LER 77-011-00, 77-014-00, and 77-106-00 for Nine Mile Point Unit 1 Regarding, Respectively, Discovery of One Reactor Low-Low Water Level Trip at 1 Water, Discovery of Indication of 50 Mr/Hr When Test Source Should Have Produced ...ML18018B156 |
Person / Time |
---|
Site: |
Nine Mile Point |
---|
Issue date: |
04/14/1977 |
---|
From: |
Schneider R Niagara Mohawk Power Corp |
---|
To: |
O'Reilly J NRC Region 1 |
---|
References |
---|
LER 77-011-00, LER 77-014-00, LER 77-016-00 |
Download: ML18018B156 (10) |
|
|
---|
Category:Letter
MONTHYEARNMP1L3570, Supplemental Information Letter - Revision to the Technical Specifications Design Features Sections to Remove the Nine Mile 3 Nuclear Project, LLC, Designation2024-02-0101 February 2024 Supplemental Information Letter - Revision to the Technical Specifications Design Features Sections to Remove the Nine Mile 3 Nuclear Project, LLC, Designation IR 05000220/20230042024-02-0101 February 2024 Integrated Inspection Report 05000220/2023004 and 05000410/2023004 NMP1L3569, CFR 50.46 Annual Report2024-01-26026 January 2024 CFR 50.46 Annual Report ML24004A2122024-01-0808 January 2024 Senior Reactor and Reactor Operator Initial License Examinations ML23354A0012024-01-0404 January 2024 Exemption from Select Requirements of 10 CFR Part 73 (EPID L-2023-LLE-0059 (Security Notifications, Reports, and Recordkeeping and Suspicious Activity Reporting)) ML23278A1292023-12-14014 December 2023 Units 1 & 2; Limerick, Units 1 & 2; Nine Mile Point, Units 1 & 2; and Peach Bottom, Units 2 & 3 -Revision to Approved Alternatives to Use Boiling Water Reactor Vessel and Internals Project Guidelines NMP1L3566, Radiological Emergency Plan Document Revision. Includes EP-AA-1013, Revision 10, Radiological Emergency Plan Annex for Nine Mile Point Station2023-12-14014 December 2023 Radiological Emergency Plan Document Revision. Includes EP-AA-1013, Revision 10, Radiological Emergency Plan Annex for Nine Mile Point Station IR 05000410/20243012023-12-14014 December 2023 Initial Operator Licensing Examination Report 05000410/2024301 ML23305A1402023-12-13013 December 2023 Units 1 & 2; Nine Mile Point, Unit 2; Peach Bottom, Units 2 & 3; and Quad Cities, Units 1 and 2 - Issuance of Amendments to Adopt Traveler TSTF-580 NMP1L3564, Supplemental Response to Part 73 Exemption Request - Withdrawal of Request for Exemption from 10 CFR 73, Subpart B, Preemption Authority Requirements2023-12-0707 December 2023 Supplemental Response to Part 73 Exemption Request - Withdrawal of Request for Exemption from 10 CFR 73, Subpart B, Preemption Authority Requirements ML23291A4642023-12-0707 December 2023 Issuance of Amendment No. 251 Regarding the Adoption of Title 10 the Code of Federal Regulations Section 50.69, Risk-Informed Categorization and Treatment of SSC for Nuclear Power Plants ML23289A0122023-12-0606 December 2023 Issuance of Amendment No. 250 Regarding the Revision to Technical Specifications to Adopt TSTF-505, Revision 2, Provide Risk-Informed Extended Completion Times - RITSTF Initiative 4b NMP1L3563, Submittal of Relief Request I5R-12, Revision 0, Concerning the Installation of a Full Structural Weld Overlay on Reactor Pressure Vessel Recirculation Inlet Nozzle N2E Safe End-to-Nozzle Dissimilar Metal Weld (32-WD-208)2023-12-0404 December 2023 Submittal of Relief Request I5R-12, Revision 0, Concerning the Installation of a Full Structural Weld Overlay on Reactor Pressure Vessel Recirculation Inlet Nozzle N2E Safe End-to-Nozzle Dissimilar Metal Weld (32-WD-208) IR 05000220/20234022023-11-28028 November 2023 Security Baseline Inspection Report 05000220/2023402 and 05000410/2023402 NMP1L3557, Request for Exemption from Enhanced Weapons, Firearms Background Checks, and Security Event Notifications Implementation2023-11-22022 November 2023 Request for Exemption from Enhanced Weapons, Firearms Background Checks, and Security Event Notifications Implementation ML23317A1192023-11-10010 November 2023 Constellation Energy Generation, LLC - 2023 Annual Report - Guarantees of Payment of Deferred Premiums IR 05000220/20234202023-11-0101 November 2023 Security Baseline Inspection Report 05000220/2023420 and 05000410/2023420 