page 4 of 7

L-MT-18-023 NSPM Enclosure, Attachment 2 Component N-4A NV Report No. 2017UT016 Parallel (Circumferential) Scan Plot NOTES:

Weld Region: Points B-C-F-G Shell Region: Points C-D-E-F Nozzle Cylinder Region: Points A-B-G-H Required Exam Volume: Points A-B-C-D-E-F-G-H Vessel Exterior Surface: Points A-B-C-D Vessel Interior Surface: Points E-F-G-H Bolded, slashed pattern area indicates exam area of coverage obtained.

Report No. 2017UT017 applicable to inner 15% for parallel (circ) scan Page 5 of 7

L-MT-18-023 NSPM Enclosure, Attachment 2 Component N-9 NV Report No. 2017UT018 Axial (Radial) Scan Plot NOTES:

Weld Region: Points B-C-F-G Shell Region: Points C-D-E-F Nozzle Cylinder Region: Points A-B-G-H Required Exam Volume: Points A-B-C-D-E-F-G-H Vessel Exterior Surface: Points A-B-C-D Vessel Interior Surface: Points E-F-G-H Bolded area indicates exam area of coverage obtained.

Page 6 of 7

L-MT-18-023 NSPM Enclosure, Attachment 2 Component N-9 NV Report No. 2017UT018 Parallel (Circumferential) Scan Plot NOTES:

Weld Region: Points B-C-F-G Shell Region: Points C-D-E-F Nozzle Cylinder Region: Points A-B-G-H Required Exam Volume: Points A-B-C-D-E-F-G-H Vessel Exterior Surface: Points A-B-C-D Vessel Interior Surface: Points E-F-G-H Bolded area indicates exam area of coverage obtained.

Report No. 2017UT020 applicable to inner 15% for parallel (circ) scan Page 7 of 7

ENCLOSURE, ATTACHMENT 3 MONTICELLO NUCLEAR GENERATING PLANT 10 CFR 50.55a Request RR-012 Inservice Inspection Impracticality in Accordance with 10 CFR 50.55a(g)(5)(iii) during the Fifth Ten-Year Interval

SUMMARY

OF PAST 4TH AND 5TH INTERVAL EXAMINATION RESULTS FOR WHICH THE NRC GRANTED RELIEF DUE TO EXAM LIMITATIONS (2 Pages Follow)

L-MT-18-023 NSPM Enclosure, Attachment 3 Summary of 4th and 5th Interval Examination Results for which the NRC Granted Relief Due to Exam Limitations Table B: Summary of 4th Interval Nozzle-to-Vessel Weld Examinations with Previously Granted NRC Relief for the Subject Welds in this Request 4th Interval 4th Interval Exam Exam 4th Interval Exam 10 CFR 50.55a NRC Approval Weld Year Coverage Results Request Date RR-13 July 18, 2006 N-2E NV 2005 78% No flaw indications (Reference 1) (Reference 2)

RR-15 May 19, 2008 N-4A NV 2007 79% No flaw indications (Reference 3) (Reference 4)

RR-15 May 19, 2008 N-9 NV 2007 85% No flaw indications (Reference 3) (Reference 4)

Table C: Summary of 5th Interval Nozzle-to-Vessel Weld Examinations to Date with Previously Granted NRC Relief Due to Exam Limitations 5th Interval 5th Interval Exam Exam 5th Interval Exam 10 CFR 50.55a NRC Approval Weld Year Coverage Results Request Date RR-009 Feb. 19, 2015 N-1A NV 2013 83% No flaw indications (Reference 5) (Reference 6)

RR-009 Feb. 19, 2015 N-2D NV 2013 82% No flaw indications (Reference 5) (Reference 6)

RR-009 Feb. 19, 2015 N-4C NV 2013 79% No flaw indications (Reference 5) (Reference 6)

RR-009 Feb. 19, 2015 N-5B NV 2013 81% No flaw indications (Reference 5) (Reference 6)

RR-009 Feb. 19, 2015 N-8A NV 2013 83% No flaw indications (Reference 5) (Reference 6)

Page 1 of 2

L-MT-18-023 NSPM Enclosure, Attachment 3 REFERENCES FOR ENCLOSURE, ATTACHMENT 3

1. NMC letter to the NRC, 10 CFR 50.55a Request No. 13: Relief from Impractical Examination Coverage Requirements Pursuant to 10 CFR 50.55a(g)(5)(iii) for the Fourth Ten-Year Inservice Inspection Interval, dated September 27, 2005. (ADAMS Accession No. ML052760169)
2. NRC letter to NMC, Monticello Nuclear Generating Plant (MNGP) - Fourth 10-Year Interval Inservice Inspection (ISI) Program Plan Relief Request No. 13 (TAC No.

MC8882), dated July 18, 2006. (ADAMS Accession No. ML061780172)

3. NMC letter to the NRC, 10 CFR 50.55a Request No. 15: Relief from Impractical Examination Coverage Requirements Pursuant to 10 CFR 50.55a(g)(5)(iii) for the Fourth Ten-Year Inservice Inspection Interval, dated September 26, 2007. (ADAMS Accession No. ML072710119)
4. NRC letter to NMC, Monticello Nuclear Generating Plant (MNGP) - Granting of Relief Regarding Limited Ultrasonic Examination Coverage of Five Welds (TAC No.

MD6854), dated May 19, 2008. (ADAMS Accession No. ML081050678)

5. NSPM letter to NRC, 10 CFR 50.55a Request No. 009: Relief from Impractical Examination Coverage Requirements Pursuant to 10 CFR 50.55a(g)(5)(iii) for the Fifth Ten-Year Inservice Inspection Interval, dated June 6, 2014. (ADAMS Accession No. ML14157A205)
6. NRC letter to NSPM, Monticello Nuclear Generating Plant - Relief Request RR-009 Regarding Relief from Examination Coverage Requirements of Section XI of the American Society of Mechanical Engineers Boiler and Pressure Vessel Code for the Fifth 10-Year Inservice Inspection Program Interval (TAC No. MF4258), dated February 19, 2015. (ADAMS Accession No. ML15028A152)

Page 2 of 2