Letter Sequence Other |
---|
CAC:MG0196, Relocate Surveillance Frequencies to Licensee Control - RITSTF Initiative 5B (Approved, Closed) CAC:MG0197, Relocate Surveillance Frequencies to Licensee Control - RITSTF Initiative 5B (Approved, Closed) EPID:L-2017-LLA-0284, Relocate Surveillance Frequencies to Licensee Control - RITSTF Initiative 5B (Approved, Closed) |
|
MONTHYEARML17292A0812017-10-23023 October 2017 Supplemental Information Needed for Acceptance of Requested Licensing Action Application to Adopt 10CFR 50.69, Risk-Informed Categorization and Treatment of Sscs for Nuclear Power Plants. Project stage: Acceptance Review NRC 2017-0052, Supplement to LAR 287, Application to Adopt 10 CFR 50.69, Risk-Informed Categorization and Treatment of Structures, Systems, and Components for Nuclear Power Plants2017-10-26026 October 2017 Supplement to LAR 287, Application to Adopt 10 CFR 50.69, Risk-Informed Categorization and Treatment of Structures, Systems, and Components for Nuclear Power Plants Project stage: Supplement ML17310A1072017-11-13013 November 2017 Acceptance of Requested Licensing Action - License Amendment Request 287, Application to Adopt 10 CFR 50.69 (CAC Nos. MG0196 and MG0197; EPID L-2017-LLA-0284) Project stage: Acceptance Review ML18046A9872018-02-21021 February 2018 Audit Plan and Setup of Online Reference Portal for License Amendment Request-10 CFR 50.69 (CAC Nos. MGO196 and MG0197; EPID L-2017-LLA-0284) Project stage: Other ML18166A2992018-06-14014 June 2018 NRR E-mail Capture - Draft - Point Beach - 50.69 Risk Informed LAR 287, Request for Additional Information, CAC Nos. MG0196 and MG0197, EPID L-2017-LLA-0284 Project stage: Draft RAI ML18199A6032018-07-26026 July 2018 Audit Summary for Duane Arnold and Point Beach, License Amendment Requests to Adopt Title 10 of the Code of Federal Regulations Part 50.69, Risk-Informed Categorization and Treatment of Structures, Systems, and Components for Nuclear Power Project stage: Other NRC 2018-0038, Response to Request for Additional Information Regarding License Amendment Request 287, Application to Adopt 10 CFR 50.69, Risk Informed Categorization and Treatment of Structures, System, and Components (Sscs) for Nuclear2018-08-10010 August 2018 Response to Request for Additional Information Regarding License Amendment Request 287, Application to Adopt 10 CFR 50.69, Risk Informed Categorization and Treatment of Structures, System, and Components (Sscs) for Nuclear Project stage: Response to RAI NRC 2018-0044, Supplement to Response to Request for Additional Information Regarding License Amendment Request 287, Application to Adopt 10 CFR 50.69, Risk Informed Categorization and Treatment of Structures, ...2018-09-28028 September 2018 Supplement to Response to Request for Additional Information Regarding License Amendment Request 287, Application to Adopt 10 CFR 50.69, Risk Informed Categorization and Treatment of Structures, ... Project stage: Supplement ML18289A3782018-11-26026 November 2018 Issuance of Amendments to Adopt Title 10 of Code of Federal Regulations 50.69, Risk Informed Categorization and Treatment of Structures, Systems and Components for Nuclear Power Reactors Project stage: Approval 2018-02-21
[Table View] |
|
---|
Category:Audit Plan
MONTHYEARML23201A0872023-08-0303 August 2023 Audit Plan in Support of Review of License Amendment ML22264A3052022-09-30030 September 2022 Regulatory Audit in Support of Review of License Amendment Request Regarding Risk-Informed Approach for Closure of Generic Safety Issue-191 ML22216A2032022-08-11011 August 2022 Regulatory Audit in Support of Review of the Application to Adopt Risk-Informed Extended Completion Times - RITSTF Initiative 4B ML21214A0352021-08-16016 August 2021 Subsequent License Renewal Application (SLRA) Compiled Aging Management Audit Breakout Questions ML21070A2072021-03-15015 March 2021 License Renewal Regulatory Audit Regarding the Environmental Review of the Subsequent License Renewal Application ML21007A2602021-01-15015 January 2021 Subsequent License Renewal Application - Aging Management Audit Plan ML18046A9872018-02-21021 February 2018 Audit Plan and Setup of Online Reference Portal for License Amendment Request-10 CFR 50.69 (CAC Nos. MGO196 and MG0197; EPID L-2017-LLA-0284) ML17319A2272017-11-17017 November 2017 Audit Plan for License Amendment Request to Resolve Non-Conformances Relating to Containment Dome Truss ML17202G5912017-07-25025 July 2017 Audit Plan and Setup of Online Reference Portal for License Amendment Request - Risk-Informed Approach to Resolve Construction Truss Design Code Nonconformances ML16259A1892016-12-0505 December 2016 Nuclear Regulatory Commission Plan for the Audit of Mitigation Strategies Assessment Submittals Related to Order EA-12-049, Order to Modify Licenses With Regard to Requirements for Mitigation Strategies for Beyond-Design-Basis External Events ML15153A1522015-06-0404 June 2015 Nuclear Regulatory Commission Plan for the Audit of NextEra Energy Point Beach, Llc'S Flood Hazard Reevaluation Report Submittal Relating to the Near-Term Task Force Recommendation 2.1 - Flooding for Point Beach Nuclear Plant, Units 1 and 2 ML15117A6662015-05-0404 May 2015 Plan for the Onsite Audit Regarding Implementation of Mitigating Strategies and Reliable Spent Fuel Instrumentation Related to Orders EA-12-049 and EA-12-051 ML14356A0032015-02-10010 February 2015 Audit of Licensee Responses to the Expedited Seismic Evaluation Process to Support Implementation of Near-Term Task Force Recommendation 2.1, Seismic ML14127A2942014-05-0909 May 2014 Regulatory Audit in Support of License Amendment Request to Implement NFPA 805, as Incorporated Into 10 CFR 50.48(c) ML14083A6202014-03-26026 March 2014 Nuclear Regulatory Commission Audits of Licensee Responses to Reliable Spent Fuel Pool Instrumentation Order EA-12-051 ML13130A0452013-05-17017 May 2013 Seismic Walkdown Audit Plan 2023-08-03
[Table view] Category:Letter
MONTHYEARML24036A2652024-02-0505 February 2024 Notice of Inspection and Request for Information for the NRC Age-Related Degradation Inspection: Inspection Report 05000266/2024010 and 05000301/2024010 IR 05000266/20230042024-02-0101 February 2024 Integrated Inspection Report 05000266/2023004 and 05000301/2023004 ML24030A0352024-01-30030 January 2024 Information Request for the Cyber-Security Baseline Inspection, Notification to Perform Inspection L-2024-001, Relief Request CISl-03-01 for Relief Concerning Containment Unbonded Post-Tensioning System Inservice Inspection Requirements2024-01-26026 January 2024 Relief Request CISl-03-01 for Relief Concerning Containment Unbonded Post-Tensioning System Inservice Inspection Requirements L-2024-010, Point Units 3 and 4, Seabrook, Duane Arnold, and Point Beach Units 1 and 2, Nuclear Property Insurance - 10 CFR 50.54(w)(3)2024-01-25025 January 2024 Point Units 3 and 4, Seabrook, Duane Arnold, and Point Beach Units 1 and 2, Nuclear Property Insurance - 10 CFR 50.54(w)(3) ML24005A3242024-01-24024 January 2024 Exemption from Select Requirements of 10 CFR Part 73 (EPID L-2023-LLE-0040 (Security Notifications, Reports, and Recordkeeping and Suspicious Activity Reporting)) ML23352A2752024-01-23023 January 2024 Issuance of Amendment Nos. 274 and 276 Regarding Revision to Technical Specification 5.5.17, Pre-Stressed Concrete Containment Tendon Surveillance Program L-2023-173, Quality Assurance Topical Report (FPL-1) Revision 30 Update2023-12-15015 December 2023 Quality Assurance Topical Report (FPL-1) Revision 30 Update L-2023-174, Subsequent License Renewal Application - Third Annual Update2023-12-13013 December 2023 Subsequent License Renewal Application - Third Annual Update L-2023-176, Supplement to Exemption Request Regarding Enhanced Weapons, Firearms Background Checks, and Security Event Notifications Final Rule2023-11-29029 November 2023 Supplement to Exemption Request Regarding Enhanced Weapons, Firearms Background Checks, and Security Event Notifications Final Rule L-2023-155, Supplement to Response to Request for Additional Information, Revised NextEra Common Emergency Plan, and Revised Site-Specific Emergency Plan Annexes Regarding License Amendment Request for Common Emergency Plan Consistent with NUREG-06542023-11-28028 November 2023 Supplement to Response to Request for Additional Information, Revised NextEra Common Emergency Plan, and Revised Site-Specific Emergency Plan Annexes Regarding License Amendment Request for Common Emergency Plan Consistent with NUREG-0654, L-2023-159, Part 3 Exemption Request Regarding Enhanced Weapons, Firearms Background Checks and Security Event Notifications Final Rule2023-11-16016 November 2023 Part 3 Exemption Request Regarding Enhanced Weapons, Firearms Background Checks and Security Event Notifications Final Rule IR 05000266/20234022023-11-14014 November 2023 Security Baseline Inspection Report 05000266/2023402 and 05000301/2023402 ML23279A0672023-11-0909 November 2023 Issuance of Relief Request I6 RR 02 - Examination of the Unit 2 Steam Generator Feedwater Nozzle Extension to Nozzle Weld Sixth 10 Year Inservice Inspection Program Interval IR 05000266/20230032023-10-16016 October 2023 Integrated Inspection Report 05000266/2023003 and 05000301/2023003 ML23346A1322023-10-0606 October 2023 Communication from C-10 Research & Education Foundation Regarding NextEra Common Emergency Fleet Plan License Amendment Request and Related Documents Subsequently Published L-2023-128, License Amendment Request to Revise TS 5.5.17, Pre-Stressed Concrete Containment Tendon Surveillance Program2023-09-19019 September 2023 License Amendment Request to Revise TS 5.5.17, Pre-Stressed Concrete Containment Tendon Surveillance Program ML23243A9102023-09-0606 September 2023 Closeout of Generic Letter 2004-02, Potential Impact of Debris Blockage on Emergency Recirculation During Design Basis Accidents at Pressurized-Water Reactors IR 05000266/20235012023-08-29029 August 2023 Emergency Preparedness Biennial Exercise Inspection Report 05000266/2023501 and 05000301/2023501 ML23208A2262023-08-28028 August 2023 Exemption from the Requirements of 10 CFR 50,46, Acceptance Criteria for Emergency Core Cooling Systems for Light Water Nuclear Power Reactors (EPID L-2022-LLE-0026) - Letter ML23208A0952023-08-28028 August 2023 Issuance of Amendment Nos. 273 and 275 Regarding Revising Licensing Basis to Address Generic Safety Issue-191 and Respond to Generic Letter 2004-02 Using a Risk Informed Approach IR 05000266/20230052023-08-24024 August 2023 Updated Inspection Plan for Point Beach Nuclear Plant (Report 05000266/2023005 and 05000301/2023005) ML23160A0642023-08-21021 August 2023 Issuance of Amendment Nos. 272 and 274 Regarding Revision to Use Beacon Power Distribution Monitoring System L-2023-114, Proposed Turkey Point Units 6 and 7; Seabrook Station; Point Beach Units 1 and 2 - Official Service List Update2023-08-17017 August 2023 Proposed Turkey Point Units 6 and 7; Seabrook Station; Point Beach Units 1 and 2 - Official Service List Update ML23221A0522023-08-0909 August 2023 Confirmation of Initial License Examination, March 2024 L-2023-098, and Point Beach Units 1 and 2 - Response to Request for Additional Information Regarding License Amendment Request for Common Emergency Plan Consistent with NUREG-0654, Revision 22023-08-0707 August 2023 and Point Beach Units 1 and 2 - Response to Request for Additional Information Regarding License Amendment Request for Common Emergency Plan Consistent with NUREG-0654, Revision 2 ML23201A0872023-08-0303 August 2023 Audit Plan in Support of Review of License Amendment L-2023-089, Refueling Outage Owner'S Activity Report (OAR-1) Unit 2 for Inservice Inspections2023-07-24024 July 2023 Refueling Outage Owner'S Activity Report (OAR-1) Unit 2 for Inservice Inspections IR 05000266/20230022023-07-18018 July 2023 Integrated Inspection Report 05000266/2023002 and 05000301/2023002 IR 05000266/20234012023-07-13013 July 2023 Public-Point Beach Nuclear Plant-Security Baseline Inspection Report 05000266/2023401; 05000301/2023401; Independent Spent Fuel Storage Security Inspection Report 07200005/2023401 L-2023-087, Florida Power & Light/Nextera Energy, Results of the Safety Culture Program Effectiveness Review, March 20, 2023 (ADAMS Accession No. ML22340A452)2023-06-29029 June 2023 Florida Power & Light/Nextera Energy, Results of the Safety Culture Program Effectiveness Review, March 20, 2023 (ADAMS Accession No. ML22340A452) ML23178A2422023-06-28028 June 2023 Reassignment of the U.S. Nuclear Regulatory Commission Branch Chief in the Division of Operating Reactor Licensing for Plant Licensing Branch III L-2023-088, 10 CFR 50.55a Requests, Relief Requests I6-RR-1, I6-RR-2, and I6-RR-3 Sixth Ten-Year Inservice Inspection Program Interval2023-06-27027 June 2023 10 CFR 50.55a Requests, Relief Requests I6-RR-1, I6-RR-2, and I6-RR-3 Sixth Ten-Year Inservice Inspection Program Interval ML23171B1062023-06-21021 June 2023 Info Meeting with a Question and Answer Session to Discuss NRC 2022 EOC Plant Performance Assessment of Ptbh, Units 1 and 2 ML23163A2422023-06-13013 June 2023 Notification of NRC Baseline Inspection and Request for Information; Inspection Report 05000266/2023004 L-2023-075, Response to Request for Additional Information (RAI) Regarding Exemption Request, License Amendment Request and Revised Response in Support of a Risk-Informed Resolution of Generic Letter 2004-022023-06-0909 June 2023 Response to Request for Additional Information (RAI) Regarding Exemption Request, License Amendment Request and Revised Response in Support of a Risk-Informed Resolution of Generic Letter 2004-02 L-2023-073, Subsequent License Renewal Application, Second Annual Update Request for Additional Information Set 1 Response2023-06-0101 June 2023 Subsequent License Renewal Application, Second Annual Update Request for Additional Information Set 1 Response ML23103A1332023-06-0101 June 2023 Issuance of Amendment Nos. 271 and 273 Regarding Technical Specifications to Adopt TSTF-505, Revision 2, Provide Risk-Informed Extended Completion Times - RITSTF Initiative 4b L-2023-071, NextEra Energy Quality Assurance Topical Report (FPL-1) Revision 29 and Florida Power and Light Company Quality Assurance Program Description for 10 CFR Part 52 Licenses (FPL-2) Revision 11, Annual Submittal2023-05-22022 May 2023 NextEra Energy Quality Assurance Topical Report (FPL-1) Revision 29 and Florida Power and Light Company Quality Assurance Program Description for 10 CFR Part 52 Licenses (FPL-2) Revision 11, Annual Submittal ML23118A1762023-05-0404 May 2023 Audit Summary for License Amendment Request Regarding Risk-Informed Approach for Closure of Generic Safety Issue 191 IR 05000266/20230012023-05-0101 May 2023 Integrated Inspection Report 05000266/2023001 and 05000301/2023001 ML23114A1222023-04-25025 April 2023 Information Request to Support the NRC Annual Baseline Emergency Action Level and Emergency Plan Changes Inspection L-2023-058, 2022 Annual Monitoring Report2023-04-10010 April 2023 2022 Annual Monitoring Report L-2023-021, Units, 1 and 2, Turkey Point, Units 3 and 4, Seabrook Station and Point Beach, Units 1 and 2 - Decommissioning Funding Status Reports / Independent Spent Fuel Storage Installation (ISFSI) Financial Assurance Update2023-03-28028 March 2023 Units, 1 and 2, Turkey Point, Units 3 and 4, Seabrook Station and Point Beach, Units 1 and 2 - Decommissioning Funding Status Reports / Independent Spent Fuel Storage Installation (ISFSI) Financial Assurance Update L-2023-028, and Point Beach Units 1 and 2, 10 CFR 50.46 Annual Reporting of Changes to, or Errors in Emergency Core Cooling System Models or Applications2023-03-27027 March 2023 and Point Beach Units 1 and 2, 10 CFR 50.46 Annual Reporting of Changes to, or Errors in Emergency Core Cooling System Models or Applications 2024-02-05
[Table view] |
Text
UNITED STATES NUCLEAR REGULATORY COMMISSION WASHINGTON, D.C. 20555-0001 February 21, 2018 Mr. Robert Craven Plant General Manager NextEra Energy Point Beach, LLC 6610 Nuclear Road Two Rivers, WI 54241
SUBJECT:
POINT BEACH NUCLEAR PLANT, UNITS 1 AND 2 - AUDIT PLAN AND SETUP OF ONLINE REFERENCE PORTAL FOR LICENSE AMENDMENT REQUEST-10 CFR 50.69, "RISK-INFORMED CATEGORIZATION AND TREATMENT OF STRUCTURES, SYSTEMS AND COMPONENTS FOR NUCLEAR POWER PLANTS" (CAC NOS. MG0196 AND MG0197; EPID L-2017-LLA-0284)
Dear Mr. Craven:
By letter dated August 31, 2017 (Agencywide Documents Access and Management System (ADAMS) Accession No. ML17243A201 ), NextEra Energy Point Beach, LLC (NextEra) submitted a license amendment request (LAR) for the Point Beach Nuclear Plant PBNP),
Units 1 and 2. The proposed amendment would revise the licensing basis by adding a license condition to allow for the implementation of the provisions of Title 10 of the Code of Federal Regulations (10 CFR) Section 50.69, "Risk-Informed Categorization and Treatment of Structures, Systems and Components for Nuclear Power Reactors."
To improve the efficiency of the U.S. Nuclear Regulatory Commission (NRC) reviews, the licensee's representatives and the NRC staff have discussed the use of an audit using an online reference portal that would allow the NRC staff and contractors limited read-only access to the basis documents and other reference materials cited in the applications. The staff plans to initially conduct a desk audit to review the documentation provided on the portal. The online reference portal would allow the NRC staff to audit basis documents to determine whether the information included in the documents is necessary to reach a safety conclusion on the application. Documents identified as necessary for analysis of the application will be identified by the NRC staff. NextEra will be formally requested to submit those documents on the NRC docket. Use of the on line reference portal is acceptable as long as the following conditions are met:
- The online reference portal will be password-protected and passwords will be assigned to those directly involved in the review on a need-to-know basis;
- The online reference portal will be sufficiently secure to prevent staff from printing, saving, or downloading any documents; and
- Conditions of use of the online reference portal will be displayed on the login screen and will require concurrence by each user.
The NRC staff would like to request that the portal be populated with the documents listed in the enclosure to this letter. This is the initial list identified by the NRC staff. The staff may request additional documents during the review, which will be transmitted to you via email. This
R. Craven will help with the preparation for a possible site audit. Please provide NRC staff access to the portal and send me the information needed to access the portal, such as username and password, as soon as possible.
The conditions associated with the online reference portal must be maintained throughout the duration of the review process. Please provide written confirmation that NextEra agrees to the terms and conditions set forth in this letter.
If you have any questions, please contact me at (301) 415-8371 or Mahesh.Chawla@nrc.gov.
Sincerely, K~~4f~hr Mahesh L. ChaJ/a:Project Manager Plant Licensing Branch Ill Division of Operating Reactor Licensing Office of Nuclear Reactor Regulation Docket Nos. 50-266 and 50-301
Enclosure:
As stated cc: ListServ
AUDIT PLAN NEXTERA ENERGY POINT BEACH, LLC POINT BEACH NUCLEAR PLANT, UNITS 1 AND 2 DOCKET NOS. 50-266 AND 50-301 BACKGROUND Section 3.3 of the license amendment request (LAR), "PRA [probabilistic risk assessment]
Review Process Results (10 CFR 50.69(b)(2)(iii))," states:
Closed findings were reviewed and closed using the process documented in Appendix X to NEI [Nuclear Energy Institute] 05-04, NEI 07-12 and NEI 12-13, "Close-out of Facts and Observations" (F&Os) (Reference 19) as accepted by NRC [U.S. Nuclear Regulatory Commission] in the staff memorandum dated May 3, 2017 (ML17079A427) (Reference 20). The results of this review have been documented and are available for NRC audit.
In accordance with the memorandum dated May 3, 2017, the NRC will periodically conduct audits of licensee's implementation of the Appendix X F&O closure process, as well as review a sampling of the final independent assessment team reports, and expects licensees to adhere to the guidance in Appendix X in its entirety. However, based on staff observations of implementation of the Appendix X F&O closure process for Point Beach, Duane Arnold Energy, St. Lucie, Turkey Point, and Seabrook Nuclear Stations from July 18 and 19, 2017, the staff observed that vital steps in Appendix X may not have been fully applied.
While the observations do not reflect a final assessment by the NRC staff, a review of the F&O closure process is necessary to follow-up with these observations and ensure the guidance in Appendix X was adhered to in its entirety.
REGULATORY AUDIT BASES The NRC staff's review of the LAR has commenced in accordance with the Office of Nuclear Reactor Regulation's Office Instruction LIC-101, "License Amendment Review Procedures." Information that the staff relies upon to make findings in the safety evaluation must be submitted on the docket. However, there may be supporting information that, although not required to be submitted as part of the licensing action, would help the staff better understand the licensee's submitted information.
An audit was determined to be the most efficient approach toward a timely review of supporting information and resolution of questions associated with this LAR, since the NRC staff will have an opportunity to minimize the potential for further rounds of requests for additional information (RAls) and ensure no unnecessary burden will be imposed by requiring the licensee to address issues that are not necessary to make a safety determination. The staff is requesting an initial Enclosure
review of documentation at the NRC headquarters. Upon completion of this desk audit, the staff is expected to achieve the following.
- 1. Determine the need for additional documentation.
- 2. Develop an RAI.
- 3. Decide if a site audit is required to verify information.
The RAls will be issued soon after the audit, with an expected response being delivered by the licensee by an agreed upon date. The information discussed in the audit to be included in the development of the technical NRC staff's safety evaluation will be requested to be submitted on the docket.
REGULATORY AUDIJ SCOPE OR METHODOLOGY The desk audit is being conducted to get a better understanding of the submittal and the availability of the information to make an assessment of NextEra's review approach. The areas of focus for the regulatory audit are the information that will be requested by the NRC. The staff will review the documentation and generate any RAls necessary to complete the review. It will also lead to the decision if a site audit is necessary.
INFORMATION AND OTHER MATERIAL NECESSARY FOR THE REGULATORY AUDIT The NRC staff has determined that the following information would be useful to gain a better understanding of NextEra's LAR, in particular, LAR Section 3.3, related to the technical adequacy of the PRA.
The following information is requested for the initial desk audit:
- Point Beach F&O closure report that was developed in accordance with Appendix X to NEI 05-04, NEI 07-12 and NEI 12-13, "Close-out of Facts and Observations (F&Os)," as accepted by NRC in the staff memorandum dated May 3, 2017 (Agencywide Documents Access and Management System (ADAMS) Accession No. ML17079A427).
NextEra will be informed via electronic mail if there is a need for additional supporting documentation.
TEAM ASSIGNMENTS Key licensee personnel involved in the development of the RAI responses should be made available on a mutually agreeable schedule to respond to any questions from the NRC staff.
Team Title Division Area of Responsibility Member Mahesh Project Manager NRR/DORL/LPL3 Project Management Chawla Todd Reliability and Risk NRR/ORA/APLA Reliability and Risk Hilsmeier Analyst Analysis Mihaela Biro Reliability and Risk Analyst
Garill Coles Principal Engineer Pacific Northwest Reliability and Risk National Analysis Laboratory Additional NRC staff may be involved in the review of documents on the portal as the staff's review progresses.
LOGISTICS The audit will be started once an online reference portal is set up and the documentation is made available to the NRC staff. The desk audit will be conducted over a few weeks consistent with the internal review schedule for the issuance of the request for additional information.
NextEra will be kept informed on a regular basis during biweekly discussions with the project manager regarding the progress and the decision to arrange a site visit.
DELIVERABLES The NRC team will develop an audit summary report to convey the results. The report will be placed in ADAMS within 30 days of the completion of the final audit session. The NRC will also finalize the RAls after completion of the desk audit and issue them to the licensee.
ML18046A987 OFFICE NRR/DORL/LPL3/PM NRR/DORL/LPL3/LA NRR/DRA/APLA/BC MChawla NAME SRohrer SRosenburg (Kimberly Green for)
DATE 2/20/18 2/20/18 2/20/18 OFFICE NRR/DORL/LPL3/BC NRR/DORL/LPL3/PM MChawla NAME DWrona (Kimberly Green for)
DATE 2/21/18 2/21/18