ML18095A259

From kanterella
Jump to navigation Jump to search
Forwards Corrected Unit Shutdown & Power Reductions, Page for Apr 1990 Monthly Operating Rept
ML18095A259
Person / Time
Site: Salem PSEG icon.png
Issue date: 06/01/1990
From: Miller L
Public Service Enterprise Group
To:
NRC OFFICE OF INFORMATION RESOURCES MANAGEMENT (IRM)
Shared Package
ML18095A260 List:
References
NUDOCS 9006110377
Download: ML18095A259 (2)


Text

,-

.:)I

,,~-

OPS~G Public Service Electric and Gas Company P_Q_ Box E Hancocks Bridge, New Jersey 08038 Salem Generating Station June 1, 1990 U.S. Nuclear Regulatory Commission Document Control Desk Washington, DC 20555

Dear Sir:

MONTHLY OPERATING REPORT - (Revision)

SALEM NO. 1 DOCKET NO. 50-272 The attached "Unit Shutdown and Power Reduction" page, for the month of April 1990, has been revised and is being submitted to you to replace the one supplied in the Salem No. 1 Monthly Operating Report for the period in question. Please insert this page into your copy of the report in place of the one originally submitted.

Sincerely yours, L. K. Miller General Manager -

Salem Operations RH:pc cc: Mr. William T. Russell Regional Administrator USNRC Region I 631 Park J>.venue King of Prussia, PA 19046 Enclosures Unit Shutdown and Power Reduction Form


*~6()t. f f6:37'/'- *~0060 l.

PDR ADOCK 05000272 R PDC The Energy People 95-2189 (11 M) 12-84

"\

UNIT SHUTDOWN AND POWER REDUCTIONS OOCKEr NO. : 50-272


~

REFDRT MONI'H -

APRIL 1990 TJNIT NAME: Salem #1 DATE: 05-10-90 . . ' (

CDMPLErED BY: Art Orticelle '

TELEPHONE: 339-2122 NO. DATE TYPE 1 DURATION (HOURS) REASON 2 MEI'HOD OF SHUTI'ING DOWN REACIDR I.JCENSE EVENT REFDRT #

SYSTEM CDDE 4 COMfDNENT CDDE 5 CAUSE AND CDRRECTIVE ACTION

'IO PREVENT RECURRENCE

( *.

0033 4-01-90 F 156.68 A 4 --- IB INSTRU 1A S.E.C. 0035 4-09-90 F 513.45 A 3 CH INSTRU #12 S.G. FEED PUMP

\

I

r.nJ*{.1 r-11-1~,
o*::

1:;--

t-=-1 D~\

Hr-**

C.10"i c1*-.J.:

-:A.'*(tl i::::-*~)1 01::::*,,

()C:s\

11-;--.

1J:-=,.1*:JI r-Jt*.)~:

  • =°!-...l I t*.)

I I

1 2 3 4 5 F: Forced Reason: Method: Exhibit G - Instructions Exhibit 1 - Sarne S: Scheduled A-Fquipnent Failure (Explain) 1-Manual for Preparation of Data Source B-Maintenance or Test 2-Manual Scram Entry Sheets for Licensee C-Refueling 3-Autanatic Scrarn Event Report (LER) File D-Regulatory Restriction 4-Continuation of (NUREG--0161)

E--Operator Training &License Examination Previous outage F-Administrative 5-Load Reduction G-Operational Error (Explain) 9-0ther H-other (Explain)