ML23305A0052023-11-0101 November 2023 Operator Licensing Examination Approval IR 05000220/20230032023-10-25025 October 2023 Integrated Inspection Report 05000220/2023003 and 05000410/2023003 IR 05000220/20235012023-10-17017 October 2023 Emergency Preparedness Biennial Exercise Inspection Report 05000220/2023501 and 05000410/2023501 IR 05000220/20230112023-10-16016 October 2023 Comprehensive Engineering Team Inspection Report 05000220/2023011 and 05000410/2023011 RS-23-097, Constellation Energy Generation, LLC, Advisement of Leadership Changes and Submittal of Updated Standard Practice Procedures Plans2023-10-12012 October 2023 Constellation Energy Generation, LLC, Advisement of Leadership Changes and Submittal of Updated Standard Practice Procedures Plans NMP1L3554, Submittal of Revision 28 to the Final Safety Analysis Report (Updated), Fire Protection Design Criteria Document, 10CFR50.59 Evaluation Summary Report, 10CFR54.37(b) Aging Management Review, and Technical Specifications with Revised Bases2023-10-0606 October 2023 Submittal of Revision 28 to the Final Safety Analysis Report (Updated), Fire Protection Design Criteria Document, 10CFR50.59 Evaluation Summary Report, 10CFR54.37(b) Aging Management Review, and Technical Specifications with Revised Bases C IR 05000220/20233032023-09-20020 September 2023 Retake Operator Licensing Examination Report 05000220/2023303 ML23250A0822023-09-19019 September 2023 Regulatory Audit Summary Regarding LARs to Adopt TSTF-505, Rev. 2, and 10 CFR 50.69 ML23257A1732023-09-14014 September 2023 Requalification Program Inspection IR 05000220/20230052023-08-31031 August 2023 Updated Inspection Plan for Nine Mile Point Nuclear Station, Units 1 and 2 (Report 05000220/2023005 and 05000410/2023005) RS-23-080, Constellation Energy Generation, LLC, Application to Revise Technical Specifications to Adopt TSTF-264-A, Revision 0, 3.3.9 and 3.3.10 - Delete Flux Monitors Specific Overlap Requirement SRs2023-08-30030 August 2023 Constellation Energy Generation, LLC, Application to Revise Technical Specifications to Adopt TSTF-264-A, Revision 0, 3.3.9 and 3.3.10 - Delete Flux Monitors Specific Overlap Requirement SRs NMP2L2851, Relief Request Associated with Successive Inspections for Generic Letter 88-01 / BWRVIP-75-A Augmented Examinations2023-08-25025 August 2023 Relief Request Associated with Successive Inspections for Generic Letter 88-01 / BWRVIP-75-A Augmented Examinations ML23151A3472023-08-21021 August 2023 Issuance of Amendments to Adopt TSTF-295-A, Modify Note 2 to Actions of PAM Table to Allow Separate Condition Entry for Each Penetration NMP1L3534, License Amendment Request - Revision to the Technical Specifications Design Features Sections to Remove the Nine Mile 3 Nuclear Project, LLC, Designation2023-08-18018 August 2023 License Amendment Request - Revision to the Technical Specifications Design Features Sections to Remove the Nine Mile 3 Nuclear Project, LLC, Designation ML23220A0262023-08-0808 August 2023 Licensed Operator Positive Fitness-for-Duty Test IR 05000220/20234012023-08-0808 August 2023 Cyber Security Inspection Report 05000220/2023401 and 05000410/2023401 (Cover Letter Only) NMP1L3545, Supplemental Information Letter to Adopt TSTF-505, Provide Risk- Informed Extended Completion Times - RITSTF Initiative 4b, Revision 2 and 10 CFR 50.69, Risk-informed Categorization and Treatment of Structures, Systems .2023-08-0404 August 2023 Supplemental Information Letter to Adopt TSTF-505, Provide Risk- Informed Extended Completion Times - RITSTF Initiative 4b, Revision 2 and 10 CFR 50.69, Risk-informed Categorization and Treatment of Structures, Systems . RS-23-087, Revision to Approved Alternatives Associated with the Use of the BWRVIP Guidelines in Lieu of Specific ASME Code Requirements on Reactor2023-08-0404 August 2023 Revision to Approved Alternatives Associated with the Use of the BWRVIP Guidelines in Lieu of Specific ASME Code Requirements on Reactor IR 05000220/20230022023-08-0101 August 2023 Integrated Inspection Report 05000220/2023002 and 05000410/2023002 ML23207A0762023-07-14014 July 2023 EN 56557 - Update to Part 21 Report Re Potential Defect with Trane