Category:Letter
MONTHYEARML19045A6752019-02-14014 February 2019 Entergy - 10 CFR 140.15 Proof of Financial Protection ML19036A9442019-02-0404 February 2019 Indemnity Agreements for Arkansas Nuclear One Units 1 and 2, and Grand Gulf Nuclear Station, Unit 1 ML19031C8882019-01-31031 January 2019 Relief Request Number EN-19-RR-1, Proposed Alternative to Use ASME Code Case N-831-1, Ultrasonic Examination in Lieu of Radiography for Welds in Ferritic or Austenitic Pipe Section Xi, Division 1 ML19032A2562019-01-31031 January 2019 Application to Revise Technical Specifications to Adopt TSTF-529 11 Clarify Use and Application Rules, 11 Revision 4 IR 05000268/20182012019-01-29029 January 2019 NRC Inspection Report 05000313/2018201 and 05000268/2018201 ML19029A1472019-01-25025 January 2019 U.S. Additional Protocol IR 05000313/20180042019-01-23023 January 2019 NRC Integrated Inspection Report 05000313/2018004 and 05000368/2018004 ML19025A0782019-01-23023 January 2019 Inservice Inspection Summary Report for the Twenty-Sixth Refueling Outage ML18337A2472019-01-17017 January 2019 Issuance of Amendment Nos. 263 and 314 Revision to Emergency Action Level Scheme ML19016A1662019-01-11011 January 2019 Entergy - 2019 Nuclear Energy Liability Evidence of Financial Protection ML19010A1692019-01-10010 January 2019 10 CFR 72.48 Summary Report for the Reporting Period January 1, 2017, Through December 31, 2018 ML19015A0222019-01-0909 January 2019 Revision 19 of the ANO Security Plan ML18346A3142019-01-0707 January 2019 Relief Nos. ANO1-ISI-027, -028, -029, -030, and -031 from ASME Code, Section Xi, Examination Requirements for Fourth 10-Year Inservice Inspection Interval (EPID L-2018-LLR-0063, -0064, -0065, -0066, -0067) ML18362A2512018-12-28028 December 2018 Arkansas Nuclear One, Indian Point Energy Center, Grand Gulf Nuclear Station, Palisades Nuclear Plant, River Bend Station, Pilgrim Nuclear Station and Waterford 3 - Entergy Response to Confirmatory Order EA-17-132/EA-17-153, Element K ML19002A2042018-12-21021 December 2018 to Engine Systems, Inc., Part 21 Report Re Emd Fuel and Soakback Pumps - Potentially Undertorqued Cover Bolts ML18353B0492018-12-19019 December 2018 License Amendment Request, Add Actions to Address Inoperability of the Containment Building Sump ML18317A3822018-12-19019 December 2018 Issuance of Amendment No. 313, Revise Technical Specification 3.3.3.6, Post-Accident Instrumentation ML18353B0442018-12-19019 December 2018 Application to Revise Technical Specifications to Adopt TSTF-567, Add Containment Sump TS to Address GSI-191 Issues ML18353A2742018-12-19019 December 2018 Arkansas Nuclear One, Unit 1 (ANO-1) - Core Operating Limits Report (Colr) Cycle 28 Colr, Revision 2 ML18347A4422018-12-13013 December 2018 Entergy - 2018 Certification of Foreign Ownership Control or Influence ML18346A5392018-12-11011 December 2018 Supplement to the Application for Technical Specification Change Regarding Risk-Informed Justification for the Relocation of Specific Surveillance Frequency Requirements to a Licensee Controlled Program (TSTF-425) ML18337A0342018-12-0606 December 2018 Entergy Arkansas Nuclear One Reminder - Information on Additional Protocol Forms to Licensees and Manufacturers to Assist in Meeting the International Atomic Energy Agency Treaty Obligations ML18306A5132018-11-30030 November 2018 and Grand Gulf Nuclear Station, Unit 1 - Issuance of Conforming Amendment Nos. 262, 312 and 215 Transfers of Renewed Facility Operating Licenses ML18298A0122018-11-27027 November 2018 Issuance of Amendment No. 311 Updating