|
---|
Category:Letter
MONTHYEARIR 05000282/20230042024-02-0101 February 2024 Integrated Inspection Report 05000282/2023004 and 05000306/2023004 ML24025A9362024-01-31031 January 2024 Exemption from Select Requirements of 10 CFR Part 73 (EPID L-2023-LLE-0055 (Security Notifications, Reports, and Recordkeeping and Suspicious Activity Reporting)) IR 05000263/20230042024-01-31031 January 2024 Integrated Inspection Report 05000263/2023004 ML23356A1232024-01-29029 January 2024 Exemption from Select Requirements of 10 CFR Part 73 (Security Notifications, Reports, and Recordkeeping and Suspicious Activity Reporting) ML24024A0722024-01-24024 January 2024 Independent Spent Fuel Storage Installation, Onticello, Supplement to Request for Exemption from Enhanced Weapons, Firearms Background Checks, and Security Event Notifications Implementation IR 05000263/20244012024-01-22022 January 2024 Information Request for the Cyber-Security Baseline Inspection, Notification to Perform Inspection 05000263/2024401 ML24017A0182024-01-19019 January 2024 Confirmation of Initial License Examination ML23356A0032024-01-17017 January 2024 Issuance of Amendments Revise Technical Specification 5.6.6, Reactor Coolant System (RCS) Pressure and Temperature Limits Report (PTLR) L-MT-23-054, Subsequent License Renewal Application Supplement 82024-01-11011 January 2024 Subsequent License Renewal Application Supplement 8 L-PI-23-034, Response to Request for Additional Information Regarding License Amendment Request to Revise Technical Specification 3.7.8, Cooling Water (Cl) System,2024-01-0202 January 2024 Response to Request for Additional Information Regarding License Amendment Request to Revise Technical Specification 3.7.8, Cooling Water (Cl) System, L-MT-23-047, License Amendment Request: Revision to the MNGP Pressure Temperature Limits Report to Change the Neutron Fluence Methodology and Incorporate New Surveillance Capsule Data2023-12-29029 December 2023 License Amendment Request: Revision to the MNGP Pressure Temperature Limits Report to Change the Neutron Fluence Methodology and Incorporate New Surveillance Capsule Data IR 07200010/20234012023-12-20020 December 2023 Independent Spent Fuel Storage Installation Security Inspection Report 07200010/2023401 L-PI-23-035, Response to Request for Additional Information Regarding License Amendment Request to Revise Technical Specifications Section 5.6.6, Reactor Coolant System (RCS) Pressure and Temperature Limits Report2023-12-20020 December 2023 Response to Request for Additional Information Regarding License Amendment Request to Revise Technical Specifications Section 5.6.6, Reactor Coolant System (RCS) Pressure and Temperature Limits Report L-MT-23-056, Subsequent License Renewal Application Response to Request for Additional Information and Request for Confirmation of Information - Set 1 Part 22023-12-18018 December 2023 Subsequent License Renewal Application Response to Request for Additional Information and Request for Confirmation of Information - Set 1 Part 2 ML23349A0572023-12-15015 December 2023 and Independent Spent Fuel Storage Installation, Revision to Correspondence Service List for Northern States Power - Minnesota ML23215A1672023-12-15015 December 2023 Acceptance of Requested Licensing Action Amendment Request to Revise Surveillance Requirement 3.8.1.2 Note 3 IR 05000282/20234012023-12-13013 December 2023 Security Baseline Inspection Report 05000282/2023401 and 05000306/2023401 IR 05000263/20234022023-12-13013 December 2023 Security Baseline Inspection Report 05000263/2023402 L-MT-23-042, 2023 Annual Report of Changes in Emergency Core Cooling System Evaluation Models Pursuant to 10 CFR 50.462023-12-11011 December 2023 