External Auto/Stop Emergency Stop Relay Card Pn: XI2650728-06 NMP1L3544, Fifth Inservice Inspection Interval, First Inservice Inspection Period 2023 Owner'S Activity Report for RFO-27 Inservice Examinations2023-07-14014 July 2023 Fifth Inservice Inspection Interval, First Inservice Inspection Period 2023 Owner'S Activity Report for RFO-27 Inservice Examinations ML23186A1642023-07-0606 July 2023 Operator Licensing Retake Examination Approval NMP2L2846, Nine Mire Point Nuclear Station, Units 1 and 2, General License 30-day Cask Registration Notifications2023-07-0505 July 2023 Nine Mire Point Nuclear Station, Units 1 and 2, General License 30-day Cask Registration Notifications ML23192A0622023-06-30030 June 2023 Engine Systems, Inc., 10CFR21 Reporting of Defects and Non-Compliance, Report No. 10CFR21-0136, Rev. 0 IR 05000220/20230102023-06-29029 June 2023 Biennial Problem Identification and Resolution Inspection Report 05000220/2023010 and 05000410/2023010 ML23131A4242023-06-23023 June 2023 Issuance of Amendment No. 249 Regarding the Revision to Technical Specification 3.3.1 to Adopt Technical Specifications Task Force Traveler TSTF-568 RS-23-077, Response to NRC Regulatory Issue Summary 2023-01, Preparation and Scheduling of Operator Licensing Examinations2023-06-16016 June 2023 Response to NRC Regulatory Issue Summary 2023-01, Preparation and Scheduling of Operator Licensing Examinations NMP1L3539, Day Commitment Response - Relief Request I5R-11 Concerning the Installation of a Weld Overlay on Reactor Pressure Vessel Recirculation Inlet Nozzle N2E Safe End-to-Nozzle Dissimilar Metal Weld (32-WD-208)2023-06-0909 June 2023 Day Commitment Response - Relief Request I5R-11 Concerning the Installation of a Weld Overlay on Reactor Pressure Vessel Recirculation Inlet Nozzle N2E Safe End-to-Nozzle Dissimilar Metal Weld (32-WD-208) ML23159A0052023-06-0505 June 2023 56557-EN 56557 - Paragon - Redlined RS-23-042, Application to Revise Technical Specifications to Adopt TSTF-580, Provide Exception from Entering Mode 4 with No Operable RHR Shutdown Cooling2023-05-25025 May 2023 Application to Revise Technical Specifications to Adopt TSTF-580, Provide Exception from Entering Mode 4 with No Operable RHR Shutdown Cooling IR 05000410/20233022023-05-15015 May 2023 Initial Operator Licensing Examination Report 05000410/2023302 2024-02-01
[Table view] Category:Licensee Event Report (LER)
MONTHYEARML18018B1152018-01-18018 January 2018 Scram Summary 91-01 Relating to a Turbine Trip and Automatic Reactor Scram When the Main Transformer Phase B Developed an Internal Fault on August 13, 1991 ML18018B1122018-01-18018 January 2018 Scram Summary 91-01 Relating to an Event on August 13, 1991 Concerning a Turbine Trip and Automatic Reactor Scram When the Main Transformer Phase B Developed an Internal Fault 05000410/LER-2017-0022017-11-28028 November 2017 Secondary Containment Inoperable Due to Wind Conditions, LER 17-002-00 for Nine Mile Point Nuclear Station, Unit 2 Regarding Secondary Containment Inoperable Due to Wind Conditions 05000220/LER-2017-0032017-11-0202 November 2017 Automatic Reactor Scram due to Reactor Vessel Low Water Level, LER 17-003-00 for Nine Mile Point, Unit 1, Regarding Automatic Reactor Scram due to Reactor Vessel Low Water Level 05000410/LER-2017-0012017-10-0404 October 2017 1 OF 5, LER 17-001-00 for Nine Mile Point Nuclear Station, Unit 2, Regarding Automatic Reactor Scram due to High Reactor Pressure 05000220/LER-2017-0022017-05-18018 May 2017 Manual Reactor Scram Due to Pressure Oscillations, LER 17-002-00 for Nine Mile Point Nuclear Station, Unit 1 Regarding Manual Reactor Scram Due to Pressure Oscillations 05000220/LER-2017-0012017-02-0808 February 2017 Manual Reactor Scram Due to Hiah Turbine Vibration, LER 17-01-00 for Nine Mile Point Unit 1 RE: Manual Reactor Scram Due to High Turbine Vibration NMP1L3129, LER 17-01-00 for Nine Mile Point Unit 1 Manual Reactor Scram Due to High Turbine Vibration2017-02-0808 February 2017 LER 17-01-00 for Nine Mile Point Unit 1 Manual Reactor Scram Due to High Turbine Vibration 05000220/LER-2016-0022016-09-26026 September 2016 Isolation of both Emergency Condensers due to loss