ML18016A114

From kanterella
Jump to navigation Jump to search
Approval of Proposed Alternate Reviewing Officials for the General Electric Vallecitos Nuclear Center
ML18016A114
Person / Time
Site: Vallecitos Nuclear Center, 07000754, 07200001, 05200001, 03036792, 05200010, 07001220
Issue date: 01/30/2018
From: Zimmerman J I
NRC/NMSS/DFCSE/ECB
To: Juan Ayala
GE Hitachi Nuclear Energy
Siurano-Perez O
References
EA-06-155, EA-06-203, EA-06-250
Download: ML18016A114 (3)


Text

UNITED STATES NUCLEAR REGULATORY COMMISSION WASHINGTON, D.C. 20555

-0001 January 30, 2018 Mr. Juan Ayala Manager , Regulatory Compliance GE Hitachi Nuclear Energy Americas, LLC Vallecitos Nuclear Center 6705 Vallecitos Road Sunol, CA 94586

SUBJECT:

APPROVAL OF PROPOSE D ALTERNATE REVIEWING OFFICIALS FOR THE GENERAL ELECTRIC VALLECITOS NUCLEAR CENT ER

Dear Mr. Ayala:

By letter dated September 20, 2017 (Agencywide Documents Access and Management Systems (ADAMS) Accession Number ML17263A118

), Mr. Mark Leik, former Manager, Regulatory Compliance, General Electric

-Hitachi (GEH) Vallecitos Nuclear Center (VNC), request ed U.S. Nuclear Regulatory Commission (NRC) authorization for Mr. Steven M. Cavanaugh, Mr. Matt J. Feyrer , and Mr. Bruce Wade Mattox as reviewing officials for NRC License Number SNM-960 (Docket Number 07000754) and NRC License Number SNM-1270 (Docket Number 07001220) for the VNC

. We have completed our review of the submittal. Based on the information provided, the NRC staff has determined that Mr. Cavanaugh, Mr. Feyrer , and Mr. Mattox meet the criteria specified in NRC Order s EA-06-155 , EA-06-203, and EA-06-250 and, as such, are authorized to serve as VNC Reviewing Officials for the above referenced NRC licenses.

Reviewing officials must maintain and protect all fingerprints and Federal Bureau of Investigation criminal history records, other related records, and are authorized to grant access to Safeguards Information, as specified in the Order

s. Please note that if GEH wishes to assign new or additional reviewing officials, the NRC must approve each individual before he/she can act in that position.

In accordance with 10 CFR Section 2.390 of the NRC's "Agency Rules of Practice and Procedure," a copy of this letter will be available electronically for public inspection in the NRC Public Document Room, or from the Publicly Available Records Component of NRC's ADAMS. ADAMS is accessible from the NRC Web site at: http://www.nrc.gov/reading

-rm/adams.html

.

J. Ayala 2 If you have any questions regarding this matter, please contact Mr. Osiris Siurano

-Perez at (301) 415-7827, or via e-mail at Osiris.Siurano

-Perez@nrc.gov

. Sincerely, \RA\ Jacob I. Zimmerman, Chief Enrichment and Conversion Branch Division of Fuel Cycle Safety , Safeguards and Environmental Review Office of Nuclear Material Safety and Safeguards Docket Nos.

07000754, 07001220 License No s.: S NM-960, SNM-12 7 0 cc: Scott P. Murray, Manager Facility Licensing GE-Hitachi Nuclear Energy Americas

, LLC J. Ayala 3

SUBJECT:

APPROVAL OF PROPOSED ALTERNATE REVIEWING OFFICIALS FOR THE GENERAL ELECTRIC VALLECITOS NUCLEAR CENT ER DATED: Janaury 30, 2018 DISTRIBUTION

FCS E r/f RBrowder, RIV REvans, R-IV RKellar, RIV RStone, NSIR ADAMS Accession Package Number: ML18016A113 *Via Email OFFICE FCSE/ECB FCSE/ERB ADM FCSE/ECB NAME OSiurano AWalker-Smith *CBlakeney JZimmerman DATE 01/29/201 8 01/30/201 8 01/17/201 8 01/30/201 8 OFFICIAL RECORD COPY