the Reactor Coolant System Pressure Temperature Limits ML18324A8052018-11-19019 November 2018 Notification of an NRC Triennial Fire Protection Baseline Inspection Report 05000313/2019010 and 05000368/2019010) and Request for Information ML18320A2032018-11-16016 November 2018 Submittal of 10 CFR 50.71(e) Report, Revision 18 of the Fire Hazards Analysis ML18320A2222018-11-16016 November 2018 Supplemental to the Application for Technical Specification Change Regarding Risk-Informed Justification for the Relocation of Specific Surveillance Frequency Requirements to a Licensee Controlled Program (TSTF-425) ML18319A3472018-11-15015 November 2018 Arkansas Nuclear One, Units 1 & 2 and ISFSI, River Bend, Unit 1 & ISFSI, Waterford, Unit 3, & ISFSI, Grand Gulf, & ISFSI, Transfer of Control of License - Order Response IR 05000313/20180032018-11-13013 November 2018 Arkansas Nuclear One - NRC Integrated Inspection Report 05000313/2018003 and 05000368/2018003 ML18327A0412018-11-13013 November 2018 Radiological Preparedness Final Report for the Arkansas Nuclear One (Ano), Medical Services and Reception Center Drills Evaluated on September 27, 2018 ML18323A1452018-11-12012 November 2018 ANO Unit 1 SAR Amendment 28, Trm, TS Bases, 10 CFR 50.59 Report, and Commitment Change Summary Report ML18304A4502018-10-31031 October 2018 Request for Relief from American Society of Mechanical Engineers (ASME) Section Xi Visual Examination Requirements ANO1-ISI-032 Fourth 10-Year Interval, Third Period ML18298A0632018-10-25025 October 2018 ANO-2 Cycle 27 Colr ML18260A3392018-10-24024 October 2018 Issuance of Amendment No. 261 Revision to Technical Specification Bases Related to Emergency Feedwater Turbine-Driven Pump Steam Supply Valves ML18295A3822018-10-22022 October 2018 Arkansas Nuclear One - NRC Design Bases Assurance Inspection (Teams) Inspection Report (05000313/20180011 and 05000368/20180011) ML18290B0602018-10-17017 October 2018 Response to Request for Additional Information Related to the Application for Technical Specification Change Regarding Risk-Informed Justification for the Relocation of Specific Surveillance Frequency Requirements to ... ML18283A5992018-10-10010 October 2018 Responses to the Request for Additional Information Regarding License Amendment Request to Update the Reactor Coolant System Pressure-Temperature Limits ML18283A7282018-10-10010 October 2018 Submittal of 45th-Year Reactor Building Inspection Report ML18297A0572018-10-0505 October 2018 After Action Report/Improvement Plan for the Arkansas Nuclear One Exercise by FEMA Region 6 for Exercise Conducted on July 7, 2018 ML18277A3782018-10-0404 October 2018 Submittal of Emergency Plan Implementing Procedure OP-1903.010, Rev. 57 ML18262A0972018-10-0404 October 2018 Acknowledgement of License Renewal Regulatory Commitment Changes ML18270A4302018-09-27027 September 2018 Entergy Response to Confirmatory Order EA-17-132/EA-17-153, Element J ML18267A2222018-09-24024 September 2018 Snubber Testing Program for Fifth Inservice Test Interval ML18260A3662018-09-17017 September 2018 Arkansas Nuclear One, Units 1 and 2 - Response to Request for Additional Information Related to the Application for Adoption of Emergency Action Level Schemes Pursuant to NEI 99-01, Revision 6 IR 05000313/20180052018-08-31031 August 2018 Updated Inspection Plan for Arkansas Nuclear One (Report 05000313/2018005 and 05000368/2018005) NRC-2017-0188, Letter from the Secretary to the Petitioners Regarding Director'S Decision DD-18-032018-08-28028 August 2018 Letter from the Secretary to the Petitioners Regarding Director'S Decision DD-18-03 ML18241A0882018-08-27027 August 2018 Inservice Testing Plan for the Fifth 10-Year Interval 2019-02-04