of UPS 162B, LER 16-002-00 for Nine Mile Point, Unit 1, Regarding Isolation of Both Emergency Condensers due to Loss of UPS 1628 05000220/LER-2016-0012016-07-12012 July 2016 Secondary Containment Inoperable Due to Simultaneous Opening of Airlock Doors, LER 16-001-00 for Nine Mile Point Nuclear Station Unit 1 Regarding Secondary Containment Inoperable Due to Simultaneous Opening of Airlock Doors 05000410/LER-2016-0012016-06-0606 June 2016 Secondary Containment Inoperable Due to Simultaneous Opening of Airlock Doors, LER 16-001-00 for Nine Mile Point, Unit 2, Regarding Secondary Containment Inoperable Due to Simultaneous Opening of Airlock Doors 05000410/LER-2015-0032016-03-31031 March 2016 Primary Containment Isolation Function for some valves not maintained during Surveillance Testing, LER 15-003-01 for Nine Mile Point, Unit 2, Regarding Primary Containment Isolation Function For Some Valves Not Maintained During Surveillance Testing ML1005504842010-02-15015 February 2010 Special Report: Inoperable Suppression Chamber Water Level Instrumentation ML0903605172009-01-21021 January 2009 Special Report: Inoperable Channel of Suppression Chamber Water Level Instrumentation ML0534802052005-12-0202 December 2005 Special Report for Nine Mile Point Unit 1 Re Channel #12 of the Containment Hydrogen Monitoring System Inoperable ML0515400362005-05-24024 May 2005 Special Report, Channel #11 of the Containment Hydrogen Monitoring Inoperable for Scheduled Preventive Maintenance ML0509602422004-12-17017 December 2004 Final Precursor Analysis - NMP-1 Grid Loop ML0509602522004-12-17017 December 2004 Final Precursor Analysis - NMP-2 Grid Loop ML0434304492004-11-22022 November 2004 Special Report for Nine Mile Point, Unit 1 Regarding Channel #12 of the Containment Hydrogen Monitoring System Removed from Service for Planned Maintenance ML0425300732004-08-27027 August 2004 Special Report for Nine Mile Point Unit 1 Re Channel #11 of the Containment Hydrogen Monitoring System Inoperable for Scheduled Preventive Maintenance ML0418105152004-06-18018 June 2004 Revised Special Report for Nine Mile Point, Unit 1 Re Channel #12 of the Containment Hydrogen Monitoring System Inoperable ML0413204992004-05-0404 May 2004 Special Report for Nine Mile Point Unit 1 Regarding Inoperability of Channel #12 of the Containment Hydrogen Monitoring System ML0410603992004-04-0707 April 2004 Special Report, Channel #11 of the Containment Hydrogen Monitoring System Inoperable for Scheduled Corrective Maintenance ML0336404932003-12-19019 December 2003 Special Report Regarding Channel #11 Containment Hydrogen Monitoring System Being Inoperable for Scheduled Preventive Maintenance ML0221303572002-07-23023 July 2002 Special Report for Nine Mile Point Unit 2 Re Noble Gas Activity Monitoring Instrumentation Inoperable for Greater than 72 Hours ML18018B1112000-03-0707 March 2000 LER 99-019-01 Supplement 1, for Nine Mile Point, Unit 2, Regarding Two Standby Liquid Control Valves Not Tested as Required by Technical Specification 4.0.5 and LER 99-010-01, Supplement 1, Unit 2 Reactor Trip Due to a Feedwater Master .. ML18018B0771997-12-29029 December 1997 Letter Replying to Notice of Violation as Contained in NRC Inspection Report 50-220/97-07 and 50-410/97-07 ML18018B1171991-09-0404 September 1991 NRC UPS Meeting ML18018B2511978-09-29029 September 1978 LER 78-034-00 for Nine Mile Point, Unit 2, Regarding an Environmental Contractor Obtaining 22 Hourly Fish Impingement Samples, and One Two-Hour Sample, Which Is Contrary to the Technical Specification Requiring 24 Hourly Samples ML18018B2521978-08-24024 August 1978 LER 78-030-00, 78-031-00, and 78-032-00 for Nine Mile Point Unit 1 Regarding, Respectively, Unavailability of Feedwater Pump 29-03 While Its Pump Seals Were Replaced, Unavailability of Liquid Poison Pump NP02A While a Frozen Valve .. ML18018B2531978-07-28028 July 1978 LER 78-029-00 for Nine Mile Point, Unit 2, Regarding Discovery of High Drywell Pressure Switches RE04A, RE04B, and RE04C with Setpoints Less Conservative than the Technical Specifications ML18018B2541978-07-25025 July 1978 LER 78-028-00 for Nine Mile Point Unit 1 Regarding Discovery of the