2023 Annual Report of Changes in Emergency Core Cooling System Evaluation Models Pursuant to 10 CFR 50.46 L-PI-23-033, Supplement to License Amendment Request to Revise Technical Specification 3.8.1, Surveillance Requirement 3.8.1.2, Note 32023-12-0505 December 2023 Supplement to License Amendment Request to Revise Technical Specification 3.8.1, Surveillance Requirement 3.8.1.2, Note 3 L-MT-23-052, Subsequent License Renewal Application Supplement 72023-11-30030 November 2023 Subsequent License Renewal Application Supplement 7 L-MT-23-051, Update to the Technical Specification Bases2023-11-28028 November 2023 Update to the Technical Specification Bases L-MT-23-049, Subsequent License Renewal Application Response to Request for Additional Information and Request for Confirmation of Information - Set 12023-11-21021 November 2023 Subsequent License Renewal Application Response to Request for Additional Information and Request for Confirmation of Information - Set 1 ML23319A3182023-11-15015 November 2023 Request for Exemption from Enhanced Weapons, Firearms Background Checks, and Security Event Notifications Implementation ML23304A1632023-11-15015 November 2023 Supplemental Information Needed for Acceptance of Requested Licensing Action Amendment Request to Revise SR 3.8.1.2 Note 3 IR 05000263/20230032023-11-13013 November 2023 Integrated Inspection Report 05000263/2023003 and 07200058/2023001 L-MT-23-043, 10 CFR 50.55a(z)(1) Request Regarding OMN-17, Revision 1. VR-092023-11-13013 November 2023 10 CFR 50.55a(z)(1) Request Regarding OMN-17, Revision 1. VR-09 L-MT-23-038, License Amendment Request to Revise Monticello Technical Specification Surveillance Requirement 3.8.6.62023-11-10010 November 2023 License Amendment Request to Revise Monticello Technical Specification Surveillance Requirement 3.8.6.6 L-MT-23-046, Subsequent License Renewal Application Response to Request for Additional Information Round 2 - Set 12023-11-0909 November 2023 Subsequent License Renewal Application Response to Request for Additional Information Round 2 - Set 1 IR 05000282/20230032023-11-0808 November 2023 Integrated Inspection Report 05000282/2023003 and 05000306/2023003 ML23311A3572023-11-0707 November 2023 Core Operating Limits Report (COLR) for Prairie Island Nuclear Generating Plant (PINGP) Unit 2. Cycle 33. Revision 0 ML23291A1102023-10-23023 October 2023 Environmental Audit Summary and RCIs and RAIs ML23285A3062023-10-12012 October 2023 Implementation of the Fleet Standard Emergency Plan for the Monticello Nuclear Generating Plant and the Prairie Island Nuclear Generating Plant L-MT-23-041, Subsequent License Renewal Application Response to Request for Confirmation of Information Set 22023-10-0303 October 2023 Subsequent License Renewal Application Response to Request for Confirmation of Information Set 2 ML23270B9022023-09-29029 September 2023 Review of Reactor Vessel Material Surveillance Program Capsule N Technical Report L-PI-23-025, License Amendment Request to Revise Technical Specification 3.8.1, Surveillance Requirement 3.8.1.2, Note 32023-09-28028 September 2023 License Amendment Request to Revise Technical Specification 3.8.1, Surveillance Requirement 3.8.1.2, Note 3 ML23265A2532023-09-26026 September 2023 Review of Reactor Vessel Material Surveillance Program Capsule N Technical Report L-MT-23-037, Subsequent License Renewal Application Response to Request for Additional Information Set 32023-09-22022 September 2023 Subsequent License Renewal Application Response to Request for Additional Information Set 3 ML23262B0372023-09-19019 September 2023 Response to NRC Request for Additional Information Regarding the 2023 Monticello and Prairie Island Plant Decommissioning Funding Status Reports ML23248A2092023-09-18018 September 2023 Proposed Alternative VR-11 to the Requirements of the ASME OM Code Associated with Periodic Verification Testing of MO-2397, Reactor Water Cleanup Inboard Isolation Valve ML23256A1682023-09-13013 September 2023 Independent Spent Fuel Storage Installation and Monticello Nuclear Generating Plant - Voluntary Security Clearance Program 2023 Insider Threat Program Self-Inspection 2024-02-01
