Monthly Operating Rept for June 1999 for Salem,Unit 1.With 990713 Ltr
ML18107A435
Person / Time
Site: Salem PSEG icon.png
Issue date: 06/30/1999
From: Garchow D, Knieriem R
Public Service Enterprise Group
To:
NRC OFFICE OF INFORMATION RESOURCES MANAGEMENT (IRM)
References
LR-N99-0324, LR-N99-324, NUDOCS 9907190008
Download: ML18107A435 (4)


Text

e OPS~G Public Service Electric and Gas Company P.O. Box 236 Hancocks Bridge, New Jersey 08038-0236 Nuclear Business Unit UULi $ ~999 LR-N99-0324 U.S. Nuclear Regulatory Commission Document Control Desk Washington, DC 20555 Attn: Document Control Desk MONTHLY OPERATING REPORT SALEM UNIT NO. 1 ,

DOCKET NO. 50-272 Gentlemen:

In compliance with Section 6.9.1.6, Reporting Requirements for the Salem Technical I

Specifications, the original Monthly Operating report for June 1999 is attached.

Sincerely, f}

o.FJ/wJ!.

D. F. G~rcho~

General Manager -

Salem Operations

/rbk Enclosures C Mr. H.J. Miller Regional Administrator USNRC, Region 1 475 Allendale Road King of Prussia, PA_19046___ ~

,~ -9907190008 990630 . ~

PDR ADOCK 05000272

  • R . :PDR The power is in your hands.
  • 95-2168 REV. 6/94

DOCKET NO.: 50-272 UNIT: Salem 1 DATE: 7/15/99 COMPLETED BY: R. Knieriem TELEPHONE: (609) 339-1782 Reporting Period: June 1999 OPERATING DATA REPORT Design Electrical Rating (MWe-Net) 1115 Maximum Dependable Capacity (MWe-Net) 1106 Month Year-to-date Cumulative No. of hours reactor was critical 720 4203 115023 No. of hours generator was on line (service hours) 720 4170 1--~~~1--~~~~~~-1--~~~~~-1 110758 Unit reserve shutdown hours 0 0 0 Net Electrical Energy (MWH) 751384 4436380 111048543 UNIT SHUTDOWNS NO. DATE TYPE DURATION REASON METHOD OF CORRECTIVE F=FORCED (HOURS) (1) SHUTTING ACTION/COMMENT S=SCHEDULED DOWN THE REACTOR(2)

(1) Reason (2) Method A - Equipment Failure (Explain) 1 - Manual B - Maintenance or Test 2 - Manual Trip/Scram C - Refueling 3 - Automatic Trip/Scram D - Regulatory Restriction 4 - Continuation E - Operator Training/License Examination 5 - Other (Explain)

F Administrative G- Operational Error (Explain)

H-Other Summary:

Salem Unit 1 began the month of June 1999, operating at full power. Full power operation continued until June 2, 1999 when power was reduced to 78% to perform maintenance on the 11 Turbine Auxiliary Cooling heat exchanger, and on Containment Fan Coil Units. The unit returned to full power on June 7, 1999. Full power operation continued until June 9, 1999 when power was reduced to 90% to address Main Power transformer high temperature. Salem Unit 1 returned to full power the next day and continued full power operation for the remainder of the month.

DOCKET NO.: 50-272 UNIT: Salem 1 DATE: 7715799 COMPLETED BY: R. B. Knieriem TELEPHONE: (609) 339-1782

SUMMARY

OF CHANGES, TESTS, AND EXPERIMENTS FOR THE SALEM UNIT 1 GENERATING STATION MONTH: June 1999 The following items completed during June 1999 have been evaluated to determine:

1. If the probability of occurrence or the consequences of an accident or malfunction of equipment important to safety previously evaluated in the safety analysis report may be increased; or
2. If a possibility for an accident or malfunction of a different type than any evaluated previously in the safety analysis report may be created; or
3. If the margin of safety as defined in the basis for any technical specification is reduced.

The 10CFR50.59 Safety Evaluations showed that these items did not create a new safety hazard to the plant; nor did they affect the safe shutdown of the reactor. These items did not change the plant effluent releases and did not alter the existing environmental impact. The 10CFR50.59 Safety Evaluations determined that no unreviewed safety or environmental questions are involved.

Design Changes - Summary of Safety Evaluations There were no changes in this category implemented during June 1999.

Temporary Modifications - Summary of Safety Evaluations There were no changes in this category implemented during June 1999.

Procedures - Summary of Safety Evaluations There were no changes in this category implemented during June 1999.

UFSAR Change Notices - Summary of Safety Evaluations There were no changes in this category implemented during June 1999.

Deficiency Reports - Summary of Safety Evaluations There were no changes in this category implemented during June 1999.

Other - Summary of Safety Evaluations There were no changes in this category implemented during June 1999.