Allowable Test Interval of TS 4.1.4c for the Core Spray Power-Operated Valves Had Been Exceeded ML18018B2551978-07-13013 July 1978 LERs 78-025-00, 78-026-00, and 78-027-00 for Nine Mile Point Unit 1 Regarding, Respectively, Discovery of RE04D with a Setpoint of 3.70 PSIG, Discovery of Numerous Small Leaks in Small Sample and Instrument Pipes, and Discovery of RE22D wit ML18018B2561978-06-21021 June 1978 LER 78-024-00 for Nine Mile Point Unit 1 Regarding Discovery That Test N1-St-Q2,4,5,7,8,9, and 10 Had Not Been Performed During a Review of Quarterly Surveillance Test Results ML18018B2571978-06-12012 June 1978 LERs 78-020-00, 78-021-00, 78-022-00, and 78-023-00 for Nine Mile Point Unit 1 Regarding, Respectively, Discovery of RE18A with a Setpoint of 135 Inches Wc, Discovery of RE04A and RE04B with a Setpoint of 3.65 PSIG, Discovery of Turbine ... ML18018B2591978-06-0101 June 1978 LER 78-019-00 for Nine Mile Point Unit 1 Regarding Discovery That Hydraulic Snubber 31-HS-1 Had Failed and Was Empty of Hydraulic Fluid and Disconnected from Its Anchor at the Feedwater Pipe ML18018B2581978-05-26026 May 1978 LER 78-009-01 for Nine Mile Point Unit 1 Regarding Replacement of Explosive Charges in the TIP Shear Valves with New Charges and the Resulting Unsatisfactory Ohmmeter Continuity Test for Acceptable Electric Contact ML18018B2601978-04-24024 April 1978 LER 78-018-00 for Nine Mile Point Unit 1 Regarding Discovery of Main Steam High Flow Switch with a Setpoint of 106.2 PSI, Which Is Above the Technical Specification ML18018B2611978-04-0707 April 1978 LERs 78-014,00, 78-016-00, and 78-016-00 for Nine Mile Point Unit 1 Regarding, Respectively, Discovery That the Fuel Transfer Pump on 102 D/G Would Not Fill the Day Tank, Discovery of RE18C with a Setpoint of 129 Inches Wc, and RE04B .. ML18018B2621978-03-28028 March 1978 LER 78-014-00 and LER 78-015-00 for Nine Mile Point Unit 1 Regarding, Respectively, Discovery That the Fuel Transfer Pump in 102 D/G Would Not Fill the Day Tank and Discovery That #12 Control Room Air Treatment Fan Would Not Run ML18018B2631978-03-16016 March 1978 LER 78-011-00, LER 78-012-00 and LER 78-013-00 for Nine Mile Point, Unit 1 Re Technical Specification Violations of Section 3.6.2 ML18018B2641978-03-0101 March 1978 LER 78-007-00, LER 78-008-00, LER 78-009-00 and LER 78-010-00 for Nine Mile Point, Unit 1 Re Technical Specification Violations of Listed Sections ML18018B2651978-02-24024 February 1978 LER 78-006-00 for Nine Mile Point, Unit 1 Re During Steady State Operation, Performance of Surveillance Test IC-75 Found a Trip Setpoint of 22.5 Inches Water on One Vacuum Switch in the Vacuum Relief System from the Pressure Suppression Cha ML18018B2661978-02-0707 February 1978 LER 78-004-00 and LER 78-005-00 for Nine Mile Point, Unit 1 Re During Unit Shutdown, Reserve Power Breaker on Power Board II Failed to Close in After Loss of Normal Power and During Plant Outage While Marking Up Outside MSIV 01-03 Discovere ML18094A0301978-01-31031 January 1978 LER 1978-003-03 for Nine Mile Point Unit 1 Re Surveillance Test Found Main Steam High Flow Switch with Setpoint of 107.5 PSI ML18018B1221978-01-31031 January 1978 LER 78-002-00 for Nine Mile Point 1 Regarding Drywell High Pressure Switch RE04A Setpoint Drift and LER 78-003-00 ML18018B2701978-01-13013 January 1978 Submittal of Licensee Event Report LER 78-01 Concerning Delta Temperature of the Discharge Water Exceeded Environmental Tech. Spec ML18094A0291978-01-13013 January 1978 LER 1978-001-00 for Nine Mile Point Station Unit 1 Re Delta Temperature of Discharge Water Exceeded Specification 2.1.5 of Environmental Tech Specs ML18018B1361977-07-21021 July 1977 LER 77-032-00 for Nine Mile Point Unit 1 Regarding a Water Phase Material Sample in the Reactor Vessel Inspection Lapse During Refueling ML18018B1421977-07-14014 July 1977 LER 77-029-00, 77-030-00, 77-031-00, 77-034-00, & 77-035-00 for Nine Mile Point Unit 1 Low-Low-Low Level Set Point Out of Specs on RE-18A, Vacuum Switch Trip & Reset Point on Torus Relief Valves Out of Specs, Weld Leak in Emergency Condense 2018-01-18
[Table view] |
Text
NRC FonM 195 U.Se NUCLEAR REGULATORY C EMISSION DOCKET NUMBER.
