MONTHYEARNG-17-0169, License Amendment Request TSCR-175, Application to Adopt 10 CFR 50.69, Risk-Informed Categorization and Treatment of Structures, Systems, and Components (Sscs) for Nuclear Power Reactors2017-08-31031 August 2017 License Amendment Request TSCR-175, Application to Adopt 10 CFR 50.69, Risk-Informed Categorization and Treatment of Structures, Systems, and Components (Sscs) for Nuclear Power Reactors Project stage: Request NRC 2017-0043, License Amendment Request 287, Application to Adopt 10 CFR 50.69, Risk-informed Categorization and Treatment of Structures, System, and Components (Sscs) for Nuclear Power Plants2017-08-31031 August 2017 License Amendment Request 287, Application to Adopt 10 CFR 50.69, Risk-informed Categorization and Treatment of Structures, System, and Components (Sscs) for Nuclear Power Plants Project stage: Request ML18046A9882018-02-21021 February 2018 Audit Plan and Setup of Online Reference Portal for License Amendment Request - 10 CFR 50.69, Risk-Informed Categorization and Treatment of Structures, System and Components for Nuclear Power Plants (CAC No. MG0199; EPID L-2017-LLA-0283) Project stage: Other ML18108A3102018-04-12012 April 2018 NRR E-mail Capture - Audit at NextEra Headquarters, Juno Beach, Florida - April 24, 2018 Through April 26, 2018 - 50.69 LARs for Duane Arnold Energy Center (Daec), and Point Beach Nuclear Plant (Pbnp), Units 1 and 2 - EPIDs L-2017-LLA-0283/ Project stage: Other NG-18-0076, Withdrawal of License Amendment Request to Implement the Provisions of 10 CFR 50.692018-06-12012 June 2018 Withdrawal of License Amendment Request to Implement the Provisions of 10 CFR 50.69 Project stage: Withdrawal ML18165A2602018-06-20020 June 2018 Withdrawal of Amendment Request for Adoption of 10 CFR 50.69 Risk-Informed Categorization and Treatment of Structures, Systems, and Components (Sscs) for Nuclear Power Reactors Project stage: Withdrawal ML18165A3972018-06-20020 June 2018 FRN - Withdrawal of Amendment Request for Adoption of 10 CFR 50.69 Risk-Informed Categorization and Treatment of Structures, Systems, and Components (Sscs) for Nuclear Power Reactors Project stage: Withdrawal NRC-2018-0123, Duane Arnold Energy Center FRN - Withdrawal of Amendment Request for Adoption of 10 CFR 50.69 Risk-Informed Categorization and Treatment of Structures, Systems, and Components (Sscs) for Nuclear Power Reactors2018-06-20020 June 2018 Duane Arnold Energy Center FRN - Withdrawal of Amendment Request for Adoption of 10 CFR 50.69 Risk-Informed Categorization and Treatment of Structures, Systems, and Components (Sscs) for Nuclear Power Reactors Project stage: Withdrawal ML18199A6032018-07-26026 July 2018 Audit Summary for Duane Arnold and Point Beach, License Amendment Requests to Adopt Title 10 of the Code of Federal Regulations Part 50.69, Risk-Informed Categorization and Treatment of Structures, Systems, and Components for Nuclear Power Project stage: Other 2018-04-12
[Table View] |
|
---|
Category:Letter
MONTHYEARL-2024-010, Point Units 3 and 4, Seabrook, Duane Arnold, and Point Beach Units 1 and 2, Nuclear Property Insurance - 10 CFR 50.54(w)(3)2024-01-25025 January 2024 Point Units 3 and 4, Seabrook, Duane Arnold, and Point Beach Units 1 and 2, Nuclear Property Insurance - 10 CFR 50.54(w)(3) NG-23-0010, Supplement to Duane Arnold Exemption Request Regarding Enhanced Weapons, Firearms Background Checks, and Security Event Notifications Final Rule2023-12-0606 December 2023 Supplement to Duane Arnold Exemption Request Regarding Enhanced Weapons, Firearms Background Checks, and Security Event Notifications Final Rule NG-23-0009, Part 73 Exemption Request Regarding Enhanced Weapons, Firearms Background Checks, and Security Event Notifications Final Rule2023-11-16016 November 2023 Part 73 Exemption Request Regarding Enhanced Weapons, Firearms Background Checks, and Security Event Notifications Final Rule ML23201A0872023-08-0303 August 2023 Audit Plan in Support of Review of License Amendment