ML18054A046

From kanterella
Jump to navigation Jump to search
NRR E-mail Capture - (External_Sender) Public Comments Related to Digital I&C RIS 2002-22, Supplement 1 - RIS Update
ML18054A046
Person / Time
Site: Nuclear Energy Institute
Issue date: 08/15/2017
From: Fregonese V
Nuclear Energy Institute
To: Wendell Morton
Division of Engineering
Shared Package
ML18039A804 List:
References
Download: ML18054A046 (5)


Text

NRR-DMPSPEm Resource From: FREGONESE, Victor <vxf@nei.org>

Sent: Tuesday, August 15, 2017 1:51 PM To: Morton, Wendell Cc: Rahn, David

Subject:

[External_Sender] RIS Update Here is my brief summary of the way I see the comments.

This is not an official NEI position or commentary, just provided to give you a heads up. Hope this helps you to decipher them when you get them.

  • 31 of the formal comments are repeats from the previous, draft comments we sent
  • We received a lot of comments and suggestions from the reviewers on the RIS and Attachment. We tried to provide suggested changes, edits, and rewording whenever possible, and to provide a basis for our comment or concern.
  • I dont think that there is anything that you have not heard from the industry before, though some of the comments do reflect items that may have been discussed in early meetings. An example of this were some comments we received about the relationship of the RIS to CCF Policy and BTP 7-19. The one item I would consider really new, that came up very late (was briefly mentioned in the last meeting) was that the non-power reactor community wanted to understand how/if this RIS applies to them, so you will see a few comments from them. I would still say that the 2 key areas to be further discussed in detail are the applicability of the RIS and Attachment to non-safety related upgrades, and the plant level malfunction position.

The comments fall into the following general categories (just a quick way to bucket them):

E-Editorial, Clarification, Descriptive Information, Wording, Format FT - Flowchart and Tables S-Scope, applicability D- Definitions, terms QC -Quality, codes and Standards B - Regulatory Basis R-Use of new RIS with old RIS and NEI 01-01 There are about a 100 comments total, which include the previous 31 we sent. I tried to eliminate repeat comments, but some do overlap and cover more than one point. May sound like a lot, but once you get through the editorial and table/flowchart ones, I believe we are still down to a handful of key issues that need to be resolved, as discussed in the last meeting.

Breakdown as I see them:

E - 37 FT - 23 S - 17 D-7 QC - 5 B - 11 R-4 1

Vic Fregonese Senior Project Manager Nuclear Generation Division Nuclear Energy Institute 1201 F Street, NW, Suite 1100 Washington, DC 20004 www.nei.org M: 704-953-4544 E: vxf@nei.org From: Morton, Wendell [1]

Sent: Tuesday, August 15, 2017 10:55 AM To: FREGONESE, Victor Cc: Rahn, David

Subject:

RE: RE: RIS Update Hi Vic, Just checking in regarding a few items before you guys complete your work:

  • Regarding the discussion in the August 2nd workshop, NEI expressed concerns that you would prefer to Criterion VI discussion to be settled or clarified in the RIS supplement. We want to encourage you to provide that as a formal public comment in the package you plan to submit. Wed also encourage you to provide any other comments you had from the public meetings into your formal package as well.
  • Do you believe youll be able to submit your comments package prior to the upcoming deadline?

Wendell From: FREGONESE, Victor [2]

Sent: Monday, August 14, 2017 4:02 PM To: Rahn, David <David.Rahn@nrc.gov>

Cc: Morton, Wendell <Wendell.Morton@nrc.gov>

Subject:

[External_Sender] RE: RIS Update We received a lot of good input. The majority of the comments are editorial/wording/clarification/format/descriptive information suggestions, or on the flowchart and tables.

I will send you a better summary tomorrow am Vic Fregonese Senior Project Manager Nuclear Generation Division 2

Nuclear Energy Institute 1201 F Street, NW, Suite 1100 Washington, DC 20004 www.nei.org M: 704-953-4544 E: vxf@nei.org From: Rahn, David [3]

Sent: Monday, August 14, 2017 12:47 PM To: FREGONESE, Victor Cc: Morton, Wendell

Subject:

RE: RIS Update Thanks for the update!