[Table view] Category:License-Operator
MONTHYEARML19011A3712019-01-10010 January 2019 Announcement of Generic Fundamentals Examination Section of the Written Operator Licensing Examination for 2019 ML18114A0162018-04-24024 April 2018 Response to Regulatory Issue Summary 2018-02, Preparation and Scheduling of Operator Licensing Examinations ML18096A1012018-03-0707 March 2018 Arkansas Nuclear One, Unit 1-2018-02-Public Forms ML18051A4252018-02-16016 February 2018 Arkansas Nuclear One, Unit 1 - NRC Initial Operator Licensing Examination Approval 05000313/2018301 ML18009A9852018-01-0808 January 2018 Announcement of Generic Fundamentals Examination Section of the Written Operator Licensing Examination for 2018 IR 05000313/20173022017-06-13013 June 2017 NRC Retake Operator Licensing Examination Approval 05000313/2017302 ML17123A3272017-05-0303 May 2017 Response to Regulatory Issue Summary 2017-03, Preparation and Scheduling of Operator Licensing Examinations. ML17046A5172017-02-10010 February 2017 Arkansas Nuclear One, Unit 2: NRC Initial Operator Licensing Examination Approval 05000368/2017301 ML17013A5482017-01-13013 January 2017 Generic Fundamentals Section of the Written Operator Licensing Examination Scheduled for 2017 ML16272A1472016-09-28028 September 2016 Generic Fundamentals Examination Results Sept 2016 ML16260A1902016-09-0101 September 2016 Arkansas Nuclear One, Unit 1-2016-09-DRAFT Operating Test ML16260A0672016-09-0101 September 2016 Arkansas Nuclear One, Unit 1-2016-09-DRAFT Outlines ML16260A3062016-09-0101 September 2016 Arkansas Nuclear One, Unit 1-2016-09 ES-401-6 ML16260A1712016-09-0101 September 2016 Arkansas Nuclear One, Unit-1-2016-09-DRAFT Operating Test Comments, Part 55 ML16259A3792016-09-0101 September 2016 Arkansas Nuclear One, Unit 1-2016-09-FINAL Operating Test ML16260A3102016-09-0101 September 2016 2016-09 - Public Documents ML16260A1522016-09-0101 September 2016 Arkansas Nuclear One, Unit 1-2016-09-DRAFT Written Exam Comments ML16259A3632016-09-0101 September 2016 Arkansas Nuclear One, Unit 1-2016-09-FINAL Written Exam ML16260A2212016-09-0101 September 2016 Arkansas Nuclear One, Unit 1-2016-09-FINAL Outlines ML16260A0732016-09-0101 September 2016 Arkansas Nuclear One, Unit 1-2016-9-DRAFT Written Exam ML16260A0712016-09-0101 September 2016 Arkansas Nuclear One, Unit 1-2016-09-Draft Outline Comments ML16228A0242016-08-12012 August 2016 NRC Initial Operator Licensing Examination Approval 05000313/2016301 ML16201A0702016-07-18018 July 2016 Response to Regulatory Issue Summary 2016-09, Preparation and Scheduling of Operator Licensing Examinations. ML16182A2852016-06-30030 June 2016 Arkansas, Units 1 and 2,South Texas Project, Units 1 and 2, Wolf Creek, Generic Fundamentals Examination Results for June 8, 2016 ML16181A1252016-06-29029 June 2016 Notification of NRC Initial Operator Licensing Examination 05000368/2017301 ML15351A0282015-12-17017 December 2015 Generic Fundamentals Section of the Written Operator Licensing Examination Scheduled for 2016 ML15273A3322015-09-30030 September 2015 Generic Fundamentals Examination Results Sept 2015 ML15265A3062015-09-0909 September 2015 Arkansas Nuclear One, Unit 2-2015-09-DRAFT-OUTLINES ML15265A3162015-09-0909 September 2015 Arkansas Nuclear One, Unit 2-2015-09-Draft-Written Examination Comments ML15264A7192015-09-0909 September 2015 Arkansas Nuclear One, Unit 2-2015-09-Final-Operating Test