NG-23-0006, Independent Spent Fuel Storage Installation (ISFSI) Financial Assurance Update2023-05-23023 May 2023 Independent Spent Fuel Storage Installation (ISFSI) Financial Assurance Update ML23137A1672023-05-11011 May 2023 Submittal of 2022 Annual Radiological Environmental Operating Report NG-23-0004, 2022 Annual Radioactive Material Release Report2023-04-25025 April 2023 2022 Annual Radioactive Material Release Report NG-23-0003, 2022 Annual Exposure Report - Form 5s2023-04-21021 April 2023 2022 Annual Exposure Report - Form 5s NG-23-0002, 10 CFR 50.59 Report, Commitment Changes, 10 CFR 72.48 Report, Quality Assurance Program Changes, Technical Specification Basis Changes, and Revision of the DAEC Defueled Safety Analysis Report2023-03-27027 March 2023 10 CFR 50.59 Report, Commitment Changes, 10 CFR 72.48 Report, Quality Assurance Program Changes, Technical Specification Basis Changes, and Revision of the DAEC Defueled Safety Analysis Report NG-23-0001, 2023 Annual Decommissioning and Spent Fuel Management Funding Status Report2023-03-27027 March 2023 2023 Annual Decommissioning and Spent Fuel Management Funding Status Report L-2023-029, and Point Beach Units 1 and 2 Nuclear Property Insurance - 10 CFR 50.54(w)(3)2023-03-10010 March 2023 and Point Beach Units 1 and 2 Nuclear Property Insurance - 10 CFR 50.54(w)(3) ML22361A1022023-02-24024 February 2023 Reactor Decommissioning Branch Project Management Changes for Some Decommissioning Facilities and Establishment of Backup Project Manager for All Decommissioning Facilities ML22339A0012022-12-22022 December 2022 Acceptance of Requested Licensing Action Amendment Request for Common Emergency Plan IR 05000331/20220032022-12-13013 December 2022 NRC Inspection Report No. 05000331/2022003 (Drss) ML22285A0072022-10-13013 October 2022 NRC Analysis of NextEra Energy Duane Arnold'S Decommissioning Funding Status Report, Docket No. 50-331 IR 05000331/20220022022-07-13013 July 2022 NRC Inspection Report Nos. 05000331/2022002(DNMS) and 07200032/2022002(DNMS) ML22090A1922022-05-26026 May 2022 Letter to B. Coffey, FPL from M. Doell - Duane Arnold Post Shutdown Activities Report Review Letter ML22132A2872022-05-24024 May 2022 ISFSI DQAP Approval Letter ML22111A0332022-05-20020 May 2022 Operating License Page Correction Letter to B. Coffey, Florida Power and Light, from M. Doell NG-22-0055, Revision to Duane Arnold Energy Center (DAEC) ISFSI-Only Emergency Plan2022-05-20020 May 2022 Revision to Duane Arnold Energy Center (DAEC) ISFSI-Only Emergency Plan ML22089A0492022-05-12012 May 2022 Sfmp Review Letter NG-22-0053, 2021 Annual Radiological Environmental Operating Report2022-05-0606 May 2022 2021 Annual Radiological Environmental Operating Report NG-22-0052, Regulatory Issue Summary 2000-11. NRC Emergency Telecommunications System, Statement of Intent to Implement the Proposed Voluntary Initiative2022-05-0404 May 2022 Regulatory Issue Summary 2000-11. NRC Emergency Telecommunications System, Statement of Intent to Implement the Proposed Voluntary Initiative IR 05000331/20224012022-04-27027 April 2022 Decommissioning Security Inspection Report 05000331/2022401 NG-22-0050, Revised Response to Request for Additional Information Relating to Decommissioning Quality Assurance Program, Revision 02022-04-26026 April 2022 Revised Response to Request for Additional Information Relating to Decommissioning Quality Assurance Program, Revision 0 NG-22-0049, 2021 Annual Radioactive Material Release Report2022-04-26026 April 2022 2021 Annual Radioactive Material Release Report L-2022-068, NextEra Energy Duane Arnold Quality Assurance Topical Report (FPL-3) Revision 22022-04-25025 April 2022 NextEra Energy Duane Arnold Quality Assurance Topical Report (FPL-3) Revision 2 ML22066A7632022-04-25025 April 2022 ISFSI-Only Emergency Plan License Amendment Approval NG-22-0035, Response to Request for Additional Information Relating to Decommissioning Quality Assurance Program. Revision 02022-04-13013 April 2022 Response to Request for