0CAN041801, Response to Regulatory Issue Summary 2018-02, Preparation and Scheduling of Operator Licensing Examinations

From kanterella
(Redirected from ML18114A016)
Jump to navigation Jump to search
Response to Regulatory Issue Summary 2018-02, Preparation and Scheduling of Operator Licensing Examinations
ML18114A016
Person / Time
Site: Arkansas Nuclear  Entergy icon.png
Issue date: 04/24/2018
From: Pyle S
Entergy Operations
To:
Document Control Desk, Office of Nuclear Reactor Regulation
References
0CAN041801, RIS-18-002
Download: ML18114A016 (4)


Text

Entergy Operations, Inc.

1448 S.R. 333 Russellville, AR 72802 Tel 479-858-4704 Stephenie L. Pyle Manager, Regulatory Assurance Arkansas Nuclear One 0CAN041801 April 24, 2018 U. S. Nuclear Regulatory Commission Attn: Document Control Desk Washington, DC 20555-0001

Subject:

Response to Regulatory Issue Summary 2018-02, Preparation and Scheduling of Operator Licensing Examinations (ML18029A423)

Arkansas Nuclear One - Units 1 and 2 Docket Nos. 50-313 and 50-368 License Nos. DPR-51 and NPF-6

Dear Sir or Madam:

Regulatory Issue Summary 2018-02 requests that licensees voluntarily update Operator licensing examination schedules and applicant estimates for calendar years 2020 through 2023.

The requested information has been compiled by the Arkansas Nuclear One (ANO) Training Department for ANO Units 1 and 2 and is documented on the enclosed NRC Form 536. It should be noted that a separate NRC Form 536 was completed for each unit; therefore, there are two completed forms enclosed.

There are no commitments contained in this submittal. Should you have any questions concerning this submittal, please contact Randal Martin at 479-858-6844.

Sincerely, ORIGINAL SIGNED BY STEPHENIE L. PYLE SLP/mkh Enclosures

0CAN041801 Page 2 of 2 cc: Mr. Kriss Kennedy Regional Administrator U. S. Nuclear Regulatory Commission, Region IV 1600 East Lamar Boulevard Arlington, TX 76011-4511 Mr. Vince Gaddy, Chief Operations Branch Division of Reactor Safety U.S. Nuclear Regulatory Commission, Region IV 1600 East Lamar Boulevard Arlington, TX 76011-4511

NRC FORM 536 U.S. NUCLEAR REGULATORY COMMISSION APPROVED BY 0MB: NO. 3150-0131 EXPIRES: 11/30/2020 (11-2017)

~ flREG(I<

~v "'> Estimated burden per response to comply with this voluntary information collection request: 1 hour1.157407e-5 days <br />2.777778e-4 hours <br />1.653439e-6 weeks <br />3.805e-7 months <br /> This

,'~%

~

0 0

OPERATOR LICENSING information collection is used to plan budgets and resources for operator examinations. Send comments regarding burden estimate to the lnfonmation Services Branch (T-2 F43). U.S. Nuclear

~

~

~

i:; EXAMINATION DATA Regulatory Commission. Washington. DC20555-0001 . or by e-mail to lnfocollects.Resource@nrc.gov.

""'-1,l'J

........ +o.e, and to the Desk Officer. Office of Information and Regulatory Affairs. NEOB-10202. (3150-01 31). Office of Management and Budget. Washington. DC 20503. If a means used to impose an information collection does not display a currently valid 0MB control number. the NRG may not conduct or sponsor.

and a person is not required to respond to, the information collection.

FACILITY NRC REGION

!Arkansas Nuclear One, Unit 1 I l1v I A. PROPOSED EXAMINATION PREPARATION SCHEDULE PROPOSED NUMBER CY2020 CY 2021 CY 2022 cy2023 ESTIMATED NUMBER OF LICENSEE-PREPARED 1 0 1 0 EXAMINATIONS ESTIMATED NUMBER OF NRG-PREPARED 0 0 0 0 EXAMINATIONS B. INITIAL OPERATOR LICENSE EXAMINATIONS PROPOSED NUMBER CY2020 CY2021 CY2022 CY2023 NUMBER OF REACTOR OPERATORS 12 0 12 0 NUMBER OF SENIOR REACTOR OPERATORS - INSTANT 4 0 4 0 NUMBER OF SENIOR REACTOR OPERATORS-UPGRADE 4 0 4 0 NUMBER OF SENIOR REACTOR OPERATORS - LIMITED 0 0 0 0 PROPOSED DATES PRIMARY DATE 03/30/2020 03/14/2022 ALTERNATE DATE 04/13/2020 03/28/2022 NRG FORM 536 (11-2017)

NRC FORM 536 U.S. NUCLEAR REGULATORY COMMISSION APPROVED BY 0MB: NO. 3150-0131 EXPIRES: 11/30/2020 (11-2017)

~ flREG(I<

~v "'> Estimated burden per response to comply with this voluntary information collection request: 1 hour1.157407e-5 days <br />2.777778e-4 hours <br />1.653439e-6 weeks <br />3.805e-7 months <br /> This

,'~%

~

0 0

OPERATOR LICENSING information collection is used to plan budgets and resources for operator examinations. Send comments regarding burden estimate to the lnfonmation Services Branch (T-2 F43). U.S. Nuclear

~

~

~

i:; EXAMINATION DATA Regulatory Commission. Washington. DC20555-0001 . or by e-mail to lnfocollects.Resource@nrc.gov.

""'-1,l'J

........ +o.e, and to the Desk Officer. Office of Information and Regulatory Affairs. NEOB-10202. (3150-01 31). Office of Management and Budget. Washington. DC 20503. If a means used to impose an information collection does not display a currently valid 0MB control number. the NRG may not conduct or sponsor.

and a person is not required to respond to, the information collection.

FACILITY NRC REGION

!Arkansas Nuclear One, Unit 2 I l1v I A. PROPOSED EXAMINATION PREPARATION SCHEDULE PROPOSED NUMBER CY2020 CY 2021 CY 2022 cy2023 ESTIMATED NUMBER OF LICENSEE-PREPARED 0 1 0 1 EXAMINATIONS ESTIMATED NUMBER OF NRG-PREPARED 0 0 0 0 EXAMINATIONS B. INITIAL OPERATOR LICENSE EXAMINATIONS PROPOSED NUMBER CY2020 CY2021 CY2022 CY2023 NUMBER OF REACTOR OPERATORS 0 12 0 12 NUMBER OF SENIOR REACTOR OPERATORS - INSTANT 0 4 0 4 NUMBER OF SENIOR REACTOR OPERATORS-UPGRADE 0 4 0 4 NUMBER OF SENIOR REACTOR OPERATORS - LIMITED 0 0 0 0 PROPOSED DATES PRIMARY DATE 03/29/2021 03/06/2023 ALTERNATE DATE 04/19/2021 02/20/2023 NRG FORM 536 (11-2017)