Forwards Rev 0 to TVA-COLR-BF3C9, Bfnp Unit 3,Cycle 9 COLR, Per TS 5.6.5.d.No New Commitments Are Contained in Ltr
ML18039A560
Person / Time
Site: Browns Ferry Tennessee Valley Authority icon.png
Issue date: 10/05/1998
From: Abney T
TENNESSEE VALLEY AUTHORITY
To:
NRC OFFICE OF INFORMATION RESOURCES MANAGEMENT (IRM)
Shared Package
ML18039A561 List:
References
NUDOCS 9810140181
Download: ML18039A560 (8)


Text

CATEGORY j.

REGULA 'Y INFORMATION DISTRIBUTIV SYSTEM (RIDS)

ACCESSION NBR:9810140181 DOC.DATE: 98/10/05 NOTARIZED: NO DOCKET ¹ FACIL:50-296 Browns Ferry Nuclear Power Station, Unit 3, Tennessee 05000296 AUTH ..".TAME ., AUTHOR AFFILIATION ABNEY,T.E. Tennessee Valley Authority RECIP.NAME RECIPIENT AFFILIATION Records Management Branch (Document Control Desk)

SUBJECT:

Forwards rev 0 to TVA-COLR-BF3C9, "BFNP Unit 3,Cycle 9 COLR," per -TS 5.6.5.d.No new commitments are contained. in ltr.

DISTRIBUTION CODE: D030D COPIES RECEIVED:LTR I ENCL L SIRE: + 21 TITLE: TVA Facilities - Routine Correspondence NOTES:

RECIPIENT COPIES RECIPIENT COPIES

,ID CODE/NAME LTTR ENCL ID CODE/NAME LTTR ENCL PD2-3 1 1 PD2-3-PD 1 1 DEAGAZIO,A 1 1 INTERNAL: ACRS 1 1 E CENTER 1 1 OGC/HDS3 1 0 SES 1 1 EXTERNAL: NOAC 1 1 NRC PDR 1 1 N

NOTE TO ALL'RIDS" RECIPIENTS:

PLEASE HELP US TO REDUCE WASTE. TO HAVE YOUR NAME OR ORGANIZATION REMOVED FROM DISTRIBUTION LISTS OR REDUCE THE NUMBER OF COPIES RECEIVED BY YOU OR YOUR ORGANIZATZONi CONTACT THE DOCUMENT CONTROL DESK (DCD) ON EXTENSION 415-2083 TOTAL NUMBER OF COPIES REQUIRED: LTTR 9 ENCL 8

II k Tennessee Valley Authority, Post Office Box 2000, Decatur, Alabama 35609-2000 October 5, 1998 U.S. Nuclear Regulatory Commission ATTN: Document Control Desk Washington, D.C. 20555 Gentlemen:

In the Matter of ) Docket No. 50-296 Tennessee Valley Authority )

BROWNS FERRY NUCLEAR PLANT (BFN) UNIT 3 CORE OPERATING LIMITS REPORT FOR UNIT 3 CYCLE 9 OPERATION In accordance with the requirements of Technical Specification 5.6.5.d, TVA is submitting, in the enclosure, Revision 0 of the Core Operating Limits Report (COLR) for BFN 'Unit 3 Cycle 9 operation.

There are no new commitments contained in this letter. If you .have any questions, please contact me at (256) 729-2636.

S'erely T. E. Abney .

Manager o xcensin and In ustry Affa'rs Enclosure 0~

cc: see page 2 l: J 9810i40i8i 98i005 0500029b PDR .ADOCK P PDR

I' 4k

U.S. Nuclear 'Regulatory Commission

'Page 2 October 5, 1998 Enclosure cc (Enclosure):

Mr. Harold O. Christensen, 'Branch Chief U.S. Nuclear Regulatory Commission Region II 61'orsyth Street, S.W.

Suite 23T85 Atlanta, Georgia 30303 NRC Resident Inspector Browns Ferry Nuclear Plant 10833 Shaw Road Athens, Alabama 35611 Mr. Albert W.. De Agazio, Project Manager U.S. Nuclear Regulatory Commission One White Flint, North 11555 Rockville Pike Rockville, Maryland 20852 Mr. Lakshminaras Raghavan, Project Manager U.S. Nuclear Regulatory Commission One White Flint, North 11555 Rockville Pike Rockville, Maryland 20852

II ENCLOSURE TENNESSEE VALLEY AUTHORITY BROWNS FERRY NUCLEAR PLANT (BFN)

UNIT 3 CORE OPERAT ING' IMI TS REPORT (COLR)

REVISION 0 FOR CYCLE 9 OPERATION (SEE ATTACHED)