(2 76) 5 F I I. E NUMBER NRC DISTRIBUTION FDR PART 50 DOCKET MATERIAL INCIDENT REPORT TO: i.P.O'REILLY ~S FROM: NIAGARA MOHAWK POWER CORP. DATE OF DOCUMENT.
SYRACUSE, N.Y. 14 R.R.SCHNEIDER DATE RECEIVED 4 2 QLETTER ONOTORIZED PROP INPUT FORM NUMBER OF COPIES RECEIVED 03ORIGINAL EUNCLASSIFI ED OCOPV 1 SIGNED DESCRIPTION ENCLOSURE LTR. TRANS THE FOLLOWING......... LICENSEE EVENT REPORT f/ 77-11, ON 3/20/77 CON-CERNING ONE OF THE REACTOR LOW-LOW WATER LEVEL TRIP BEING OUT OF REQUIRED XEGH SPEC LIMIT...
LICENSEE EVENT REPORT i/ 77-14, ON 3/26/77 CON-CERNING DETECTOR EXCEEDING TEST SOURCE..
lItlki144/LFOIIFIl LICENSEE EVENT REPORT jF 77-16, ON 4/6/77 CON-h P ' CERNING THE FISH TAGGING PROGRAM INDICATING
. PMNP SAB
~: NINE IIII VA MILE)R I)g
'(i'<<"""
(1P POSSIBLE NON-COMPLIANCE WITH SECTION...
(3P)
NOTE: IF PERSONNEL EXPOSURE IS INVOLVED SEND DIRECTLY TO KREGER/J COLLINS
~i hIE< a W Whar FOR ACTION/INFORMATION BRANCEI CHIEF' 3 CYS FOR ACTION LIC, ASST<<:
W CYS ACRS CYS HOLDING S NT INTERNAL 0 ISTRI BUTION G FILE NRC
,I 6c-E 2 MIPC SCHROEDER/IPPOLITO HOUSTON NOVAK/CHECK GRIMES CASE BUTLER HANAUER TEDESCO/HACCARY EISENHUT BAER SHAO VOLUKR/BUNCH KREGER/ J ~ COLLINS EXTERNAL DISTRIBUTION CONTROL NUMBER LPDR:
TIC
>7/tQ u/9/
N e NRC FORM 196 {2 76)
~ " kent
~ ~ 0 ~ ~ 0
' ~
ltd I '
~ '
NMP-0012 NIAGARA MOHAWK POWER CORPORATION NIAGARA MOWAWK 300 ERIE BOULEVARD. WEST SYRACUSE. N. Y. I3202 Ap~ 14, 1977 ReguiatDIy gale t y, (g R, A.. Jamm P. OIR~y KUv(0 9
NAe~h.
Unkted Regin I
~u NueLea/I. Regula'o~ Connuamn )gag,g 05S77 631 Pmk Avenue, C+4I cocII G'ng o$ Pruusm, PA. 19406 RE: Sock& No. 50-220 8~ Nt,. O'Reify:
In acco~ce wMh Nine'Xe Po~ NueL~ S~on Unit <1 TeckucaL Speci,peatiom, we, heILeby submit'ic~ee Event'epo~
LER 77-11, 77-14, and 77-16.