Additional Information Relating to Decommissioning Quality Assurance Program. Revision 0 NG-22-0047, Registration of Independent Spent Fuel Installation Storage Cask and Notification of Permanent Removal of All Spent Fuel Assemblies from the Spent Fuel Pool2022-04-11011 April 2022 Registration of Independent Spent Fuel Installation Storage Cask and Notification of Permanent Removal of All Spent Fuel Assemblies from the Spent Fuel Pool NG-22-0042, Registration of Independent Spent Fuel Installation Storage Casks2022-04-0808 April 2022 Registration of Independent Spent Fuel Installation Storage Casks NG-22-0041, and Independent Spent Fuel Storage Installation, 2022 Annual Decommissioning and Spent Fuel Management Funding Status Report2022-03-31031 March 2022 and Independent Spent Fuel Storage Installation, 2022 Annual Decommissioning and Spent Fuel Management Funding Status Report NG-22-0031, 2021 Annual Exposure Report - Form 5s2022-03-23023 March 2022 2021 Annual Exposure Report - Form 5s NG-22-0030, Registration of Independent Spent Fuel Installation Storage Casks2022-03-23023 March 2022 Registration of Independent Spent Fuel Installation Storage Casks ML22080A1822022-03-22022 March 2022 Letter to B. Coffey from M. Doell - Duane Arnold ISFSI QAPD RAI Letter L-2022-012, Florida Power & Light Company Nuclear Property Insurance - 10 CFR 50.54(w)(3)2022-03-16016 March 2022 Florida Power & Light Company Nuclear Property Insurance - 10 CFR 50.54(w)(3) ML22059A7462022-03-10010 March 2022 ISFSI-Only Physical Security Plan License Amendment Approval NG-22-0025, Registration of Independent Spent Fuel Installation Storage Casks2022-03-0808 March 2022 Registration of Independent Spent Fuel Installation Storage Casks IR 05000331/20220012022-03-0404 March 2022 Subject: NRC Inspection Report Nos. 05000331/2022001(DNMS) and 07200032/2022001(DNMS) NG-22-0021, Registration of Independent Spent Fuel Installation Storage Casks2022-02-24024 February 2022 Registration of Independent Spent Fuel Installation Storage Casks ML22007A2722022-02-11011 February 2022 Cover Letter - NRC Duane Arnold Exemption Issuance NG-22-0014, Registration of Independent Spent Fuel Installation Storage Casks2022-02-10010 February 2022 Registration of Independent Spent Fuel Installation Storage Casks ML22028A2822022-02-0303 February 2022 Defueled Physical Security Plan License Amendment Approval ML22033A0802022-02-0202 February 2022 Supplement to License Amendment Request (TSCR-188): Proposed Change to the Physical Security Plan for the Post-Shutdown and Permanently Defueled Condition IR 05000331/20210012022-01-25025 January 2022 NRC Inspection Report Nos. 05000331/2021001(DNMS); 07200032/2021001(DNMS); and 07200032/2021002(DNMS) - Duane Arnold Energy Center ML21172A2172022-01-21021 January 2022 Issuance of License Amendment to Adopt ISFSI-Only Technical Specifications NG-22-0009, Registration of Independent Spent Fuel Installation Storage Casks2022-01-20020 January 2022 Registration of Independent Spent Fuel Installation Storage Casks NG-22-0001, Supplement to Exemption Request for Failed Fuel Can Weight in a Certificate of Compliance 1004 Renewed Amendment 17 61BTH Type 2 Dry Shielded Canister2022-01-0606 January 2022 Supplement to Exemption Request for Failed Fuel Can Weight in a Certificate of Compliance 1004 Renewed Amendment 17 61BTH Type 2 Dry Shielded Canister NG-21-0038, Registration of Independent Spent Fuel Installation Storage Casks2021-12-22022 December 2021 Registration of Independent Spent Fuel Installation Storage Casks NG-21-0035, Supplement to Exemption Request for Failed Fuel Can Weight in a Certificate of Compliance 1004 Renewed Amendment 17 61 Bth Type 2 Dry Shielded Canister2021-12-10010 December 2021 Supplement to Exemption Request for Failed Fuel Can Weight in a Certificate of Compliance 1004 Renewed Amendment 17 61 Bth Type 2 Dry Shielded Canister 2024-01-25
[Table view] |
Text