[Table view] Category:License-Fitness for Duty (FFD) Performance Report
MONTHYEARML23058A1742023-02-27027 February 2023 Submittal of Fitness for Duty Performance Date for 2022 ML23058A1852023-02-27027 February 2023 Annual Report Form for Drug and Alcohol Tests for 2022 ML23058A1862023-02-27027 February 2023 Annual Fatigue Report Form for 2022 ML23058A1872023-02-27027 February 2023 Single Positive Test Form Collected on 01/10/2022 ML23058A1882023-02-27027 February 2023 Single Positive Test Form Collected on 04/25/2022 ML23058A1892023-02-27027 February 2023 Single Positive Test Form Collected on 06/14/2022 ML23058A1902023-02-27027 February 2023 Single Positive Test Form Collected on 06/20/2022 ML23058A1912023-02-27027 February 2023 Single Positive Test Form Collected on 09/14/2022 ML23058A1922023-02-27027 February 2023 Single Positive Test Form Collected on 09/26/2022 ML23058A1932023-02-27027 February 2023 Single Positive Test Form Collected on 09/27/2022 ML23058A1942023-02-27027 February 2023 Single Positive Test Form Collected on 10/03/2022 ML23058A1952023-02-27027 February 2023 Single Positive Test Form Collected on 10/06/2022 ML23058A1962023-02-27027 February 2023 Single Positive Test Form Collected on 10/24/2022 ML23058A1772023-02-27027 February 2023 Annual Report Form for Drug and Alcohol Tests for 2022 ML23058A1782023-02-27027 February 2023 Annual Fatigue Report Form for 2022 ML23058A1792023-02-27027 February 2023 Single Positive Test Form Collected on 03/28/2022 ML23058A1802023-02-27027 February 2023 Single Positive Test Form Collected on 05/16/2022 ML23058A1812023-02-27027 February 2023 Single Positive Test Form Collected on 08/15/2022 ML23058A1822023-02-27027 February 2023 Single Positive Test Form Collected on 10/03/2022 ML23058A1832023-02-27027 February 2023 Single Positive Test Form Collected on 10/17/2022 ML23058A1842023-02-27027 February 2023 Single Positive Test Form Collected on 12/17/2022 ML22056A0462022-02-25025 February 2022 Single Positive Test Form Collected on 10/04/2021 ML22056A0452022-02-25025 February 2022 Single Positive Test Form Collected on 09/30/2021 ML22056A0442022-02-25025 February 2022 Single Positive Test Form Collected on 09/30/2021 ML22056A0432022-02-25025 February 2022 Single Positive Test Form Collected on 09/28/2021 ML22056A0422022-02-25025 February 2022 Single Positive Test Form Collected on 09/21/2021 ML22056A0412022-02-25025 February 2022 Single Positive Test Form Collected on 09/21/2021 ML22056A0402022-02-25025 February 2022 Single Positive Test Form Collected on 09/21/2021 ML22056A0392022-02-25025 February 2022 Single Positive Test Form Collected on 09/20/2021 ML22056A0262022-02-25025 February 2022 Annual Report Form for Drug and Alcohol Tests for 2021 ML22056A0272022-02-25025 February 2022 Annual Fatigue Report Form for 2021 ML22056A0282022-02-25025 February 2022 Single Positive Test Form Collected on 01/04/2021 ML22056A0292022-02-25025 February 2022 Single Positive Test Form Collected on 06/07/2021 ML22056A0302022-02-25025 February 2022 Single Positive Test Form Collected on 09/13/2021 ML22056A0312022-02-25025 February 2022 Single Positive Test Form Collected on 09/27/2021 ML22056A0342022-02-25025 February 2022 Single Positive Test Form Collected on 