Submits Response to Concern Expressed in Insp Rept 50-255/98-06 Re Whether Palisades ISI Program Was Being Conducted IAW Applicable Requirements
ML18066A389
Person / Time
Site: Palisades Entergy icon.png
Issue date: 01/28/1999
From: Haskell N
CONSUMERS ENERGY CO. (FORMERLY CONSUMERS POWER CO.)
To:
NRC OFFICE OF INFORMATION RESOURCES MANAGEMENT (IRM)
References
50-255-98-06, 50-255-98-6, NUDOCS 9902090100
Download: ML18066A389 (2)


Text

        • .

l A CMS Energy Company Palisades Nuclear Plant Tel: 616 764 2276

  • 27780 Blue Star Memorial Highway Fax: 616 764 2490 Covert, Ml 49043 . .llwl L. ,,....,,

Director. Ucensing January 28, 1999 U.S. Nuclear Regulatory Commission ATTN: Document Control Desk.

Washington, DC 20555 DOCKET 50-255 - LICENSE PPR PALISADES PLANT RESPONSE TO CONCERN EXPRESSED IN INSPECTION REPORT 50-255/98006(DRS)

Consumers Energy received NRC Inspection Report 50-255/98006(DRS) dated June 12, 1998, which reported the results of an inspection to determine if the Palisades lnservice Inspection (ISi) Program was being conducted in accordance with the applicable requirements. Within the Executive Summary of that report, the NRC stated:

"... the limited scope of the foreign object search and retrieval inspection of the secondary side of the steam generators demonstrated a less than comprehensive effort."

Consumers Energy agrees that the inspection performed was of very limited scope. A foreign object search and retrieval (FOSAR) inspection was not originally planned for the 1998 refueling outage. This decision was based on the successful results of the extensive secondary side manual and video inspections conducted during the 1996.

1/ - .

refueling outage. However, when *possible loose parts (PLPs) were identified during the eddy current examinations of the steam generator tubes in-1998,-a-limited FOSAR  ;-r>

. inspection was pertormed of the periphery of the tubesheet, where the majority of the PLPs were located. The limited FOSAR provided sufficient evidence to conclude that significant problems with loose parts have not occurred and that the scope of the FOSAR did not need to be expanded.

9902090100 990128 ~

PDR ADOCK 05000255 *.'

Q PDR

2 As a part of the normal steam generator maintenance program, Consumers Energy is planning extensive FOSAR with remote and manual visual secondary side inspections and secondary side sludge lancing concurrent with eddy current testing during the 1999 refueling outage. *

SUMMARY

OF COMMITMENTS This letter contains no new commitments and no revisions to existing commitmer:its.

CC Administrator, Region Ill, USNRC Project Manager, NRR, USNRC NRC Resident Inspector - Palisades