UNITED STATES NUCLEAR REGULATORY COMMISSION WASHINGTON, D.C. 20555-0001 February 21, 2018 Mr. Dean Curtland NextEra Energy Duane Arnold Energy Center 3277 DAEC Road Palo, IA 52324-9785
SUBJECT:
DUANE ARNOLD ENERGY CENTER -AUDIT PLAN AND SETUP OF ONLINE REFERENCE PORTAL FOR LICENSE AMENDMENT REQUEST - 10 CFR 50.69, "RISK-INFORMED CATEGORIZATION AND TREATMENT OF STRUCTURES, SYSTEMS AND COMPONENTS FOR NUCLEAR POWER PLANTS" (CAC NO. MG0199; EPID L-2017-LLA-0283)
Dear Mr. Curtland:
By letter dated August 31, 2017 (Agencywide Documents Access and Management System (ADAMS) Accession No. ML17243A469), NextEra Energy Duane Arnold, LLC (NextEra) submitted a license amendment request (LAR) for the Duane Arnold Energy Center. The proposed amendment would revise the licensing basis by adding a license condition to allow for the implementation of the provisions of Title 10 of the Code of Federal Regulations (10 CFR)
Section 50.69, "Risk-Informed Categorization and Treatment of Structures, Systems and Components for Nuclear Power Reactors."
To improve the efficiency of the U.S. Nuclear Regulatory Commission (NRC) reviews, the licensee's representatives and the NRC staff have discussed the use of an audit using an online reference portal that would allow the NRC staff and contractors limited read-only access to the basis documents and other reference materials cited in the applications. The staff plans to initially conduct a desk audit to review the documentation provided on the portal. The online reference portal would allow the staff to audit basis documents to determine whether the information included in the documents is necessary to reach a safety conclusion on the application. Documents identified as necessary for analysis of the application will be identified by the NRC staff. NextEra will be formally requested to submit those documents on the NRC docket. Use of the online reference portal is acceptable, as long as the following conditions are met:
- The online reference portal will be password-protected and passwords will be assigned to those directly involved in the review on a need-to-know basis;
- The on line reference portal will be sufficiently secure to prevent staff from printing, saving, or downloading any documents; and
- Conditions of use of the on line reference portal will be displayed on the login screen and will require concurrence by each user.
The NRC staff would like to request that the portal be populated with the documents listed in the enclosure to this letter. This is the initial list identified by the NRC staff. The staff may request additional documents during the review, which will be transmitted to you via email. This will help with the preparation for a possible site audit. Please provide NRC staff access to the
D. Curtland portal and send me the information needed to access the portal, such as username and password, as soon as possible.
The conditions associated with the online reference portal must be maintained throughout the duration of the review process. Please provide written confirmation that NextEra agrees to the terms and conditions set forth in this letter.
If you have any questions, please contact me at (301) 415-8371 or Mahesh.Chawla@nrc.gov.
Sincerely, r<'l"'l,u ~ '}~ ~ cfo,-
Mahesh L. Chawla, Project Manager Plant Licensing Branch Ill Division of Operating Reactor Licensing Office of Nuclear Reactor Regulation Docket No. 50-331 cc: ListServ
AUDIT PLAN NEXTERA ENERGY DUANE ARNOLD, LLC DUANE ARNOLD ENERGY CENTER DOCKET NO. 50-331 BACKGROUND Section 3.3 of the license amendment request (LAR), "PRA [probabilistic risk assessment]
Review Process Results (1 O CFR 50.69(b)(2)(iii))," states:
Closed findings were reviewed and closed using the process documented in Appendix X to NEI [Nuclear Energy Institute] 05-04, NEI 07-12 and NEI 12-13, "Close-out of Facts and Observations" (F&Os) (Reference 12) as accepted by NRC [U.S. Nuclear Regulatory Commission] in the staff memorandum dated May 3, 2017 (ML17079A427) (Reference 13). The results of this review have been documented and are available for NRC audit.