04/05/2021 ML22056A0352022-02-25025 February 2022 Single Positive Test Form Collected on 05/03/2021 ML22056A0362022-02-25025 February 2022 Single Positive Test Form Collected on 05/03/2021 ML22056A0372022-02-25025 February 2022 Single Positive Test Form Collected on 06/07/2021 ML22056A0382022-02-25025 February 2022 Single Positive Test Form Collected on 08/25/2021 ML22056A0332022-02-25025 February 2022 Annual Fatigue Report Form for 2021 ML22056A0322022-02-25025 February 2022 Annual Report Form for Drug and Alcohol Tests for 2021 ML21057A0542021-02-26026 February 2021 Annual Fatigue Report Form for 2020 ML21057A0572021-02-26026 February 2021 Single Positive Test Form Collected on 11/30/2020 ML21057A0582021-02-26026 February 2021 Annual Report Form for Drug and Alcohol Tests for 2020 ML21057A0622021-02-26026 February 2021 Single Positive Test Form Collected on 08/26/2020 ML21057A0502021-02-26026 February 2021 Submittal of Fitness for Duty Performance Data for 2020 ML21057A0532021-02-26026 February 2021 Annual Report Form for Drug and Alcohol Tests for 2020 ML21057A0552021-02-26026 February 2021 Single Positive Test Form Collected on 03/16/2020 ML21057A0562021-02-26026 February 2021 Single Positive Test Form Collected on 07/15/2020 2023-02-27
[Table view] |
Text
414 Nicollet Mall Minneapolis, MN 55401 (l Xcel Energy*
RES P 0 N S I B L E B Y NAT U R E 011 800.895.4999 xcelenergy.com February 28, 2018 L-XE-18-004 10 CFR 26.717(e) 10 CFR 26.203(e)
ATTN: NRC Document Control Desk U.S. Nuclear Regulatory Commission Washington, DC 20555-0001 Prairie Island Nuclear Generating Plant, Monticello Nuclear Generating Plant Units 1 and 2 Docket 50-263 Docket 50-282 and 50-306 Renewed Facility Operating License Renewed Facility Operating License Nos. No. DPR-22 DPR-42 and DPR-60 Fitness for Duty Performance Data In accordance with 10 CFR 26 .203(e) and 10 CFR 26.717(e), Northern States Power Company, a Minnesota corporation (NSPM), d/b/a Xcel Energy, hereby submits the Fitness for Duty Performance Data Report, including the Annual Fatigue Reporting Form and Single Positive Test Forms, for the 12-month period ending December 31 , 2017.
If you have any questions concerning this letter or electronic submittal forms , please contact Dana Hickey at (612) 330-5707.
Summary of Commitments This letter makes no new commitments and no revisions to existing commitments.
es~
Director, Nuclear Licensing and Regulatory Services Northern States Power Company- Minnesota
Document Control Desk Page 2 Document Components:
001_Transmittal Cover Letter 002_Xcel Corporate FFD Report 2017 003_Xcel Corporate Single Positive Test Form_CORP20170612_C_AMP_PA_NRC 004_Xcel Corporate Single Positive Test Form_CORP20170626_THC_R_NRC 005_Xcel Corporate Single Positive Test Form_CORP20171003_A_PA_NRC 006_Xcel Corporate Single Positive Test Form_CORP20171006_THC_FC_NRC 007_Monticello FFD Report 2017 008_Monticello Fatigue Report 2017 009_Monticello Single Positive Test Form_MT20170404_THC_PA_NRC 010_Monticello Single Positive Test Form_MT20170411_C_PA_NRC 011_Monticello Single Positive Test Form_MT20170413_A_FC_NRC 012_Prairie Island FFD Report 2017 013_Prairie Island Fatigue Report 2017 014_Prairie Island Single Positive Test Form_PI20170123_AMP_PA_NRC 015_Prairie Island Single Positive Test Form_PI20170612_C_PA_NRC 016_Prairie Island Single Positive Test Form_PI20170814_THC_PA_NRC 017_Prairie Island Single Positive Test Form_PI20171010_A_PA_NRC 018_Prairie Island Single Positive Test Form_PI20171011_THC_PA_NRC cc: Administrator, Region Ill, USNRC Project Manager, Prairie Island, USNRC Resident Inspector, Prairie Island, USNRC Project Manager, Monticello, USNRC Resident Inspector, Monticello, USNRC