ML18058B350

From kanterella
Jump to navigation Jump to search
Proposed Tech Specs Re Control Rod Drive Mechanism Testing Requirement
ML18058B350
Person / Time
Site: Palisades Entergy icon.png
Issue date: 01/19/1993
From:
CONSUMERS ENERGY CO. (FORMERLY CONSUMERS POWER CO.)
To:
Shared Package
ML18058B349 List:
References
NUDOCS 9301270198
Download: ML18058B350 (4)


Text


~----

ATTACHMENT 1 Consumers Power Company Palisades Plant Docket 50-255 PROPOSED TECHNICAL SPECIFICATION PAGE January 19, 1993 1 Page 9301270198 930119 PDR ADOCK 05000255 P PDR

Table 4.2.2 Minimum Frequencies for Equipment Tests FSAR Section Test Frequency Reference

1. Control Rods Drop Times of All Full- Each Refueling 7.4.1.3 Length Rods Shutdown
2. Control Rods Partial Movement of All Every Two Weeks* 7.4.1.3 Rods (Minimum of 6 In)
3. Pressurizer Safety Set Point One Each Refueling 7.3.7 Valves Shutdown
4. Main Steam Safety Set Point Five Each Refueling 4.3.4 Valves Shutdown
5. Refueling System Functioning Prior to Refueling 9.11.3 Interlocks Operations
6. Service Water Functioning Each Refueling 9.1.2 System Valve Operation Actuation (SIS-CHP)
7. Primary System Evaluate Daily 4 Leakage Amend 15, Ques 4.3.7
8. Diesel Fuel supply Fuel Inventory Dai Ly 8.4.1
  • During the remainder of cycle 10, CRD-20 and CRD-31 will be tested once in March 1993 in lieu of testing once every two weeks.

4-15 Amendment No 112.P/1,lB1ff1J'fJ1.

ATTACHMENT 2 Consumers Power Company Palisades Plant Docket 50-255 EXISTING TECHNICAL SPECIFICATION PAGE MARKED TO SHOW THE PROPOSED CHANGES January 19, 1993 1 Page

Table 4.2.2 Minimum Frequencies for Equipment Tests FSAR Section Test Frequency Reference

1. Control Rods Drop Times of All Full- Each Refueling 7.4.1.3 Length Rods Shutdown
2. Control Rods Partial Movement of All Every Two Weeks~ 7.4.1.3 Rods (Minimum of 6 In)
3. Pressurizer Safety Set Point One Each Refueling 7.3.7 Valves Shutdown
4. Main Steam Safety Set Point Five Each Refueling 4.3.4 Valves Shutdown
5. Refueling System Functioning Prior to Refueling 9.11.3 Interlocks Operations
6. Service Water Functioning Each Refueling 9.1.2 System Valve Operation Actuation (SIS-CHP)
7. Primary System Evaluate Daily 4 Leakage Amend 15, Ques 4.3.7
8. Diesel Fuel Supply Fuel Inventory Daily 8.4.1 7(- DLLr~~~+hL \e.,M~ncle.,v- o+ C-LJCJtL !o i CIC'D-Jo a.~ CJC.\'J-5 l wi \.\

b.. +eskA o ~~ t I'\ mc..v-c ~ i 1q3 1 V\ \ 1e.u._ o{ +esft.\ onc_e euex-y

+wo we.e.K ~.

4-15 Amendment No 1/2.8'1, 1 Ba f ¢'J.

Gorrooted November 13, 1992