In accordance with the memorandum dated May 3, 2017, the NRC will periodically conduct audits of licensee's implementation of the Appendix X F&O closure process, as well as review a sampling of the final independent assessment team reports, and expects licensees to adhere to the guidance in Appendix X in its entirety. However, based on NRC staff observations of implementation of the Appendix X F&O closure process for Point Beach, Duane Arnold Energy, St. Lucie, Turkey Point, and Seabrook Nuclear Stations from July 18 and 19, 2017, the staff observed that vital steps in Appendix X may not have been fully applied.
While the observations do not reflect a final assessment by the NRC staff, a review of the F&O closure process is necessary to follow-up with these observations and ensure the guidance in Appendix X was adhered to in its entirety.
REGULATORY AUDIT BASES The NRC staff's review of the LAR has commenced in accordance with the Office of Nuclear Reactor Regulation's Office Instruction LIC-101, "License Amendment Review Procedures." Information that the staff relies upon to make findings in the safety evaluation must be submitted on the docket. However, there may be supporting information that, although not required to be submitted as part of the licensing action, would help the staff better understand the licensee's submitted information.
An audit was determined to be the most efficient approach toward a timely review of supporting information and resolution of questions associated with this LAR, since the NRC staff will have an opportunity to minimize the potential for further rounds of requests for additional information (RAls) and ensure no unnecessary burden will be imposed by requiring the licensee to address issues that are not necessary to make a safety determination. The staff is requesting an initial Enclosure
review of documentation at the NRC headquarters. Upon completion of this desk audit, the staff is expected to achieve the following.
- 1. Determine the need for additional documentation.
- 2. Develop an RAI.
- 3. Decide if a site audit is required to verify information.
The RAls will be issued soon after the audit, with an expected response being delivered by the licensee by an agreed upon date. The information discussed in the audit to be included in the development of the technical NRC staff's safety evaluation will be requested to be submitted on the docket.
REGULATORY AUDIT SCOPE OR METHODOLOGY The desk audit is being conducted to get a better understanding of the submittal and the availability of the information to make an assessment of NextEra's review approach. The areas of focus for the regulatory audit are the information that will be requested by the NRC. The staff will review the documentation and generate any RAls necessary to complete the review. It will also lead to the decision if a site audit is necessary.
INFORMATION AND OTHER MATERIAL NECESSARY FOR THE REGULATORY AUDIT The NRC staff has determined that the following information would be useful to gain a better understanding of NextEra's LAR, in particular, LAR Section 3.3, related to the technical adequacy of the PRA.
The following information is requested for the initial desk audit:
- Duane Arnold F&O closure report that was developed in accordance with Appendix X to NEI 05-04, NEI 07-12 and NEI 12-13, "Close-out of Facts and Observations (F&Os)," as accepted by NRC in the staff memorandum dated May 3, 2017 (Agencywide Documents Access and Management System (ADAMS) Accession No. ML17079A427).
NextEra will be informed via electronic mail if there is a need for additional supporting documentation.
TEAM ASSIGNMENTS Key licensee personnel involved in the development of the RAI responses should be made available on a mutually agreeable schedule to respond to any questions from the NRC staff.
Team Title Division Area of Responsibility Member Mahesh Project Manager N RR/DORL/LPL3 Project Management Chawla Mihaela Biro Reliability and Risk NRR/DRA/APLA Reliability and Risk Analyst Analysis Steve Reliability and Risk Dinsmore Analyst
Garill Coles Principal Engineer Pacific Northwest Reliability and Risk National Analysis Laboratory Additional NRC staff may be involved in the review of documents on the portal as the staff's review progresses.
LOGISTICS The audit will be started once an online reference portal is set up and the documentation is made available to the NRC staff. The desk audit will be conducted over a few weeks consistent with the internal review schedule for the issuance of the request for additional information.
NextEra will be kept informed on a regular basis during biweekly discussions with the project manager regarding the progress and the decision to arrange a site visit.
DELIVERABLES The NRC team will develop an audit summary report to convey the results. The report will be placed in ADAMS within 30 days of the completion of the final audit session. The NRC will also finalize the RAls after completion of the desk audit and issue them to the licensee.
ML18046A988 OFFICE NRR/DORL/LPL3/PM NRR/DORL/LPL3/LA NRR/DRA/APLNBC MChawla NAME SRohrer SRosenbug (Kimberly Green for)
DATE 02/20/2018 02/20/2018 02/20/2018 OFFICE NRR/DORL/LPL3/BC NRR/DORL/LPL3/PM MChawla NAME DWrona (Kimberly Green for)
DATE 02/21/2018 02/21/2018