ML15265A3092015-09-0909 September 2015 Arkansas Nuclear One, Unit 2-2015-09-Draft-Outline Comments ML15264A6812015-09-0909 September 2015 Arkansas Nuclear One, Unit 2-2015-09-FINAL-WRITTEN Exam ML15268A3162015-09-0909 September 2015 Arkansas Nuclear One, Unit 2-2015-09-PUBLIC Forms ML15265A3172015-09-0909 September 2015 2015-09 - Draft - Operating Test ML15264A7492015-09-0909 September 2015 Arkansas Nuclear One, Unit 2-2015-09-POST Exam Comments ML15266A0702015-09-0909 September 2015 Arkansas Nuclear One, Unit 2-2015-09 - Final Outlines ML15265A3132015-09-0909 September 2015 Arkansas Nuclear One, Unit 2-2015-09-DRAFT Written Exam ML15265A3202015-09-0909 September 2015 2015-09 - Draft - Operating Test Comments ML15230A0882015-08-18018 August 2015 Arkansas Nuclear One, Unit 2-09/2015-Examination Approval ML15180A0512015-06-29029 June 2015 Generic Fundamentals Examination Results June 2015 ML15008A0412015-01-0808 January 2015 Generic Fundamentals Examination Results for December 10, 2014 ML14338A5692014-12-21021 December 2014 Arkansas Nuclear One, Unit 1-2014-11 Public Forms ML14345A3302014-12-11011 December 2014 Announcement of the Generic Fundamentals Section of the Written Operator Licensing Examinations for 2015 ML14336A3762014-11-21021 November 2014 Arkansas Nuclear One, Unit 1-2014-11 Final Operating Test ML14336A3612014-11-21021 November 2014 Arkansas Nuclear One, Unit 1-2014-11 Draft Written Exam Comments ML14336A3862014-11-21021 November 2014 Arkansas Nuclear One, Unit 1-2014-11 Post Examination Analysis ML14336A3272014-11-21021 November 2014 Arkansas Nuclear One, Unit 1-2014-11 Draft Outlines ML14336A3732014-11-21021 November 2014 Arkansas Nuclear One, Unit 1-2014-11 Final Written Exam ML14336A3402014-11-21021 November 2014 Arkansas Nuclear One, Unit 1-2014-11 Draft Outline Comments ML14336A3682014-11-21021 November 2014 Arkansas Nuclear One, Unit 1-2014-11 Final Outlines 2019-01-10
[Table view] Category:Part 55 Examination Related Material
MONTHYEARML18114A0162018-04-24024 April 2018 Response to Regulatory Issue Summary 2018-02, Preparation and Scheduling of Operator Licensing Examinations ML18096A1012018-03-0707 March 2018 Arkansas Nuclear One, Unit 1-2018-02-Public Forms ML18051A4252018-02-16016 February 2018 Arkansas Nuclear One, Unit 1 - NRC Initial Operator Licensing Examination Approval 05000313/2018301 ML18009A9852018-01-0808 January 2018 Announcement of Generic Fundamentals Examination Section of the Written Operator Licensing Examination for 2018 ML17123A3272017-05-0303 May 2017 Response to Regulatory Issue Summary 2017-03, Preparation and Scheduling of Operator Licensing Examinations. ML17046A5172017-02-10010 February 2017 Arkansas Nuclear One, Unit 2: NRC Initial Operator Licensing Examination Approval 05000368/2017301 ML16272A1472016-09-28028 September 2016 Generic Fundamentals Examination Results Sept 2016 ML16260A2212016-09-0101 September 2016 Arkansas Nuclear One, Unit 1-2016-09-FINAL Outlines ML16260A0732016-09-0101 September 2016 Arkansas Nuclear One, Unit 1-2016-9-DRAFT Written Exam ML16260A1902016-09-0101 September 2016 Arkansas Nuclear One, Unit 1-2016-09-DRAFT Operating Test ML16260A0712016-09-0101 September 2016 Arkansas Nuclear One, Unit 1-2016-09-Draft Outline Comments ML16260A0672016-09-0101 September 2016 Arkansas Nuclear One, Unit 1-2016-09-DRAFT Outlines ML16260A3062016-09-0101 September 2016 Arkansas Nuclear One, Unit 1-2016-09 ES-401-6 ML16260A1712016-09-0101 September 2016 Arkansas Nuclear One, Unit-1-2016-09-DRAFT Operating Test Comments, Part 55 ML16259A3792016-09-0101 