ML17355A414

From kanterella
Jump to navigation Jump to search
Documents That Util Has No Concerns or Challenges Related to site-specific Written Exam Administered at Plant on 990830
ML17355A414
Person / Time
Site: Turkey Point  NextEra Energy icon.png
Issue date: 09/02/1999
From: Hovey R
FLORIDA POWER & LIGHT CO.
To: Christensen H, Reyes L
NRC OFFICE OF INSPECTION & ENFORCEMENT (IE REGION II)
References
RTR-NUREG-1021 L-99-198, NUDOCS 9909150089
Download: ML17355A414 (3)


Text

CATEGORY ly REGULATORY INFORMATXON DISTRZBUTXON SYSTEM {RIDS)

ACCESSION NBR: 9909150089 DOC. DATE: 99/09/02 NOTARIZED: NO DOCKET ,Z4; ~

FACXL:50-250 Turkey Point Plant, Unit 3, Florida Power and Light, C 05000250 50-251 Turkey Point Plant, Unit 4, Floxida Power and Light C "05000251 v AUTH.NAME AUTHOR AFFILIATION HOVEYP R. J. Florida Power & Light Co.

RECXP.NAME RECXPXENT AFFILZATZON CHRXSTENSEN,H. Region 2 (Post 820201)

REYES,L.A. Region 2 (Post 820201)

SUBJECT:

Documents that util has no concerns or challenges related to site-specific written exam administered at plant on 990830. A 4

DISTRIBUTION CODE: IE42D COPIES RECEIVED:LTR I ENCL SIZE: g S TXTLE: Operator Licensing Examination .Reports E,.

NOTES:

RECIPIENT COPXES RECIPXENT COPIES ID CODE/NAME LTTR ENCL ID CODE/NAME LTTR ENCL 0 '

LPD2<<2 PD JABBOUR, K R

XNT s WILE CENTER NRR/DZPM/OLHP 01 EXTERNALv NOAC NRC PDR NOTE TO ALL "RZDS" RECIPIENTS:

PLEASE HELP US TO REDUCE WASTE. TO HAVE YOUR NAME OR ORGANIZATION REMOVED FROM DISTRIBUTION LISTS OR REDUCE THE NUMBER OF COPIES RECEIVED BY YOU OR YOUR ORGANIZATION, CONTACT THE DOCUMENT CONTROL DESK,(DCD) ON EXTENSION 415-2083 TOTAL NUMBER OF COPIES REQUIRED'TTR 7 ENCL P

Nr. Luis A. Reyes Regional. Administrator, Region II Attn: Harold Christen" en U. S. Nuclear Regulatory Commission Atlanta Federal Center 61 Forsyth Street, S. W., Suite 23T85 Atlanta, QA 3 03 03

Dear Mr. Reyes:

Re: Turkey Point Units 3 and 4 Docket Nos. 50-250 and 50-251 SRO RO License Examination The provisions of NUREG-1021, Operator Licensing Examiner Standards, Examiner Standards ES-402, Administering Initial Written Examinations, allow the opportunity for submittal of comments on the written portion of the SRO/RO License Examination to the NRC. This letter documents that Florida Power and Lighr Co'. has no concerns or challenges related to the site-specific written examination administered aL Turkey Point on August 30, 1999.

Should there be any questions, please contact Ms. Maria Lacai at (305) 246"6476.

Very truly yours, R. J. Hovey Vice Presiden Turkey Point Plant OIH cc: Harold Christensen, Chief, Operator Licensing and Human Performance Branch, Region XX, USNRC R. Aiello, Chief Examiner, Region II, USNRC Senior Resident Inspector, USMC, Turkey Point Plant Document Control Desk, VSNRC, Washington, D.C.

9909i 50089 990902 05000250 PDR ADOCK V PDR dn FPL Graup company

0