7hne. aepo~ weIIe complied ~ Che fonna'u~gnated an Xhe Licence Eve RepoM Im~~on Booklet 00E-$ $ -001, ~ed O&obn 1974, aevL6ed Vecembe/I, 8, 1975.
Very ~tIt pouch, R.R. Schneidet Vxce PJI.u&eet-Et'.e~c Paodu~n hfAS/mmmm Enc..
'I II U ~
~, ~
I V
Al W
I ra ~, 4 y
'I
~ ~ w 1CENBEE EVENT'EPORT CONTROL BLOCK: t:PLEASE PRIST A3-L REaulRED IBFDR?RATIOS) 1 LICENSEE LICENSE EVENT NAME LICENSE NUMBER TYPE TYPE toag N Y N N P I 4 1 1 ~os32 '0
~
7 89 14 15 25 26 31 REPORT REPORT CATEGORY TYPE SOURCE OD KET NUMBER EVENT DATE REPORT DATE
[QD1]coN'T L 0 5 0 0 2 2 0 0 3 2 0 7 7 0 4 1 4 7 7 7 8 57 58 59 60 61 68 69 74 75 80 EVENT DESCRIPTION Qo 2 During routine surveillance, one reactor low-,low water level trip was found at 1" water 7 8 9 '80 when the re uired set oint is = 5" water. Allowable setpoint deviation is += 2.6"
[oaf 7 89 80 Qg water. The tri was reset to 6". At the time, the system was bypassed for major 80 Jog a e and s ecial level isntrumentation was in- service.
/ 8 9 80 Jog 'ER 77-11 7 89 PRh'IE 80 SYSTEhI CAUSE COMPONENT COMPONENT CODE CODE COMPONFNT CODE SUPPUER MANUFACTURER VA)IATK)N LIIAJ I 0 0 II
~E N S T R 0 Y 1 7 8 9 10 11 12 17 47 CAUSE DESCRIPTION LThe set oint had chan d ui ed redundant normal low-low tri s were o erable 7 8 9 80 as re uired b 7 89'o]
80 7 89 FACILITY METHOD OF 80 STATUS 55 POIVER OTHER STATUS DISCOVERY OI>COVERY DESCRIPTION 0 ~00 0 NA B NA 7 8 9 10 12 13 a5 46 FORM OF ACTIVITY COPITENT RELEASED OF RELEASE AMOUiIT Or ACTIVITY LOCATION OF RELEASE 12 Z Z NA NA 7 9 10 11 aa .'5 80 PERSONNEL EXPOSURES NUMBER TYPE DESCRIPTION
~SHOO 0 Z . NA 7 89 11 12 13 eo PERSONNEL INJURIES NUAABER DESCRIPTION 7 89
~00 0 11 12 NA 80
)ONtt X coNsEOUENcES PROBABLE Q~g NA 7 89 LOSS OR DAMAGE TO FACILITY TYPE DESCRIPTION Q~Q Z NA
/ 89 10 80 PUBLICITY NA 7 89 ADDITIONAL FACTORS Q~g [ NA 7 89 Q~g
4 ll, 1"'Ji 0 t rC r
t'I I
I 1 g
J l
i I Al F
I 1
h
%P
/
t P t
K
IC i'JSEE EVENT REPORT CONTROL BLOCK: /PLEASE PR)ST ALLMQUIREO li3FOWRATIOH)
LICENSEE LICENSE NUMBcR UCENSE 'VENT NAME TYPE TYPE
[Pg N Y. Ni'I P 1 4 1 1 1 1 ~03
~
7 80 14 15 25 28 30 31 32 REPORT REPORT CATEGORY SOURCE DOCKET NUMBER EVENT DATE REPORT DATE
~oi coii'T TYPE L ~L 0 5 0 0 2 2 0 0 3 2 6 7 7 0 4 1 4 7 7 7 8 57 5B 59 60 61 i, 68 69 74 75 80 I
EVENT DESCRIPTION
~os Durin routine calibration of emer ency condenser vent monitor, found indication of 7 8 9 50 mr/hr when test source should have roduced indication of only 6 mr/hr. Since 7 89 80
~o 4 tri oint was set at 25 mr hr and checked as correct 'mer ency condenser would 7 89 80 d radiation.
7 8.9 80 77-14 7'9 Jog PRM =
LER
. 80 7 8 9 10 SYSTEM CQQE L0BI Ljj CAUSE CODE 11 12 CQiMPONENT CODE
'7 COiViPOiiIENT SUPPUER LOJ 43 44 G
COMPQ<iIENT tiIAtiUFACIURER 0 8 0:.
47 1 "SIATKIN
~N 48 i
CAUSE DESCRIPTION
~o 8 Reset output of detector to produce monitor readings corresponding to the test 7 8 9 80 Qo 9
'ource. Res onse as found would have been cons'ervative.
7 8 9 80 Qo]
7 89 FACILITY METHOD OF 80 STATUS POV/ER OitIER STATUS DISCOVERY DISCOVERY OEcSCRIPTIQIi3
/~i 0 ~oo o n5 46 NA 7 8 9 10 12 13 80 FORM OF AMOUIiIT OF ACTIVITY LOCATION OF RELEASE NA NA 7 8 9 10 11 44, 45 80 PERSONNEL EXPOSURES NUMBcR TYPE DESCRIPTION IiioI ~oo o z 'NA 7 89 11 12 13 80 PERSONNEI. INJURIES NUiIBER QESCRIPTIQiN
~ii ~oo o NA 7 89 11 12 80 XXNSXK CONSEoUENcES PROBABLE
@~I . NA 7 8 9 80 LOSS OR DAMAGE TO FACILITY TYPc DESCRIPTION Q~g Z NA 7 89 10 PUBLICITY NA 7 89 ADDFRONAL FACTORS Q~g Also found m 7 8 9 80 allowable instrument de~iation of +100%-50K when reset.
HI
l f 0 1
4 s
I A
h I
P s
l
~
~
I Aa < r' I jl f '
e
'I
'I ~
9 ~"
ICENSEF EVENT'EPORT CONTROL BLOCK: 0 LEASE PR)87 aLL REaulRED I8FDRPRATIOH) 1 LICENSEE LICENSE EVENT NAME UCENSE NUMBER TYPE Q~g N Y N:N P 1 4 1 1 1 1 ~04
~
? 89 14 15 P5 26 30 31 32 REPORT REPORT CATEGORY TYPE, SOURCE DOCKET NUMBER EVENT DATE RcPORT DATE
~o~ coNi T ~L 0 5 0 0 2 2 0 0 4 0 6 7 7 0 4 1 5 7 7 8 57 58 59 60 61 68 69 74 75 80 EVENT DESCRIPTION The fish tagging program currently being conducted to fulfil the ETS requirement for-trap 8 9 80
[QQ3]
nets (Section 3. 1 . 2a(l ) (v) ) indicates possible non-compl iance with this section with 7 89 80 Q~gr regards to frequency, location and:sam ling period. It 'w'as also discovered that the data 7 8 9 80 g from this ro ram had not been re orted as er ETS Section 5.6.1 7 8 9 80 t006j LER 77-16 7 8 9 PRME 80 SYSTEM CAUSE COMPONENT COMPONENT
~ov 7 8 9 '10 CODE
'~Z.Z
'1 CAUSE DESCRIPTION CODE P
12
'Z.
COMPONENT COBE Z Z Z Z Z 17 SUP?UJI
~Z 43 44 Z
MANUFACIURcR 9 9&I9 47 VOLATION 48
[oOSJ .
~
Ambi uous wordin in the Environmental Technical S ecifications.
7 8 9 80
[oaf 7 8 9 80
~10 7 89 METHOD Oiic 80 7
[gg 8
FACILITY STATUS 9
Z 10 8 POWER
~ZZ Z 12 13
'A OTHcR STATUS 44 DISCOVERY 45 b
46 Management OLSCOVERY Dc&CRiPTION review 80 FORM OF ACTIVITY COhlTENT C RELcMSEO OF RFLEASE AMOUNT OF ACTIVITY LOCATION OF REL'EASE 7
Q~g 8
~Z 9
gJ 10 11 NA 44 45 NA PERSONNEL EXPOSURES NUMBcR TYPE DESCRIPTION Q1g ~00 0 Z NA 7 8 9 11 12 13 .
PERSONNEL INJURIES NUliIGER DESCRIPTION
~>4 ~0. 0 0 NA 7 8 9 11 12 80 dNSfKXCDNSEOUENCES PROBABLE Q~ 5 Occurrence had no effect on inhabitants of surrounding area.
7 8 9 80 LOSS OR DAMAGE TO FACILITY TYPc DESCRIPTION Q1g Z NA 7 0 9 'IO PUBLICITY NA 7 89 ADDITIONAL FACTORS Environtment contractor was instructed to propose and implement trapnet procedures. ETS Q~ 9
>> changes were submitted to Licensing .(1/6/77) that will delete this requirement. 00
, Data from current program to be submitted to NRC upon receipt.
Haj
00CUPiEHT RECEIYEO UHIT P ROC'ESSIHG PM l 'll SH ÃR 20 6G WEEL gI