September 2016 Arkansas Nuclear One, Unit 1-2016-09-FINAL Operating Test ML16260A3102016-09-0101 September 2016 2016-09 - Public Documents ML16260A1522016-09-0101 September 2016 Arkansas Nuclear One, Unit 1-2016-09-DRAFT Written Exam Comments ML16259A3632016-09-0101 September 2016 Arkansas Nuclear One, Unit 1-2016-09-FINAL Written Exam ML16228A0242016-08-12012 August 2016 NRC Initial Operator Licensing Examination Approval 05000313/2016301 ML16201A0702016-07-18018 July 2016 Response to Regulatory Issue Summary 2016-09, Preparation and Scheduling of Operator Licensing Examinations. ML16182A2852016-06-30030 June 2016 Arkansas, Units 1 and 2,South Texas Project, Units 1 and 2, Wolf Creek, Generic Fundamentals Examination Results for June 8, 2016 ML15351A0282015-12-17017 December 2015 Generic Fundamentals Section of the Written Operator Licensing Examination Scheduled for 2016 ML15273A3322015-09-30030 September 2015 Generic Fundamentals Examination Results Sept 2015 ML15264A7492015-09-0909 September 2015 Arkansas Nuclear One, Unit 2-2015-09-POST Exam Comments ML15266A0702015-09-0909 September 2015 Arkansas Nuclear One, Unit 2-2015-09 - Final Outlines ML15265A3132015-09-0909 September 2015 Arkansas Nuclear One, Unit 2-2015-09-DRAFT Written Exam ML15265A3202015-09-0909 September 2015 2015-09 - Draft - Operating Test Comments ML15265A3062015-09-0909 September 2015 Arkansas Nuclear One, Unit 2-2015-09-DRAFT-OUTLINES ML15265A3162015-09-0909 September 2015 Arkansas Nuclear One, Unit 2-2015-09-Draft-Written Examination Comments ML15264A7192015-09-0909 September 2015 Arkansas Nuclear One, Unit 2-2015-09-Final-Operating Test ML15265A3092015-09-0909 September 2015 Arkansas Nuclear One, Unit 2-2015-09-Draft-Outline Comments ML15264A6812015-09-0909 September 2015 Arkansas Nuclear One, Unit 2-2015-09-FINAL-WRITTEN Exam ML15268A3162015-09-0909 September 2015 Arkansas Nuclear One, Unit 2-2015-09-PUBLIC Forms ML15265A3172015-09-0909 September 2015 2015-09 - Draft - Operating Test ML15230A0882015-08-18018 August 2015 Arkansas Nuclear One, Unit 2-09/2015-Examination Approval ML15180A0512015-06-29029 June 2015 Generic Fundamentals Examination Results June 2015 ML15008A0412015-01-0808 January 2015 Generic Fundamentals Examination Results for December 10, 2014 ML14338A5692014-12-21021 December 2014 Arkansas Nuclear One, Unit 1-2014-11 Public Forms ML14345A3302014-12-11011 December 2014 Announcement of the Generic Fundamentals Section of the Written Operator Licensing Examinations for 2015 ML14336A3402014-11-21021 November 2014 Arkansas Nuclear One, Unit 1-2014-11 Draft Outline Comments ML14336A3682014-11-21021 November 2014 Arkansas Nuclear One, Unit 1-2014-11 Final Outlines ML14336A3672014-11-21021 November 2014 2014-11 Draft Operating Test Comments ML14336A3532014-11-21021 November 2014 Arkansas Nuclear One, Unit 1-2014-11 Draft Written Exam ML14336A3762014-11-21021 November 2014 Arkansas Nuclear One, Unit 1-2014-11 Final Operating Test ML14336A3612014-11-21021 November 2014 Arkansas Nuclear One, Unit 1-2014-11 Draft Written Exam Comments ML14336A3862014-11-21021 November 2014 Arkansas Nuclear One, Unit 1-2014-11 Post Examination Analysis ML14336A3272014-11-21021 November 2014 Arkansas Nuclear One, Unit 1-2014-11 Draft Outlines ML14336A3732014-11-21021 November 2014 Arkansas Nuclear One, Unit 1-2014-11 Final Written Exam ML14317A5042014-11-13013 November 2014 2014-11 - Errata Examination Approval Ltr ML14316A1622014-11-10010 November 2014 Er 05000313/2014301, Arkansas Nuclear One, Unit 1, Approval Ltr 2018-04-24
[Table view] |