From: FREGONESE, Victor [4]

Sent: Monday, August 14, 2017 11:46 AM To: Morton, Wendell <Wendell.Morton@nrc.gov>; Rahn, David <David.Rahn@nrc.gov>

Subject:

[External_Sender] RIS Update Comments are in final review at NEI this morning.

Should have to you tomorrow first thing. Will keep you posted Vic Fregonese Senior Project Manager Nuclear Generation Division Nuclear Energy Institute 1201 F Street, NW, Suite 1100 Washington, DC 20004 www.nei.org M: 704-953-4544 E: vxf@nei.org This electronic message transmission contains information from the Nuclear Energy Institute, Inc. The information is intended solely for the use of the addressee and its use by any other person is not authorized. If you are not the intended recipient, you have received this communication in error, and any review, use, disclosure, copying or distribution of the contents of this communication is strictly prohibited. If you have received this electronic transmission in error, please notify the sender immediately by telephone or by electronic mail and permanently delete the original message. IRS Circular 230 disclosure: To ensure compliance with requirements imposed by the IRS and other taxing authorities, we inform you that any tax advice contained in this communication (including any attachments) is not intended or written to be used, and cannot be used, for the purpose of (i) avoiding penalties that may be imposed on any taxpayer or (ii) promoting, marketing or recommending to another party any transaction or matter addressed herein.

Sent through www.intermedia.com 3

This electronic message transmission contains information from the Nuclear Energy Institute, Inc. The information is intended solely for the use of the addressee and its use by any other person is not authorized. If you are not the intended recipient, you have received this communication in error, and any review, use, disclosure, copying or distribution of the contents of this communication is strictly prohibited. If you have received this electronic transmission in error, please notify the sender immediately by telephone or by electronic mail and permanently delete the original message. IRS Circular 230 disclosure: To ensure compliance with requirements imposed by the IRS and other taxing authorities, we inform you that any tax advice contained in this communication (including any attachments) is not intended or written to be used, and cannot be used, for the purpose of (i) avoiding penalties that may be imposed on any taxpayer or (ii) promoting, marketing or recommending to another party any transaction or matter addressed herein.

Sent through www.intermedia.com This electronic message transmission contains information from the Nuclear Energy Institute, Inc. The information is intended solely for the use of the addressee and its use by any other person is not authorized. If you are not the intended recipient, you have received this communication in error, and any review, use, disclosure, copying or distribution of the contents of this communication is strictly prohibited. If you have received this electronic transmission in error, please notify the sender immediately by telephone or by electronic mail and permanently delete the original message. IRS Circular 230 disclosure: To ensure compliance with requirements imposed by the IRS and other taxing authorities, we inform you that any tax advice contained in this communication (including any attachments) is not intended or written to be used, and cannot be used, for the purpose of (i) avoiding penalties that may be imposed on any taxpayer or (ii) promoting, marketing or recommending to another party any transaction or matter addressed herein.

Sent through www.intermedia.com 4

Hearing Identifier: NRR_DMPS Email Number: 186 Mail Envelope Properties (41207040FCA6A84984074E806C73D73EE1FDCF)

Subject:

[External_Sender] RIS Update Sent Date: 8/15/2017 1:51:13 PM Received Date: 8/15/2017 1:51:32 PM From: FREGONESE, Victor Created By: vxf@nei.org Recipients:

"Rahn, David" <David.Rahn@nrc.gov>

Tracking Status: None "Morton, Wendell" <Wendell.Morton@nrc.gov>

Tracking Status: None Post Office: mbx023-e1-nj-2.exch023.domain.local Files Size Date & Time MESSAGE 8055 8/15/2017 1:51:32 PM Options Priority: Standard Return Notification: No Reply Requested: No Sensitivity: Normal Expiration Date:

Recipients Received: