ML18040A370

From kanterella
Jump to navigation Jump to search
Provides Changes to Application for Amend Re Volumes 1-11 of 981016 Submittal & Discard & Insertion Instructions Re Integration of Proposed Changes,In Response to NRC RAIs
ML18040A370
Person / Time
Site: Nine Mile Point Constellation icon.png
Issue date: 09/30/1999
From: Abbott R
NIAGARA MOHAWK POWER CORP.
To:
NRC OFFICE OF INFORMATION RESOURCES MANAGEMENT (IRM)
Shared Package
ML17059C792 List:
References
MA3822, NMP2L-1900, NUDOCS 9910120302
Download: ML18040A370 (90)


Text

CATEGORY 1 REGULAT Y INFORMATION DISTRIBUTION SYSTEM (RIDS)

ACCESSION NBR:9910120302 DOC.DATE: 99/09/30 NOTARIZED: NO DOCKET FACIL:50-410 Nine Mile Point Nuclear Station, Unit 2, Niagara Moha 05000410 AUTH. NAME AUTHOR AFFILIATION ABBOTT,R.B. 'Niagara Mohawk Power Corp.

RECIP.NAME RECIPIENT AFFILIATION Records Management Branch (Do ument Control Desk)

SUBJECT:

Provides summary of changes to proposed license amend.

Attachment 2 provides discard & insertion instructions pertaining to integration of proposed changes into application for amend,dtd 981016. A D1STRZBUTZON CODE: AOOZD CORTES RECEZVED:LTR ( ENCL I SZEE: thdd TITLE: OR Submittal: General Distribution E

NOTES:

RECIPIENT COPIES RECIPIENT COPIES ID CODE/NAME LTTR ENCL ID CODE/NAME LTTR ENCL LITTLE,S 1 1 'HOOD,D 1 1 SC 1 1 INTERNAL: ACRS 1 1 1 1 NRR/DSSA/SPLB 1 1 NRR/DSSA/SRXB 1 1 NUDOCS-ABSTRACT 1 1 OGC/RP 1 0 EXTERNAL: NOAC 1 1 NRC PDR 1 1 D

'E NOTE TO ALL "RIDS" RECIPIENTS:

PLEASE HELP US TO REDUCE WASTE. TO HAVE YOUR NAME OR ORGANIZATION REMOVED FROM DISTRIBUTION OR REDUCE THE NUMBER OF COPIES RECEIVED BY YOU OR YOUR ORGANIZATION, CONTACT LISTS THE DOCUMENT CONTROL DESK (DCD) ON EXTENSION 415-2083 TOTAL NUMBER OF. COPIES REQUIRED: LTTR 11 ENCL 10

0 N

~ ~

Niagara Q$3Mohawk Richard B. Abbott Phone: 315.349.181 2 Vice President September 30, 1999 Fax: 315.349.4417 Nuclear Engineering NMP2L 1900 U. S. Nuclear Regulatory Commission Attn: Document Control Desk Washington, DC 20555 RE: Nine Mile Point Unit 2 Docket No. 50-410

Subject:

Conversion of the Nine Mile Point Unit 2 Current Technical Specifications to the Improved Technical SpecjPcations (TAC No. MA3S22)

Gentlemen:

Niagara Mohawk Power Corporation (NMPC) transmitted an Application for Amendment regarding the above subject by letter dated October 16,-1998 (NMP2L 1830). Subsequently, by letters dated March 26, 1999; May 10, 1999; May 18, 1999; June 16, 1999 and September 2, 1999, the Nuclear Regulatory Commission (NRC) requested additional information pertaining to the Application for Amendment. NMPC provided the requested additional information by letters dated May 10, 1999 (NMP2L 1866); June 15, 1999 (NMP2L 1872);

July 30, 1999 (NMP2L 1881); August 2, 1999 (NMP2L 1883); August 11, 1999 (NMP2L 1885); August 16, 1999 (NMP2L 1886); August 19, 1999 (NMP2L 1888); August 27, 1999 (NMP2L 1893) and September 10, 1999 (NMP2L 1896). The additional information provided by NMPC in these letters included commitments to revise the Application for Amendment.

Accordingly, the Enclosure to this letter provides the appropriate changes to our Application for Amendment regarding Volumes 1 through 11 of our October 16, 1998 submittal. The specific changes are annotated by a vertical bar and a "B" in the right margin.

Attachment 1 of this letter provides a summary of the changes to the proposed License Amendment. In addition, Attachment 2 provides the discard and insertion instructions pertaining to the integration of the proposed changes into our Application for Amendment dated October 16, 1998.

NMPC has determined that the revision of our proposed License Amendment does not involve a significant hazards consideration. The evaluation supporting this determination is included in the enclosure to our letter dated October 16, 1998, as revised by the enclosure to this letter.

In addition, the revision as discussed herein does not create a potential for a significant change in the types or a significant increase in the amounts of any effluents that may be released offsite, nor do the changes involve a significant increase in individual or cumulative 99iOaaoaok e9O930,j,t PDR ADOCK 050004i0.', "

P PD~R Nine Mile Point Nuclear Station PO. Box 63, Lycoming, New York 13093 0063 ~ www.nimo.corn

~ >>

n,

Page 2 occupational radiation exposure. Accordingly, the revision of our proposed License Amendment meets the eligibility criteria for categorical exclusion as set forth in 10 CFR 51.22(c)(9). Therefore, pursuant to 10 CFR 51.22(b), an environmental assessment of the revision to our proposed License Amendment is not required.

Pursuant to 10 CFR 50.91(b)(1), NMPC has provided a copy of the revision to this License Amendment application and the associated analysis regarding no significant hazards consideration to the appropriate state representative.

Sincerely, Richard B. Abbott Vice President - Nuclear Engineering RBA/KWK/jb Attachments 1 and 2 Enclosure xc: Mr. H. J. Miller, NRC Regional Administrator, Region I Mr. S. S. Bajwa, Section Chief PD-I, Section 1, NRR Mr. G. K. Hunegs, NRC Senior Resident Inspector Mr. D. S. Hood, Senior Project Manager, NRR Mr. J. P. Spath NYSERDA 286 Washington Avenue Ext.

Albany, NY 12203-6399 Records Management

M h

ATTACHMENTI

SUMMARY

OF CHANGES This attachment provides a brief summary of the changes in Revision B. The original Technical Specification amendment request (Revision A) was submitted to the NRC on October 16, 1998.

The summary of the changes is provided in Chapter/Section order. Within each Chapter/Section, changes resulting from an NRC Request for Additional Information (RAI) are provided first, followed by additional changes identified by Nine Mile Point Unit 2 (NMP2), Page removal and insert instructions have also been provided in Attachment 2 to facilitate updating the amendment request to include Revision B.

1. The changes committed to in the NMP2 response to RAI 1 have been made. The changes affect Improved Technical Specification (ITS) 1.1, page 1.1-3, the Current Technical Specification (CTS) markup for Chapter 1.0, page 5 of 15, and the Improved Standard Technical Specification (ISTS) markup, page 1.1-3.

The word "significant" had been removed from the Background and Applicable Safety Analyses sections of the ITS 2.1.1 Bases when referring to the fuel cladding integrity safety limit (no significant fuel damage is calculated to occur). After a phone conversation with the NRC and further review, this word will be maintained. This change affects ITS 2.1.1, Bases pages B 2.0-1 and B 2,0-3, the ISTS Bases markup pages B 2.0-1 and B 2.0-4, and the Justification for Deviations (JFD) to Bases Chapter 2.0, JFD 1 (page 1).

2. A typographical error was noted in the Reference section of the ISTS 2.1.2 Bases, in that a reference identified in the Reference section was not used in the body of the Bases. Thisreference(GDC28) hasbeen deleted. This changeaffectsITS2.1.2, Bases page B 2.0-8 and the ISTS Bases markup page B 2.0-11.
1. The changes committed to in the NMP2 response to RAI 3.0-1 have been made. These changes affect ITS 3.0 Bases page B 3,0-10, the ISTS Bases markup pages B 3.0-11 1 of 18

>>1012030>

and insert page B 3.0-11 and the Justification for Deviations to Bases Section 3.0, JFD 11 (pages 1 and 2).

2. Discussion of Change (DOC) A.12 for ITS Section 3.0 identified that CTS 4.0.5 was being moved to Specification 5.5.6. The NRC has approved an amendment that affects one of the CTS pages (NMP2 License Amendment 84, dated December 3, 1998) ~

Therefore, the currently approved CTS page is provided. This change affects the CTS markup for Section 3.0, page 5 of 8.

1. The changes committed to in the NMP2 response to RAI 3. 1-4 have been made. These changes affect ITS 3.1.7 Bases page B 3.1-42 and the ISTS Bases markup page B 3.1-44.

The changes committed to in the NMP2 response to RAI 3.2-1 have been made. These changes affect ITS 3.2.4, pages 3.2-5 and 3.2-6 and Bases page B 3.2-14, the CTS markup for Specification 3.2.4, page 1 of 1, the ISTS markup pages 3.2-4 and 3.2-5, and the ISTS Bases markup page B 3.2-14.

2. Changes have been made to be consistent with approved Technical Specification Task Force (TSTF)-229. These changes affect ITS 3.2.2 Bases page B 3.2-7 and the ISTS Bases markup insert page B 3.2-8.
1. The changes committed to in the NMP2 response to RAI 3.3.1.1-2 have been made.

These changes affect the Justification for Deviations to ITS 3.3.1.1, JFD 7 (page 2).

2. The changes committed to in the NMP2 response to RAI 3.3.1.1-4 have been made.

These changes affect the Discussion of Changes for ITS 3.3.1.1, DOC LA.2 (page 6),

and the Justification for Deviations to ITS 3.3,1.1, JFD 3 (page 1).

The changes committed to in the NMP2 response to RAI 3.3.1.1-5 have been made.

These changes affect the Discussion of Changes for ITS 3.3.1.1, DOC L.3 (page 15),

the Discussion of Changes for ITS 3.3.2.1, DOC L.1 (page 5), the Discussion of Changes for ITS 3.3.2.2, DOC L.1 (page 4), the Discussion of Changes for ITS 3.3.4.1, DOC L.1 (page 5), the Discussion of Changes for ITS 3.3.4.2, DOC L.1 2 of 18

k'>

(page 5), the Discussion of Changes for ITS 3.3.5.1, DOC L.1 (page 16), the Discussion of Changes for ITS 3.3.5.2, DOC L.1 (page 7), the Discussion of Changes for ITS 3.3.6.1, DOC L.1 (page 20), the Discussion of Changes for ITS 3.3.6.2, DOC L.1 (page 7), the Discussion of Changes for ITS 3.3.7.2, DOC L.1 (page 6), the Discussion of Changes for ITS 3.3.8.1, DOC L.1 (page 6), the No Significant Hazards Evaluation (NSHE) 'or ITS 3.3.1.1, NSHE L.3 (page 3), the No Significant Hazards Evaluation for ITS 3.3.2.1, NSHE L.1 (page 1), the No Significant Hazards Evaluation for ITS 3.3.2.2, NSHE L.1 (page 1), the No Significant Hazards Evaluation for ITS 3.3.4.1, NSHE L.1 (page 1), the No Significant Hazards Evaluation for ITS 3.3.4.2, NSHE L.1 (page 1), the No Significant Hazards Evaluation for ITS 3.3.5.1, NSHE L.1 (page 1), the No Significant Hazards Evaluation for ITS 3.3.5.2, NSHE L.1 (page 1), the No Significant Hazards Evaluation for ITS 3.3.6.1, NSHE L.1 (page 1),

the No Significant Hazards Evaluation for ITS 3.3.6.2, NSHE L.1 (page 1), the No Significant Hazards Evaluation for ITS 3.3.7.2, NSHE L.1 (page 1), and the No Significant Hazards Evaluation for ITS 3.3.8.1, NSHE L.1 (page 1).

The changes committed to in the NMP2 response to RAI 3.3.3.1-2 have been made.

These changes affect the CTS markup for Specification 3.3.3.1, page 6 of 6, and the Discussion of Changes for ITS 3.3.3.1, DOC A.6 (pages 1 and 2).

The changes committed to in the NMP2 response to RAI 3.3.3.2-1 have been made.

These changes affect the CTS markup for Specification 3.3.3.2, pages 1 of 4 and 4 of 4, the Discussion of Changes for ITS 3.3.3.2, DOC A.3 (page 1) and DOC L.3 (pages 7 and 8), and the No Significant Hazards Evaluation for ITS 3.3.3.2, NSHE L.3 (page 3).

The changes committed to in the NMP2 response to RAI 3.3.4.2-2 have been made.

These changes affect the Discussion of Changes for ITS 3.3.4.2, DOC L.3 (page 7).

The changes committed to in the NMP2 response to RAI 3.3.5.1-1 have been made.

These changes affect the CTS markup for Specification 3.3.5.1, page 6 of 29, the Discussion of Changes for ITS 3.3.5.1, DOC A.7 (page 2) and DOC L.12 (page 22),

and the No Significant Hazards Evaluation for ITS 3.3.5.1, NSHE L.12 (page 15).

The changes committed to in the NMP2 response to RAI 3.3.5.1-2 have been made.

These changes affect the Discussion of Changes for ITS 3.3.5.1, DOC L.5 (page 18),

and the No Significant Hazards Evaluation for ITS 3.3.5.1, NSHE L.5 (page 6).

The changes committed to in the NMP2 response to RAI 3.3.5.2-1 have been made.

These changes affect the CTS markup for Specification 3.3.5.2, page 3 of 5, and the Discussion of Changes for ITS 3.3.5.2, DOC A.7 (page 2).

3 of 18

The changes committed to in the NMP2 response to RAI 3.3.6.1-1 have been made.

These changes affect the CTS markup for Specification 3.3.6.1, page 7 of 19, the Discussion of Changes for ITS 3.3.6.1, DOC A.9 (page 3) and DOC L.14 (page 33),

and the No Significant Hazards Evaluation for ITS 3.3.6.1, NSHE L, 14 (page 18).

The changes committed to in the NMP2 response to RAI 3.3.6.1-2 have been made.

These changes affect the Discussion of Changes for ITS 3.3.6.1, DOC L.7 (page 29).

The changes committed to in the NMP2 response to RAI 3.3.6.1-3 have been made.

These changes affect the CTS markup for Specification 3.3.6.1, page 3 of 19 and 4 of 19, and the Discussion of Changes for ITS 3.3.6.1, DOC A.16 (pages 5 and 6).

The changes committed to in the NMP2 response to RAI 3.3.6.2-1 have been made.

These changes affect the Discussion of Changes for ITS 3.3.6.2, DOC A.6 (page 2).

The changes committed to in the NMP2 response to RAI 3.3.7.1-1 have been made.

These changes affect the Discussion of Changes for ITS 3.3.7.1, DOC L.1 (pages 7 and 8).

The changes committed to in the NMP2 response to RAI 3.3.7.2-1 have been made.

These changes affect the Discussion of Changes for ITS 3.3.7.2, DOC M.1 (pages 2 and 3).

The changes committed to in the NMP2 response to RAI 3.3.8.2-1 have been made.

These changes affect the CTS markup for Specification 3.3.8.2, page 1 of 1, the Discussion of Changes for ITS 3.3.8.2, DOC M.2 (page 2) and DOC L.5 (page 7), the CTS markup for Specification 3.3.8.3, page 1 of 1, the Discussion of Changes for ITS 3.3.8.3, DOC M.1 (page 2) and DOC L.5 (page 6), the No Significant Hazards Evaluation for ITS 3.3.8.2, NSHE L.5 (page 6), and the No Significant Hazards Evaluation for ITS 3.3.8.3, NSHE L.5 (page 6).

The changes committed to in the NMP2 response to RAI 3.3.8.2-3 have been made.

These changes affect the Discussion of Changes for ITS 3.3.8.2, DOC L.1 (page 5).

It was noted that a statement concerning under what conditions the minimum Source Range Monitor count rate was determined, i.e., "with the detector full in," was added into the Bases for Surveillance Requirement (SR) 3.3.1.2.4. This statement is not in the ISTS 3.3.1.2 Bases (since it is already effectively covered by the first paragraph of the Background section of the Bases) and has been deleted. This change affects ITS 3.3.1.2 Bases page B 3.3-39 and the ISTS Bases markup page B 3.3-40.

It was noted that, in the CTS markup and Discussion of Changes for ITS 3.3.2.2, an "LA" DOC was used to describe the change to the "simulated automatic operation" 4 of 18

portion of CTS 4.3.9.2. In other Technical Specifications where the actuated components do not have an individual system Technical Specification (i.e., EOC-RPT and ATWS-RPT), the change to the same portion of the comparable requirement was described using an "A" DOC. Therefore, for consistency with how this change was described in other similar requirements, an "A" DOC has been provided and the "LA" DOC" has been deleted. This change affects the CTS markup for ITS 3.3.2.2, page 1 of 5, and the Discussion of Changes for ITS 3.3.2.2, DOC A.5 (page 1) and DOC LA.1 (page 2).

20. A typographical error was noted in the Discussion of Changes for ITS 3.3.3.2, DOC LE.1 (the value "30" was inadvertently repeated). This has been corrected. This change affects the Discussion of Changes for ITS 3.3.3.2, DOC LE.1 (page 4).
21. A typographical error was noted in the Discussion of Changes for ITS 3.3.4.1, DOC LA.1 (SR 3.3.4.1.5 should have been SR 3.3.4.1.4) This has been corrected. This

~

change affects the Discussion of Changes for ITS 3.3.4.1, DOC LA.1 (page 3).

22. Typographical errors were noted in the Justification for Deviations to ITS 3.3.5.1, JFD 3 (the Function numbers were incorrectly identified). The correct Function numbers were provided to the NRC reviewer during a phone conversation. These errors have been corrected. This change affects the Justification for Deviations to ITS 3.3.5.1, JFD 3 (page 1).

A typographical error was noted in the Discussion of Changes for ITS 3.3.6.1, DOC M.5 (Function 2.d should have been Function 2.c). This has been corrected. This change affects the Discussion of Changes for ITS 3.3.6.1, DOC M.5 (page 8).

24. It was noted that the use of the term "room" and "area" and the term "pump" in the ITS 3.3.6.1 Bases was not consistent with the use in ITS Table 3.3.6.1-1. This has been corrected. These changes affect ITS 3.3.6.1 Bases pages B 3.3-169 and B 3.3-176 and the ISTS Bases markup pages B 3.3-156 and insert page B 3.3-164.
25. NMP2 License Amendment 85, issued by the NRC on December 22, 1998, removed CTS 3/4.3.7.3, the Meteorological Monitoring Instrumentation from the Technical Specifications. Therefore, changes have been made as a result of this amendment.

These changes affect the Split Report (Attachment page 6 and Appendix 1 page 9 of 43), the CTS markup for Current Specification 3/4.3.7.3, page 1 of 3, page 2 of 3, and page 3 of 3 (all pages deleted), the Discussion of Changes for CTS 3/4.3.7.3 (deleted),

the Discussion of Changes for ITS Section 3.3 - Instrumentation Bases (page 1), and the No Significant Hazards Evaluation for CTS 3/4.3.7.3 (deleted). In addition, typographical errors on the Discussion of Changes for ITS Section 3.3-Instrumentation Bases (page 1) were also corrected.

5 of 18

Grammatical errors were noted in the ISTS 3.3.8.2 and 3.3.8.3 Bases markup. The first and second sentences of the Bases for SR 3.3.8.2.3 and SR 3.3.8.3.3 have been combined into one sentence, consistent with the wording in the BWR/4 ISTS, NUREG-1433, Rev. 1. These changes affect ITS 3.3.8.2 Bases page B 3.3-233, ITS 3.3.8.3 Bases page B 3.3-241, and ISTS Bases markup pages B 3.3-246 and insert page B 3.3-246i.

1. The changes committed to in the NMP2 response to RAI 3.4.1-1 have been made.

These changes affect the Discussion of Changes for ITS 3.4.2, DOC A.2 (page 1).

2. The changes committed to in the NMP2 response to RAI 3.4.5-7 have been made.

These changes affect the Discussion of Changes for ITS 3.4,5, DOC L.2 (page 2).

3. The changes committed to in the NMP2 response to RAI 3.4.7-1 have been made.

These changes affect the Discussion of Changes for ITS 3.4.7, DOC L.1 (pages 3 and 4).

4. The changes committed to in the NMP2 response to RAI 3.4.8-1 have been made.

These changes affect the Discussion of Changes for ITS 3.4.8, DOC A.2 (page 1).

5. NRC RAI 3.4.6-1 which id not req uire an NMP2 re spo n s, e stated th at the chan ge identified by DOC A.3 was a change to the CTS requirements that had been previously submitted to the NRC by another license amendment request, and that the PM needed to track the license amendment request. This license amendment request has been approved. Therefore, DOC A.3 is no longer necessary and the currently approved CTS pages are provided. This change affects the CTS markup for Specification 3.4.5, page 2 of 5, the CTS markup for Specification 3.4.6, page 2 of 5, and the Discussion of Changes for ITS 3.4.6, DOC A.3 (page 1).
6. t DOC A.2 for ITS 3.4.9 identified that CTS 3.4.9.1 footnote and DOC A.2 for ITS 3.4.10 identified that CTS 3.4.9.2 footnote 4 were being moved to LCO 3.10.1. The NRC has approved an amendment that affects these pages (NMP2 License Amendment 84, dated December 3, 1998). Therefore, the currently approved CTS pages are provided. This change affects the CTS markup for Specification 3.4.9, page 1 of 1, and the CTS markup for Specification 3.4.10, page 1 of 1.

6 of 18

4 'l

v. NRC RAI 3.4.11-2, which did not require an NMP2 response, stated that the change identified by DOC A.9 was a change to the CTS requirements that had been previously submitted to the NRC by another license amendment request, and that the PM needed to track the license amendment request. This license amendment request has been approved (NMP2 License Amendment 84, dated December 3, 1998). Therefore, DOC A.9 is no longer necessary and the currently approved CTS pages are provided. This change affects the CTS markup for Specification 3.4.11, pages 1 of 10 and 3 of 10, and the Discussion of Changes for ITS 3.4.11, DOC A.9 (page 3).

The changes committed to in the NMP2 response to RAI 3.5. 1-1 have been made.

These changes affect ITS 3,5.1 Bases page B 3.5-11, the Discussion of Changes for ITS 3.5.1, DOC A.5 (page 2), and the ISTS Bases markup page B 3.5-10.

2. A typographical error was noted in the Surveillance Requirements section of the ITS 3.5.2 Bases, in that the reference to SR 3.5.1.7 should be SR 3.5.1.8. This has been corrected. This change affects ITS 3.5.2 Bases page B 3.5-20 and the ISTS Bases markup page B 3.5-17.
1. The changes committed to in the NMP2 response to RAI 3.6.1.1-2 have been made.

These changes affect ITS 3.6.1.1 Bases page B 3.6-1 and the ISTS Bases markup page B 3.6-1.

2. The changes committed to in the NMP2 response to RAI 3.6.1.1-3 have been made.

These changes affect the CTS markup for Specification 3.6.1.1, page 10 of 10, the Discussion of Changes for ITS 3.6.1.1, DOC A.8 (page 3) and DOC L.3 (page 6), and the No Significant Hazards Evaluation for ITS 3.6.1.1, NSHE L.3 (page 3).

3. The changes committed to in the NMP2 response to RAI 3.6.1.1-4 have been made.

These changes affect the CTS markup for Specification 3.6.1.1, page 10 of 10, the Discussion of Changes for ITS 3.6.1.1, DOC A.10 (page 3) and DOC L.4 (pages 6 and 7), and the No Significant Hazards Evaluation for ITS 3.6.1.1, NSHE L.4 (page 4).

7of18

1

~~

4. The changes committed to in the NMP2 response to RAI 3.6.1.1-5 have been made.

These changes affect the Discussion of Changes for ITS 3.6.1.1, DOC A.11 (pages 3 and 4).

5. The changes committed to in the NMP2 response to RAI 3.6.1.1-8 have been made.

These changes affect ITS 3.6.1.1 Bases pages B 3.6-1 and B 3.6-4 and the ISTS Bases markup pages B 3.6-1 and B 3.6-4.

6. The changes committed to in the NMP2 response to RAI 3.6.1.2-1 have been made.

These changes affect the Discussion of Changes for ITS 3.6.1.2, DOC L.3 (page 6).

7. The changes committed to in the NMP2 response to RAI 3.6.1,2-5 have been made.

These changes affect ITS 3.6.1.2 Bases page B 3.6-8 and the ISTS Bases markup page B 3.6-8.

8. The changes committed to in the NMP2 response to RAI 3.6.1.2-6 have been made.

These changes affect the ISTS 3.6.1.2 Bases markup pages B 3.6-13 and insert page B 3.6-13 and the Justification for Deviations to ITS Bases 3.6.1.2, JFD 8 (page 1).

9. The changes committed to in the NMP2 response to RAI 3.6.1.3-2 have been made.

These changes affect the CTS markup for Specification 3.6.1.3, pages 4 of 14 and 11 of 14, and the Discussion of Changes for ITS 3.6.1.3, DOC A.2 (page 1) and DOC A.3 (page 1).

10. The changes committed to in the NMP2 response to RAI 3.6.1.3-4 have been made.

These changes affect ISTS 3.6.1.3 markup page 3.6-14.

The changes committed to in the NMP2 response to RAI 3.6.1.3-9 have been made.

These changes affect ITS 3.6.1.3 Bases pages B 3.6-25 and B 3.6-26 and the ISTS Bases markup pages B 3.6-26 and B 3.6-27,

12. The changes committed to in the NMP2 response to RAI 3.6.1.3-10 have been made.

These changes affect ITS 3.6.1.3, page 3.6-13 and Bases pages B 3.6-17, B 3.6-19, B 3.6-21, and B 3.6-22, the CTS markup for Specification 3.6.1.3, page 7 of 14, the Discussion of Changes for ITS 3.6.1.3, DOC L.12 (page 10), the ISTS markup page 3.6-11, the Justification for Deviations to ITS 3.6.1.3, JFD 3 (pages 1 and 2), JFD 7 (page 2), and JFD 17 (page 4), the ISTS Bases markup pages B 3.6-19, B 3.6-20, B 3.6-21, B 3.6-22, and insert page B 3.6-22, the Justification for Deviations to ITS Bases 3.6.1.3, JFD 15 (page 2), and the No Significant Hazards Evaluation for ITS 3.6.1.3, NSHE L.12 (page 14).

13. The changes committed to in the NMP2 response to RAI 3.6.1.3-12 have been made.

These changes affect the Discussion of Changes for ITS 3.6.1.3, DOC L.12 (page 10).

8 of 18

kar

14. The changes committed to in the NMP2 response to RAI 3.6.1.3-13 have been made.

These changes affect ITS 3.6.1.3, page 3.6-12 and Bases page B 3.6-20, the CTS markup for Specification 3.6.1.3, page 5 of 14, the ISTS markup page 3.6-11, the Justification for Deviations to ITS 3.6.1.3, JFD 6 (page 2), and the ISTS Bases markup page B 3.6-21.

15. The changes committed to in the NMP2 response to RAI 3.6.1.3-15 have been made.

These changes affect ITS 3.6.1.3 Bases pages B 3.6-14, B 3.6-15, B 3.6-16, B 3.6-30, and B 3.6-31 and the ISTS Bases markup pages B 3.6-15, B 3.6-16, B 3.6-17, B 3.6-29, and B 3.6-32.

16. The changes committed to in the NMP2 response to RAI 3.6.1.3-17 have been made.

These changes affect ITS 3.6.1.3 Bases page B 3.6-30 and the ISTS 3.6.1.3 Bases markup insert page B 3.6-29.

17. The changes committed to in the NMP2 response to RAI 3.6.1.3-18 have been made.

These changes affect the ISTS 3.6.1.3 Bases markup pages B 3.6-25 and B 3.6-26.

18. The changes committed to in the NMP2 response to RAI 3.6.1.3-19 have been made.

These changes affect the ISTS 3.6.1.3 Bases markup page B 3.6-30.

19. The changes committed to in the NMP2 response to RAI 3.6.1.3-20 have been made.

These changes affect ITS 3.6.1.3, page 3.6-11 and Bases page B 3.6-20, the CTS markup for Specification 3.6.1.3, page 1 of 14, the Discussion of Changes for ITS 3.6.1.3, DOC L.1 (page 6) and DOC L.4 (page 7), the ISTS markup page 3.6-11, the Justification for Deviations to ITS 3.6.1.3, JFD 5 (page 2), the ISTS Bases markup pages B 3.6-21 and B 3.6-32, the Justification for Deviations to ITS Bases 3.6.1.3, JFD 11 (page 1) and JFD 15 (page 2), and the No Significant Hazards Evaluation for ITS 3.6.1.3, NSHE L.1 (page 1).

20. The changes committed to in the NMP2 response to RAI 3.6.1.3-21 have been made.

These changes affect ITS 3.6.1.3 Bases page B 3.6-16, the ISTS Bases markup page B 3.6-17, and the Justification for Deviations to ITS Bases 3.6.1.3, JFD 16 (page 2).

21. The changes committed to in the NMP2 response to RAI 3.6.1.3-22 have been made.

These changes affect ITS 3.6.1.3 Bases pages B 3.6-25 and B 3.6-26 and the ISTS Bases markup pages B 3.6-26 and B 3.6-27.

22. The changes committed to in the NMP2 response to RAI 3.6.1.3-23 have been made.

These changes affect ITS 3.6.1.3 Bases page B 3.6-23 and the ISTS Bases markup insert page B 3.6-23.

9 of 18

tv '

The changes committed to in the NMP2 response to RAI 3.6.1.4-1 have been made.

These changes affect the ISTS 3.6.1.4 Bases markup page B 3.6-33 and the Justification for Deviations to ITS Bases 3.6.1.4, JFD 4 (page 1).

24. The changes committed to in the NMP2 response to RAI 3.6.1.5-2 have been made.

These changes affect ITS 3.6.1.5 Bases pages B 3.6-35 and B 3.6-36 and the ISTS Bases markup insert page B 3.6-36.

25. The changes committed to in the NMP2 response to RAI 3.6.1.7-1 have been made.

These changes affect the Discussion of Changes for ITS 3.6.1.7, DOC A.1 (page 1).

26. The changes committed to in the NMP2 response to RAI 3.6.1.7-4 have been made.

These changes affect the CTS markup for Specification 3.6.1.7, page 2 of 2, the Discussion of Changes for ITS 3.6.1,7, DOC A.4 (page 1) and DOC L.4 (page 4), and the No Significant Hazards Evaluation for ITS 3.6.1.7, NSHE L.4 (page 4).

27. The changes committed to in the NMP2 response to RAI 3.6.1.7-8 have been made.

These changes affect the Justification for Deviations to ITS Bases 3.6.1.7, JFD 6 (page 1).

28. The changes committed to in the NMP2 response to RAI 3.6.2.1-1 have been made.

These changes affect the CTS markup for Specification 3.6.2.1, page 3 of 4, and the Discussion of Changes for ITS 3.6.2.1, DOC M.3 (page 2).

29. The changes committed to in the NMP2 response to RAI 3.6.2.1-2 have been made.

These changes affect the Discussion of Changes for ITS 3.6.2.1, DOC A,2 (page 1).

30. The changes committed to in the NMP2 response to RAI 3.6.2.1-6 have been made.

These changes affect ITS 3.6.2.1 Bases page B 3.6-48 and the ISTS Bases markup insert page B 3.6-56.

31. The changes committed to in the NMP2 response to RAI 3,6.2.1-8 have been made.

These changes affect the ISTS 3.6.2.1 Bases markup page B 3.6-58 and the Justification for Deviations to ITS Bases 3.6.2.1, JFD 7 (page 1).

32. The changes committed to in the NMP2 response to RAI 3.6.2.3-2 have been made.

These changes affect the ISTS 3.6.2.3 markup page 3.6-33, the Justification for Deviations to ITS 3.6.2.3, JFD 6 (page 1), the ISTS Bases markup page B 3.6-67, and the Justification for Deviations to ITS Bases 3.6.2.3, JFD 9 (page 1).

33. The changes committed to in the NMP2 response to RAI 3.6.2.4-2 have been made.

These changes affect the Discussion of Changes for ITS 3.6.2.4, DOC A.1 (page 1).

10 of 18

P a.

The changes committed to in the NMP2 response to RAI 3.6.3.1-3 have been made.

These changes affect ITS 3.6.3.1 Bases page B 3.6-67 and the ISTS Bases markup page B 3.6-78.

35. The changes committed to in the NMP2 response to RAI 3.6.3.1-4 have been made. In addition, a typographical error was also noted in ITS 3.6.3.1 Condition B (the words "hydrogen recombiners" were not separated by a space). This was corrected. These changes affect ITS 3.6.3.1 page 3.6-37, the ISTS markup page 3.6-37, and the Justification for Deviations to ITS 3.6.3.1, JFD 6 (page 1).
36. The changes committed to in the NMP2 response to RAI 3.6.3.1-5 have been made.

These changes affect ITS 3.6.3.1 Bases page B 3.6-67 and the ISTS Bases markup page B 3.6-78.

37. The changes committed to in the NMP2 response to RAI 3.6.3.2-1 have been made.

These changes affect the Discussion of Changes for ITS 3.6.3.2, DOC A.1 (page 1).

38. The changes committed to in the NMP2 response to RAI 3.6.3.2-2 have been made.

These changes affect ITS 3.6.3.2 Bases page B 3.6-70, the ISTS Bases markup insert page B 3.6-80a, and the Justification for Deviations to ITS Bases 3.6.3.2, JFD 3 (page 1).

The changes committed to in the NMP2 response to RAI 3.6.4.1-2 have been made.

These changes affect ITS 3.6.4.1, page 3.6-42 and Bases pages B 3.6-76 and B 3.6-77, the Discussion of Changes for ITS 3.6.4.1, DOC A.3 (page 1), the ISTS markup page 3.6-46, the Justification for Deviations to ITS 3.6.4.1, JFD 2 (page 1), the ISTS Bases markup pages B 3.6-95 and insert page B 3.6-95, and the Justification for Deviations to ITS Bases 3.6.4.1, JFD 6 (page 1).

40. The changes committed to in the NMP2 response to RAI 3.6.4.2-3 have been made.

These changes affect the Discussion of Changes for ITS 3.6.4.2, DOC L.1 (page 3).

41. The changes committed to in the NMP2 response to RAI 3.6.4.2-4 have been made.

These changes affect ITS 3.6.4.2 Bases pages B 3.6-79, B 3.6-80, and B 3.6-85, and the ISTS Bases markup pages B 3.6-97, B 3.6-98, and B 3.6-103.

42. The changes committed to in the NMP2 response to RAI 3.6.4.2-6 have been made.

These changes affect ISTS 3.6.4.2 Bases markup page B 3.6-99.

43. The changes committed to in the NMP2 response to RAI 3.6.4.2-8 have been made.

These changes affect ITS 3.6.4.2 Bases pages B 3.6-82 and B 3.6-84 and the ISTS Bases markup pages B 3.6-100 and B 3.6-102.

11 of 18

S

~4. A typographical error was noted in ITS 3.6.1.3 Table 3.6.1.3-1, page 2 of 2. The valve number "2IAS~V44B" has been changed to "2IAS*V448." This change affects ITS 3.6.1.3 page 3.6-21 and the ISTS Bases markup insert page B 3.6-18b.

45. Two minor errors were noted in the ITS 3.6.1.3 Bases and have been corrected as described in the following: a) the Condition C Note description has been modified by the words "or more" to be consistent with a change made to ITS 3.6.1.3 Condition C; and b) the words "to be" in the description of the ITS SR 3.6.1.3.13 Frequency have been deleted. The second correction is also consistent with the BWR/4 ISTS (NUREG-1433, Rev. 1). The changes affect ITS 3.6.1.3 Bases pages B 3.6-20 and B 3.6-31 and the ISTS Bases markup pages B 3,6-21 and B 3.6-31.
46. A minor error was noted in ITS 3.6.1.7, Condition A. The word "required" should have been deleted. This word had been previously deleted in other places in this Specification (i.e., SR 3.6.1.7.2 and SR 3.6.1.7.3). The change affects ITS 3.6.1.7 page 3.6-26, the ISTS markup insert page 3,6-24a, and the Justification for Deviations to ITS 3.6.1.7, JFD 3 (page 1).
47. NMP2 noted that the method described in the ITS 3.6.2.1 Bases by which suppression pool average temperature is determined is not the normal method used by NMP2 operations personnel. The normal method uses the Technical Specification required post accident monitoring instrumentation. Therefore, the normal method has been added to the ITS SR 3.6.2.1.1 Bases. This change affects ITS 3.6.2.1 Bases page B 3.6-52 and the ISTS Bases markup page B 3.6-60.
48. NMP2 committed (in the response to RAI 3.6.1.3-21) to make changes to the Limiting Condition for Operation (LCO) section of the ITS 3.6.1.3 Bases. In reviewing these changes, it was noted that similar words appear in the LCO section of the ITS 3.6.4.2 Bases. Therefore, NMP2 has made changes to ITS 3.6.4'.2 Bases, similar to, (but not identical, due to differences between Primary Containment Isolation Valves (PCIVs) and Secondary Containment Isolation Valves (SCIVs); i.e., NMP2 does not have any automatic SCIVs that are normally closed and de-activated) the changes made to the LCO section of ITS 3.6.1.3 Bases. The changes affect ITS 3.6.4,2 Bases page B 3.6-80, the ISTS Bases markup page B 3.6-98, and the Justification for Deviations to ITS Bases 3.6.4.2, JFD 7 (page 1).
49. In the original ITS submittal, NMP2 added a Standby Gas Treatment (SGT) subsystem flow rate requirement to the Bases for ITS SR 3.6.4.3.1 (the 10 hour1.157407e-4 days <br />0.00278 hours <br />1.653439e-5 weeks <br />3.805e-6 months <br /> monthly run test).

NMP2 has noted that SGT System flow rate requirements are already specified in ITS 5.5.7. In addition, similar words were not added to the Control Room Envelope Filtration System Bases for a similar Surveillance Requirement. Therefore, these added words have been deleted. This change affects ITS 3.6.4.3 Bases page B 3.6-90 and ISTS Bases markup page B 3.6-108.

12 of 18

l<

< ~ ~

8'Jg I

The changes committed to in the NMP2 response to RAI 3.7.1-1 have been made.

These changes affect ITS 3.7.1 Bases page B 3.7-8 and the ISTS Bases markup page B 3.7-5.

The changes committed to in the NMP2 response to RAI 3.7.2-2 have been made.

These changes affect ITS 3.7.2 Bases pages B 3.7-12 and B 3.7-13, and the ISTS Bases markup insert page B 3.7-12.

The changes committed to in the NMP2 response to RAI 3;7.2-3 have been made.

These changes affect ITS 3.7.2 Bases pages B 3.7-12, B 3.7-13, B 3.7-14, B 3.7-16, B 3.7-18, and B 3.7-19, ITS 3.7,3 Bases pages B 3.7-21, B 3.7-22, and B 3.7-24, the ISTS Bases markup for ITS 3.7.2, pages B 3.7-12, insert page B 3.7-12, insert page B 3.7-13, insert page B 3.7-15, insert page B 3.7-16, and B 3.7-17, and the ISTS Bases markup for ITS 3.7.3, pages B 3.7-19, insert page B 3.7-19, B 3.7-20, insert page B 3.7-20, and insert page B 3.7-21.

The changes committed to in the NMP2 response to RAI 3.7.2-4 have been made, with one exception. The words "Standard Review Plan Table 6.4-1" will be replaced with "NUREG-0800, Table 6.4-1, Ref. 2." This is consistent with other places in the ISTS where NUREG-0800 is used as a reference (i.e., it is identified by its number, not by its title, and a Bases reference number is attached. These changes affect ITS 3.7.2 Bases pages B 3.7-13, B 3.7-14, B 3.7-18, B 3.7-19, and B 3.7-20, and the ISTS Bases markup pages B 3.7-12, B 3.7-13, B 3.7-17, and B 3.7-18.

The changes committed to in the NMP2 response to Out of Scope RAI 3 have been made. These changes affect the Discussion of Changes for ITS 3.7.2, DOC LD.1 (pages 4 and 5).

A typographical error was noted in the Background section of the ITS 3.7.3 Bases, in that two words were reversed (i.e., incorrectly stated "assembly filter" in lieu of "filter assembly" ). This has been corrected. This change affects ITS 3.7.3 Bases page B 3.7-21 and the ISTS Bases markup insert page B 3.7-19.

The changes committed to in the NMP2 response to RAI 3.8.1-01 have been made.

These changes affect the CTS markup for Specification 3.8.1, page 1 of 12, the Discussion of Changes for ITS 3.8.1, DOC A.4 (page 1) and DOC L.22 (page 19),

and the No Significant Hazards Evaluation for ITS 3.8.1, NSHE L.22 (page 24).

13 of 18

The changes committed to in the NMP2 response to RAI 3.8.1-07 have been made.

These changes affect the Discussion of Changes for ITS 3.8.1, DOC M.11 (page 6).

The changes committed to in the NMP2 response to RAI 3.8.1-09 have been made.

These changes affect the ISTS 3.8.1 markup pages 3.8-11 and 3.8-17 and the Justification for Deviations to ITS 3.8.1, JFD 17 (page 4).

The changes committed to in the NMP2 response to RAI 3.8.1-10 have been made.

These changes affect ITS 3.8.1, page 3.8-6 and Bases pages B 3.8-16 and B 3.8-17, the CTS markup for Specification 3.8.1, page 5 of 12, the Discussion of Changes for ITS 3.8.1, DOC L.10 (page 15), the ISTS markup page 3.8-6, the Justification for Deviations to ITS 3.8.1, JFD 7 (page 1), the ISTS Bases markup pages B 3.8-16 and B 3.8-17, and the No Significant Hazards Evaluation for ITS 3.8.1, NSHE L. 10 (page 10).

The changes committed to in the NMP2 response to RAI 3.8.1-13 have been made.

These changes affect the ISTS 3.8.1 markup page 3.8-12 and the Justification for Deviations to ITS 3.8.1, JFD 17 (page 4).

The changes committed to in the NMP2 response to RAI 3,8.1-15 have been made.

These changes affect the ISTS 3.8.1 markup page 3.8-12 and the Justification for Deviations to ITS 3.8,1, JFD 17 (page 4).

The changes committed to in the NMP2 response to RAI 3.8.1-17 have been made.

These changes affect ITS 3.8,1, page 3.8-10 and Bases pages B 3.8-4, B 3.8-23, and B 3.8-34, the CTS markup for Specification 3.8.1, pages 7 of 12 and 8 of 12, the Discussion of Changes for ITS 3.8.1, DOC L.15 (page 17), the ISTS markup pages 3.8-11 and 3.8-16, the Justification for Deviations to ITS 3.8.1, JFD 17 (page 4), the ISTS Bases markup pages B 3.8-4, B 3.8-24, and B 3.8-37, and the No Significant Hazards Evaluation for ITS 3.8.1, NSHE L,15 (pages 16 and 17).

The changes committed to in the NMP2 response to RAI 3.8.2-02 have been made.

These changes affect the Discussion of Changes for ITS 3.8.2, DOC LA.2 (pages 3 and 4).

The changes committed to in the NMP2 response to RAI 3 8.2-04 have been made.

~

These changes affect ITS 3.8.1 Bases page B 3.8-4, ITS 3.8.2 Bases page B 3.8-35, the ISTS 3.8.1 Bases markup page B 3.8-3, and the ISTS 3.8.2 Bases markup page B 3.8-38.

The changes committed to in the NMP2 response to RAI 3.8.3-02 have been made.

These changes affect the Discussion of Changes for ITS 3.8.3, DOC L.4 (pages 3 and 4).

14 of 18

~ \>

The changes committed to in the NMP2 response to RAI 3.8.3-03 have been made.

These changes affect ITS 3.8.3 Bases page B 3.8-44 and the ISTS Bases markup page B 3.8-47.

12. The changes committed to in the NMP2 response to RAI 3.8.3-05 have been made.

These changes affect the ISTS 3.8.3 Bases markup 'page B 3.8-48.

13. The changes committed to in the NMP2 response to RAI 3.8.4-01 have been made.

These changes affect the Discussion of Changes for ITS 3.8.4, DOC L.6 (page 7).

14. The changes committed to in the NMP2 response to RAI 3.8.4-03 have been made.

These changes affect the Discussion of Changes for ITS 3.8.4, DOC LA.1 (page 2).

15. The changes committed to in the NMP2 response to RAI 3.8.4-04 have been made.

These changes affect ITS 3.8.4 Bases page B 3.8-55 and the ISTS Bases markup page B 3.8-58.

16. The changes committed to in the NMP2 response to RAI 3.8,5-01 have been made.

These changes affect the Discussion of Changes for ITS 3.8.5, DOC LA.1 (page 3).

17. The changes committed to in the NMP2 response to RAI 3.8.6-02 have been made.

These changes affect ITS 3.8.6, page 3.8-35 and Bases pages B 3.8-67 and B 3.8-68, the ISTS markup page 3.8-36, the Justification for Deviations to ITS 3.8.6, JFD 6 (page 1), and the ISTS Bases markup page B 3.8-70.

18. The changes committed to in the NMP2 response to RAI 3.8.7-01 have been made.

These changes affect the Discussion of Changes for ITS 3.8.7, DOC L.1 (page 3).

19. The changes committed to in the NMP2 response to RAI 3.8.7-03 have been made.

These changes affect the Discussion of Changes for ITS 3.8.7, DOC LA.1 (page 2).

20. The changes committed to in the NMP2 response to RAI 3,8.8-02 have been made.

These changes affect the Discussion of Changes for ITS 3.8.8, DOC L.1 (page 3).

21. The changes committed to in the NMP2 response to RAI 3.8. 8-03 have been made.

These changes affect the Discussion of Changes for ITS 3.8.8, DOC L.1 (page 3).

22. The changes committed to in the NMP2 response to RAI 3.8.8-04 have been made.

These changes affect the Discussion of Changes for ITS 3.8.8, DOC LA.2 (pages 2 and 3).

15 of 18

) ~ -'\'

~

The changes committed to in the NMP2 response to RAI 3.8.8-06 have been made.

These changes affect ITS 3.8.8 Bases page B 3.8-74 and the ISTS Bases markup page B 3.8-82.

24. The changes committed to in the NMP2 response to RAI 3.8.8-08 have been made.

These changes affect ITS 3.8.8 Bases page B 3.8-76 and the ISTS Bases markup page B 3.8-83.

25. The changes committed to in the NMP2 response to RAI 3.8.8-11 have been made.

These changes affect ITS 3.8.8 Bases page B 3.8-82 and the ISTS Bases markup page B 3,8-89.

26. The changes committed to in the NMP2 response to RAI 3.8.8-13 have been made.

These changes affect ITS 3.8.8 Bases page B 3.8-83 and the ISTS Bases markup insert page B 3.8-89.

27. The changes committed to in the NMP2 response to RAI 3.8.9-5 have been made.

These changes affect ITS 3.8.9 Bases page B 3.8-88, the Discussion of Changes for ITS 3.8.9, DOC LA.2 (page 3), and the ISTS Bases markup insert page B 3.8-94.

28. Two typographical errors were noted in the ISTS 3.8.1 Bases. These have been corrected. These changes affect ITS 3.8.1 Bases pages B 3.8-10 and B 3.8-24 and the ISTS Bases markup pages B 3.8-10 and B 3.8-26.
29. DOC L.4 for ITS 3.8.3 identified that the CTS 4.8.1.1.2.h reference to Section II was changed to Section XI by a Technical Specification change submitted by NMP2 letter NMP2L-1756, dated February 5, 1998. This Technical Specification change has been approved by the NRC in the NMP2 License Amendment 84, dated December 3, 1998.

Therefore, the DOC L.4 reference is no longer necessary and the currently approved CTS pages are provided. This change affects the CTS markup for Specification 3.8.1, page 11 of 12 (the new page does not actually affect Specification 3.8.1, since the change to the CTS page only affects a requirement being moved to Specification 3.8.3), the CTS markup for Specification 3.8.3, page 4 of 6, and the Discussion of Changes for ITS 3.8.3, DOC L.4 (page 3).

The changes committed to in the NMP2 response to RAI 3.9.1-1 have been made.

These changes affect the Justification for Deviations to ITS 3.9.1, JFD 1 (page 1).

2. The changes committed to in the NMP2 response to RAI 3.9.5-1 have been made.

These changes affect the Discussion of Changes for ITS 3.9.5, DOC M.1 (page 2).

16 of 18

af The changes committed to in the NMP2 response to RAI 3.9.5-2 have been made.

These changes affect the Discussion of Changes for ITS 3.9.5, DOC L.1 (page 3) and the No Significant Hazards Evaluation for ITS 3.9.5, NSHE L.1 (page 1).

A typographical error was noted in the Actions section of the ISTS 3.9.1 Bases markup, in that the word "and" was omitted from the header of Actions A.1, A.2.1, and A.2.2. This has been corrected. This change affects ITS 3.9.1 Bases markup page B 3.9-3.

DOC A.2 and DOC A.S for ITS 3.10.1 identified that the changes to the CTS markup were consistent with the Technical Specifications change submitted to the NRC for approval per NMP2 letter NMP2L-1756, dated February 5, 1998. This Technical Specification change has been approved by the NRC in the NMP2 License Amendment 84, dated December 3, 1998. Therefore, DOC A.2 is no longer necessary, the reference to the Technical Specifications change is no longer necessary, and the currently approved CTS pages are provided. This change affects the CTS markup for Specification 3.10.1, page 1 of 3, page 2 of 3, and page 3 of 3, and the Discussion of Changes for ITS 3.10.1, DOC A.2 (page 1) and DOC A.5 (page 2).

DOC A.6 for ITS Chapter 4.0 identified that Table 5.7.1-1 was being moved to Specification 5.5.5. The NRC has approved an amendment that affects this CTS page (NMP2 License Amendment 84, dated December 3, 1998). Therefore, the currently approved CTS page is provided. This change affects the CTS markup for Chapter 4.0, page 11 of 11.

The changes committed to in the NMP2 response to RAI 5.2-01 have been made.

These changes affect ITS 5.2 page 5.0-4, the CTS markup for Specification 5.2, page 6 of 6, the Discussion of Changes for ITS 5.2, DOC A.6 (page 2), the ISTS markup page 5.0-4, and the Justification for Deviations to ITS 5.2, JFD 6 (page 1).

The changes committed to in the NMP2 response to RAI 5.5-02 have been made.

These changes affect ITS 5.5 pages 5.0-9 and 5.0-10, the ISTS markup pages 5.0-9, insert page 5.0-9, and 5.0-10, and the Justification for Deviations to ITS 5.5, JFD 23 (pages 3 and 4).

17 of 18

M4 3.

~ The changes committed to in the NMP2 response to RAI 5.5-03 have been made.

These changes affect the CTS markup for Specification 5.5, pages 15 of 22 and 17

~ ~

of 22, and the Discussion of Changes for ITS 5.5, DOC A.18 (page 4).

4. The changes committed to in the NMP2 response to RAI 5.5-04 have been made.

These changes affect ITS 5.5 page 5.0-13, the CTS markup for Specification 5.5, page 16 of 22 and page 18 of 22, the Discussion of Changes for ITS 5.5, DOC A.19 (page 4), and the ISTS markup page 5.0-13.

5. It was noted that the Discussion of Changes for ITS 5.2, DOC LA.1, did not fully address all changes for which it was associated. This has been corrected by discussing these changes in DOC LA.2. This change affects the CTS markup for Specification 5.2, page 5 of 6, and the Discussion of Changes for ITS 5.2, DOC LA.2 (page 3).
6. A typographical error was noted in ITS 5.5.7.e, in that the unit "KW" should be "kW." This has been corrected. This change affects ITS 5.5 page 5.0-13.
7. DOC A.16 and DOC A.17 for ITS 5.5 identified that the changes to the CTS markup were consistent with the Technical Specifications change submitted to the NRC for approval per NMP2 letter NMP2L-1756, dated February 5, 1998. This Technical Specification change has been approved by the NRC in the NMP2 License Amendment 84, dated December 3, 1998. Therefore, DOC A.16 and DOC A.17 are no longer necessary and the currently approved CTS pages are provided. This change affects the CTS markup for Specification 5.5, page 13 of 22 and page 22 of 22, and the Discussion of Changes for ITS 5.5, DOC A.16 (page 4) and DOC A.17 (page 4).

18 of 18

ATTACHMENT2 DISCARD AND INSERTION INSTRUCTIONS n t'...' "VOLUME', ': ."i,'i i"',, ': 'l".'" .

"<','i "il:n'i,t,"i l

'.'PLIT REPORT

; ...'; ...::;;-, "DISCARD INSERT-:;.:::",::':":: '.,'~," i; """

Attachment page 6 Attachment page 6 Appendix 1 page 9 of 43 Appendix 1 page 9 of 43 CHAPTER 1.0 ITS page 1.1-3 ITS page 1.1-3 CTS markup for Chapter 1.0 page 5 of 15 CTS markup for Chapter 1.0 page 5 of 15 ISTS markup page 1.1-3 ISTS markup page 1.1-3 CHAPTER 2.0 ITS Bases page B 2.0-1 ITS Bases page B 2.0-1 ITS Bases page B 2.0-3 ITS Bases page B 2.0-3 ITS Bases page B 2.0-8 ITS Bases page B 2.0-8 ISTS Bases markup page B 2.0-1 ISTS Bases markup page B 2.0-1 ISTS Bases markup page B 2.0-4 ISTS Bases markup page B 2.0-4 ISTS Bases markup page B 2.0-11 ISTS Bases markup page B 2.0-11 Justification for Deviations to ITS Bases Chapter Justification for Deviations to ITS Bases Chapter 2.0 page 1 2.0 page 1 SECTION 3.0 ITS Bases page B 3.0-10 ITS Bases page B 3.0-10 CTS markup for Section 3.0 page 5 of 8 CTS markup for Section 3.0 page 5 of 8 ISTS Bases markup page B 3.0-11 ISTS Bases markup page B 3.0-11 and insert page B 3.0-1 1 Justification for Deviations to ITS Bases Section Justification for Deviations to ITS Bases Section 3.0 page 1 3.0 pages 1 and 2 Page 1 of 18

VOLUME.2 3.1 'ECTION DISCARD ITS Bases page B 3.1-42 ITS Bases page B 3.1-42 ISTS Bases markup page B 3.1-44 ISTS Bases markup page B 3.1-44 SECTION 3.2 ITS pages 3.2-5 and 3.2-6 ITS pages 3.2-5 and 3.2-6 ITS Bases page B 3.2-7 ITS Bases page B 3.2-7 ITS Bases page B 3.2-14 ITS Bases page B 3.2-14 CTS markup for Specification 3.2.4 page 1 of 1 CTS markup for Specification 3.2.4 page 1 of 1 ISTS markup pages 3.2-4 and 3.2-5 ISTS markup pages 3.2-4 and 3.2-5 ISTS Bases markup insert page B 3.2-8 ISTS Bases markup insert page B 3.2-8 ISTS Bases markup page B 3.2-14 ISTS Bases markup page B 3.2-14 Page 2 of 18

-" VOLUME3 SECTION 3.3: ITS, Bases, and CTS Markup/DOCs DISCARD........':::,:.....:.:,.: .'-';::::,,:...,.: -.'.:,:,:;;::=":.:.,'=":-':;:;::,:::.:.:"::::;:;::::.:'.;:',:,'::,,,

....;;INSERT. ',:",,...'-', ";;,,:,,

ITS Bases pages B 3.3-39 and B 3.3-40

'TS Bases pages B 3.3-39 and B 3.3-40 ITS Bases page B 3.3-169 ITS Bases page B 3.3-169 ITS Bases page B 3.3-176 ITS Bases page B 3.3-176 ITS Bases page B 3.3-233 ITS Bases page B 3.3-233 ITS Bases page B 3.3-241 ITS Bases page B 3.3-241 Discussion of Changes for ITS 3.3.1.1 pages 6 Discussion of Changes for ITS 3.3.1-1 pages 6 through 23 through 24 Discussion of Changes for ITS 3.3.2.1 pages 5 and Discussion of Changes for ITS 3.3.2.1 pages 5 and 6 6 CTS markup for Specification 3.3.2.2 page 1 of 5 CTS markup for Specification 3.3.2.2 page 1 of 5 Discussion of Changes for ITS 3.3.2.2 pages 1 Discussion of Changes for ITS 3.3.2.2 pages 1 through 7 through 7 CTS markup for Specification 3.3.3.1 page 6 of 6 CTS markup for Specification 3.3.3.1 page 6 of 6 Discussion of Changes for ITS 3.3.3.1 pages 1 Discussion of Changes for ITS 3.3.3.1 pages 1 through 7 through 6 CTS markup for Specification 3.3.3.2 page 1 of 4 CTS markup for Specification 3.3.3.2 page 1 of 4 CTS markup for Specification 3.3.3.2 page 4 of 4 CTS markup for Specification 3.3.3.2 page 4 of 4 Discussion of Changes for ITS 3.3.3.2 pages 1 Discussion of Changes for ITS 3.3.3.2 pages 1 through 8 through 8 Discussion of Changes for ITS 3.3.4.1 page 3 Discussion of Changes for ITS 3.3.4.1 page 3 Discussion of Changes for ITS 3.3.4.1 pages 5 and Discussion of Changes for ITS 3.3.4.1 pages 5 and 6 6 Discussion of Changes for ITS 3.3.4.2 pages 5 Discussion of Changes for ITS 3.3.4.2 pages 5 through 7 through 8 CTS markup for Specification 3.3.5.1 page 6 of CTS markup for Specification 3.3.5.1 page 6 of 29 29 Discussion of Chan es for ITS 3.3.5.1 a e 2 Discussion of Chan es for ITS 3.3.5.1 a e 2 Discussion of Changes for ITS 3.3.5.1 pages 16 Discussion of Changes for ITS 3.3.5.1 pages 16 throu h 22 throu h 22 CTS marku for S ecification 3.3.5.2 a e 3 of 5 CTS marku for S ecification 3.3.5.2 a e 3 of 5 Page 3 of 18

VOLUME.3 (Cont'd)

SECTION 3.3: ITS, Bases, and CTS Markup/DOCs DISCARD INSERT Discussion of Changes for ITS 3.3.5.2 pages 2 Discussion of Changes for ITS 3.3.5.2 pages 2 throu h 8 throu h 8 CTS markup for Specification 3.3.6.1 page 3 of CTS markup for Specification 3.3.6.1 page 3 of 19and a e4 of 19 19 and a e 4 of 19 CTS markup for Specification 3.3.6.1 page 7 of CTS markup for Specification 3.3.6.1 page 7 of 19 19 Discussion of Changes for ITS 3.3.6.1 pages 3 Discussion of Changes for ITS 3.3.6.1 pages 3 throu h 31 throu h 33 Discussion of Changes for ITS 3.3.6.2 pages 2 Discussion of Changes for ITS 3.3.6,2 pages 2 throu h 8 throu h 8 Discussion of Changes for ITS 3.3.7.1 pages 7 Discussion of Changes for ITS 3.3.7.1 pages 7 throu h 9 throu h 9 Discussion of Changes for ITS 3.3.7.2 pages 2 Discussion of Changes for ITS 3.3.7.2 pages 2 throu h 8 throu h 8 Discussion of Chan es for ITS 3.3.8.1 a e 6 Discussion of Chan es for ITS 3.3.8.1 a e 6 CTS marku for S ecification 3.3.8.2 a e 1 of 1 CTS marku for S ecification 3.3.8.2 a e1of1 Discussion of Changes for ITS 3.3.8.2 pages 2 Discussion of Changes for ITS 3.3.8.2 pages 2 throu h 7 throu h7 CTS marku for S ecification 3.3.8.3 a e 1 of 1 CTS marku for S ecification 3.3.8.3 a e 1 of 1 Discussion of Changes for ITS 3.3.8.3 pages 2 Discussion of Changes for ITS 3.3.8.3 pages 2 throu h 6 throu h 6 CTS markup for Current Specification 3/4.3.7.3 a e1of3 throu h a e3of3 Discussion of Chan es for CTS 3/4.3.7.3 a e 1 Discussion of Chan es for ITS Section 3.3 a e 1 Discussion of Chan es for ITS Section 3.3 a e 1 Page 4 of 18

VOLUME4.--

SECTION3.3: ISTS/JFDs ISTS Bases/JFDs and NSHE DISCARD  :: ..INSERT:..:-.: .::.:i".:::'-'":::-::;:.:::

Justification for Deviations to ITS 3.3.1,1 pages 1 Justification for Deviations to ITS 3.3.1.1 pages 1 throu h3 throu h 3 Justification for Deviations to ITS 3.3.5.1 a e 1 Justification for Deviations to ITS 3.3.5.1 a e 1 ISTS Bases marku a e B 3.3-40 ISTS Bases marku a e B 3.3-40 ISTS Bases marku a e B 3.3-156 ISTS Bases marku a e B 3.3-156 ISTS Bases marku insert a e B 3.3-164 ISTS Bases marku insert a e B 3.3-164 ISTS Bases marku a e B 3.3-246 ISTS Bases marku a e B 3.3-246 ISTS Bases marku insert a e B 3.3-246i ISTS Bases marku insert a e B 3.3-246i No Significant Hazards Evaluation for ITS No Significant Hazards Evaluation for ITS 3.3.1.1 a es 3 and 4 3.3.1.1 a es 3 and 4 No Significant Hazards Evaluation for ITS No Significant Hazards Evaluation for ITS 3.3.2.1 a es 1 and 2 3.3.2.1 a es1and2 No Significant Hazards Evaluation for ITS No Significant Hazards Evaluation for ITS 3.3.2.2 a es 1 and 2 3.3.2.2 a es 1 and 2 No Significant Hazards Evaluation for ITS 3.3.3.2 a e 3 No Significant Hazards Evaluation for ITS No Significant Hazards Evaluation for ITS 3.3.4.1 a es 1 and 2 3.3.4.1 a es 1 and 2 No Significant Hazards Evaluation for ITS No Significant Hazards Evaluation for ITS 3.3.4.2 a es1 and 2 3.3.4.2 a es1and2 No Significant Hazards Evaluation for ITS No Significant Hazards Evaluation for ITS 3.3.5.1 a es 1 and 2 3.3.5.1 a es 1 and 2 No Significant Hazards Evaluation for ITS No Significant Hazards Evaluation for ITS 3.3.5.1 a e 6 3.3.5.1 a e 6 No Significant Hazards Evaluation for ITS 3.3.5.1 a e 15 No Significant Hazards Evaluation for ITS No Significant Hazards Evaluation for ITS 3.3.5.2 a es 1 and 2 3.3.5.2 a es 1 and 2 No Significant Hazards Evaluation for ITS No Significant Hazards Evaluation for ITS 3.3.6.1 a es 1 and 2

~ ~ 3.3.6.1 a es1and2 Page 5 of 18

VOLUME4 (Cont'd)

SECTION3.3: ISTS/JFDs ISTS Bases/JFDs and NSHE DISCARD INSERT.

No Significant Hazards Evaluation for ITS 3.3.6.1 a e 18 No Significant Hazards Evaluation for ITS No Significant Hazards Evaluation for ITS 3.3.6.2 a es 1 and 2 3.3.6.2 a es1and2 No Significant Hazards Evaluation for ITS No Significant Hazards Evaluation for ITS 3.3.7.2 a es 1 and 2 3.3.7.2 a es 1 and 2 No Significant Hazards Evaluation for ITS No Significant Hazards Evaluation for ITS 3.3.8.1 a es1and 2 3.3.8.1 a es 1 and 2 No Significant Hazards Evaluation for ITS 3.3.8.2 a e 6 No Significant Hazards Evaluation for ITS 3.3.8.3 a e 6 No Significant Hazards Evaluation for CTS 3/4.3.7.3 a e 1 Page 6 of 18

VOLUME 3.4 5'ECTION DISCARD,  :,::,',::.: ','.:,

INSERT::-,'iscussion of Changes for ITS 3.4.2 pages 1 Discussion of Changes for ITS 3.4.2 pages 1 throu h3 throu h3 CTS marku for S ecification 3.4.5 a e 2 of 5 CTS marku for S ecification 3.4.5 a e2 of 5 Discussion of Changes for ITS 3.4.5 page 2 Discussion of Changes for ITS 3.4.5 pages 2 and 3

CTS marku for S ecification 3.4.6 a e2 of5 CTS marku for S ecification 3.4.6 a e2of5 Discussion of Changes for ITS 3.4.6 pages 1 and Discussion of Changes for ITS 3.4.6 pages 1 and 2 2 Discussion of Changes for ITS 3.4.7 pages 3 Discussion of Changes for ITS 3.4.7 pages 3 and and 4 4 Discussion of Changes for ITS 3.4.8 pages Discussion of Changes for ITS 3.4.8 pages 1 1 throu h3 throu h3 CTS marku for S ecification 3.4.9 a e 1 of 1 CTS marku for S ecification 3.4.9 a e1of 1 CTS marku for S ecification 3.4.10 a e 1 of 1 CTS marku for S ecification 3.4.10 a e 1 of 1 CTS markup for Specification 3.4.11 page 1 of CTS markup for Specification 3.4.11 page 1 of 10 10 CTS markup for Specification 3.4.11 page 3 of CTS markup for Specification 3.4.11 page 3 of 10 10 Discussion of Changes for ITS 3.4.11 pages 3 Discussion of Changes for ITS 3.4.11 pages 3 throu h5 and 4 SECTION 3.5 ITS Bases a e B 3.5-11 ITS Bases a e B 3.5-11 ITS Bases a e B 3.5-20 ITS Bases a e B 3.5-20 Discussion of Changes for ITS 3.5.1 pages 2 Discussion of Changes for ITS 3.5.1 pages 2 throu h 14 throu h 14 ISTS Bases marku a e B 3.5-10 ISTS Bases marku a e B 3.5-10 ISTS Bases marku a' B 3.5-17 ISTS Bases marku a e B 3.5-17 Page 7 of 18

VOLUME6 SECTION 3.6: ITS Bases and CTS Marku /DOCs DISCARD INSERT; ITS a e 3.6-11 throu h 3.6.13 ITS a e 3.6-11 throu h 3.6.13 ITS a e3.6-21 ITS a e 3,6-21 ITS a e 3.6-26 ITS a e 3.6-26 ITS a e 3.6-37 ITS a e 3.6-37 ITS a e 3.6-42 ITS a e 3.6-42 ITS Bases a es B 3.6-1 throu h B 3.6-5 ITS Bases a es B 3.6-1 throu h B 3.6-5 ITS Bases a e B 3.6-8 ITS Bases a e B 3.6-8 ITS Bases a es B 3.6-14 throu h B 3.6-31 ITS Bases a es B 3.6-14 throu h B 3.6-31 ITS Bases a es B 3.6-35 and B 3.6-36 ITS Bases a es B 3.6-35 and B 3,6-36 ITS Bases a e B 3.6-48 ITS Bases a e B 3.6-48 ITS Bases a e B 3.6-52 ITS Bases a e B 3.6-52 ITS Bases a e B 3.6-67 ITS Bases a e B 3.6-67 ITS Bases a e B 3.6-70 ITS Bases a e B 3.6-70 ITS Bases a es B3.6-76 throu h B3.6-80 ITS Bases a es B 3.6-76 throu h B 3.6-80 ITS Bases page B 3.6-82 ITS Bases page B 3.6-82 ITS Bases a es B 3.6-84 and B 3.6-85 ITS Bases a es B 3.6-84 and B 3.6-85 ITS Bases a eB 3.6-90 ITS Bases a e B 3.6-90 CTS markup for Specification 3,6.1.1 page 10 of CTS markup for Specification 3.6.1.1 page 10 of 10 10 Discussion of Changes for ITS 3.6.1.1 pages 3 Discussion of Changes for ITS 3.6.1.1 pages 3 throu h 6 throu h 7 Discussion of Chan es for ITS 3.6.1.2 a e 6 Discussion of Chan es for ITS 3.6.1.2 a e6 CTS markup for Specification 3.6.1.3 page 1 of CTS markup for Specification 3.6.1.3 page 1 of 14 14 CTS markup for Specification 3.6.1.3 pages 4 of CTS markup for Specification 3.6.1.3 pages 4 of 14 and 5 of 14 14 and 5 of 14 CTS markup for Specification 3.6.1.3 page 7 of CTS markup for Specification 3.6.1.3 page 7 of 14 14 Page 8 of 18

'OLUME 6'(Cont'd) 3.6: ITS Bases and CTS Marku /DOCs

'ECTION DISCARD INSERT:-

CTS markup for Specification 3.6.1.3 page 11 of CTS markup for Specification 3.6.1.3 page 11 of 14 14 Discussion of Chan es for ITS 3.6.1.3 a e 1 Discussion of Chan es for ITS 3.6.1.3 a e 1 Discussion of Changes for ITS 3.6.1.3 pages 6 Discussion of Changes for ITS 3.6.1.3 pages 6 aild 7 aild 7 Discussion of Changes for ITS 3.6.1.3 page 10 Discussion of Changes for ITS 3.6.1.3 page 10 throu h 13 throu h 14 CTS'marku for S ecification 3.6.1.7 a e 2 of 2 CTS marku for S ecification 3.6.1.7 a e 2 of 2 Discussion of Chan es for ITS 3.6.1.7 a e 1 Discussion of Chan es for ITS 3.6.1.7 a e 1

'iscussion of Chan es for ITS 3.6.1.7 a e 4 Discussion of Chan es for ITS 3.6.1.7 a e 4 CTS marku for S ecification 3.6.2.1 a e 3 of 4 CTS marku for S ecification 3.6.2.1 a e 3 of 4 Discussion of Changes for ITS 3.6.2.1 pages 1 Discussion of Changes for ITS 3.6.2.1 pages 1 throu h 3 throu h4 Discussion of Chan es for ITS 3.6.2.4 a e 1 Discussion of Chan es for ITS 3.6.2.4 a e1 Discussion of Chan es for ITS 3.6.3.2 a e 1 Discussion of Chan es for ITS 3.6.3.2 a e 1 Discussion of Chan es for ITS 3.6.4.1 a e 1 Discussion of Chan es for ITS 3.6.4.1 a e 1 Discussion of Changes for ITS 3.6.4.2 pages 3 Discussion of Changes for ITS 3.6.4.2 pages 3 and 4 and 4 Page 9 of 18

tree

-: VOLUME.7': '.

SECTION3.6: ISTS/JFDs ISTS Bases/JFDs and NSHE DISCARD . INSERT...

ISTS marku a e3.6.11 and insert a e3.6.11 ISTS marku a e 3.6.11 ISTS marku a e 3.6-14 ISTS marku a e 3.6-14 ISTS marku insert a e 3.6-18b ISTS marku insert a e 3.6-18b Justification for Deviations to ITS 3.6.1.3 pages 1 Justification for Deviations to ITS 3.6.1.3 pages 1 throu h 4 throu h4 ISTS marku insert a e 3.6-24a ISTS marku insert a e 3.6-24a Justification for Deviations to ITS 3.6.1.7 a e 1 Justification for Deviations to ITS 3.6.1.7 a e 1 ISTS marku a e 3.6-33 ISTS marku a e 3.6-33 Justification for Deviations to ITS 3.6.2.3 a e 1 Justification for Deviations to ITS 3.6.2.3 a e 1 ISTS marku a e 3.6-37 ISTS marku a e 3.6-37 Justification for Deviations to ITS 3.6.3.1 a e 1 Justification for Deviations to ITS 3.6.3.1 a e 1 ISTS marku a e 3.6-46 ISTS marku a e 3.6-46 Justification for Deviations to ITS 3.6.4.1 a e 1 Justification for Deviations to ITS 3.6.4.1 a e 1 ISTS Bases marku a e B 3.6-1 ISTS Bases marku a e B 3.6-1 ISTS Bases marku a e B 3.6-4 ISTS Bases marku a e B 3.6-4 ISTS Bases marku a e B 3.6-8 ISTS Bases marku a e B 3,6-8 ISTS Bases markup page B 3.6-13 and insert ISTS Bases markup page B 3.6-13 and insert a e B 3.6.13 a e B 3.6.13 Justification for Deviations to ITS Bases 3.6.1.2 Justification for Deviations to ITS Bases 3.6.1.2 a e1 a e1 ISTS Bases markup pages B 3.6-15 through ISTS Bases markup pages B 3.6-15 through B 3.6-17 B 3.6-17 ISTS Bases marku a es B 3.6-19 and B 3.6.20 ISTS Bases marku a es B 3.6-19 and B 3.6.20 ISTS Bases markup page B 3.6-21 and insert ISTS Bases markup page B 3.6-21 a e B 3.6-21 ISTS Bases markup page B 3.6-22 and insert ISTS Bases markup page B 3.6-22 and insert a eB3.6-22 a eB 3.6-22 ISTS Bases marku insert a e B 3.6-23 ISTS Bases marku insert a e B 3.6-23 Page 10 of 18

VOI UME':7':(Co'nt'.d),

SECTION3.6: ISTS/JFDs ISTS Bases/JFDs and NSHE

",:,::.'::- iDISC'ARD':"'.,':"',

ISTS Bases marku a es B 3.6-25 and B 3.6-26 ISTS Bases marku a es B 3.6-25 and B 3.6-26 ISTS Bases markup page B 3.6-27 ISTS Bases marku age B 3.6-27 ISTS Bases markup page B 3.6-29 and insert ISTS Bases markup page B 3.6-29 and insert a e B 3.6-29 a eB 3.6-29 ISTS Bases markup pages B 3.6-30 through ISTS Bases markup pages B 3.6-30 through B 3.6-32 B 3.6-32 Justification for Deviations to ITS Bases 3.6.1.3 Justification for Deviations to ITS Bases 3.6.1.3 a es 1 and2 a es 1 and2 ISTS Bases marku a e B 3.6-33 ISTS Bases marku a e B 3.6-33 Justification for Deviations to ITS Bases 3.6.1.4 Justification for Deviations to ITS Bases 3.6.1,4 a el a el ISTS Bases marku insert a e B 3.6-36 ISTS Bases marku insert a e B 3.6-36 Justification for Deviations to ITS Bases 3.6.1.7 Justification for Deviations to ITS Bases 3.6.1.7 a el a el ISTS Bases marku insert a e B 3.6-56 ISTS Bases marku insert a e B 3.6-56 ISTS Bases marku a e B 3.6-58 ISTS Bases marku a e B 3.6-58 ISTS Bases marku a e B 3.6-60 ISTS Bases marku a e B 3.6-60 Justification for Deviations to ITS Bases 3.6.2,1 Justification for Deviations to ITS Bases 3.6.2.1 a el a el ISTS Bases marku a e B 3.6-67 ISTS Bases marku a e B 3.6-67 Justification for Deviations to ITS Bases 3.6.2.3 Justification for Deviations to ITS Bases 3.6.2.3 a el a el ISTS Bases marku a e B 3.6-78 ISTS Bases marku a e B 3.6-78 ISTS Bases insert a e B 3.6-80a ISTS Bases insert a e B 3.6-80a Justification for Deviations to ITS Bases 3.6.3.2 Justification for Deviations to ITS Bases 3.6.3.2 a el a el ISTS Bases markup page B 3.6-95 ISTS Bases markup page B 3.6-95 and insert a e B 3.6-95 Justification for Deviations to ITS Bases 3.6.4.1 Justification for Deviations to ITS Bases 3.6.4.1 a el a el Page 11 of 18

VOLUME7 (Cont'd SECTION3.6: ISTS/JFDs ISTS Bases/JFDs and NSHE DISCARD ..':::.:.:;:-:':::-:::.::::::: .. '::=:.'::::::INSERT.

ISTS Bases markup pages B 3.6-97 through ISTS Bases markup pages B 3.6-97 through B 3.6-100 B 3.6-100 ISTS Bases marku a e B 3.6-102 ISTS Bases marku a e B 3.6-102 ISTS Bases markup age B 3.6-103 ISTS Bases markup page B 3.6-103 Justification for Deviations to ITS Bases 3.6.4.2 Justification for Deviations to ITS Bases 3.6.4.2 a el a el ISTS Bases marku a e B 3.6-108 ISTS Bases marku a e B 3.6-108 No Significant Hazards Evaluation for ITS 3.6.1.1 a es 3 and 4 No Significant Hazards Evaluation for ITS No Significant Hazards Evaluation for ITS 3.6.1.3 a es 1 and 2 3.6.1.3 a es 1 and 2 No Significant Hazards Evaluation for ITS No Significant Hazards Evaluation for ITS 3.6.1.3 a e 14 3.6.1.3 a e 14 No Significant Hazards Evaluation for ITS 3.6.1.7 a e 4 Page 12 of 18

VOLUMES SECTION 3.7 DISCARD INSERT.

ITS Bases a es B 3.7-8 throu h B 3.7-25 ITS Bases a es B 3.7-8 throu h B 3.7-25 Discussion of Changes for ITS 3.7.2 pages 4 Discussion of Changes for ITS 3.7.2 pages 4 throu h 7 throu h 7 ISTS Bases marku a e B 3.7-5 ISTS Bases marku a e B 3.7-5 ISTS Bases markup page B 3.7-12 and insert ISTS Bases markup page B 3.7-12 and insert a e B 3.7-12 a e B 3.7-12 ISTS Bases marku a e B 3.7-13 ISTS Bases marku a e B 3.7-13 ISTS Bases marku insert a e B 3.7-15 ISTS Bases marku insert a e B 3.7-15 ISTS Bases marku insert a e B 3.7-16 ISTS Bases marku insert a e B 3.7-16 ISTS Bases marku a es B 3.7-17 and B 3.7.18 ISTS Bases marku a es B 3.7-17 and B 3.7.18 ISTS Bases markup page B 3.7-19 and insert ISTS Bases markup page B 3.7-19 and insert a e B 3.7-19 a e B 3.7-19 ISTS Bases markup page B 3.7-20 and insert ISTS Bases markup page B 3.7-20 and insert a e B 3.7-20 a e B 3.7-20 ISTS Bases marku insert a e B 3.7-21 ISTS Bases marku insert a e B 3.7-21 Page 13 of 18

J%t

.: I VOLUME9" '-" - '"

SECTION 3.8

.::DISCARD INSERT" ITS a e 3.8-6 ITS a e 3.8-6 ITS a e 3.8-10 ITS a e 3.8-10 ITS a e 3.8-35 ITS a e 3.8-35 ITS Bases a eB3.8-4 ITS Bases a e B 3.8-4 ITS Bases a e B 3.8-10 ITS Bases a e B 3.8-10 ITS Bases a es B 3.8-16 and B 3.8-17 ITS Bases a es B 3.8-16 and B 3.8-17 ITS Bases a es B 3.8-23 and B 3.8-24 ITS Bases a es B 3.8-23 and B 3.8-24 ITS Bases a es B 3.8-34 throu h B 3.8-37 ITS Bases a es B 3.8-34 throu h B 3.8-37 ITS Bases a e B3.8-44 ITS Bases a e B 3.8-44 ITS Bases a eB3.8-55 ITS Bases a e B 3.8-55 ITS Bases a es B 3.8-67 and B 3.8-68 ITS Bases a es B 3.8-67 and B 3.8-68 ITS Bases a es B 3.8-74 throu h B 3.8-83 ITS Bases a es B 3.8-74 throu h B 3.8-83 ITS Bases a e B 3.8-88 ITS Bases a e B 3.8-88 CTS marku for S ecification 3.8.1 a e 1 of 12 CTS marku for S ecification 3.8.1 a e 1 of 12 CTS marku for S ecification 3.8.1 a e 5 of 12 CTS marku for S ecification 3.8.1 a e 5 of 12 CTS markup for Specification 3.8.1 page 7 of 12 CTS markup for Specification 3.8.1 page 7 of 12 and a e8of12 and a e8of12 CTS markup for Specification 3.8.1 page 11 of CTS markup for Specification 3.8.1 page 11 of 12 12 Discussion of Changes for ITS 3.8.1 pages 1 Discussion of Changes for ITS 3.8.1 pages 1 throu h3 throu h 3 Discussion of Chan es for ITS 3.8.1 a e 6 Discussion of Chan es for ITS 3.8.1 a e 6 Discussion of Changes for ITS 3.8.1 pages 15 Discussion of Changes for ITS 3.8.1 pages 15 throu h 19 throu h 19 Discussion of Changes for ITS 3.8.2 pages 3 Discussion of Changes for ITS 3.8.2 pages 3 throu h5 throu h5 CTS marku for S ecification 3.8.3 a e 4 of 6 CTS marku for S ecification 3.8.3 a e 4 of 6 Discussion of Changes for ITS 3.8.3 pages 3 and Discussion of Changes for ITS 3.8.3 pages 3 and 4 4 Page 14 of 18

VOLUME:9'(Cont'd)':

SECTION 3.8

'DISCARD INSERT::-::.::::

of Changes for ITS 3.8.4 page 2 Discussion of Changes for ITS 3.8.4 :'iscussion page 2 Discussion of Chan es for ITS 3.8.4 a e 7 Discussion of Chan es for ITS 3.8.4 a e 7 Discussion of Chan es for ITS 3.8.5 a e 3 Discussion of Chan es for ITS 3.8.5 a e 3 Discussion of Changes for ITS 3.8.7 pages 2 and Discussion of Changes for ITS 3.8.7 pages 2 and 3 3 Discussion of Changes for ITS 3.8.8 pages 2 and Discussion of Changes for ITS 3.8.8 pages 2 and 3 3 Discussion of Changes for ITS 3.8.9 pages 3 and Discussion of Changes for ITS 3.8.9 pages 3 and 4 4 ISTS marku a e 3.8-6 ISTS marku a e 3.8-6 ISTS marku a es 3.8-11 and 3.8-12 ISTS marku a es 3.8-11 and 3.8-12 ISTS marku a es 3.8-16 and 3.8-17 ISTS marku a es 3.8-16 and 3.8-17 Justification for Deviations to ITS 3.8.1 a e 1 Justification for Deviations to ITS 3.8.1 a e 1 Justification for Deviations to ITS 3.8.1 a e 4 Justification for Deviations to ITS 3.8.1 a e 4 ISTS marku a e 3.8-36 ISTS marku a e 3.8-36 Justification for Deviations to ITS 3.8.6 a e 1 Justification for Deviations to ITS 3.8.6 a e 1 ISTS Bases marku a es B 3.8-3 and B 3.8-4 ISTS Bases marku a es B 3.8-3 and B 3.8-4 ISTS Bases marku a e B 3.8-10 ISTS Bases marku a e B 3.8-10 ISTS Bases marku a es B 3.8-16 and B 3.8-17 ISTS Bases marku a es B 3.8-16 and B 3.8-17 ISTS Bases marku a e B 3.8-24 ISTS Bases marku a e B 3.8-24 ISTS Bases marku a e B 3.8-26 ISTS Bases marku a e B 3.8-26

, ISTS Bases marku a es B 3.8-37 and B 3.8-38 ISTS Bases marku a es B 3.8-37 and B 3.8-38 ISTS Bases marku a es B 3.8-47 and B 3.8-48 ISTS Bases marku a es B 3.8-47 and B 3.8-48 ISTS Bases marku a e B 3.8-58 ISTS Bases marku a e B 3.8-58 ISTS Bases marku a e B 3.8-70 ISTS Bases marku a e B 3.8-70 ISTS Bases marku a es B 3.8-82 and B 3.8-83 ISTS Bases marku a es B 3.8-82 and B 3.8-83 ISTS Bases markup page B 3.8-89 and insert ISTS Bases markup page B 3.8-89 and insert a e B 3.8-89 a e B 3.8-89 Page 15 of 18

VOLUME:9::(Co'nt'd)

SECTION 3.8 DISCARD: INSERT ISTS Bases marku insert a e B 3.8-94 ISTS Bases marku insert a e B 3.8-94 No Significant Hazards Evaluation for ITS 3.8.1 No Significant Hazards Evaluation for ITS 3.8.1 page 10 page 10 No Significant Hazards Evaluation for ITS 3.8.1 No Significant Hazards Evaluation for ITS 3.8.1 a es16and 17 a es 16 and 17 No Significant Hazards Evaluation for ITS 3.8.1 a e24 Page 16 of 18

VOLUME:10 SECTION 3.9 DISCARD Discussion of Changes for ITS 3.9.5 pages 2 and Discussion of Changes for ITS 3.9.5 pages 2 and 3 3 Justification for Deviations to ITS 3.9.1 a e 1 Justification for Deviations to ITS 3.9.1 a e 1 ISTS Bases marku a e B 3.9-3 ISTS Bases marku a e B 3.9-3 No Significant Hazards Evaluation for ITS 3.9.5 No Significant Hazards Evaluation for ITS 3.9.5 a e1 a el SECTION 3.10 CTS markup for Specification 3.10.1 page 1 of 3 CTS markup for Specification 3.10.1 page 1 of 3 throu h a e3of3 throu h a e3of3 Discussion of Changes for ITS 3.10.1 pages 1 Discussion of Changes for ITS 3.10.1 pages 1 throu h 3 throu h 3 Page 17 of 18

, VOLUMEI1,',

CHAPTER 4.0 DISCARD .'.: '-INSERT CTS marku for Cha ter4.0 a e 11 of 11 CTS marku for Cha ter4.0 a e11of11 CHAPTER 5.0 ITS a e 5.0-4 ITS a e 5.0-4 ITS a es 5.0-9 and 5.0-10 ITS a es 5.0.-9 and 5.0-10 ITS a es 5.0-13 and 5.0-14 ITS a es 5.0-13 and 5.0-14 CTS markup for Specification 5.2 page 5 of 6 and CTS markup for Specification 5.2 page 5 of 6 and a e6of6 page 6 of 6 Discussion of Changes for ITS 5.2 pages 2 Discussion of Changes for ITS 5.2 pages 2 throu h5 throu h 6 CTS marku for S ecification 5.5 a e 13 of 22 CTS marku for S ecification 5.5 a e 13 of 22 CTS markup for Specification 5.5 page 15 of 22 CTS markup for Specification 5.5 page 15 of 22 throu h a e18 of 22 throu h a e18of22 CTS marku for S ecification 5.5 a e 22 of 22 CTS marku for S ecification 5.5 a e 22 of 22 Discussion of Changes for ITS 5.5 pages 4 Discussion of Changes for ITS 5.5 pages 4 throu h 11 throu h 12 ISTS marku a e 5.0-4 ISTS marku a e 5.0-4 Justification for Deviations to ITS 5.2 a e 1 Justification for Deviations to ITS 5.2 a e 1 ISTS markup page 5.0-9 and insert page ISTS markup page 5.0-9 and insert page 5.0-9 5.0-9 ISTS marku a e 5.0-10 ISTS marku a e 5.0-10 ISTS marku a e 5.0-13 ISTS marku a e 5.0-13 Justification for Deviations to ITS 5.5 page 3 Justification for Deviations to ITS 5.5 pages 3 and 4 Page 18 of 18

e ENCLOSURE

Volume 1 Split Report, Chapters 1.0 and 2.0, and Section 3.0

0 Split Report

SUMMARY

DISPOSI N MATRIXFOR NMP2 RETAINED/

CRITERION ITS FOR Ia)

CTS NUMBER TITLE NUMBER INCLUSION BASIS FOR INCLUSION/EXCLUSION INSTRUMENTATION(continuedl 3/4.3.6.2 Source Range Monitor Relocated See Appendix A, Page 3.

3/4.3.6.3 Intermediate Range Monitor Relocated No See Appendix A, Page 4.

3/4.3.6.4 Scram Discharge Volume Relocated See Appendix A, Page 5.

3/4.3.6.5 Reactor Coolant System Recirculation Flow Relocated No See Appendix A, Page 6.

3/4.3.6.6 Reactor Mode Switch 3.3.2.1.3 Yes-3 Reactor Mode Switch-Shutdown Position Control Rod Block ensures the reactor 3.9.2 remains subcritical by blocking control rod withdrawal thereby preserving the assumptions of the safety analysis. Reactor Mode Switch.Refuel Position Control Rod Block provides an interlock to preclude fuel loading with control rods withdrawn.

Also restricts movement of control rods to prevent reactor criticality during refueling.

Operation is assumed in the control rod withdrawal error during refueling accident analysis.

3/4.3.7 Monitoring Instrumentation 3/4.3.7.1N Radiation Monitoring Instrumentation 3/4.3.7.1.1 Mein Control Room Ventilation Radiation Monitors 3.3.7.1 Yes-3 Actuates to maintain control room habitability so that operation can continue from the control room following DBAs.

3/4.3.7.1.2 Area Monitors Relocated See Appendix A, Page 7.

3/4.3.7.2 Seismic Monitoring Instrumentation Relocated See Appendix A, Page 8.

3/4.3.7.3 Relocated by Amendment 85 fa) The applicable safety analyses are discussed in the Bases for the individual Technical Specifications.

Ib) For CTS 3/4.3.2, 3/4.3.3, 3/4.3.6, 3/4.3.7.1, and 3/4.3.9, when an individual instrument is listed, the CTS number consists of the Specification number and the instrument's number from the associated 3.3.X-1 Table. For example, the RCIC Drywall Pressure-Highinstrument for the Isolation Actuationlnstrumentationis numbered 3/4.3.2.2.h, where 3/4.3.2 is the Specifica-tion number and 2.h is the location of the RCIC Drywall Pressure-High instrument in Table 3.3.2-1.

Revision 8

This Page Intentionally Left Blank Page 9 of 43 Revision

Chapter 1.0